PUBLIC PROJECTS
The main problem in most public project
appraisals is
• their uneconomic nature
• impossibility to measure data
like turnover and current costs,
necessary for NPV or IRR
calculation.
Therefore, because of the intangible
nature of pure public projects,
Cost – Benefit Analysis (CBA) is
applied instead.
3
COST-BENEFIT ANALYSIS
Cost–Benefit Analysis was
developed by J. Dupoit at the
beginning and lately by J. Hicks.
CBA provides information for
decision making process, but
it does not by itself make
decisions.
The purpose of CBA is to ensure
that the public sector allocates
scarce resources efficiently to
competing public sector
projects.
4
COST-BENEFIT ANALYSIS
Often the short-term distributional objectives may come into
conflict with longer-term efficiency and distributional
objectives (often the case with politicians).
CBA estimates and totals up the equivalent money value of
the benefits and costs to the community of projects to
establish whether they are worthwhile.
This means that all benefits and
costs of a project should be
measured in terms of their
equivalent money value and
in particular time.
5
STEPS TO COST-BENEFIT ANALYSIS
A comprehensive cost-benefit analysis
consists of main three steps (Samuelson,
Marks, 1998):
1) Identification of all the factors
(favourable and unfavourable) which
can flow into community because of
that project.
2) Financial valuation of costs and
benefits.
3) Choice of the best alternative with net
social benefits, that means a surplus
of total benefits on total costs.
6
STEP 1: IDENTIFYING COST & BENEFITS
A common mistake in CBA
is failure to identify all the
relevant costs and
benefits.
The analyst should
consider tangible and
intangible flows.
Some of the costs and
benefits may be easily
quantified and others are
more difficult to quantify.
7
STEP 1: IDENTIFYING COSTS
• Investment costs e.g.:
construction costs, materials etc
• IT costs
• Fixed assets
• Equipment
• Overheads
• Operating costs
• Maintenance costs
• Negative externalities (e.g.
water/noise pollution)
Categorizing costs is important
because it gives an insight into
cost behaviour and the drivers of
individual costs.
Fixed costs remain static over a
given level of activity or output e.g.
rent
Variable costs change in line with
changes to the volume of activity or
output e.g. operating costs
Semi variable costs can include a
fixed and a variable component e.g.
maintenance costs
8
STEP 1: IDENTIFYING BENEFITS
• Reduction in loss of life
• Reduction in health care costs
• Accident savings
• Travel time savings
• Reduced environmental emissions
• Lower operating and maintenance
costs
• Job creation
• Increased water quality
• Scenic benefits
The benefits of a project can
be more difficult to identify
because these are often not
obvious cashflows but are
outcomes relating to the
objectives of the CBA.
In identifying benefits, the
analyst should have due
regard to the direct and
indirect effects of the
interventions.
9
STEP 2: VALUATING COSTS
Market prices normally reflect the best alternative uses to which the goods or
services could be put or the opportunity cost.
Some Cost Estimation issues are:
1. CONTINGENCY COSTS :
Allowance should be made where contingencies are part of the expected costs
of the proposal and included in the CBA. Projects with large initial capital outlays
should include a contingency provision for escalating construction costs or
delays.
2. SUNK AND OPPORTUNITY COSTS :
Sunk costs has already been incurred and cannot be recovered. Sunk costs
could include expenditure on previous feasibility studies. CBA is only concerned
with costs about which decisions can still be made.
10
STEP 2: VALUATING BENEFITS
Benefits should always be valued based on willingness to pay.
1. REVEALED PREFERENCE
Inferring a price from observing consumer behaviour
2. STATED PREFERENCE
Estimated by asking people what they would be willing to pay for a particular
benefit: can be willingness to pay or willingness to accept
3. HEDONIC PRICING
Using the different characteristics of a traded good to establish the value of a
non traded good e.g. value of a seafront by comparing prices of houses with and
without the seafront
11
STEP 2: VALUATING BENEFITS
4. TRAVEL COST ANALYSIS
Using the value of traded goods and services to estimate the value of non traded
goods and services e.g. value of an amenity using travel costs and time
5. CONTINGENT VALUATION
Asking consumers about value they would place on outputs/benefits through
interviews or questionnaires
12
STEP 3: BENEFIT COST RATIO
• The BCR is also a useful measure because it allows a large
number of projects to be ranked. It attempts to summarize the
overall value for money of a project or proposal.
• Accept all projects with a BCR greater than 1, when costs and
benefits are discounted at the opportunity cost of capital.
• (a positive BCR does not automatically mean a proposal is
accepted as other issues are relevant such as affordability
constraints and qualitative factors)
13
STEP 3: POLITICAL JUDGEMENT
The final step of using of investment criteria is a selecting a
set of investment projects from a large number, subject to
economic, political, and social constraints
Public sector projects are usually subject to some sort of
political judgement, and public project analysis is often
made only to support political decisions with logic.
Decisions regarding to social investments are strictly bounded
with political problems and pressure
14
CASE: CONSTRUCTION OF FOREST ROAD, FUKUI CITY
15
CASE – BENEFITS & COSTS
The BENEFITS included cost savings in forestry :
1. Benefits received by producers and consumers due to the
increase in lumber production, which is brought about by the
construction of forest roads
2. Benefits brought by production cost savings in forestry
3. Benefits of the good effect, from the environmental conservation
aspect, due to the active forestry production activity
4. Benefits for community roads
5. Benefits for securing domestic lumber resources
The COSTS for the project included expenses incurred in road
construction, forest clearing, labour, etc
16
CASE – CONCLUSION
BCR = 0.38SUSPENDED
Cost per area (in 2001) : 8.11 Million Yen per ha
17
RESEARCH PAPERS
NEIL MATHEW
B . T E C H + M B A

