SlideShare ist ein Scribd-Unternehmen logo
1 von 12
Downloaden Sie, um offline zu lesen
NewGate India
               Hyderbad, Andhra Pradesh- 500038


                  Website: www.newgate.in
                 Email: contact@newgate.in
   Slideshare URL : http://www.slideshare.net/newgateindia




Production & Operations Management
 Case Study: Distribution Transformer Company Limited
Case Summary


     DTCL (Distribution Transformer Company Limited) is a Transformer manufacturing
Company dealing with Power Sector. Earlier it used to concentrate mainly on the domestic
market but after facing severe financial crisis owing to delayed payments of the State
electricity Board, it channelized its efforts to tap the export market especially the South-Asian
Market which had huge scope. With Company’s export growing to INR 1 billion, they
expanded their export business to Distribution Transformer with the already existing Single
Phase Transformer. With the Company going global, the number of the Customers and their
specifications increased manifolds. The Engineering Department of the Company is thus
facing several issues with specifications of the new materials which results in increased lead-
time and also rejection of material at the last moment due to Quality Issues. Owing to these
reasons, The Company is finding it difficult to comply with the Orders in time, thereby ending
up paying huge amount as penalty.

     DTCL soon realized that this will threaten their position in the global market and
competing with the World Players will be even more difficult. DTCL, thus, set up a Team to
estimate the time required for the accomplishment of an order. Thus, focusing on overall
lead time reduction to reduce cost and improve efficiency of Order fulfillment became even
easier. The team was also supposed to come up with options by which orders can be fulfilled
in a much efficient manner. The team identified the entire set of activities involves in the
order fulfillment as summarized below:-

A list of activities for execution of an order at DTCL
      Activity no.   Description
          01         Processing and circulation of customer order
          02         Preparation of customer drawings
          03         Customer drawings to marketing
          04         Checking and forwarding to customer
          05         Getting approval from customer
          05’        Customer comments
          06         Preparation of manufacturing drawings
          07         Issuing manufacturing drawings to planning
          08         Issue from planning to other departments
          08’        Revision
          09         Material procurement-prototype
          10         Processing tools required for manufacturing
          11         Manufacturing- prototype
          12         Material processing-final order execution
          13         Manufacturing-final order execution
          14         Organizing customer inspection through marketing
          16         Dispatch


                                                                                        Page | 2
After the Order has been placed by the Customer, the Marketing Department reviews it
 and sends it to all Departments involved. The Engineering Department starts preparing the
 Electrical Design which is sent for approval from the Customers. If approved they are sent
 back to the Engineering Department and if otherwise Marketing and Engineering Department
 addresses the Issues within 3 days.

      Along with the process of the approval, the Engineering Department parallel prepares
 the Manufacturing Drawings and informs the Materials Department regarding Material
 Requirements to accomplish the Order. After the Manufacturing Drawings are approved,
 they are being sent to the PPC (Production Planning and Control) Department which in turn
 issues the Drawings to the Concerned Department.


      Revision to the Drawings and Distribution of BOMs (Bill of Materials) is followed by the
 Procurement of the by the Procurement of the Materials. Based on the tentative dates of
 Job-Completion, the Marketing Department is informed to organize for Customer inspection
 following which the Dispatching of the Products takes place. Based on the steps discussed
 above, the data was collected for a sample of 4 orders which are discussed in details later.


Assumptions taken in case


     An activity named 05 was taken for Customer comments which was mentioned in the
      case but not included in the table. Its time was 3 days. So a constant 3 days activity
      time was assumed for all the 4 orders.
     An activity named 08’ was taken for Revision which was mentioned in the case but not
      included in the table. Its time was 2 days. So a constant 2 days of activity time was
      assumed for all the 4 orders.
     An activity named 14 named Organizing customer inspections, no time was mentioned
      for it. So we assumed a time of 3 days for all the 4 orders.

