SlideShare ist ein Scribd-Unternehmen logo
1 von 59
Scheduling and Controls of Project Manufacturing Mohamed El-Mehalawi, Ph.D, PMP Senior Project Controls Manager Faithful+Gould
The Presentation is not available on the Conference DVD.If you like a copy send me an email I will send you a link to it.Mohamed.el-mehalawi@fgould.comor pick up my card.
About the Author I love KISS Keep It Simple, Smart
I Love Manufacturing
I Love Project Management There is no exact science that is applied to get project management results. It depends on personal traits:  Creativity Problem solving Communication One mile long – one inch deep !
The Problem
Manufacturing Management Management of manufacturing is based until today on two environments: Mass production and assembly line Job-shop manufacturing I am suggesting a third method called Project Manufacturing
Mass Production Line
Mass Production LineVideos
Mass Production:Definition Mass production is the production of large amounts of standardized products on production lines.  It was popularized by Henry Ford in the early 20th Century, notably in his Ford Model T.  It was reinvented by Toyota in the 1950s.
Production Line:Definition A Production Line is a manufacturing process in which interchangeable parts are added to a product in a sequential manner to create an end product.
Scheduling & Controls in Mass Production  Push/Pull production scheduling Ford focused on the Push system Push the material into the line Toyota focused more on the Pull system Products at the end of the line generate signal to push material into the line.
Scheduling & Controls in Mass Production
Job-Shop Manufacturing
Job-Shop Manufacturing
Job-Shop ManufacturingDefinition The job shop scheduling problem (JSP) is a traditional decision making problem that is encountered in: Low volume–high variety manufacturing systems Job-shop scheduling is dedicated tolow volume repetitiveproducts manufacturing Job-Shop is a good strategy for make-to-order not for unique and temporaryengineer-to-order products.
Scheduling and Controls in Job-Shop Manufacturing There are thousands of algorithms based on mathematical methods to resolve the job-shop scheduling problems. The “Goal” or TOC by Eliyahu Goldratt gave a common-sense methodology for the job-shop problem. CPM is not the best methodology for job-shop scheduling
Project Manufacturing Image provided courtesy of The Babcock & Wilcox Company
Project Manufacturing Image provided courtesy of The Babcock & Wilcox Company
Project Manufacturing
Project Manufacturing:Definition Project manufacturing is dedicated to producing or assembling one unit of each unique product. Although it is a manufacturing environment, it follows the project definition of being temporary and unique.
Project Manufacturing:Definition It is the process of manufacturing a temporary and unique product that has a very high number of non-standard components. It is the process of manufacturing an engineer-to-order product.
Project vs. Repetitive Manufacturing
Project vs. Repetitive Manufacturing
Presentation Overview This presentation is focused on the scheduling and controls of project manufacturing using critical path method (CPM). Project manufacturing plant Benefits Project manufacturing scheduling  Automating the schedule Automating schedule updates Utilizing enterprise scheduling system to manage resources Implementation results
Project Manufacturing Plant Image provided courtesy of The Babcock & Wilcox Company
Project Manufacturing Plant There is no production line There is no job-shop Image provided courtesy of The Babcock & Wilcox Company
Management in Project Manufacturing Plant The majority of project manufacturing shops in the US use manufacturing management based on job-shop. They utilize machine loading, master scheduling, process improvements, and quality assurance exactly like mass production plants.
CPM in Project Manufacturing Objectives of this study or the benefits of using CPM in scheduling project manufacturing: Providing a project-based methodology to a project-based process. Integrating the fabrication phase of the project with the rest of the project schedule. Will come back to these later.
Methodology Concept Given a sheet and a bar of wood, you need to produce the shown chair.  It has 6 parts; A,B,C,D,E&F as shown.
Methodology Concept
Methodology Concept After having all parts, we need to: Insert two D into E, -> T, glue(5) & sand(6) Insert T into B, -> S, glue & sand Insert two C into S -> R, glue & sand Insert two F into A -> Q, glue, screw(7), and sand Insert Q into R -> W (the chair), glue, screw, sand, and paint(9).
Network Diagram for Chair Project
Schedule for the Chair Project Once the project network is created, each of the 30 activities can be assigned: Duration … to calculate start and finish Labor hours … with skill set determines labor requirements Machine hours … with work-center type specifies machine reqrt. Raw materials … raw material needed Finished material … determines the progres of each activity
Custom Chair Manufacturing Plant Assume the plant does not produce two similar chairs. Each chair will have a resource loaded schedule. Each chair schedule can be combined with chair design, engineering and procurement schedules. Combining all chair schedules in an enterprise system will allow the production manager to plan for resource requirements.  The schedule can be updated based on the consumed duration and the quantity of finished goods.