Weitere ähnliche Inhalte

Was ist angesagt?

Stiglitz
StiglitzStiglitz
Stiglitz
M R
 
Social cost benefit analysis
Social cost benefit analysisSocial cost benefit analysis
Social cost benefit analysis
Neeti Gupta
 
Unit 3 multiplier & super multiplier
Unit 3 multiplier & super multiplierUnit 3 multiplier & super multiplier
Unit 3 multiplier & super multiplier
Sudarshan Kadariya
 

Was ist angesagt? (20)

Social Cost Benefi Analysis
Social Cost Benefi AnalysisSocial Cost Benefi Analysis
Social Cost Benefi Analysis
 
Stiglitz
StiglitzStiglitz
Stiglitz
 
Econometrics
EconometricsEconometrics
Econometrics
 
Cost Benifit Analysis
Cost Benifit AnalysisCost Benifit Analysis
Cost Benifit Analysis
 
Cost benefit analysis
Cost benefit analysisCost benefit analysis
Cost benefit analysis
 
Social cost benefit analysis
Social cost benefit analysisSocial cost benefit analysis
Social cost benefit analysis
 
Econometrics ch2
Econometrics ch2Econometrics ch2
Econometrics ch2
 
Unit 3 multiplier & super multiplier
Unit 3 multiplier & super multiplierUnit 3 multiplier & super multiplier
Unit 3 multiplier & super multiplier
 
DUMMY VARIABLE REGRESSION MODEL
DUMMY VARIABLE REGRESSION MODELDUMMY VARIABLE REGRESSION MODEL
DUMMY VARIABLE REGRESSION MODEL
 
Dummy variables
Dummy variablesDummy variables
Dummy variables
 
Benefit cost analysis bca
Benefit cost analysis bcaBenefit cost analysis bca
Benefit cost analysis bca
 
ACCELERATOR THEORY OF INVESTMENT
ACCELERATOR THEORY OF INVESTMENT ACCELERATOR THEORY OF INVESTMENT
ACCELERATOR THEORY OF INVESTMENT
 
Pareto optimality
Pareto optimalityPareto optimality
Pareto optimality
 
Dualgap analysis
Dualgap analysisDualgap analysis
Dualgap analysis
 
Market Failure
Market FailureMarket Failure
Market Failure
 
Cost Benefit Analysis(CBA)
Cost Benefit Analysis(CBA)Cost Benefit Analysis(CBA)
Cost Benefit Analysis(CBA)
 
