International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1335
Evaluating Cost-Effective Railway Level Crossing Protection Systems
Ms. Madhura J. Joshi1, Prof. D. B. Desai2
1PG Student, Department of Civil Engineering, Dr. J. J. Magdum College of Engineering, Jaysingpur, Maharashtra,
India
2Assistant Prof., Department of Civil Engineering, Dr. J. J. Magdum College of Engineering, Jaysingpur,
Maharashtra, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Improving safety at railway level crossings (RLX) is costly and funds are always limited, it is important to search for
cost-effective alternative solutions. There are low-cost innovative RLX-protection systemsavailableworldwide withopportunities
for application in Australia, subject to their effectivenessandappropriateness. Todate, thereisnosystematicapproachavailable in
Australia to evaluating those systems. This paper sets out a methodology to identify and evaluate suitabletechnologies inrelation
to their adoption and adaptation to conditions.
1. INTRODUCTION
Railway safety is a crucial aspect of rail operation the world over. Malfunctions resulting in accidentsusuallygetwidemedia
coverage even when the railway is not at fault and give to rail transport, among theuninformedpublic,anundeservedimageof
inefficiency often fuelling calls for immediate reforms. Rail/road intersections are very unique, special, potentiallydangerous
and yet unavoidable in the world. Here two different entities with entirely different responsibilities, domains, performances
come together and converge for a single cause of providing a facility to the roaduser.Duringthenormal operationalso,thereis
every possibility of accidents occurring even with very little negligence in procedure and the result is of very high risk. The
potential for accidents is made higher as the railways control onlyhalftheproblem.Theotherhalf,meanwhile,cannotreallybe
said to be controlled by one entity, as even though traffic rules and road design standards supposedly exist, the movements of
road users are not organized and monitored by one specific entity as rigidly as rail movements.A very high number of these
collisions are caused by the negligence, incompetence or incapacity of road vehicle drivers, who by and large operate their
vehicles in environments in which safety consciousness is practically non-existent.
Since it is the railway, which must bear the responsibility for ensuring that road users protect it from the transgressions
(despite the fact that in many countries the law gives it priority of passage over road users), it is the railway which also has to
shoulder most of the financial burden of providing this protection.
Similarly, it is the railway, which has most of the responsibility for educating road users on the safe use of its cost effective
system for railway level crossing protection appears that in many regions, railways are ill-equipped to be in a position to
monitor level crossing safety effectively and to take both correctiveandpro-activemeasurestoimprovethesafetyoftheirlevel
crossing installations. Railway is an eco-friendly and popular mode of transport in major cities of the world. Train accidents
occur normally due to safety violations resulting from human errors or limitations and equipment failures loosing precious
lives. The Ministry of Railways (Railway Board), Govt. of India has referred many collisions in the past fewyearsandtherefore
need for research is very important in this field.
2. LITERATURE REVIEW
2.1 A.J. Powderham and G. J. Tamaro [1995],
Settlements occurring during the first phase of tunnelling for the extension oftheDocklandsLightRailwayinLondoncaused
concern for damage to the Mansion House during subsequent phases of the work. The building is a landmark structureand no
further damage could be accepted. Tunnellingwashalted until a satisfactoryprotectionprogramwasinplace.Variousmeansof
protecting the structure were investigated, ranging from full structural underpinning toa least-risk methodologybasedonthe
observational method. This paper describes the background to the development and implementation of the observational
method to successfully protect the building and complete construction. This requiredappropriatecontingencymeasurestobe
identified and planned. Of the contingencies involving preventive or strengthening works, a system of structural ties through
the building was selected as most appropriate, least risky, and most economical. Trigger levels for building response were
established. Extensive instrumentation was installed and the building was fully monitored during the subsequent phases of
tunneling.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1336
2.2 Yeboah Gyasi-Agyei [2004],
An advanced technology cost-effective drip irrigation system design and setup on environmentally sensitive elevatedsteep
slopes ~batters! Of a coal train derailment site in Central Queensland, Australia, are presented. The final profile of the coal
burial site consists of six batters and associated berms with a drop in elevation of about 35 m. A small dam constructed
downstream of the confluence of the two main drainage channels at the site supplied water for irrigation of the batters to aid
the establishment of grass to control erosion. Waterwasperiodicallypumpedfromthe small damtothreestoragetanksusinga
petrol (gas) pump. Three solar pumps drew water from the storage tanks and dam to irrigate the top four batters. Contactors,
pressure switches and irrigation control valves in turn shared a singlesolarpowersourcebetweenthesolarpumps.Level balls
(floating switches) placed in the storage tanks cut the solar power supply to the pumps when the storage tanks were nearly
empty. On the whole, the irrigation system worked very well and excellent grass cover wasestablished within12 weeks.Given
the environmental risks associated with the on-site burying of coal and the estimated cost of about AU $11.73/m2 (every 10
years) in maintenance if the railway batters are not treated, the estimated total cost of AU$4.61/m2of batterarea treated with
irrigation, including AU$3.08/m2 in irrigation cost, is justified.
2.3 Alfred E. Fazio [2004],
Light rail transit (LRT) offers the widest range of opportunities to the design community in applications engineering. There
are certainly more varied possibilities in the design and configuration of LRT than in that of rail rapid transitorcommuter rail.
Consequently, it is particularly important to understand the relationship between applications design and railwayoperations
when deploying light rail. The development of a new rail system should begin with a clearly stated operational requirements
document and then evolve to a comprehensive, systems-level design. This evolution must be supported by an active systems
integration process. Examples of this approach are taken from the deployment of the Hudson-Bergen Light Rail, a high-
performance light rail transit system located in northern New Jersey that is currently in deployment through a design, build,
operate, and maintain contract.
3. LEVEL CROSSING SAFETY IN INDIA
The Indian Railway network with a route length of 62,495 km has a total of 40,445level crossings,oranaverageofone every