      The Sample of 4 orders is given below in the following table:-




                                                                                       Page | 3
Order execution details: a sample analysis


 Activity     Description       Domesti   Domesti   Average    Export   Export   Average of
   no.                          c order   c order     of       order    order      Export
                                   1         2      Domestic     1        2        order
                                                     order
             Processing and
   01         circulation of      2         2          2         3        3          3
            customer order
             Preparation of
   02           customer          30        18        24        13       16        14.5
                drawings
                Customer
   03          drawings to        2         3         2.5        1        1          1
                marketing
              Checking and
   04         forwarding to       2         1         1.5        3        3          3
                customer
   05       Getting approval      447       98       272.5      396      93        244.5
             from customer

   05’          Customer          3         3          3         3        3          3
               comments
             Preparation of
    06       manufacturing       400       120        260       400      23        211.5
                drawings
                  Issuing
   07        manufacturing        2         3         2.5       17        1          9
              drawings to
                planning
               Issue from
   08          planning to        1         2         1.5        2        1         1.5
                   other
              departments
   08’           Revision         2         2          2         2        2          2
                Material
 09,10,1     procurement-        603       228       415.5      486      167       326.5
    1       (prototype, final
            order execution)

             Manufacturing
  12,13     (prototype, final    341       160       256.5      36        5        20.5
            order execution)

   14          Inspection         3         3          3         3        3         3
   15           dispatch          8        130        69        18       15        16.5




                                                                                  Page | 4
Questions


Q1) Develop a network representation of the execution of an order for distribution
    transformers at DTCL.



 Ans : The network is drawn by both AON and PERT diagrams. The PERT chart is as follows for
   the ordering.




 The AON chart is as follows for the ordering.




                                                                                    Page | 5
Q2) Use the network and develop time estimates for execution of the order. What
     are the key activities that require better managerial control?


 Ans: The critical path of both the domestic order and export order are drawn. Then the
 critical activities are decided from the PERT chart.


Domestic Orders




 The critical path is 1,2,3,4,6,9,10,11,7,8,8’,12,13,14,16

     These are the activities which require better managerial control and can be crashed.
     The time allocated with each activity can be optimized.

 Total lead time = 1034 days

 The real float associated for 05 is 403 days.


Export Orders




                                                                                      Page | 6
The critical path is 1,2,3,4,6,9,10,11,7,8,8’,12,13,14,16

     These are the activities which require better managerial control and can be crashed.
     The time allocated with each activity can be optimized.

 Total lead time = 612 days

 The real float associated with 05 is 294 days.

 Q3) Can you identify activities that require immediate attention in order to reduce
     execution time. How can DTCL organize the manufacture of transformers so
     that there will be a significant reduction in execution lead time


 Ans: AON chart is drawn. The group activities are divided into workstations. The balance
 delay for both the ordering process is found out.


Domestic Orders

 Domestic with 3 workstations
      The three workstations are engineering drawing department, marketing department
 and the production department. The AON chart is as follows




                                    W1                W2
                                                                          W3
               Work Station     (Engineering    (Manufacturing
                                                                   (Purchasing Dept.)
                                   Dept.)           Dept.)
                 Activities    01,02,03,06,07   04,05,05',14,16   08,08',09,10,11,12,13
                Order Time          291              349                  669.5


                                                                                          Page | 7
Total Processing Time

Tp = 291 + 349 + 669.5

Tp = 1309.5 days

Cycle time

CL= Max (T1, T2, T3) = Max (291, 249, 669.5)

CL = 669.5 days

Balance Delay

Bd = (n CL - Tp)/ nCL X 100 = (3 X 669.5 – 1309)/ (3 X 669.5 )

Balance Delay = 34.82%

Domestic with 4 workstations
    The four workstations are engineering drawing department, marketing department,
production department and the procurement department. The AON chart is as follows




               W1 (Engineering   W2 (Manufacturing                          W4 (Procurement
Work Station                                         W3 (Purchasing Dept)
                   Dept.)             Dept.)                                     Dept)

 Activities     01,02,03,06,07    04,05,05',14,16        08,08',12,13          09,10,11
Order Time         291 days          349 days             254 days             415.5 days



Total Processing Time

Tp = 291 + 349 + 254 + 415.5

Tp = 1309.5 days
                                                                                    Page | 8
Cycle time

 CL= Max (T1, T2, T3, T4) = Max (291,249,254,415.5)

 CL = 415.5 days

 Balance Delay

 Bd = (n CL - Tp)/ nCL X 100 =   (3 X 415.5 – 1309 )/ (3 X 415.5)

 Balance Delay = 21.23%


Conclusion of Domestic Order
  From both the AON chart it is visible that in the case of domestic orders, the number of
 workstations should be four as it generates less balance delay. As the number of
 workstations is increased to 4, the balance delay is decreased by 39%.

