A Policy Guide to prepare and
implement long term Regional
Building Energy Renovation
Strategies
MARIE ROAD MAP
______________________________________________________
CONTENTS
1. INTRODUCTION
2. POLICY COMMITMENTS
3. MAXIMUM INTERST AND IMPACT PROJECTS
4. MAXIMUM SUPPORT OF ALL PARTIES INVOLVED
5. MULTI BENEFITS OBJECTIVES APPROACH
6. CONSIDERING MEDBEE STRATEGIC MEASURES AND TOOLS
7. COMMON PROCEDURE
MARIE ROAD MAP
_____________________________________________________
1. INTRODUCTION
MARIE project was launched in April 2011, within the framework of the 2007โ€“
2013 MED Programme (Europe in the Mediterranean), and it aims to promote
the implementation of the principles of energy efficiency in buildings.
The project extends over 45 months, until December 2014, and is led by the
Department of Territory and Sustainability (DTES) of the Government of
Catalonia. It involves twentyโ€“three organisations from the Mediterranean area.
More specifically, MARIE project covers 8 countries of the MED Space (CY, FR,
IT, GR, MT, PT, SI and SP) and 1 country of the IPA Area (ME). The different
nature and scale of partners and associates offers a comprehensive coverage
of the MED Area, and enables direct capitalisation in, at least, 9 MED Regions
(Andalusia, Catalonia, Provence-Alps-Cote dโ€™Azur, Liguria, Piedmont, Friuli-
Venezia-Giulia, Basilicata, Umbria and Western Macedonia), which all together
have a population of 30 million inhabitants approximately.
MARIE aims to establish the socio-economic conditions for Energy Efficiency
improvement in the Mediterranean building stock, in the framework of EU policy
objectives, overcoming barriers and creating sustainable development
opportunities in the MED Area.
In MARIE Application Form (outputs of the project) is clearly defined the aim of
the project to produce policy commitments and specific regional policy changes
especially in MARIE regions. Moreover the MED Management Authority has
clearly request to MARIE Lead Partner that Regional Policy Commitments
should be one of the main results of the project.
Specifically MARIE aims to achieve:
- Encouraging authorities of the Mediterranean Regions to introduce
energy efficiency in buildings as a top priority in their operational
programs and policies.
- The adaptation and updating of integrated urban and regional regulations
for sustainable energy renovation of existing buildings (ERB).
- The innovation of financing models and mechanisms for ERB based on
public-private synergies and the structuration of funding sources.
- The ERB-market activation through new marketing formulas and
innovation in materials, products and services supply, adapted to the
current needs of ERB.
MARIE ROAD MAP
_____________________________________________________
In this sense MARIE Road Map is a synthetic reference document that MARIE
Regions, but also other MED Regions, can use as reference document to be
included in the official ERB policy commitments.
To achieve all these objectives, MARIE partnership has been used a
methodology based on 5 main steps:
1. Barriers analysis
2. Determining strategic lines to overcome main barriers
3. Testing strategic measures and tools
4. Defining strategic measures, key outputs and action plan
5. Road map preparation
MARIE Road MAP is the final step of a complete process to build a guide to
implement the EE/27/2012 EU Directive in MED Area. MARIE Road Map is
structured on 6 main outlines:
โˆ’ Policy commitments and coordination at all public administration levels
โˆ’ Maximum Interest And Impact Projects (MIIPs) development based on
concrete effective and measurable results.
โˆ’ Maximum support from all parties involved
โˆ’ Multi-benefit objectives approach
โˆ’ MEDBEE 14 strategic measures-tools and 4 outputs (Awareness and
Training Campaign, Cooperation Hub, Innovation Laboratory and Intervention
factory).
โˆ’ Common procedure
2. POLICY COMMITMENTS
In order to start up an ERB process it's crucial to have a clear policy
commitment. Public administrations should work together in the same direction,
in order to achieve good results in short time. An initial policy commitment is
needed in order to open the process with the best success expectations. The
contents of this initial commitment are not complex, but it is necessary to clarify
and publish the official position of the policy actors.
The commitments should be focused on the declaration of intent to prepare and
develop long term national, regional and local strategies to renovate public and