1.5 kilometre. Of this total, 16,132 crossings are some form of barrier protection facing road users, 20,528 are open crossings
with fixed road warning signs, 948 are road crossings adjacent to canals without barrier protection, and with the warning of
road warning signs, and 2,837.
In 1997/98, level crossing accidents constituted 65 out of 420 the accidents (or 15 percent) of all types intheindian railway
network. However, in the same year, level crossing accidents accounted for 42 percent (134 individuals)ofall fatalitiesand 18
percent (179 persons) accidents on the network. In one year surveyed, 80 percent of all level crossing accidents occurred
crossings which were unmanned Indian Railways has recently crossing to the effect that the decision has taken Number of
unmanned gates with a high level of usage by road and / or rail and not to Unmanned operation.
4. LEVEL CROSSING SAFETY INITIATIVES
a) Manning Of Unprotected Level Crossings
The current five-year plan (covering the period 1999/2000 to 2003/2004) provides for the progressive conversion of
unmanned &unprotected crossings to manned &protected status. Depending upon the assignedcategoryofeachcrossing,this
will involve installation of warning signs or lights and boom barriers of various types as well as construction of a crossing
attendant's workstation at prioritized locations.
b) Other Level Crossing Upgrading Measures
In addition to conversion of unprotected level crossings to manned status, the Indian Railways has a plan to grade separate
or to relay interlock some of the more densely trafficked crossings on its network.
c) Road User Education
The Indian Railways has only a very small budget for road user education but does make use of the mass media (mainly
television and newspapers) to promote public awareness of the need for caution when using level crossings. One effective
means of disseminating this message is the use of notice boards in punjayat (or local village) offices to display safety posters.
Since residents of rural areas tend to regularly visit their punjayat offices, this initiative has the potential to reach a wide
section of the community. One such poster used to promote caution by the publicwhenusinglevel crossingisshown hereafter.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1337
d) Level Crossing Safety Impediments
Apart from a lack of adequate capital funds to upgrade level crossings, the main factors considered to be working againstan
improvement in level crossing safety in India are:
 The lack of priority
 The lack of funding priority
 Increasing disposable incomes and motorization
 The predominance of Absolute Block and Tablet systems of safe working
5. ADVANCED SYSTEMS FOR LEVEL CROSSING PROTECTION
Systems likely to be available in future for the protection of level crossings are of types:
5.1 Advanced Radio-Based Train Control System – General Features
The American and Canadian Railway Associations began to study Advanced Train Control Systems (ATCS) in 1984. The
systems then investigated involved the use of radio, satelliteandradarcommunications.Followingthelengthyappraisal ofthis
technology, it will at last enter operational service with San Francisco's Bay Area Rapid Transit System (BART) in 2001.
Application of ATCS will allow elimination of track circuitsandsignalsandinfuturewill facilitatehighdensityandunmanned
train operations.
5.2 ATCS - Level Crossing Safety Features
Existing level crossing systems represent a weak point of safety management and control on railways. Adequate warning
time is needed for safe level crossing operation. Existing systems having electronic train detectors work on the basis of short
track circuits installed in the track approaches on either side of level crossings.Thesesystemscontrol the beginning andend of
the warning indication. The disadvantage ofthissystemisthatthewarninginterval becomesdisproportionatelylongwithslow
trains, because maximum train speeds normallydeterminetheinterval betweenthebeginningand endpointsoftrack circuited
sections, and thus a train operating at slow speed will take significantly longer to pass between these two points.
5.3 ATCS – Financial Benefits
The functions of CTC and ATC are added easily to the system for a relatively low additional cost. Indeed, the addition of CTC
or ATC is estimated to comprise less than 50 per cent of the total system installation cost.
An automatic level crossing warning/protection system based on conventional track circuiting is estimated to cost US$
45,000 per level crossing in Japan. By contrast, the cost of a BART-style ATCS 23 is estimated to costonlyaboutUS$22,000per
level crossing.
5.4 GPS-based Advanced Train Control System
Global Positioning Satellite (GPS) communications systems arenowincommonuseforsea,airandlandtransportnavigation
applications. GPS uses communications links with number of satellites to establish the navigation coordinates of aircraft or
surface transport receivers. GPS systems are on the whole very inexpensive – a receiver for anautomobile nowcostingaslittle
as US$ 500
6. ALTERNATIVES SYSTEM
O’’ Conner System - This system uses solar powered microwave radar sensors to detect the location,speedanddirectionof
approaching trains up to 3 km away and activate the warning device when the train is 25 seconds away. A solar-powered LED
“X” sign would be located near the crossing and interfaced to the level crossing protection system.
Solar Powered Railway Level Crossing Radio Warning System (SOLAGARDTM) - This system allows both audio and
visual warning at a crossing. An electro-magnetic track device detects an approaching train (2-5 kms from the crossing) and
actuates a solar powered VHF transmitter located about 3-4 kms from the level crossing. Through VHF Radio Communication
Link, the transmitter sends a coded radio signal towards the level crossing.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1338
Low-Cost Highway-Rail Intersection Active Warning System (HRI System) - This system providesactiveadvancedwarning
in addition to traditional flashers at the crossings. A typical crossingincludesfoursub-systems,oneon eachcross-buck (Master
and Slave) and one on each advance warning sign.
EV-Alert - In Australia, an example of a system used by the sugarindustryatRLXinQueenslandiscalledtheEV-Alert.Aradio
transmitting device is fitted to all locomotives, and constantly sends out a coded signal.
Minnesota In-Vehicle Warning - In this Minnesota project, the system used wireless vehicle and roadside communication
antennas that could be built into the familiar cross buck, “RXR” sign andfrontvehiclelicenseplate.Thetracksideunitpickedup
a signal from the railroad’s train detection electronics and transmitted that signal to antenna-signs.
7. RESULT AND DISCUSSION
a) Percentage of Accident
Level crossing accidents include a small but growing proportion of all railway accidents in India In the last year for which
data were available (1990-2016) the total number of railway accidents in India and the number of recorded accidents at level
crossings are given in table. The trends in level crossings as a proportion of all railway accidents are shown in Table 1.
Level crossing accidents include a small but growing proportion of all railway accidents in India In the last year for which