  1. The activities that require immediate attention is the procurement department as it
     take 415.5 days.

  2. It can be done by proper vendor management which helps the following ways:

      By ensuring delivery on time

      Properly forecasting the expected demand

      Adopting practices to reduce time on logistics

      Better inventory management of raw materials with proper defined reorder level.


Export Orders

 Export with 3 workstations
      The three workstations are engineering drawing department, marketing department
 and the production department. The AON chart is as follows




                                                                                    Page | 9
W1 (Engineering         W2 (Manufacturing
     Work Station                                                       W3 (Purchasing Dept)
                        Dept.)                   Dept.)

       Activities    01,02,03,06,07           04,05,05',14,16           08,08',09,10,11,12,13
      Order Time         239 days                270 days                    350.5 days


Total Processing Time

Tp = 239 + 270 + 350.5

Tp = 859.5 days

Cycle time

CL= Max (T1, T2, T3) = Max(239, 270, 350.5)

CL = 350.5 days

Balance Delay

Bd = (n CL - Tp)/ nCL X 100 =       (3 X 350.5 – 859.5) / (3 X 350.5)

Balance Delay = 18.26%

Export with 4 workstations
    The four workstations are engineering drawing department, marketing department,
production department and the procurement department. The AON chart is as follows




                                                                                                Page | 10
W1
      Work                        W2 (Manufacturing    W3 (Purchasing   W4 (Procurement
                   (Engineering
     Station                           Dept.)              Dept)             Dept)
                      Dept.)


    Activities   01,02,03,06,07    04,05,05',14,16      08,08',12,13       09,10,11
   Order Time       239 days          270 days            330 days         20.5 days


 Total Processing Time

 Tp = 239 + 270 + 330 + 20.5

 Tp = 859.5 days

 Cycle time

 CL= Max (T1, T2, T3, T4) = Max(239, 270, 330, 20.5)

 CL = 330 days

 Balance Delay

 Bd = (n CL - Tp)/ nCL X 100 = (3 X 330 – 859.5 )/ (3 X 330.5)

 Balance Delay = 34.88 %


Conclusion of Export Order
  From both the AON chart it is visible that in the case of export orders, the number of
 workstations should be three as it generates less balance delay. As the number of
 workstations is increased to 4, the balance delay is increased by 91%.
                                                                                       Page | 11
1. The activities that require immediate attention is the production as it take 350.5 days.

  2. It can be done by proper optimizing the process which helps in

        •   By avoiding abnormal wastage

        •   Reducing the error or failure rates

        •   Finding optimal product mix strategies

        •   Maintaining a constant lead time and safety stock


Overall Conclusion


        1. More emphasis has to given to the critical activities than that of slack activities.
        2. The number of workstations in domestic orders should be made four and in
           export orders it should be three for better optimized use of the resources.




                                                                                       Page | 12

Weitere ähnliche Inhalte

Was ist angesagt?

Manzana case- Bottle neck
Manzana case- Bottle neckManzana case- Bottle neck
Manzana case- Bottle neckSubhash Sn
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningRaju Pegada
 
Manufacturing operations and service operations
Manufacturing operations and service operationsManufacturing operations and service operations
Manufacturing operations and service operationsuday lakhani
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies Chaudhry Zaghum Chahal
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Timesejalgfer
 
Service Design, features of Production Line Approach. www.unitedworld.edu.in
Service Design, features of Production Line Approach. www.unitedworld.edu.inService Design, features of Production Line Approach. www.unitedworld.edu.in
Service Design, features of Production Line Approach. www.unitedworld.edu.inUnitedworld School Of Business
 
Caesars LEAN Operations_FINAL_v3
Caesars LEAN Operations_FINAL_v3Caesars LEAN Operations_FINAL_v3
Caesars LEAN Operations_FINAL_v3Natalia Loyola
 
Turnaround Management at Dabur
Turnaround Management at DaburTurnaround Management at Dabur
Turnaround Management at DaburPriyal Gupta
 
Materials and inventory management
Materials and inventory managementMaterials and inventory management
Materials and inventory managementZeynep Çıkın
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case StudyGourav Anvekar
 
Inventory management
Inventory management Inventory management
Inventory management Rahul Sunda
 
Inventory Management
Inventory ManagementInventory Management
Inventory ManagementAbu Bashar
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notesismatullahzazai
 

Was ist angesagt? (20)

Manzana case- Bottle neck
Manzana case- Bottle neckManzana case- Bottle neck
Manzana case- Bottle neck
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
 