private buildings in the country, region or city levels. These strategies should
MARIE ROAD MAP
have a common base: for this reason, it would be interesting to make reference
to a MARIE ROAD MAP as a basic document of reference.
If the regional policy commitment will include the MARIE ROAD MAP as
reference document, it will be easy to ensure a common approach. If the
commitment does not include it, then it would be necessary to establish another
form to achieve coordination with other administrations.
3. MAXIMUM INTEREST AND IMPACT PROJECT
(MIIP)
All regional strategies and policy commitments should be focused in the
preparation and production of high quality MAXIMUM INTEREST AND IMPACT
PROJECTS (MIIPs). These projects should be produced using several filter
tools (see point 6) which facilitates their technical coherence, their financial
feasibility and their social acceptance.
MIIP definition: large scale project implementing ERB strategies, financed by
private or/and public funds, supervised by a public authority that must
guarantee the achievement of fixed energy saving targets.
In technical terms, such projects should be based on an important energy
saving potential but also on applying innovative and sustainable solutions (
energy renewable materials and sources). In social terms, the MIIP should be
win/win proposals facilitating a significant ratio between investment and jobs
creation.
The combination of all these criteria (technical, financial and social) should
generate feasible MIIPs that can facilitate and accelerate the achievement of
the ambitious EU objectives for 2020 on time.
4. MAXIMUM SUPPORT OF ALL PARTIES
INVOLVED
The ERB strategies preparation should be based on a wide common
understanding within all public and private parties involved. The preparation
process should integrate the major part of the public administrations with
responsibilities in buildings (through policies, ownership and use of buildings).
However, professionals, ESCos, Industrial sector, users and owners should
have also an important role in the strategy definition, not only in its
implementation.
MARIE ROAD MAP
5. MULTI BENEFITS OBJECTIVES APPROACH
The ERB regional strategies should be based in a multi benefit approach.
At least 6 indicators should be calculated and considered to define the
strategic objectives for 2020:
- Energy: Reduction of the energy final consumption of the building stock (
- C02 Emissions: Reduction of the C02 emissions from the building stock
- Economic savings: Reduction of economic costs related to energy in
buildings
- Buildings : Intervention in the majority of the building stock
- Investment: Mobilisation of investments
- Jobs: Creation and improvement of existing jobs
- Companies innovation
6. MEDBEE STRATEGIC MEASURES AND TOOLS
Each strategy should be adapted at the own territorial context. However, the
measures, proposals and tools defined in MEDBEES final document (see
www.marieapp.eu) can be very useful to choose which one is more interesting
for each strategy.
In general ERB strategies should:
- Develop a global planning strategy;
- Have energy savings verification and registration system compatible and
inter operative;
- Develop ERB solutions should correspond to a common protocol,
integrating cost optimal analysis ;
- Use investment assessment and financial mechanisms selection tools ;
- Support a multi criteria analysis for MIIPs proposed
- Have a marketing and training program
- Support local Mediterranean SMEs competitiveness in the supply of
innovative, energy efficient and durable high quality products;
- Define and implement a new regulatory framework enforcing the use of
sustainable products and services ;
- Strength the role of the public administrations as โ€œco-innovatorโ€ and
โ€œsmart clientโ€;
- Support public administration in using new tools to drive technological
innovation;
MARIE ROAD MAP
7. COMMON PROCEDURE
The development of a ERB regional strategy road map could be structured in
the following stages:
- Preparatory activities: Needs identification (problems, barriers, gaps,
impacts and goals) +methodology definition
- Agreement on objectives and strategic lines: Parties identification +
agreement preparation + agreement approval
- Definition of the Road map: creation of working groups + strategic
actions description + roadmap definition and approval
- Implementation of the road map: Launching + Progress + evaluation
and revision