Econometrics
EconometricsEconometrics
Econometrics
 
Scba notes
Scba notesScba notes
Scba notes
 
Basic econometrics lectues_1
Basic econometrics lectues_1Basic econometrics lectues_1
Basic econometrics lectues_1
 
Cost Benefit analysis
Cost Benefit analysisCost Benefit analysis
Cost Benefit analysis
 

Ähnlich wie Cost Benefit Analysis in Public Project Appraisal (PPAC)

appraisal of Forestry projects
appraisal of Forestry projects appraisal of Forestry projects
appraisal of Forestry projects
Dronak Sahu
 
 Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx
Jaafar47
 

Ähnlich wie Cost Benefit Analysis in Public Project Appraisal (PPAC) (20)

HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEHOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
 
Vincent 3
Vincent 3Vincent 3
Vincent 3
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
NAP Training Viet Nam - Session 7 Appraising Adaptation Options
NAP Training Viet Nam - Session 7 Appraising Adaptation OptionsNAP Training Viet Nam - Session 7 Appraising Adaptation Options
NAP Training Viet Nam - Session 7 Appraising Adaptation Options
 
Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...Building an Evidence base: Introduction to Economics of Adaptation and Impact...
Building an Evidence base: Introduction to Economics of Adaptation and Impact...
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
SMART International Symposium for Next Generation Infrastructure: Cost Benefi...
SMART International Symposium for Next Generation Infrastructure: Cost Benefi...SMART International Symposium for Next Generation Infrastructure: Cost Benefi...
SMART International Symposium for Next Generation Infrastructure: Cost Benefi...
 
LIfe cycle costing case studies of RES and EE projects
LIfe cycle costing case studies of RES and EE projectsLIfe cycle costing case studies of RES and EE projects
LIfe cycle costing case studies of RES and EE projects
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
 
Social cost benefit analysis (scba)
Social cost benefit analysis (scba)Social cost benefit analysis (scba)
Social cost benefit analysis (scba)
 
Reviewing and Appraising Adaptation Options, GWP
Reviewing and Appraising Adaptation Options, GWPReviewing and Appraising Adaptation Options, GWP
Reviewing and Appraising Adaptation Options, GWP
 
Lode verstraeten kbc bank agoria presentation v15
Lode verstraeten kbc bank agoria presentation v15Lode verstraeten kbc bank agoria presentation v15
Lode verstraeten kbc bank agoria presentation v15
 
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxPUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
 
appraisal of Forestry projects
appraisal of Forestry projects appraisal of Forestry projects
appraisal of Forestry projects
 
Cost-benefit analysis in the transport sector
Cost-benefit analysis in the transport sectorCost-benefit analysis in the transport sector
Cost-benefit analysis in the transport sector
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development Mechanism
 
Lecture 5.pdf
Lecture 5.pdfLecture 5.pdf
Lecture 5.pdf
 
Ratemaking and Environmental Compliance Plans
Ratemaking and Environmental Compliance PlansRatemaking and Environmental Compliance Plans
Ratemaking and Environmental Compliance Plans
 
 Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx Financial analysis and appraisal of projects.pptx
 Financial analysis and appraisal of projects.pptx
 

Mehr von Neil Mathew

Mehr von Neil Mathew (20)

AMIZONER: Weekly Progress Reports
AMIZONER: Weekly Progress ReportsAMIZONER: Weekly Progress Reports
AMIZONER: Weekly Progress Reports
 
AMIZONER: Final Report
AMIZONER: Final ReportAMIZONER: Final Report
AMIZONER: Final Report
 
Computer Graphics Lab
Computer Graphics LabComputer Graphics Lab
Computer Graphics Lab
 
Programming in C Lab
Programming in C LabProgramming in C Lab
Programming in C Lab
 
Role of IT & Computer in Environment
Role of IT & Computer in EnvironmentRole of IT & Computer in Environment
Role of IT & Computer in Environment
 
French Open
French OpenFrench Open
French Open
 
Data Structures Lab
Data Structures LabData Structures Lab
Data Structures Lab
 
DBMS Lab
DBMS LabDBMS Lab
DBMS Lab
 
Communication Assessment File
Communication Assessment FileCommunication Assessment File
Communication Assessment File
 