Manufacturing operations and service operations
Manufacturing operations and service operationsManufacturing operations and service operations
Manufacturing operations and service operations
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies
 
Manzana insurance
Manzana insuranceManzana insurance
Manzana insurance
 
Deep change
Deep changeDeep change
Deep change
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
Scheduling
SchedulingScheduling
Scheduling
 
Service Design, features of Production Line Approach. www.unitedworld.edu.in
Service Design, features of Production Line Approach. www.unitedworld.edu.inService Design, features of Production Line Approach. www.unitedworld.edu.in
Service Design, features of Production Line Approach. www.unitedworld.edu.in
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Caesars LEAN Operations_FINAL_v3
Caesars LEAN Operations_FINAL_v3Caesars LEAN Operations_FINAL_v3
Caesars LEAN Operations_FINAL_v3
 
Turnaround Management at Dabur
Turnaround Management at DaburTurnaround Management at Dabur
Turnaround Management at Dabur
 
Materials and inventory management
Materials and inventory managementMaterials and inventory management
Materials and inventory management
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case Study
 
CVS case
CVS caseCVS case
CVS case
 
Inventory management
Inventory management Inventory management
Inventory management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notes
 

Andere mochten auch

Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Nisbets Case Study 2010
Nisbets Case Study 2010Nisbets Case Study 2010
Nisbets Case Study 2010Sajbhojani
 
Costing in Pepe Denim Case Study
Costing in Pepe Denim Case StudyCosting in Pepe Denim Case Study
Costing in Pepe Denim Case StudyMohammad Mohtashim
 
Opt case study
Opt case studyOpt case study
Opt case study9537405544
 
Volkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR ForumVolkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR ForumClayton Timms
 
Drupal case study: ABC Dig Music
Drupal case study: ABC Dig MusicDrupal case study: ABC Dig Music
Drupal case study: ABC Dig MusicDavid Peterson
 
Downfall of micromax
Downfall of micromaxDownfall of micromax
Downfall of micromaxKshitij Gupta
 
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...sarkermu
 
Panel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case StudyPanel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case StudyCompusense Inc.
 
ClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical ServicesClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical ServicesClickSoftware
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...sanobar77
 
What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...
What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...
What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...Håkan Forss
 
ABC Ltd Case solution
ABC Ltd Case solutionABC Ltd Case solution
ABC Ltd Case solutionAnchit Walia
 
4 an activity analysis of project scheduling problem a case study 1
4 an activity analysis of project scheduling problem   a case study 14 an activity analysis of project scheduling problem   a case study 1
4 an activity analysis of project scheduling problem a case study 1pmb25
 
Inventory Managment : Case Study Nationkidz Company
Inventory Managment : Case Study Nationkidz CompanyInventory Managment : Case Study Nationkidz Company
Inventory Managment : Case Study Nationkidz CompanyAmalina Athirah
 

Andere mochten auch (20)

Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Nisbets Case Study 2010
Nisbets Case Study 2010Nisbets Case Study 2010
Nisbets Case Study 2010
 
Costing in Pepe Denim Case Study
Costing in Pepe Denim Case StudyCosting in Pepe Denim Case Study
Costing in Pepe Denim Case Study
 
Opt case study
Opt case studyOpt case study
Opt case study
 
Volkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR ForumVolkswagen South Africa – Competencies Case Study presentation to HR Forum
Volkswagen South Africa – Competencies Case Study presentation to HR Forum
 
Drupal case study: ABC Dig Music
Drupal case study: ABC Dig MusicDrupal case study: ABC Dig Music
Drupal case study: ABC Dig Music
 
Downfall of micromax
Downfall of micromaxDownfall of micromax
Downfall of micromax
 
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swa...
 
Panel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case StudyPanel Recruitment and Scheduling Case Study
Panel Recruitment and Scheduling Case Study
 
Uber Operations - 2012 Capabilities Presentation
Uber Operations - 2012 Capabilities PresentationUber Operations - 2012 Capabilities Presentation
Uber Operations - 2012 Capabilities Presentation
 
Uber Operations | Capabilities Presentation 2015
Uber Operations | Capabilities Presentation 2015Uber Operations | Capabilities Presentation 2015
Uber Operations | Capabilities Presentation 2015
 
ClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical ServicesClickSoftware Case Study Ledcor Technical Services
ClickSoftware Case Study Ledcor Technical Services
 
Lean management
Lean management Lean management
Lean management
 
HP case- Implementation of operations research
HP case- Implementation of operations researchHP case- Implementation of operations research
HP case- Implementation of operations research
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
 
Rent a Car Case Study
Rent a Car Case StudyRent a Car Case Study
Rent a Car Case Study
 
What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...
What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...
What can traffic in stockholm teach you about queuing theory - Lean Kanban Ce...
 