data were available (1990-2016) the total number of railway accidents in India and the number of recorded accidents at level
crossings are given in table. The trend in level crossings as a proportion of all railway accidents is shown in Table 1.
Table - 1: Significance Of and Trend In Level Crossing Accidents in India
Year Total railway accidents (No) Accidents at level crossing (No) Level crossing accident %
1990 532 36 6.77
1991 530 47 8.87
1992 524 51 9.73
1993 520 66 12.69
1994 501 73 14.57
1995 398 68 17.09
1996 381 65 17.06
1997 396 66 16.67
1998 397 67 16.88
1999 463 93 20.09
2000 473 84 17.76
2001 415 88 21.2
2002 351 96 27.35
2003 325 95 29.23
2004 234 70 29.91
2005 234 75 32.05
2006 195 79 40.51
Year Total railway accidents (No) Accidents at level crossing (No) Level crossing accident %
2007 194 77 39.69
2008 177 69 38.98
2009 165 70 42.42
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1339
2010 141 53 37.59
2011 131 61 46.56
2012 121 58 47.93
2013 117 59 50.43
2014 135 56 41.48
2015 107 35 32.71
2016 90 16 17.78
Chart - 1: Level Crossing Accidents in India, By Type of Crossing
Nearly two-thirds of the total number of crossingsunmanned level crossingsandthisproportionhas beenincreasedoverthe
past decade as is shown in chart 1. Total no of accident are more 1990 & its decreases in early years but, in level crossing
accident continuously increases up to 2016 as per the figure.
b) Percentage of fatalities
In 2000-2001, fatalities in level crossing accidents, all fatalities in railway accidents in India, as shown in Table 2. Although
the share of level crossings deaths in all railway facilities declined significantly in the following year (2013-014), over the
decade it has shown a rising trend which is Explained in part by increasing train speeds and in part byincreasingmotorization
of rural communities.
Table - 2: Significance Of and Trend in Level Crossing Injuries in India
Year
Number of Passengers
Total Casualties per million passengers carried
Killed Injured
2000-01 55 286 0.01
2001-02 144 595 0.02
2002-03 157 658 0.03
2003-04 135 302 0.03
2004-05 50 191 0.04
2005-06 315 627 0.165
2006-07 208 402 0.098
2007-08 191 412 0.092
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1340
2008-09 209 444 0.094
2009-10 238 397 0.088
2010-11 235 358 0.078
2011-12 100 586 0.083
2012-13 60 270 0.039
2013-14 42 94 0.02
2014-15 118 340 0.05
2015-16 40 126 0.02
2017-18 156 289 0
Chart - 2: Significance Of and Trend In Level Crossing Injuries in India
Figure shows the significance & trend in crossing injuries in India, in which total no of killed and injured passengerperyear.
The highest injured in 2002-03 & lowest in 2013-14.Killed passenger are heights in 2005-06 & its decreases now a day.
c) Hazard Index of Crossings
Table shows the Hazard index of crossing year wise 2002 to 2013 ,in which hazard index of crossing calculated by
multiplying Average annual daily traffic, Average annual daily train traffic & Pf factor. The highest hazard index at 2013 is
1244346 & lowest hazard index at 2002 is 706550.
Table - 3: Hazard index of crossing
Sr.No Item Annual traffic
Annual train
traffic
Average annual
daily traffic
Average
annual daily
train traffic
Tf
Hazard index
of crossing
1 2002 4970803 63122 13618.6 172.937 0.3 706550
2 2003 5112361 63221 14006.5 173.208 0.3 727811
3 2004 5377937 63465 14734.1 173.877 0.3 768574
4 2005 5724516 63332 15683.6 173.512 0.3 816390
5 2006 6218881 63327 17038 173.499 0.3 886822
6 2007 6524377 63273 17875 173.351 0.3 929593
7 2008 6920369 64015 18959.9 175.384 0.3 997577
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1341
8 2009 7245805 63974 19851.5 175.271 0.3 1043820
9 2010 7651090 64460 20961.9 176.603 0.3 1110578
10 2011 8224384 64600 22532.6 176.986 0.3 1196386
11 2012 8420659 65436 23070.3 179.277 0.3 1240790
12 2013 8397057 65808 23005.6 180.296 0.3 1244346
Chart - 3: Index Of Crossing
Figure shows the Hazard index of crossing, in which per year hazard crossing is given, the highest hazard index at 2013 is
1244346 & lowest hazard index at 2002 is 706550.
8. CONCLUSIONS
Safety is accorded the highest priority by Indian Railways and all possible steps are undertaken on a continual basis including
up gradation of technology to prevent accidents and to enhance safety.
 Level crossing accident in India in recent year is more percentage as compared to past record, so advance protection
system to be used for safety.
 Level crossing injuries in India the rate of crossing injuries are less now a day
 Hazard index of crossing are continuously increase per year therefore more safety required for it.
 Expected no of accident or no of crashes increasing rate per year more so present&advanceprotectionsystemuse for
decreeing the rate of accident.
 Initial crash prediction is increases high in last few years.
 Alternative system, the Enhanced safety gives moresafety thereforRLXprotectionsystemsareusedinIndianrailway.
REFERENCES
[1] Alfred E. Fazio, “Relationship between Light Rail Systems Design and System Operations”, J. Transp. Eng., Vol.130, Pp
No.365-377, (2004).
[2] Attila Borsos, Miklos Gabor % C saba Koren, “Safety Ranking Of Railway Crossings In Hungary”, Transportation Research
Procedia, Vol.14, Pp No.2111 – 2120, ( 2016 )
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1342
[3] Boban Djordjevi, Evelin Krmac & Tomislav Josip Mlinari, “Non-radial DEAmodel:Anewapproachtoevaluationofsafetyat
railway level crossings”, Safety Science, Vol. 103, Pp No.234–246, (2017).
[4] Chen-Yu Chang and Hui-Yu Chou, “Transaction-Cost Approach to the Comparative Analysis of User-Pay and Government-
Pay Public-Private Partnership Systems”, J. Constr. Eng. Manage, (2014).
[5] Goran Cirovic & Dragan Pamucar, “Decision Support Model For Prioritizing Railway Level Crossings For Safety
Improvements: Application Of The Adaptive Neuro-FuzzySystem”,ExpertSystemswithApplications,Vol.40,PpNo.2208–
2223, (2013).
[6] Grégoire S. Larue, Andry Rakotonirainy, et. al., “Assessing Driver Acceptance of Intelligent Transport Systems in the
Context of Railway Level Crossing”, Transportation Research, Vol.30, Pp No.1–13, (2015).
[7] Han Zhang, Gregory A. Keoleian and Michael D. Lepech, “Network-Level Pavement Asset Management System Integrated
with Life-Cycle Analysis and Life-Cycle Optimization”, J. Infrastruct. Syst., Vol.19, Pp No.99-107, (2013).
[8] Hua Jiang and Mi G. Chorzepa, “Case Study: Evaluation of a Floating Steel Fender System for Bridge Pier Protectionagainst
Vessel Collision”, J. Bridge Eng, (2016).
[9] J. Powderham and G. J. Tamaro, “Mansion House London:Risk AssessmentandProtection”, J.Constr.Eng.Manage., Vol.121,
Pp No.266-272, (1995).
[10] Jinyun Zhao, Bo Wang, et.al, “Analysis of some problems in design of Corrosion Protection for Long-distance Pipeline”,
ICPTT, (2013).
[11] Luis Filipe Caetano and Paulo Fonseca Teixeira, “Strategic Model to Optimize Railway-Track Renewal Operations at a
Network Level”, J. Infrastruct. Syst. (2016).
[12] Victoria Gitelman, A. Shalom Hakkert, et.al., “ScreeningTools forConsideringGradeSeparationatRail-HighwayCrossings”,
J. Transp. Eng., Vol.132, Pp No. 52-59, (2006).
[13] Yeboah Gyasi-Agyei, “Cost-Effective Temporary Micro Irrigation System for Grass Establishment on Environmentally
Sensitive Steep Slopes”, J. Irrig. Drain Eng., Vol.130, Pp No.218-226, (2004).