Automating Schedule Creation The first manual implementation was on products that had about 1000 part numbers.  This generated more than 5000 activities.  Production planners complained about having to create schedules for new products while updating the schedules of active products (projects).
Automating Schedule Creation Any plant that deals with these large projects always has: An ERP system An engineering bill-of-material system (BOM) A part routing system A manufacturing execution system Usually the last three systems dump the information into the first system. The idea of automating the creation of the project/product schedule depends on the last three systems.
Part Routing System For each part, the routing sheet describes: How it is manufactured (the operations) Needed materials Needed labor skill and time for each operation Needed work-center type and time for each operation
Part Routing System Example The part is a bent tube
Part Routing Can Generate Local Schedules A resource loaded schedule for each part number is generated. The relationships between different local schedules are missing. The BOM provides those relationships.
Custom Chair Bill of Material (BOM)
BOM Creates Activity Relationships T cannot start unless 2 Ds and 1 E are finished. S cannot start unless 1 B and 1 T are finished. R cannot start unless 1 S and 2 Cs are finished. Q cannot start unless 2 Fs and 1 A are finished. W cannot start unless 1 R and 1 Q are finished. These relationships are enough to build a complete manufacturing project schedule.
The Automation of Schedule Generation If: Product routing  BOM Are available in any electronic format, then the full resource loaded schedule can easily be generated automatically.
Manufacturing Execution Systems (MES) They are information systems used to manage and manipulate data in factory floors. Different technologies are used to distribute schedule information and to collect actual production information from plant floor. Barcode, Magnetic Cards, Smart Card, RF are examples.
Automating Schedule Updates MES provide real time information for each activity: Start Finish Labor hours charged Machine hours charged Number of units finished Dumping this information into the schedule, we get an updated schedule that reflects the exact status of the project.
Project Schedule Integration
Project Schedule Integration It gives the project manager better control over the fabrication phase of the project. Any changes in engineering dates will be dynamically conveyed to the manufacturing schedule. If the project uses CPM and the fabrication uses job-shop, then there will be a disconnection in project controls.
Resource Management The manufacturing plant will have multiple concurrent projects. Concurrent projects share the same resources Constrained resource allocation to multiple projects is the hardest mathematical problem in project management.
Enterprise Project Controls Systems Enterprise project controls systems combine the requirements on each single resource from all active projects. Few resources are over allocated and few are under allocated.  If we leave the resource leveling to be automated based on a heuristic or mathematical method, it will be a mess.
Enterprise Project Controls Systems
Resolving Resource Conflicts The plant might have 500 resources.  If we try to schedule projects and pay attention to these resources, the number of production planners needed will be prohibitive. If we insert hard activity relationships to represent these resources, then all resources will be under-allocated.
Resolving Resource Conflicts: From Practice We used this system in a plant for three months trying to resolve conflicts of all resources. The implementation team was working with the production planners. We found that we only have 3 resources that are always over-allocated (bottlenecks). We manually scheduled all active projects around these three resources. No conflicts arise from other resources.
Conclusions: Workflow
Conclusions:Goals Achieved With a simple system, we achieved the implementation of our two goals: Project schedule integration specially for EPC projects Planning and controls of production within a project manufacturing plant.
Conclusions:Benefits to the Plant Plant customers (project owners) like this system because it keeps them informed on the status of their project.  Engineering departments become informed about the effects of their schedule on manufacturing schedule. Changes are handled in the plant easier than handling them using a job-shop strategy
Conclusions:Success Story My first implementation was at a plant that used to update the schedule monthly.  After implementation, I asked them to update it weekly and they agreed without any resistance because the automation of schedule creation saved them a lot of time.  After a few months they came back to me and requested to update the schedule daily.  That proves the applicability of the system in planning and controls in project manufacturing plants.
The Presentation is not available on the Conference DVD.If you like a copy send me an email I will send you a link to it.Mohamed.el-mehalawi@fgould.comor pick my card up
Thank You For Attending!