ABC Ltd Case solution
ABC Ltd Case solutionABC Ltd Case solution
ABC Ltd Case solution
 
4 an activity analysis of project scheduling problem a case study 1
4 an activity analysis of project scheduling problem   a case study 14 an activity analysis of project scheduling problem   a case study 1
4 an activity analysis of project scheduling problem a case study 1
 
Inventory Managment : Case Study Nationkidz Company
Inventory Managment : Case Study Nationkidz CompanyInventory Managment : Case Study Nationkidz Company
Inventory Managment : Case Study Nationkidz Company
 

Ähnlich wie Case study on scheduling

Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
Oskar Manufacturing Companies
Oskar Manufacturing CompaniesOskar Manufacturing Companies
Oskar Manufacturing CompaniesRaghav Agarwal
 
Reduction of Order Delivery Time of Goods.pdf
Reduction of Order Delivery Time of Goods.pdfReduction of Order Delivery Time of Goods.pdf
Reduction of Order Delivery Time of Goods.pdfStephen Chukwuemeka
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE NotesAbhay Gore
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
ie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptBasemAbdo4
 
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...IJERA Editor
 
Motorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project ReportMotorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project ReportOlusegun. B Adekoya
 

Ähnlich wie Case study on scheduling (20)

Article final ivan f
Article final ivan fArticle final ivan f
Article final ivan f
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
The Six March 19th
The Six March 19thThe Six March 19th
The Six March 19th
 
Oskar Manufacturing Companies
Oskar Manufacturing CompaniesOskar Manufacturing Companies
Oskar Manufacturing Companies
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Design notes5
Design notes5Design notes5
Design notes5
 
Design notes5
Design notes5Design notes5
Design notes5
 
Proposed Process Flow for D&D
Proposed Process Flow for D&DProposed Process Flow for D&D
Proposed Process Flow for D&D
 
Reduction of Order Delivery Time of Goods.pdf
Reduction of Order Delivery Time of Goods.pdfReduction of Order Delivery Time of Goods.pdf
Reduction of Order Delivery Time of Goods.pdf
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Agile scrum summary
Agile scrum summaryAgile scrum summary
Agile scrum summary
 
ie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.ppt
 
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Project assign 2
Project assign 2Project assign 2
Project assign 2
 
Motorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project ReportMotorcycle Pallet Rack Project Report
Motorcycle Pallet Rack Project Report
 

Mehr von NewGate India

Newgate india 2013 sociometrics
Newgate india 2013  sociometricsNewgate india 2013  sociometrics
Newgate india 2013 sociometricsNewGate India
 
Business proposal coffee shop in Canada
Business proposal coffee shop in CanadaBusiness proposal coffee shop in Canada
Business proposal coffee shop in CanadaNewGate India
 
Contagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeContagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeNewGate India
 
E-Procurement System
E-Procurement SystemE-Procurement System
E-Procurement SystemNewGate India
 
Social media statistics statistics
Social media statistics statisticsSocial media statistics statistics
Social media statistics statisticsNewGate India
 
Newgate Youtube statistics statistics
Newgate Youtube  statistics statisticsNewgate Youtube  statistics statistics
Newgate Youtube statistics statisticsNewGate India
 
Contagion effect of greece debt crisis
Contagion effect of greece debt crisisContagion effect of greece debt crisis
Contagion effect of greece debt crisisNewGate India
 
Case study on SM Tech-ppt
Case study on SM Tech-pptCase study on SM Tech-ppt
Case study on SM Tech-pptNewGate India
 
Telecom market research
Telecom market researchTelecom market research
Telecom market researchNewGate India
 
Risk management Report
Risk management ReportRisk management Report
Risk management ReportNewGate India
 
Quality control report
Quality control reportQuality control report
Quality control reportNewGate India
 
Market Research Report
Market Research ReportMarket Research Report
Market Research ReportNewGate India
 
Market research report
Market research reportMarket research report
Market research reportNewGate India
 