Weitere ähnliche Inhalte

Was ist angesagt?

Beyond Buses - Creating a better Public Transport System through Marketing, C...
Beyond Buses - Creating a better Public Transport System through Marketing, C...Beyond Buses - Creating a better Public Transport System through Marketing, C...
Beyond Buses - Creating a better Public Transport System through Marketing, C...WRI Ross Center for Sustainable Cities
 
Tram seminar ppt
Tram seminar pptTram seminar ppt
Tram seminar pptashik ks
 
A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...
A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...
A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...IJAEMSJORNAL
 
Intelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsIntelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsCognizant
 
SMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and ManagementSMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and ManagementSMART Infrastructure Facility
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)Sourabh Jain
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement ICLEI
 
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraPlanning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraWRI Ross Center for Sustainable Cities
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaeSAT Publishing House
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennaiedsley
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Gargee Ghosh
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Roundabouts on the road to sustainability
Roundabouts on the road to sustainabilityRoundabouts on the road to sustainability
Roundabouts on the road to sustainabilityJill Berberich
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250Shadina Shah
 
A survey on mobility models for vehicular ad hoc networks
A survey on mobility models for vehicular ad hoc networksA survey on mobility models for vehicular ad hoc networks
A survey on mobility models for vehicular ad hoc networkseSAT Publishing House
 

Was ist angesagt? (20)

Beyond Buses - Creating a better Public Transport System through Marketing, C...
Beyond Buses - Creating a better Public Transport System through Marketing, C...Beyond Buses - Creating a better Public Transport System through Marketing, C...
Beyond Buses - Creating a better Public Transport System through Marketing, C...
 
Dubai metro
Dubai metroDubai metro
Dubai metro
 
Tram seminar ppt
Tram seminar pptTram seminar ppt
Tram seminar ppt
 
Presentation on Raed Network
Presentation on Raed NetworkPresentation on Raed Network
Presentation on Raed Network
 
A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...
A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...
A Review of PMS systems and How Can be Implemented in Al-Qassim Municipality ...
 
Intelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsIntelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail Systems
 
SMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and ManagementSMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and Management
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement
 
Road network
Road networkRoad network
Road network
 
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador HerreraPlanning and Design of Feeder Services and Short Routes - Salvador Herrera
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
 
Simulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested areaSimulation of pedestrian at intersection in urban congested area
Simulation of pedestrian at intersection in urban congested area
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Roundabouts on the road to sustainability
Roundabouts on the road to sustainabilityRoundabouts on the road to sustainability
Roundabouts on the road to sustainability
 
MRT REPORT TPT 250
MRT REPORT TPT 250MRT REPORT TPT 250
MRT REPORT TPT 250
 
A survey on mobility models for vehicular ad hoc networks
A survey on mobility models for vehicular ad hoc networksA survey on mobility models for vehicular ad hoc networks
A survey on mobility models for vehicular ad hoc networks
 
Bill Chen
Bill ChenBill Chen
Bill Chen
 

Ähnlich wie IRJET- Evaluating Cost-Effective Railway Level Crossing Protection Systems

Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin systemASWATHY VG
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityIRJET Journal
 
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...IRJET Journal
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...IRJET Journal
 
CL436 Transport Planning Final Submission
CL436 Transport Planning Final SubmissionCL436 Transport Planning Final Submission
CL436 Transport Planning Final SubmissionGordon Best
 
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLESPROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLESijiert bestjournal
 
IRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for RoadsIRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for RoadsIRJET Journal
 
Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection Carl Jackson
 
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic HybridIntelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic HybridTELKOMNIKA JOURNAL
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET Journal
 
Automatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection SchemeAutomatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection SchemeIJERA Editor
 
Analyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyAnalyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyIRJET Journal
 
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
Ieeepro techno solutions   2013 ieee embedded project - emergency management ...Ieeepro techno solutions   2013 ieee embedded project - emergency management ...
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...srinivasanece7
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET Journal
 
When to-use-a-water-filled-barrier
When to-use-a-water-filled-barrierWhen to-use-a-water-filled-barrier
When to-use-a-water-filled-barrierTrafficSafetyStore
 
Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)eSAT Journals
 
Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)eSAT Publishing House
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
A Broadcasting Scheme for Message Dissemination in VANET
A Broadcasting Scheme for Message Dissemination in VANETA Broadcasting Scheme for Message Dissemination in VANET
A Broadcasting Scheme for Message Dissemination in VANETIJERA Editor
 

Ähnlich wie IRJET- Evaluating Cost-Effective Railway Level Crossing Protection Systems (20)

Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
 
CL436 Transport Planning Final Submission
CL436 Transport Planning Final SubmissionCL436 Transport Planning Final Submission
CL436 Transport Planning Final Submission
 
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLESPROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
PROGRESSIVE TRENDS IN ROAD SAFETY OF CARGO VEHICLES
 
Kf3418331844
Kf3418331844Kf3418331844
Kf3418331844
 
IRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for RoadsIRJET- A Study on Life Cycle Cost Analysis for Roads
IRJET- A Study on Life Cycle Cost Analysis for Roads
 
Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection Edge computing for CAVs and VRU protection
Edge computing for CAVs and VRU protection
 
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic HybridIntelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
Intelligent Bridge Seismic Monitoring System Based on Neuro Genetic Hybrid
 
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...IRJET-  	  Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
IRJET- Detailed Survey & Analysis of a Traffic System on Mid Block Sectio...
 
Automatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection SchemeAutomatic Broken Rail Crack Detection Scheme
Automatic Broken Rail Crack Detection Scheme
 
Analyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyAnalyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case study
 
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
Ieeepro techno solutions   2013 ieee embedded project - emergency management ...Ieeepro techno solutions   2013 ieee embedded project - emergency management ...
Ieeepro techno solutions 2013 ieee embedded project - emergency management ...
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
 
When to-use-a-water-filled-barrier
When to-use-a-water-filled-barrierWhen to-use-a-water-filled-barrier
When to-use-a-water-filled-barrier
 
Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)
 
Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)Portable wireless traffic light system (pwtls)
Portable wireless traffic light system (pwtls)
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
A Broadcasting Scheme for Message Dissemination in VANET
A Broadcasting Scheme for Message Dissemination in VANETA Broadcasting Scheme for Message Dissemination in VANET
A Broadcasting Scheme for Message Dissemination in VANET
 

Mehr von IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Mehr von IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Kürzlich hochgeladen

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Kürzlich hochgeladen (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