Weitere รคhnliche Inhalte

Was ist angesagt?

Ljubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signaturesLjubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signatures
Aniela2
ย 
Specifications ami-platforms-energy-renovation-paca-marie-project
Specifications ami-platforms-energy-renovation-paca-marie-projectSpecifications ami-platforms-energy-renovation-paca-marie-project
Specifications ami-platforms-energy-renovation-paca-marie-project
Aniela2
ย 

Was ist angesagt? (20)

Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
ย 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
ย 
Day 1-session 2 German Experience in Developing and Implementing National Ene...
Day 1-session 2 German Experience in Developing and Implementing National Ene...Day 1-session 2 German Experience in Developing and Implementing National Ene...
Day 1-session 2 German Experience in Developing and Implementing National Ene...
ย 
A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
ย 
The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)
ย 
Energy Efficiency in the Buildings Sector: Challenges and Opportunities
Energy Efficiency in the Buildings Sector: Challenges and OpportunitiesEnergy Efficiency in the Buildings Sector: Challenges and Opportunities
Energy Efficiency in the Buildings Sector: Challenges and Opportunities
ย 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
ย 
Horizon 2020 Food and Natural Resources: Information and Consortia Building E...
Horizon 2020 Food and Natural Resources: Information and Consortia Building E...Horizon 2020 Food and Natural Resources: Information and Consortia Building E...
Horizon 2020 Food and Natural Resources: Information and Consortia Building E...
ย 
H2020 Work Programme 2018-2020 for Food and Natural Resources
H2020 Work Programme 2018-2020 for Food and Natural ResourcesH2020 Work Programme 2018-2020 for Food and Natural Resources
H2020 Work Programme 2018-2020 for Food and Natural Resources
ย 
Ljubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signaturesLjubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signatures
ย 
Energy efficiency first โ€“ retrofitting the building stock final
Energy efficiency first โ€“ retrofitting the building stock finalEnergy efficiency first โ€“ retrofitting the building stock final
Energy efficiency first โ€“ retrofitting the building stock final
ย 
Climate Action in Development
Climate Action in DevelopmentClimate Action in Development
Climate Action in Development
ย 
EIB financing of climate action outside the EU
EIB financing of climate action outside the EUEIB financing of climate action outside the EU
EIB financing of climate action outside the EU
ย 
The Role of the Private Sector in the International Climate Finance
The Role of the Private Sector in the International Climate FinanceThe Role of the Private Sector in the International Climate Finance
The Role of the Private Sector in the International Climate Finance
ย 
Specifications ami-platforms-energy-renovation-paca-marie-project
Specifications ami-platforms-energy-renovation-paca-marie-projectSpecifications ami-platforms-energy-renovation-paca-marie-project
Specifications ami-platforms-energy-renovation-paca-marie-project
ย 
Presentation of Mr. Josรฉ Manuel Fernรกndez Riveiro - Secretariat of the Union ...
Presentation of Mr. Josรฉ Manuel Fernรกndez Riveiro - Secretariat of the Union ...Presentation of Mr. Josรฉ Manuel Fernรกndez Riveiro - Secretariat of the Union ...
Presentation of Mr. Josรฉ Manuel Fernรกndez Riveiro - Secretariat of the Union ...
ย 
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
MAGHRENOV Seminar on support to business creation: "Investing in the energy s...
ย 
Energoefektivitฤtes pakalpojuma lฤซgumi Slovฤ“nijฤ
Energoefektivitฤtes pakalpojuma lฤซgumi Slovฤ“nijฤEnergoefektivitฤtes pakalpojuma lฤซgumi Slovฤ“nijฤ
Energoefektivitฤtes pakalpojuma lฤซgumi Slovฤ“nijฤ
ย 
Sasniedzot energoefektivitฤtes mฤ“rฤทus publiskajฤ sektorฤ ar ฤrpus bilances pr...
Sasniedzot energoefektivitฤtes mฤ“rฤทus publiskajฤ sektorฤ ar ฤrpus bilances pr...Sasniedzot energoefektivitฤtes mฤ“rฤทus publiskajฤ sektorฤ ar ฤrpus bilances pr...
Sasniedzot energoefektivitฤtes mฤ“rฤทus publiskajฤ sektorฤ ar ฤrpus bilances pr...
ย 
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
ย 