Market feasibility test
Market feasibility testMarket feasibility test
Market feasibility testNewGate India
 
Report on Dasborad & scorecard
Report on Dasborad & scorecardReport on Dasborad & scorecard
Report on Dasborad & scorecardNewGate India
 
Politics in organization-PPT
Politics in organization-PPTPolitics in organization-PPT
Politics in organization-PPTNewGate India
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysisNewGate India
 
Case study on communications
Case study  on  communicationsCase study  on  communications
Case study on communicationsNewGate India
 

Mehr von NewGate India (20)

Newgate india 2013 sociometrics
Newgate india 2013  sociometricsNewgate india 2013  sociometrics
Newgate india 2013 sociometrics
 
Business proposal coffee shop in Canada
Business proposal coffee shop in CanadaBusiness proposal coffee shop in Canada
Business proposal coffee shop in Canada
 
Consumer Demand
Consumer DemandConsumer Demand
Consumer Demand
 
Contagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europeContagion effect of greece debt crisis on europe
Contagion effect of greece debt crisis on europe
 
E-Procurement System
E-Procurement SystemE-Procurement System
E-Procurement System
 
Social media statistics statistics
Social media statistics statisticsSocial media statistics statistics
Social media statistics statistics
 
Newgate Youtube statistics statistics
Newgate Youtube  statistics statisticsNewgate Youtube  statistics statistics
Newgate Youtube statistics statistics
 
Contagion effect of greece debt crisis
Contagion effect of greece debt crisisContagion effect of greece debt crisis
Contagion effect of greece debt crisis
 
Case study on SM Tech-ppt
Case study on SM Tech-pptCase study on SM Tech-ppt
Case study on SM Tech-ppt
 
Research ppt
Research pptResearch ppt
Research ppt
 
Telecom market research
Telecom market researchTelecom market research
Telecom market research
 
Risk management Report
Risk management ReportRisk management Report
Risk management Report
 
Quality control report
Quality control reportQuality control report
Quality control report
 
Market Research Report
Market Research ReportMarket Research Report
Market Research Report
 
Market research report
Market research reportMarket research report
Market research report
 
Market feasibility test
Market feasibility testMarket feasibility test
Market feasibility test
 
Report on Dasborad & scorecard
Report on Dasborad & scorecardReport on Dasborad & scorecard
Report on Dasborad & scorecard
 
Politics in organization-PPT
Politics in organization-PPTPolitics in organization-PPT
Politics in organization-PPT
 
Cipla Balance Sheet analysis
Cipla Balance Sheet analysisCipla Balance Sheet analysis
Cipla Balance Sheet analysis
 
Case study on communications
Case study  on  communicationsCase study  on  communications
Case study on communications
 

Kürzlich hochgeladen

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 

Kürzlich hochgeladen (20)