IRJET- Evaluating Cost-Effective Railway Level Crossing Protection Systems

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1335 Evaluating Cost-Effective Railway Level Crossing Protection Systems Ms. Madhura J. Joshi1, Prof. D. B. Desai2 1PG Student, Department of Civil Engineering, Dr. J. J. Magdum College of Engineering, Jaysingpur, Maharashtra, India 2Assistant Prof., Department of Civil Engineering, Dr. J. J. Magdum College of Engineering, Jaysingpur, Maharashtra, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Improving safety at railway level crossings (RLX) is costly and funds are always limited, it is important to search for cost-effective alternative solutions. There are low-cost innovative RLX-protection systemsavailableworldwide withopportunities for application in Australia, subject to their effectivenessandappropriateness. Todate, thereisnosystematicapproachavailable in Australia to evaluating those systems. This paper sets out a methodology to identify and evaluate suitabletechnologies inrelation to their adoption and adaptation to conditions. 1. INTRODUCTION Railway safety is a crucial aspect of rail operation the world over. Malfunctions resulting in accidentsusuallygetwidemedia coverage even when the railway is not at fault and give to rail transport, among theuninformedpublic,anundeservedimageof inefficiency often fuelling calls for immediate reforms. Rail/road intersections are very unique, special, potentiallydangerous and yet unavoidable in the world. Here two different entities with entirely different responsibilities, domains, performances come together and converge for a single cause of providing a facility to the roaduser.Duringthenormal operationalso,thereis every possibility of accidents occurring even with very little negligence in procedure and the result is of very high risk. The potential for accidents is made higher as the railways control onlyhalftheproblem.Theotherhalf,meanwhile,cannotreallybe said to be controlled by one entity, as even though traffic rules and road design standards supposedly exist, the movements of road users are not organized and monitored by one specific entity as rigidly as rail movements.A very high number of these collisions are caused by the negligence, incompetence or incapacity of road vehicle drivers, who by and large operate their vehicles in environments in which safety consciousness is practically non-existent. Since it is the railway, which must bear the responsibility for ensuring that road users protect it from the transgressions (despite the fact that in many countries the law gives it priority of passage over road users), it is the railway which also has to shoulder most of the financial burden of providing this protection. Similarly, it is the railway, which has most of the responsibility for educating road users on the safe use of its cost effective system for railway level crossing protection appears that in many regions, railways are ill-equipped to be in a position to monitor level crossing safety effectively and to take both correctiveandpro-activemeasurestoimprovethesafetyoftheirlevel crossing installations. Railway is an eco-friendly and popular mode of transport in major cities of the world. Train accidents occur normally due to safety violations resulting from human errors or limitations and equipment failures loosing precious lives. The Ministry of Railways (Railway Board), Govt. of India has referred many collisions in the past fewyearsandtherefore need for research is very important in this field. 2. LITERATURE REVIEW 2.1 A.J. Powderham and G. J. Tamaro [1995], Settlements occurring during the first phase of tunnelling for the extension oftheDocklandsLightRailwayinLondoncaused concern for damage to the Mansion House during subsequent phases of the work. The building is a landmark structureand no further damage could be accepted. Tunnellingwashalted until a satisfactoryprotectionprogramwasinplace.Variousmeansof protecting the structure were investigated, ranging from full structural underpinning toa least-risk methodologybasedonthe observational method. This paper describes the background to the development and implementation of the observational method to successfully protect the building and complete construction. This requiredappropriatecontingencymeasurestobe identified and planned. Of the contingencies involving preventive or strengthening works, a system of structural ties through the building was selected as most appropriate, least risky, and most economical. Trigger levels for building response were established. Extensive instrumentation was installed and the building was fully monitored during the subsequent phases of tunneling.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1336 2.2 Yeboah Gyasi-Agyei [2004], An advanced technology cost-effective drip irrigation system design and setup on environmentally sensitive elevatedsteep slopes ~batters! Of a coal train derailment site in Central Queensland, Australia, are presented. The final profile of the coal burial site consists of six batters and associated berms with a drop in elevation of about 35 m. A small dam constructed downstream of the confluence of the two main drainage channels at the site supplied water for irrigation of the batters to aid the establishment of grass to control erosion. Waterwasperiodicallypumpedfromthe small damtothreestoragetanksusinga petrol (gas) pump. Three solar pumps drew water from the storage tanks and dam to irrigate the top four batters. Contactors, pressure switches and irrigation control valves in turn shared a singlesolarpowersourcebetweenthesolarpumps.Level balls (floating switches) placed in the storage tanks cut the solar power supply to the pumps when the storage tanks were nearly empty. On the whole, the irrigation system worked very well and excellent grass cover wasestablished within12 weeks.Given the environmental risks associated with the on-site burying of coal and the estimated cost of about AU $11.73/m2 (every 10 years) in maintenance if the railway batters are not treated, the estimated total cost of AU$4.61/m2of batterarea treated with irrigation, including AU$3.08/m2 in irrigation cost, is justified. 2.3 Alfred E. Fazio [2004], Light rail transit (LRT) offers the widest range of opportunities to the design community in applications engineering. There are certainly more varied possibilities in the design and configuration of LRT than in that of rail rapid transitorcommuter rail. Consequently, it is particularly important to understand the relationship between applications design and railwayoperations when deploying light rail. The development of a new rail system should begin with a clearly stated operational requirements document and then evolve to a comprehensive, systems-level design. This evolution must be supported by an active systems integration process. Examples of this approach are taken from the deployment of the Hudson-Bergen Light Rail, a high- performance light rail transit system located in northern New Jersey that is currently in deployment through a design, build, operate, and maintain contract. 