ร„hnlich wie Road map

BCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -ENBCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -EN
ARDOR
ย 
ESA-IO_ROs_Aid_Effectiveness_Study_July_2008
ESA-IO_ROs_Aid_Effectiveness_Study_July_2008ESA-IO_ROs_Aid_Effectiveness_Study_July_2008
ESA-IO_ROs_Aid_Effectiveness_Study_July_2008
Emmerentia Erasmus
ย 

ร„hnlich wie Road map (20)

Clean Energy Finance and Investment Roadmap of Thailand: background information
Clean Energy Finance and Investment Roadmap of  Thailand: background informationClean Energy Finance and Investment Roadmap of  Thailand: background information
Clean Energy Finance and Investment Roadmap of Thailand: background information
ย 
SEMANCO Workshop Theme1 - Marie
SEMANCO Workshop Theme1 - MarieSEMANCO Workshop Theme1 - Marie
SEMANCO Workshop Theme1 - Marie
ย 
Outcome Report: B4E Global Summit 2012, Berlin
Outcome Report: B4E Global Summit 2012, BerlinOutcome Report: B4E Global Summit 2012, Berlin
Outcome Report: B4E Global Summit 2012, Berlin
ย 
Current Status of National Adaptation Plan Process in Cambodia
Current Status of National Adaptation Plan Process in CambodiaCurrent Status of National Adaptation Plan Process in Cambodia
Current Status of National Adaptation Plan Process in Cambodia
ย 
Renovation roadmaps for buildings by The Policy Partners
Renovation roadmaps for buildings by The Policy PartnersRenovation roadmaps for buildings by The Policy Partners
Renovation roadmaps for buildings by The Policy Partners
ย 
Cambodia Country Programme Review 2017
Cambodia Country Programme Review 2017Cambodia Country Programme Review 2017
Cambodia Country Programme Review 2017
ย 
COPIE Action Plan: 7 steps to promote inclusive entrepreneurship
COPIE Action Plan: 7 steps to promote inclusive entrepreneurshipCOPIE Action Plan: 7 steps to promote inclusive entrepreneurship
COPIE Action Plan: 7 steps to promote inclusive entrepreneurship
ย 
1st issue of LiCEA newsletter
1st issue of LiCEA newsletter1st issue of LiCEA newsletter
1st issue of LiCEA newsletter
ย 
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -ENBCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -EN
BCI Equinox 2022 - CLB Kien Truc Xanh - Ms Joy Esther Gai Jiazi -EN
ย 
22.0a opm managing finance nap ws manila june 2017 part 1
22.0a opm managing finance nap ws manila june 2017 part 122.0a opm managing finance nap ws manila june 2017 part 1
22.0a opm managing finance nap ws manila june 2017 part 1
ย 
A roadmap for energy efficiency financing in the Philippines, Yoshiko de Villa
A roadmap for energy efficiency financing in the Philippines, Yoshiko de VillaA roadmap for energy efficiency financing in the Philippines, Yoshiko de Villa
A roadmap for energy efficiency financing in the Philippines, Yoshiko de Villa
ย 
ipa_routemap_asset_management_module.pdf
ipa_routemap_asset_management_module.pdfipa_routemap_asset_management_module.pdf
ipa_routemap_asset_management_module.pdf
ย 
8. experience 50001 bulgaria ecq
8. experience 50001 bulgaria ecq8. experience 50001 bulgaria ecq
8. experience 50001 bulgaria ecq
ย 
ESA-IO_ROs_Aid_Effectiveness_Study_July_2008
ESA-IO_ROs_Aid_Effectiveness_Study_July_2008ESA-IO_ROs_Aid_Effectiveness_Study_July_2008
ESA-IO_ROs_Aid_Effectiveness_Study_July_2008
ย 
Foodie poster
Foodie posterFoodie poster
Foodie poster
ย 
Foodie poster
Foodie posterFoodie poster
Foodie poster
ย 
FOODIE po
FOODIE poFOODIE po
FOODIE po
ย 
Alterenergy - Energy Sustainability Planning Recommendation and Guidelines
Alterenergy - Energy Sustainability Planning Recommendation and GuidelinesAlterenergy - Energy Sustainability Planning Recommendation and Guidelines
Alterenergy - Energy Sustainability Planning Recommendation and Guidelines
ย 
Community energy planning roadmap
Community energy planning roadmapCommunity energy planning roadmap
Community energy planning roadmap
ย 
3. Concept Note
3. Concept Note3. Concept Note
3. Concept Note
ย 