Weitere ähnliche Inhalte

Was ist angesagt?

plant layout ( Operation Research )
plant layout ( Operation Research ) plant layout ( Operation Research )
plant layout ( Operation Research )
Arpit gupta
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 

Was ist angesagt? (20)

MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
plant layout ( Operation Research )
plant layout ( Operation Research ) plant layout ( Operation Research )
plant layout ( Operation Research )
 
Review on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementationReview on GROUP TECHNOLOGY & it’s implementation
Review on GROUP TECHNOLOGY & it’s implementation
 
Group technology and cellular manufacturing
Group technology and cellular manufacturingGroup technology and cellular manufacturing
Group technology and cellular manufacturing
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
094 Productivity Measurement
094 Productivity Measurement094 Productivity Measurement
094 Productivity Measurement
 
Types of loading, production & operations management
Types of loading, production & operations managementTypes of loading, production & operations management
Types of loading, production & operations management
 
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEPCOMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
COMPUTERIZED LAYOUT METHODS ,CRAFT , ALDEP
 
Method study
Method studyMethod study
Method study
 
PPC
PPCPPC
PPC
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Industrial Facility Design
Industrial Facility DesignIndustrial Facility Design
Industrial Facility Design
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Introduction to CAD/CAM
Introduction to CAD/CAMIntroduction to CAD/CAM
Introduction to CAD/CAM
 
Work measurement
Work measurementWork measurement
Work measurement
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 

Ähnlich wie Project Manufacturing

Ramon_Osuna_Resume
Ramon_Osuna_ResumeRamon_Osuna_Resume
Ramon_Osuna_Resume
Ramon Osuna
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
John Smith
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniques
Mohamad Sahiedan
 
Project Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docxProject Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docx
briancrawford30935
 
Anthony Frank resume
Anthony Frank resumeAnthony Frank resume
Anthony Frank resume
Tony Frank
 

Ähnlich wie Project Manufacturing (20)

Ramon_Osuna_Resume
Ramon_Osuna_ResumeRamon_Osuna_Resume
Ramon_Osuna_Resume
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
 
Use of ict in organisation Methods of production
Use of ict in organisation Methods of production Use of ict in organisation Methods of production
Use of ict in organisation Methods of production
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
Mini Project- Torque Control of a DC Motor
Mini Project- Torque Control of a DC MotorMini Project- Torque Control of a DC Motor
Mini Project- Torque Control of a DC Motor
 
Mfg process management
Mfg process managementMfg process management
Mfg process management
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniques
 
Ce seminar
Ce seminarCe seminar
Ce seminar
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Case study(i)
Case study(i)Case study(i)
Case study(i)
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer Science
 
Project Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docxProject Description The new computer-controlled convey.docx
Project Description The new computer-controlled convey.docx
 
Pm soln9416141129710
Pm soln9416141129710Pm soln9416141129710
Pm soln9416141129710
 
Anthony Frank resume
Anthony Frank resumeAnthony Frank resume
Anthony Frank resume
 
Design and Engineering Module 3: Prototype to Product
Design and Engineering Module 3: Prototype to ProductDesign and Engineering Module 3: Prototype to Product
Design and Engineering Module 3: Prototype to Product
 

Kürzlich hochgeladen

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Kürzlich hochgeladen (20)

Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Project Manufacturing

  • 1.
  • 2. Scheduling and Controls of Project Manufacturing Mohamed El-Mehalawi, Ph.D, PMP Senior Project Controls Manager Faithful+Gould
  • 3. The Presentation is not available on the Conference DVD.If you like a copy send me an email I will send you a link to it.Mohamed.el-mehalawi@fgould.comor pick up my card.
  • 4. About the Author I love KISS Keep It Simple, Smart
  • 6. I Love Project Management There is no exact science that is applied to get project management results. It depends on personal traits: Creativity Problem solving Communication One mile long – one inch deep !
  • 8. Manufacturing Management Management of manufacturing is based until today on two environments: Mass production and assembly line Job-shop manufacturing I am suggesting a third method called Project Manufacturing
  • 11. Mass Production:Definition Mass production is the production of large amounts of standardized products on production lines. It was popularized by Henry Ford in the early 20th Century, notably in his Ford Model T. It was reinvented by Toyota in the 1950s.
  • 12. Production Line:Definition A Production Line is a manufacturing process in which interchangeable parts are added to a product in a sequential manner to create an end product.
  • 13. Scheduling & Controls in Mass Production Push/Pull production scheduling Ford focused on the Push system Push the material into the line Toyota focused more on the Pull system Products at the end of the line generate signal to push material into the line.
  • 14. Scheduling & Controls in Mass Production
  • 17. Job-Shop ManufacturingDefinition The job shop scheduling problem (JSP) is a traditional decision making problem that is encountered in: Low volume–high variety manufacturing systems Job-shop scheduling is dedicated tolow volume repetitiveproducts manufacturing Job-Shop is a good strategy for make-to-order not for unique and temporaryengineer-to-order products.
  • 18. Scheduling and Controls in Job-Shop Manufacturing There are thousands of algorithms based on mathematical methods to resolve the job-shop scheduling problems. The “Goal” or TOC by Eliyahu Goldratt gave a common-sense methodology for the job-shop problem. CPM is not the best methodology for job-shop scheduling
  • 19. Project Manufacturing Image provided courtesy of The Babcock & Wilcox Company
  • 20. Project Manufacturing Image provided courtesy of The Babcock & Wilcox Company
  • 22. Project Manufacturing:Definition Project manufacturing is dedicated to producing or assembling one unit of each unique product. Although it is a manufacturing environment, it follows the project definition of being temporary and unique.
  • 23. Project Manufacturing:Definition It is the process of manufacturing a temporary and unique product that has a very high number of non-standard components. It is the process of manufacturing an engineer-to-order product.
  • 24. Project vs. Repetitive Manufacturing
  • 25. Project vs. Repetitive Manufacturing
  • 26. Presentation Overview This presentation is focused on the scheduling and controls of project manufacturing using critical path method (CPM). Project manufacturing plant Benefits Project manufacturing scheduling Automating the schedule Automating schedule updates Utilizing enterprise scheduling system to manage resources Implementation results
  • 27. Project Manufacturing Plant Image provided courtesy of The Babcock & Wilcox Company
  • 28. Project Manufacturing Plant There is no production line There is no job-shop Image provided courtesy of The Babcock & Wilcox Company
  • 29. Management in Project Manufacturing Plant The majority of project manufacturing shops in the US use manufacturing management based on job-shop. They utilize machine loading, master scheduling, process improvements, and quality assurance exactly like mass production plants.
  • 30. CPM in Project Manufacturing Objectives of this study or the benefits of using CPM in scheduling project manufacturing: Providing a project-based methodology to a project-based process. Integrating the fabrication phase of the project with the rest of the project schedule. Will come back to these later.
  • 31. Methodology Concept Given a sheet and a bar of wood, you need to produce the shown chair. It has 6 parts; A,B,C,D,E&F as shown.
  • 33. Methodology Concept After having all parts, we need to: Insert two D into E, -> T, glue(5) & sand(6) Insert T into B, -> S, glue & sand Insert two C into S -> R, glue & sand Insert two F into A -> Q, glue, screw(7), and sand Insert Q into R -> W (the chair), glue, screw, sand, and paint(9).
  • 34. Network Diagram for Chair Project
  • 35. Schedule for the Chair Project Once the project network is created, each of the 30 activities can be assigned: Duration … to calculate start and finish Labor hours … with skill set determines labor requirements Machine hours … with work-center type specifies machine reqrt. Raw materials … raw material needed Finished material … determines the progres of each activity
  • 36. Custom Chair Manufacturing Plant Assume the plant does not produce two similar chairs. Each chair will have a resource loaded schedule. Each chair schedule can be combined with chair design, engineering and procurement schedules. Combining all chair schedules in an enterprise system will allow the production manager to plan for resource requirements. The schedule can be updated based on the consumed duration and the quantity of finished goods.