Cloud Computing and Google's advancement in the field
Cloud Computing and Google's advancement in the fieldCloud Computing and Google's advancement in the field
Cloud Computing and Google's advancement in the field
 
Unix Programming Lab
Unix Programming LabUnix Programming Lab
Unix Programming Lab
 
The Cube - Class XII Project
The Cube - Class XII ProjectThe Cube - Class XII Project
The Cube - Class XII Project
 
Copywriting & Storyboarding (Advertising & Sales Promotion)
Copywriting & Storyboarding (Advertising & Sales Promotion)Copywriting & Storyboarding (Advertising & Sales Promotion)
Copywriting & Storyboarding (Advertising & Sales Promotion)
 
American Airlines Merger (Management In Action Case Study)
American Airlines Merger (Management In Action Case Study)American Airlines Merger (Management In Action Case Study)
American Airlines Merger (Management In Action Case Study)
 
Good Governance Leads To Flourish Society & Nation (BS SAP)
Good Governance Leads To Flourish Society & Nation (BS SAP)Good Governance Leads To Flourish Society & Nation (BS SAP)
Good Governance Leads To Flourish Society & Nation (BS SAP)
 
High Fortune (Product Brand Management)
High Fortune (Product Brand Management)High Fortune (Product Brand Management)
High Fortune (Product Brand Management)
 
Corportate Entrepreneurship at WIPRO
Corportate Entrepreneurship at WIPROCorportate Entrepreneurship at WIPRO
Corportate Entrepreneurship at WIPRO
 
Consumer Perception of Job Seekers in updating their Job Profiles on Job Portals
Consumer Perception of Job Seekers in updating their Job Profiles on Job PortalsConsumer Perception of Job Seekers in updating their Job Profiles on Job Portals
Consumer Perception of Job Seekers in updating their Job Profiles on Job Portals
 
How OLX changed the consumer involvement in the Scrap Market
How OLX changed the consumer involvement in the Scrap MarketHow OLX changed the consumer involvement in the Scrap Market
How OLX changed the consumer involvement in the Scrap Market
 
Innovation Jockeys 3 - Gramseva: Kisan
Innovation Jockeys 3 - Gramseva: KisanInnovation Jockeys 3 - Gramseva: Kisan
Innovation Jockeys 3 - Gramseva: Kisan
 

Kürzlich hochgeladen

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Kürzlich hochgeladen (20)

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 

Cost Benefit Analysis in Public Project Appraisal (PPAC)