Mehr von MARIE Project

1.2.3 rรฉno plaquette
1.2.3 rรฉno plaquette1.2.3 rรฉno plaquette
1.2.3 rรฉno plaquette
MARIE Project
ย 
MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...
MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...
MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...
MARIE Project
ย 
MARIE MED - Communication strategic analysis on energy retrofit of existing b...
MARIE MED - Communication strategic analysis on energy retrofit of existing b...MARIE MED - Communication strategic analysis on energy retrofit of existing b...
MARIE MED - Communication strategic analysis on energy retrofit of existing b...
MARIE Project
ย 
MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...
MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...
MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...
MARIE Project
ย 
Renover+ a frejus telegramme #3
Renover+ a frejus telegramme #3Renover+ a frejus telegramme #3
Renover+ a frejus telegramme #3
MARIE Project
ย 

Mehr von MARIE Project (12)

1.2.3 rรฉno plaquette
1.2.3 rรฉno plaquette1.2.3 rรฉno plaquette
1.2.3 rรฉno plaquette
ย 
Rรฉnover +
Rรฉnover +Rรฉnover +
Rรฉnover +
ย 
MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...
MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...
MARIE MED ANNEXES - Communication strategic analysis on energy retrofit of ex...
ย 
MARIE MED - Communication strategic analysis on energy retrofit of existing b...
MARIE MED - Communication strategic analysis on energy retrofit of existing b...MARIE MED - Communication strategic analysis on energy retrofit of existing b...
MARIE MED - Communication strategic analysis on energy retrofit of existing b...
ย 
MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...
MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...
MED MARIE ANNEXES - Analyse stratรฉgique de communication sur la rรฉnovation รฉn...
ย 
MED MARIE - Analyse stratรฉgique de communication sur la rรฉnovation รฉnergรฉtiqu...
MED MARIE - Analyse stratรฉgique de communication sur la rรฉnovation รฉnergรฉtiqu...MED MARIE - Analyse stratรฉgique de communication sur la rรฉnovation รฉnergรฉtiqu...
MED MARIE - Analyse stratรฉgique de communication sur la rรฉnovation รฉnergรฉtiqu...
ย 
Renover+ a frejus telegramme #3
Renover+ a frejus telegramme #3Renover+ a frejus telegramme #3
Renover+ a frejus telegramme #3
ย 
Telegramme #2 flash dignes
Telegramme #2 flash dignesTelegramme #2 flash dignes
Telegramme #2 flash dignes
ย 
Ljubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signaturesLjubljana declaration 23102013_en_signatures
Ljubljana declaration 23102013_en_signatures
ย 
Potential impact evaluation of the medbees first draf - Project MARIE
Potential impact evaluation of the medbees first draf - Project MARIEPotential impact evaluation of the medbees first draf - Project MARIE
Potential impact evaluation of the medbees first draf - Project MARIE
ย 
Draft report on the implementation and impact of the energy efficiency measur...
Draft report on the implementation and impact of the energy efficiency measur...Draft report on the implementation and impact of the energy efficiency measur...
Draft report on the implementation and impact of the energy efficiency measur...
ย 
Cesba sprintworkshop - oct 13
Cesba sprintworkshop - oct 13Cesba sprintworkshop - oct 13
Cesba sprintworkshop - oct 13
ย 

Kรผrzlich hochgeladen

Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Anamikakaur10
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
SUHANI PANDEY
ย 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
MOHANI PANDEY
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
SUHANI PANDEY
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
SUHANI PANDEY
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
garthraymundo123
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
MOHANI PANDEY
ย 