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

Case study on scheduling

  • 1. NewGate India Hyderbad, Andhra Pradesh- 500038 Website: www.newgate.in Email: contact@newgate.in Slideshare URL : http://www.slideshare.net/newgateindia Production & Operations Management Case Study: Distribution Transformer Company Limited
  • 2. Case Summary DTCL (Distribution Transformer Company Limited) is a Transformer manufacturing Company dealing with Power Sector. Earlier it used to concentrate mainly on the domestic market but after facing severe financial crisis owing to delayed payments of the State electricity Board, it channelized its efforts to tap the export market especially the South-Asian Market which had huge scope. With Company’s export growing to INR 1 billion, they expanded their export business to Distribution Transformer with the already existing Single Phase Transformer. With the Company going global, the number of the Customers and their specifications increased manifolds. The Engineering Department of the Company is thus facing several issues with specifications of the new materials which results in increased lead- time and also rejection of material at the last moment due to Quality Issues. Owing to these reasons, The Company is finding it difficult to comply with the Orders in time, thereby ending up paying huge amount as penalty. DTCL soon realized that this will threaten their position in the global market and competing with the World Players will be even more difficult. DTCL, thus, set up a Team to estimate the time required for the accomplishment of an order. Thus, focusing on overall lead time reduction to reduce cost and improve efficiency of Order fulfillment became even easier. The team was also supposed to come up with options by which orders can be fulfilled in a much efficient manner. The team identified the entire set of activities involves in the order fulfillment as summarized below:- A list of activities for execution of an order at DTCL Activity no. Description 01 Processing and circulation of customer order 02 Preparation of customer drawings 03 Customer drawings to marketing 04 Checking and forwarding to customer 05 Getting approval from customer 05’ Customer comments 06 Preparation of manufacturing drawings 07 Issuing manufacturing drawings to planning 08 Issue from planning to other departments 08’ Revision 09 Material procurement-prototype 10 Processing tools required for manufacturing 11 Manufacturing- prototype 12 Material processing-final order execution 13 Manufacturing-final order execution 14 Organizing customer inspection through marketing 16 Dispatch Page | 2
  • 3. After the Order has been placed by the Customer, the Marketing Department reviews it and sends it to all Departments involved. The Engineering Department starts preparing the Electrical Design which is sent for approval from the Customers. If approved they are sent back to the Engineering Department and if otherwise Marketing and Engineering Department addresses the Issues within 3 days. Along with the process of the approval, the Engineering Department parallel prepares the Manufacturing Drawings and informs the Materials Department regarding Material Requirements to accomplish the Order. After the Manufacturing Drawings are approved, they are being sent to the PPC (Production Planning and Control) Department which in turn issues the Drawings to the Concerned Department. Revision to the Drawings and Distribution of BOMs (Bill of Materials) is followed by the Procurement of the by the Procurement of the Materials. Based on the tentative dates of Job-Completion, the Marketing Department is informed to organize for Customer inspection following which the Dispatching of the Products takes place. Based on the steps discussed above, the data was collected for a sample of 4 orders which are discussed in details later. Assumptions taken in case  An activity named 05 was taken for Customer comments which was mentioned in the case but not included in the table. Its time was 3 days. So a constant 3 days activity time was assumed for all the 4 orders.  An activity named 08’ was taken for Revision which was mentioned in the case but not included in the table. Its time was 2 days. So a constant 2 days of activity time was assumed for all the 4 orders.  An activity named 14 named Organizing customer inspections, no time was mentioned for it. So we assumed a time of 3 days for all the 4 orders. The Sample of 4 orders is given below in the following table:- Page | 3
  • 4. Order execution details: a sample analysis Activity Description Domesti Domesti Average Export Export Average of no. c order c order of order order Export 1 2 Domestic 1 2 order order Processing and 01 circulation of 2 2 2 3 3 3 customer order Preparation of 02 customer 30 18 24 13 16 14.5 drawings Customer 03 drawings to 2 3 2.5 1 1 1 marketing Checking and 04 forwarding to 2 1 1.5 3 3 3 customer 05 Getting approval 447 98 272.5 396 93 244.5 from customer 05’ Customer 3 3 3 3 3 3 comments Preparation of 06 manufacturing 400 120 260 400 23 211.5 drawings Issuing 07 manufacturing 2 3 2.5 17 1 9 drawings to planning Issue from 08 planning to 1 2 1.5 2 1 1.5 other departments 08’ Revision 2 2 2 2 2 2 Material 09,10,1 procurement- 603 228 415.5 486 167 326.5 1 (prototype, final order execution) Manufacturing 12,13 (prototype, final 341 160 256.5 36 5 20.5 order execution) 14 Inspection 3 3 3 3 3 3 15 dispatch 8 130 69 18 15 16.5 Page | 4