  • 1. COST-BENEFIT ANALYSIS IN PUBLIC PROJECT APPRAISAL NEIL MATHEW B . T E C H + M B A A 2 3 2 4 7 1 0 0 0 2 P R O J E C T P L A N N I N G , A P P R A I S A L & C O N T R O L
  • 2. 2 PUBLIC PROJECTS The main problem in most public project appraisals is • their uneconomic nature • impossibility to measure data like turnover and current costs, necessary for NPV or IRR calculation. Therefore, because of the intangible nature of pure public projects, Cost – Benefit Analysis (CBA) is applied instead.
  • 3. 3 COST-BENEFIT ANALYSIS Cost–Benefit Analysis was developed by J. Dupoit at the beginning and lately by J. Hicks. CBA provides information for decision making process, but it does not by itself make decisions. The purpose of CBA is to ensure that the public sector allocates scarce resources efficiently to competing public sector projects.
  • 4. 4 COST-BENEFIT ANALYSIS Often the short-term distributional objectives may come into conflict with longer-term efficiency and distributional objectives (often the case with politicians). CBA estimates and totals up the equivalent money value of the benefits and costs to the community of projects to establish whether they are worthwhile. This means that all benefits and costs of a project should be measured in terms of their equivalent money value and in particular time.
  • 5. 5 STEPS TO COST-BENEFIT ANALYSIS A comprehensive cost-benefit analysis consists of main three steps (Samuelson, Marks, 1998): 1) Identification of all the factors (favourable and unfavourable) which can flow into community because of that project. 2) Financial valuation of costs and benefits. 3) Choice of the best alternative with net social benefits, that means a surplus of total benefits on total costs.
  • 6. 6 STEP 1: IDENTIFYING COST & BENEFITS A common mistake in CBA is failure to identify all the relevant costs and benefits. The analyst should consider tangible and intangible flows. Some of the costs and benefits may be easily quantified and others are more difficult to quantify.
  • 7. 7 STEP 1: IDENTIFYING COSTS • Investment costs e.g.: construction costs, materials etc • IT costs • Fixed assets • Equipment • Overheads • Operating costs • Maintenance costs • Negative externalities (e.g. water/noise pollution) Categorizing costs is important because it gives an insight into cost behaviour and the drivers of individual costs. Fixed costs remain static over a given level of activity or output e.g. rent Variable costs change in line with changes to the volume of activity or output e.g. operating costs Semi variable costs can include a fixed and a variable component e.g. maintenance costs
  • 8. 8 STEP 1: IDENTIFYING BENEFITS • Reduction in loss of life • Reduction in health care costs • Accident savings • Travel time savings • Reduced environmental emissions • Lower operating and maintenance costs • Job creation • Increased water quality • Scenic benefits The benefits of a project can be more difficult to identify because these are often not obvious cashflows but are outcomes relating to the objectives of the CBA. In identifying benefits, the analyst should have due regard to the direct and indirect effects of the interventions.
  • 9. 9 STEP 2: VALUATING COSTS Market prices normally reflect the best alternative uses to which the goods or services could be put or the opportunity cost. Some Cost Estimation issues are: 1. CONTINGENCY COSTS : Allowance should be made where contingencies are part of the expected costs of the proposal and included in the CBA. Projects with large initial capital outlays should include a contingency provision for escalating construction costs or delays. 2. SUNK AND OPPORTUNITY COSTS : Sunk costs has already been incurred and cannot be recovered. Sunk costs could include expenditure on previous feasibility studies. CBA is only concerned with costs about which decisions can still be made.
  • 10. 10 STEP 2: VALUATING BENEFITS Benefits should always be valued based on willingness to pay. 1. REVEALED PREFERENCE Inferring a price from observing consumer behaviour 2. STATED PREFERENCE Estimated by asking people what they would be willing to pay for a particular benefit: can be willingness to pay or willingness to accept 3. HEDONIC PRICING Using the different characteristics of a traded good to establish the value of a non traded good e.g. value of a seafront by comparing prices of houses with and without the seafront
  • 11. 11 STEP 2: VALUATING BENEFITS 4. TRAVEL COST ANALYSIS Using the value of traded goods and services to estimate the value of non traded goods and services e.g. value of an amenity using travel costs and time 5. CONTINGENT VALUATION Asking consumers about value they would place on outputs/benefits through interviews or questionnaires
  • 12. 12 STEP 3: BENEFIT COST RATIO • The BCR is also a useful measure because it allows a large number of projects to be ranked. It attempts to summarize the overall value for money of a project or proposal. • Accept all projects with a BCR greater than 1, when costs and benefits are discounted at the opportunity cost of capital. • (a positive BCR does not automatically mean a proposal is accepted as other issues are relevant such as affordability constraints and qualitative factors)
  • 13. 13 STEP 3: POLITICAL JUDGEMENT The final step of using of investment criteria is a selecting a set of investment projects from a large number, subject to economic, political, and social constraints Public sector projects are usually subject to some sort of political judgement, and public project analysis is often made only to support political decisions with logic. Decisions regarding to social investments are strictly bounded with political problems and pressure
  • 14. 14 CASE: CONSTRUCTION OF FOREST ROAD, FUKUI CITY
  • 15. 15 CASE – BENEFITS & COSTS The BENEFITS included cost savings in forestry : 1. Benefits received by producers and consumers due to the increase in lumber production, which is brought about by the construction of forest roads 2. Benefits brought by production cost savings in forestry 3. Benefits of the good effect, from the environmental conservation aspect, due to the active forestry production activity 4. Benefits for community roads 5. Benefits for securing domestic lumber resources The COSTS for the project included expenses incurred in road construction, forest clearing, labour, etc
  • 16. 16 CASE – CONCLUSION BCR = 0.38SUSPENDED Cost per area (in 2001) : 8.11 Million Yen per ha