Kรผrzlich hochgeladen (20)

Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
ย 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ย 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Water Pollution
Water Pollution Water Pollution
Water Pollution
ย 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
ย 
Climate Change
Climate ChangeClimate Change
Climate Change
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 

Road map

  • 1. MARIE ROAD MAP ______________________________________________________ MARIE ROAD MAP A Policy Guide to prepare and implement long term Regional Building Energy Renovation Strategies
  • 2. MARIE ROAD MAP ______________________________________________________ CONTENTS 1. INTRODUCTION 2. POLICY COMMITMENTS 3. MAXIMUM INTERST AND IMPACT PROJECTS 4. MAXIMUM SUPPORT OF ALL PARTIES INVOLVED 5. MULTI BENEFITS OBJECTIVES APPROACH 6. CONSIDERING MEDBEE STRATEGIC MEASURES AND TOOLS 7. COMMON PROCEDURE
  • 3. MARIE ROAD MAP _____________________________________________________ 1. INTRODUCTION MARIE project was launched in April 2011, within the framework of the 2007โ€“ 2013 MED Programme (Europe in the Mediterranean), and it aims to promote the implementation of the principles of energy efficiency in buildings. The project extends over 45 months, until December 2014, and is led by the Department of Territory and Sustainability (DTES) of the Government of Catalonia. It involves twentyโ€“three organisations from the Mediterranean area. More specifically, MARIE project covers 8 countries of the MED Space (CY, FR, IT, GR, MT, PT, SI and SP) and 1 country of the IPA Area (ME). The different nature and scale of partners and associates offers a comprehensive coverage of the MED Area, and enables direct capitalisation in, at least, 9 MED Regions (Andalusia, Catalonia, Provence-Alps-Cote dโ€™Azur, Liguria, Piedmont, Friuli- Venezia-Giulia, Basilicata, Umbria and Western Macedonia), which all together have a population of 30 million inhabitants approximately. MARIE aims to establish the socio-economic conditions for Energy Efficiency improvement in the Mediterranean building stock, in the framework of EU policy objectives, overcoming barriers and creating sustainable development opportunities in the MED Area. In MARIE Application Form (outputs of the project) is clearly defined the aim of the project to produce policy commitments and specific regional policy changes especially in MARIE regions. Moreover the MED Management Authority has clearly request to MARIE Lead Partner that Regional Policy Commitments should be one of the main results of the project. Specifically MARIE aims to achieve: - Encouraging authorities of the Mediterranean Regions to introduce energy efficiency in buildings as a top priority in their operational programs and policies. - The adaptation and updating of integrated urban and regional regulations for sustainable energy renovation of existing buildings (ERB). - The innovation of financing models and mechanisms for ERB based on public-private synergies and the structuration of funding sources. - The ERB-market activation through new marketing formulas and innovation in materials, products and services supply, adapted to the current needs of ERB.
  • 4. MARIE ROAD MAP _____________________________________________________ In this sense MARIE Road Map is a synthetic reference document that MARIE Regions, but also other MED Regions, can use as reference document to be included in the official ERB policy commitments. To achieve all these objectives, MARIE partnership has been used a methodology based on 5 main steps: 1. Barriers analysis 2. Determining strategic lines to overcome main barriers 3. Testing strategic measures and tools 4. Defining strategic measures, key outputs and action plan 5. Road map preparation MARIE Road MAP is the final step of a complete process to build a guide to implement the EE/27/2012 EU Directive in MED Area. MARIE Road Map is structured on 6 main outlines: โˆ’ Policy commitments and coordination at all public administration levels โˆ’ Maximum Interest And Impact Projects (MIIPs) development based on concrete effective and measurable results. โˆ’ Maximum support from all parties involved โˆ’ Multi-benefit objectives approach โˆ’ MEDBEE 14 strategic measures-tools and 4 outputs (Awareness and Training Campaign, Cooperation Hub, Innovation Laboratory and Intervention factory). โˆ’ Common procedure 2. POLICY COMMITMENTS In order to start up an ERB process it's crucial to have a clear policy commitment. Public administrations should work together in the same direction, in order to achieve good results in short time. An initial policy commitment is needed in order to open the process with the best success expectations. The contents of this initial commitment are not complex, but it is necessary to clarify and publish the official position of the policy actors. The commitments should be focused on the declaration of intent to prepare and develop long term national, regional and local strategies to renovate public and private buildings in the country, region or city levels. These strategies should