3. LEVEL CROSSING SAFETY IN INDIA The Indian Railway network with a route length of 62,495 km has a total of 40,445level crossings,oranaverageofone every 1.5 kilometre. Of this total, 16,132 crossings are some form of barrier protection facing road users, 20,528 are open crossings with fixed road warning signs, 948 are road crossings adjacent to canals without barrier protection, and with the warning of road warning signs, and 2,837. In 1997/98, level crossing accidents constituted 65 out of 420 the accidents (or 15 percent) of all types intheindian railway network. However, in the same year, level crossing accidents accounted for 42 percent (134 individuals)ofall fatalitiesand 18 percent (179 persons) accidents on the network. In one year surveyed, 80 percent of all level crossing accidents occurred crossings which were unmanned Indian Railways has recently crossing to the effect that the decision has taken Number of unmanned gates with a high level of usage by road and / or rail and not to Unmanned operation. 4. LEVEL CROSSING SAFETY INITIATIVES a) Manning Of Unprotected Level Crossings The current five-year plan (covering the period 1999/2000 to 2003/2004) provides for the progressive conversion of unmanned &unprotected crossings to manned &protected status. Depending upon the assignedcategoryofeachcrossing,this will involve installation of warning signs or lights and boom barriers of various types as well as construction of a crossing attendant's workstation at prioritized locations. b) Other Level Crossing Upgrading Measures In addition to conversion of unprotected level crossings to manned status, the Indian Railways has a plan to grade separate or to relay interlock some of the more densely trafficked crossings on its network. c) Road User Education The Indian Railways has only a very small budget for road user education but does make use of the mass media (mainly television and newspapers) to promote public awareness of the need for caution when using level crossings. One effective means of disseminating this message is the use of notice boards in punjayat (or local village) offices to display safety posters. Since residents of rural areas tend to regularly visit their punjayat offices, this initiative has the potential to reach a wide section of the community. One such poster used to promote caution by the publicwhenusinglevel crossingisshown hereafter.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1337 d) Level Crossing Safety Impediments Apart from a lack of adequate capital funds to upgrade level crossings, the main factors considered to be working againstan improvement in level crossing safety in India are:  The lack of priority  The lack of funding priority  Increasing disposable incomes and motorization  The predominance of Absolute Block and Tablet systems of safe working 5. ADVANCED SYSTEMS FOR LEVEL CROSSING PROTECTION Systems likely to be available in future for the protection of level crossings are of types: 5.1 Advanced Radio-Based Train Control System – General Features The American and Canadian Railway Associations began to study Advanced Train Control Systems (ATCS) in 1984. The systems then investigated involved the use of radio, satelliteandradarcommunications.Followingthelengthyappraisal ofthis technology, it will at last enter operational service with San Francisco's Bay Area Rapid Transit System (BART) in 2001. Application of ATCS will allow elimination of track circuitsandsignalsandinfuturewill facilitatehighdensityandunmanned train operations. 5.2 ATCS - Level Crossing Safety Features Existing level crossing systems represent a weak point of safety management and control on railways. Adequate warning time is needed for safe level crossing operation. Existing systems having electronic train detectors work on the basis of short track circuits installed in the track approaches on either side of level crossings.Thesesystemscontrol the beginning andend of the warning indication. The disadvantage ofthissystemisthatthewarninginterval becomesdisproportionatelylongwithslow trains, because maximum train speeds normallydeterminetheinterval betweenthebeginningand endpointsoftrack circuited sections, and thus a train operating at slow speed will take significantly longer to pass between these two points. 5.3 ATCS – Financial Benefits The functions of CTC and ATC are added easily to the system for a relatively low additional cost. Indeed, the addition of CTC or ATC is estimated to comprise less than 50 per cent of the total system installation cost. An automatic level crossing warning/protection system based on conventional track circuiting is estimated to cost US$ 45,000 per level crossing in Japan. By contrast, the cost of a BART-style ATCS 23 is estimated to costonlyaboutUS$22,000per level crossing. 5.4 GPS-based Advanced Train Control System Global Positioning Satellite (GPS) communications systems arenowincommonuseforsea,airandlandtransportnavigation applications. GPS uses communications links with number of satellites to establish the navigation coordinates of aircraft or surface transport receivers. GPS systems are on the whole very inexpensive – a receiver for anautomobile nowcostingaslittle as US$ 500 6. ALTERNATIVES SYSTEM O’’ Conner System - This system uses solar powered microwave radar sensors to detect the location,speedanddirectionof approaching trains up to 3 km away and activate the warning device when the train is 25 seconds away. A solar-powered LED “X” sign would be located near the crossing and interfaced to the level crossing protection system. Solar Powered Railway Level Crossing Radio Warning System (SOLAGARDTM) - This system allows both audio and visual warning at a crossing. An electro-magnetic track device detects an approaching train (2-5 kms from the crossing) and actuates a solar powered VHF transmitter located about 3-4 kms from the level crossing. Through VHF Radio Communication Link, the transmitter sends a coded radio signal towards the level crossing.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1338 Low-Cost Highway-Rail Intersection Active Warning System (HRI System) - This system providesactiveadvancedwarning in addition to traditional flashers at the crossings. A typical crossingincludesfoursub-systems,oneon eachcross-buck (Master and Slave) and one on each advance warning sign. EV-Alert - In Australia, an example of a system used by the sugarindustryatRLXinQueenslandiscalledtheEV-Alert.Aradio transmitting device is fitted to all locomotives, and constantly sends out a coded signal. Minnesota In-Vehicle Warning - In this Minnesota project, the system used wireless vehicle and roadside communication antennas that could be built into the familiar cross buck, “RXR” sign andfrontvehiclelicenseplate.Thetracksideunitpickedup a signal from the railroad’s train detection electronics and transmitted that signal to antenna-signs. 7. RESULT AND DISCUSSION a) Percentage of Accident Level crossing accidents include a small but growing proportion of all railway accidents in India In the last year for which data were available (1990-2016) the total number of railway accidents in India and the number of recorded accidents at level crossings are given in table. The trends in level crossings as a proportion of all railway accidents are shown in Table 1. Level crossing accidents include a small but growing proportion of all railway accidents in India In the last year for which data were available (1990-2016) the total number of railway accidents in India and the number of recorded accidents at level crossings are given in table. The trend in level crossings as a proportion of all railway accidents is shown in Table 1. Table - 1: Significance Of and Trend In Level Crossing Accidents in India Year Total railway accidents (No) Accidents at level crossing (No) Level crossing accident % 1990 532 36 6.77 1991 530 47 8.87 1992 524 51 9.73 1993 520 66 12.69 1994 501 73 14.57 1995 398 68 17.09 1996 381 65 17.06 1997 396 66 16.67 1998 397 67 16.88 1999 463 93 20.09 2000 473 84 17.76 2001 415 88 21.2 2002 351 96 27.35 2003 325 95 29.23 2004 234 70 29.91 2005 234 75 32.05 2006 195 79 40.51 Year Total railway accidents (No) Accidents at level crossing (No) Level crossing accident % 2007 194 77 39.69 2008 177 69 38.98 2009 165 70 42.42