  • 37. Automating Schedule Creation The first manual implementation was on products that had about 1000 part numbers. This generated more than 5000 activities. Production planners complained about having to create schedules for new products while updating the schedules of active products (projects).
  • 38. Automating Schedule Creation Any plant that deals with these large projects always has: An ERP system An engineering bill-of-material system (BOM) A part routing system A manufacturing execution system Usually the last three systems dump the information into the first system. The idea of automating the creation of the project/product schedule depends on the last three systems.
  • 39. Part Routing System For each part, the routing sheet describes: How it is manufactured (the operations) Needed materials Needed labor skill and time for each operation Needed work-center type and time for each operation
  • 40. Part Routing System Example The part is a bent tube
  • 41. Part Routing Can Generate Local Schedules A resource loaded schedule for each part number is generated. The relationships between different local schedules are missing. The BOM provides those relationships.
  • 42. Custom Chair Bill of Material (BOM)
  • 43. BOM Creates Activity Relationships T cannot start unless 2 Ds and 1 E are finished. S cannot start unless 1 B and 1 T are finished. R cannot start unless 1 S and 2 Cs are finished. Q cannot start unless 2 Fs and 1 A are finished. W cannot start unless 1 R and 1 Q are finished. These relationships are enough to build a complete manufacturing project schedule.
  • 44. The Automation of Schedule Generation If: Product routing BOM Are available in any electronic format, then the full resource loaded schedule can easily be generated automatically.
  • 45. Manufacturing Execution Systems (MES) They are information systems used to manage and manipulate data in factory floors. Different technologies are used to distribute schedule information and to collect actual production information from plant floor. Barcode, Magnetic Cards, Smart Card, RF are examples.
  • 46. Automating Schedule Updates MES provide real time information for each activity: Start Finish Labor hours charged Machine hours charged Number of units finished Dumping this information into the schedule, we get an updated schedule that reflects the exact status of the project.
  • 48. Project Schedule Integration It gives the project manager better control over the fabrication phase of the project. Any changes in engineering dates will be dynamically conveyed to the manufacturing schedule. If the project uses CPM and the fabrication uses job-shop, then there will be a disconnection in project controls.
  • 49. Resource Management The manufacturing plant will have multiple concurrent projects. Concurrent projects share the same resources Constrained resource allocation to multiple projects is the hardest mathematical problem in project management.
  • 50. Enterprise Project Controls Systems Enterprise project controls systems combine the requirements on each single resource from all active projects. Few resources are over allocated and few are under allocated. If we leave the resource leveling to be automated based on a heuristic or mathematical method, it will be a mess.
  • 52. Resolving Resource Conflicts The plant might have 500 resources. If we try to schedule projects and pay attention to these resources, the number of production planners needed will be prohibitive. If we insert hard activity relationships to represent these resources, then all resources will be under-allocated.
  • 53. Resolving Resource Conflicts: From Practice We used this system in a plant for three months trying to resolve conflicts of all resources. The implementation team was working with the production planners. We found that we only have 3 resources that are always over-allocated (bottlenecks). We manually scheduled all active projects around these three resources. No conflicts arise from other resources.
  • 55. Conclusions:Goals Achieved With a simple system, we achieved the implementation of our two goals: Project schedule integration specially for EPC projects Planning and controls of production within a project manufacturing plant.
  • 56. Conclusions:Benefits to the Plant Plant customers (project owners) like this system because it keeps them informed on the status of their project. Engineering departments become informed about the effects of their schedule on manufacturing schedule. Changes are handled in the plant easier than handling them using a job-shop strategy
  • 57. Conclusions:Success Story My first implementation was at a plant that used to update the schedule monthly. After implementation, I asked them to update it weekly and they agreed without any resistance because the automation of schedule creation saved them a lot of time. After a few months they came back to me and requested to update the schedule daily. That proves the applicability of the system in planning and controls in project manufacturing plants.
  • 58. The Presentation is not available on the Conference DVD.If you like a copy send me an email I will send you a link to it.Mohamed.el-mehalawi@fgould.comor pick my card up
  • 59. Thank You For Attending!