  • 5. MARIE ROAD MAP have a common base: for this reason, it would be interesting to make reference to a MARIE ROAD MAP as a basic document of reference. If the regional policy commitment will include the MARIE ROAD MAP as reference document, it will be easy to ensure a common approach. If the commitment does not include it, then it would be necessary to establish another form to achieve coordination with other administrations. 3. MAXIMUM INTEREST AND IMPACT PROJECT (MIIP) All regional strategies and policy commitments should be focused in the preparation and production of high quality MAXIMUM INTEREST AND IMPACT PROJECTS (MIIPs). These projects should be produced using several filter tools (see point 6) which facilitates their technical coherence, their financial feasibility and their social acceptance. MIIP definition: large scale project implementing ERB strategies, financed by private or/and public funds, supervised by a public authority that must guarantee the achievement of fixed energy saving targets. In technical terms, such projects should be based on an important energy saving potential but also on applying innovative and sustainable solutions ( energy renewable materials and sources). In social terms, the MIIP should be win/win proposals facilitating a significant ratio between investment and jobs creation. The combination of all these criteria (technical, financial and social) should generate feasible MIIPs that can facilitate and accelerate the achievement of the ambitious EU objectives for 2020 on time. 4. MAXIMUM SUPPORT OF ALL PARTIES INVOLVED The ERB strategies preparation should be based on a wide common understanding within all public and private parties involved. The preparation process should integrate the major part of the public administrations with responsibilities in buildings (through policies, ownership and use of buildings). However, professionals, ESCos, Industrial sector, users and owners should have also an important role in the strategy definition, not only in its implementation.
  • 6. MARIE ROAD MAP 5. MULTI BENEFITS OBJECTIVES APPROACH The ERB regional strategies should be based in a multi benefit approach. At least 6 indicators should be calculated and considered to define the strategic objectives for 2020: - Energy: Reduction of the energy final consumption of the building stock ( - C02 Emissions: Reduction of the C02 emissions from the building stock - Economic savings: Reduction of economic costs related to energy in buildings - Buildings : Intervention in the majority of the building stock - Investment: Mobilisation of investments - Jobs: Creation and improvement of existing jobs - Companies innovation 6. MEDBEE STRATEGIC MEASURES AND TOOLS Each strategy should be adapted at the own territorial context. However, the measures, proposals and tools defined in MEDBEES final document (see www.marieapp.eu) can be very useful to choose which one is more interesting for each strategy. In general ERB strategies should: - Develop a global planning strategy; - Have energy savings verification and registration system compatible and inter operative; - Develop ERB solutions should correspond to a common protocol, integrating cost optimal analysis ; - Use investment assessment and financial mechanisms selection tools ; - Support a multi criteria analysis for MIIPs proposed - Have a marketing and training program - Support local Mediterranean SMEs competitiveness in the supply of innovative, energy efficient and durable high quality products; - Define and implement a new regulatory framework enforcing the use of sustainable products and services ; - Strength the role of the public administrations as โ€œco-innovatorโ€ and โ€œsmart clientโ€; - Support public administration in using new tools to drive technological innovation;
  • 7. MARIE ROAD MAP 7. COMMON PROCEDURE The development of a ERB regional strategy road map could be structured in the following stages: - Preparatory activities: Needs identification (problems, barriers, gaps, impacts and goals) +methodology definition - Agreement on objectives and strategic lines: Parties identification + agreement preparation + agreement approval - Definition of the Road map: creation of working groups + strategic actions description + roadmap definition and approval - Implementation of the road map: Launching + Progress + evaluation and revision