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1339 2010 141 53 37.59 2011 131 61 46.56 2012 121 58 47.93 2013 117 59 50.43 2014 135 56 41.48 2015 107 35 32.71 2016 90 16 17.78 Chart - 1: Level Crossing Accidents in India, By Type of Crossing Nearly two-thirds of the total number of crossingsunmanned level crossingsandthisproportionhas beenincreasedoverthe past decade as is shown in chart 1. Total no of accident are more 1990 & its decreases in early years but, in level crossing accident continuously increases up to 2016 as per the figure. b) Percentage of fatalities In 2000-2001, fatalities in level crossing accidents, all fatalities in railway accidents in India, as shown in Table 2. Although the share of level crossings deaths in all railway facilities declined significantly in the following year (2013-014), over the decade it has shown a rising trend which is Explained in part by increasing train speeds and in part byincreasingmotorization of rural communities. Table - 2: Significance Of and Trend in Level Crossing Injuries in India Year Number of Passengers Total Casualties per million passengers carried Killed Injured 2000-01 55 286 0.01 2001-02 144 595 0.02 2002-03 157 658 0.03 2003-04 135 302 0.03 2004-05 50 191 0.04 2005-06 315 627 0.165 2006-07 208 402 0.098 2007-08 191 412 0.092
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1340 2008-09 209 444 0.094 2009-10 238 397 0.088 2010-11 235 358 0.078 2011-12 100 586 0.083 2012-13 60 270 0.039 2013-14 42 94 0.02 2014-15 118 340 0.05 2015-16 40 126 0.02 2017-18 156 289 0 Chart - 2: Significance Of and Trend In Level Crossing Injuries in India Figure shows the significance & trend in crossing injuries in India, in which total no of killed and injured passengerperyear. The highest injured in 2002-03 & lowest in 2013-14.Killed passenger are heights in 2005-06 & its decreases now a day. c) Hazard Index of Crossings Table shows the Hazard index of crossing year wise 2002 to 2013 ,in which hazard index of crossing calculated by multiplying Average annual daily traffic, Average annual daily train traffic & Pf factor. The highest hazard index at 2013 is 1244346 & lowest hazard index at 2002 is 706550. Table - 3: Hazard index of crossing Sr.No Item Annual traffic Annual train traffic Average annual daily traffic Average annual daily train traffic Tf Hazard index of crossing 1 2002 4970803 63122 13618.6 172.937 0.3 706550 2 2003 5112361 63221 14006.5 173.208 0.3 727811 3 2004 5377937 63465 14734.1 173.877 0.3 768574 4 2005 5724516 63332 15683.6 173.512 0.3 816390 5 2006 6218881 63327 17038 173.499 0.3 886822 6 2007 6524377 63273 17875 173.351 0.3 929593 7 2008 6920369 64015 18959.9 175.384 0.3 997577
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1341 8 2009 7245805 63974 19851.5 175.271 0.3 1043820 9 2010 7651090 64460 20961.9 176.603 0.3 1110578 10 2011 8224384 64600 22532.6 176.986 0.3 1196386 11 2012 8420659 65436 23070.3 179.277 0.3 1240790 12 2013 8397057 65808 23005.6 180.296 0.3 1244346 Chart - 3: Index Of Crossing Figure shows the Hazard index of crossing, in which per year hazard crossing is given, the highest hazard index at 2013 is 1244346 & lowest hazard index at 2002 is 706550. 8. CONCLUSIONS Safety is accorded the highest priority by Indian Railways and all possible steps are undertaken on a continual basis including up gradation of technology to prevent accidents and to enhance safety.  Level crossing accident in India in recent year is more percentage as compared to past record, so advance protection system to be used for safety.  Level crossing injuries in India the rate of crossing injuries are less now a day  Hazard index of crossing are continuously increase per year therefore more safety required for it.  Expected no of accident or no of crashes increasing rate per year more so present&advanceprotectionsystemuse for decreeing the rate of accident.  Initial crash prediction is increases high in last few years.  Alternative system, the Enhanced safety gives moresafety thereforRLXprotectionsystemsareusedinIndianrailway. REFERENCES [1] Alfred E. Fazio, “Relationship between Light Rail Systems Design and System Operations”, J. Transp. Eng., Vol.130, Pp No.365-377, (2004). [2] Attila Borsos, Miklos Gabor % C saba Koren, “Safety Ranking Of Railway Crossings In Hungary”, Transportation Research Procedia, Vol.14, Pp No.2111 – 2120, ( 2016 )
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 08 | Aug 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1342 [3] Boban Djordjevi, Evelin Krmac & Tomislav Josip Mlinari, “Non-radial DEAmodel:Anewapproachtoevaluationofsafetyat railway level crossings”, Safety Science, Vol. 103, Pp No.234–246, (2017). [4] Chen-Yu Chang and Hui-Yu Chou, “Transaction-Cost Approach to the Comparative Analysis of User-Pay and Government- Pay Public-Private Partnership Systems”, J. Constr. Eng. Manage, (2014). [5] Goran Cirovic & Dragan Pamucar, “Decision Support Model For Prioritizing Railway Level Crossings For Safety Improvements: Application Of The Adaptive Neuro-FuzzySystem”,ExpertSystemswithApplications,Vol.40,PpNo.2208– 2223, (2013). [6] Grégoire S. Larue, Andry Rakotonirainy, et. al., “Assessing Driver Acceptance of Intelligent Transport Systems in the Context of Railway Level Crossing”, Transportation Research, Vol.30, Pp No.1–13, (2015). [7] Han Zhang, Gregory A. Keoleian and Michael D. Lepech, “Network-Level Pavement Asset Management System Integrated with Life-Cycle Analysis and Life-Cycle Optimization”, J. Infrastruct. Syst., Vol.19, Pp No.99-107, (2013). [8] Hua Jiang and Mi G. Chorzepa, “Case Study: Evaluation of a Floating Steel Fender System for Bridge Pier Protectionagainst Vessel Collision”, J. Bridge Eng, (2016). [9] J. Powderham and G. J. Tamaro, “Mansion House London:Risk AssessmentandProtection”, J.Constr.Eng.Manage., Vol.121, Pp No.266-272, (1995). [10] Jinyun Zhao, Bo Wang, et.al, “Analysis of some problems in design of Corrosion Protection for Long-distance Pipeline”, ICPTT, (2013). [11] Luis Filipe Caetano and Paulo Fonseca Teixeira, “Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level”, J. Infrastruct. Syst. (2016). [12] Victoria Gitelman, A. Shalom Hakkert, et.al., “ScreeningTools forConsideringGradeSeparationatRail-HighwayCrossings”, J. Transp. Eng., Vol.132, Pp No. 52-59, (2006). [13] Yeboah Gyasi-Agyei, “Cost-Effective Temporary Micro Irrigation System for Grass Establishment on Environmentally Sensitive Steep Slopes”, J. Irrig. Drain Eng., Vol.130, Pp No.218-226, (2004).