  • 5. Questions Q1) Develop a network representation of the execution of an order for distribution transformers at DTCL. Ans : The network is drawn by both AON and PERT diagrams. The PERT chart is as follows for the ordering. The AON chart is as follows for the ordering. Page | 5
  • 6. Q2) Use the network and develop time estimates for execution of the order. What are the key activities that require better managerial control? Ans: The critical path of both the domestic order and export order are drawn. Then the critical activities are decided from the PERT chart. Domestic Orders The critical path is 1,2,3,4,6,9,10,11,7,8,8’,12,13,14,16  These are the activities which require better managerial control and can be crashed.  The time allocated with each activity can be optimized. Total lead time = 1034 days The real float associated for 05 is 403 days. Export Orders Page | 6
  • 7. The critical path is 1,2,3,4,6,9,10,11,7,8,8’,12,13,14,16  These are the activities which require better managerial control and can be crashed.  The time allocated with each activity can be optimized. Total lead time = 612 days The real float associated with 05 is 294 days. Q3) Can you identify activities that require immediate attention in order to reduce execution time. How can DTCL organize the manufacture of transformers so that there will be a significant reduction in execution lead time Ans: AON chart is drawn. The group activities are divided into workstations. The balance delay for both the ordering process is found out. Domestic Orders Domestic with 3 workstations The three workstations are engineering drawing department, marketing department and the production department. The AON chart is as follows W1 W2 W3 Work Station (Engineering (Manufacturing (Purchasing Dept.) Dept.) Dept.) Activities 01,02,03,06,07 04,05,05',14,16 08,08',09,10,11,12,13 Order Time 291 349 669.5 Page | 7
  • 8. Total Processing Time Tp = 291 + 349 + 669.5 Tp = 1309.5 days Cycle time CL= Max (T1, T2, T3) = Max (291, 249, 669.5) CL = 669.5 days Balance Delay Bd = (n CL - Tp)/ nCL X 100 = (3 X 669.5 – 1309)/ (3 X 669.5 ) Balance Delay = 34.82% Domestic with 4 workstations The four workstations are engineering drawing department, marketing department, production department and the procurement department. The AON chart is as follows W1 (Engineering W2 (Manufacturing W4 (Procurement Work Station W3 (Purchasing Dept) Dept.) Dept.) Dept) Activities 01,02,03,06,07 04,05,05',14,16 08,08',12,13 09,10,11 Order Time 291 days 349 days 254 days 415.5 days Total Processing Time Tp = 291 + 349 + 254 + 415.5 Tp = 1309.5 days Page | 8
  • 9. Cycle time CL= Max (T1, T2, T3, T4) = Max (291,249,254,415.5) CL = 415.5 days Balance Delay Bd = (n CL - Tp)/ nCL X 100 = (3 X 415.5 – 1309 )/ (3 X 415.5) Balance Delay = 21.23% Conclusion of Domestic Order From both the AON chart it is visible that in the case of domestic orders, the number of workstations should be four as it generates less balance delay. As the number of workstations is increased to 4, the balance delay is decreased by 39%. 1. The activities that require immediate attention is the procurement department as it take 415.5 days. 2. It can be done by proper vendor management which helps the following ways:  By ensuring delivery on time  Properly forecasting the expected demand  Adopting practices to reduce time on logistics  Better inventory management of raw materials with proper defined reorder level. Export Orders Export with 3 workstations The three workstations are engineering drawing department, marketing department and the production department. The AON chart is as follows Page | 9
  • 10. W1 (Engineering W2 (Manufacturing Work Station W3 (Purchasing Dept) Dept.) Dept.) Activities 01,02,03,06,07 04,05,05',14,16 08,08',09,10,11,12,13 Order Time 239 days 270 days 350.5 days Total Processing Time Tp = 239 + 270 + 350.5 Tp = 859.5 days Cycle time CL= Max (T1, T2, T3) = Max(239, 270, 350.5) CL = 350.5 days Balance Delay Bd = (n CL - Tp)/ nCL X 100 = (3 X 350.5 – 859.5) / (3 X 350.5) Balance Delay = 18.26% Export with 4 workstations The four workstations are engineering drawing department, marketing department, production department and the procurement department. The AON chart is as follows Page | 10
  • 11. W1 Work W2 (Manufacturing W3 (Purchasing W4 (Procurement (Engineering Station Dept.) Dept) Dept) Dept.) Activities 01,02,03,06,07 04,05,05',14,16 08,08',12,13 09,10,11 Order Time 239 days 270 days 330 days 20.5 days Total Processing Time Tp = 239 + 270 + 330 + 20.5 Tp = 859.5 days Cycle time CL= Max (T1, T2, T3, T4) = Max(239, 270, 330, 20.5) CL = 330 days Balance Delay Bd = (n CL - Tp)/ nCL X 100 = (3 X 330 – 859.5 )/ (3 X 330.5) Balance Delay = 34.88 % Conclusion of Export Order From both the AON chart it is visible that in the case of export orders, the number of workstations should be three as it generates less balance delay. As the number of workstations is increased to 4, the balance delay is increased by 91%. Page | 11
  • 12. 1. The activities that require immediate attention is the production as it take 350.5 days. 2. It can be done by proper optimizing the process which helps in • By avoiding abnormal wastage • Reducing the error or failure rates • Finding optimal product mix strategies • Maintaining a constant lead time and safety stock Overall Conclusion 1. More emphasis has to given to the critical activities than that of slack activities. 2. The number of workstations in domestic orders should be made four and in export orders it should be three for better optimized use of the resources. Page | 12