LEVEL 5 LEVEL 6
UPSTREAM WBS EXAMPLE < WELL HEAD PLATFORM,RISER PLATFORM,FPSO,FLNG,SUBSEA FACITIY >
ENGINEERING
1.2.1 GENERAL
1.2.1.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.1.2 CALCULATIONS
1.2.1.3 DATA SHEETS
1.2.1.4 DRAWINGS
1.2.1.5 MATERIAL REQUISITIONS
1.2.1.6 TECHNICAL BID EVALUATION (TBE)
1.2.1.7 VENDOR DOCUMENTS
1.2.2 PROCESS
1.2.2.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.2.2 CALCULATIONS
1.2.2.3 DATA SHEETS
1.2.2.4 DRAWINGS
1.2.2.5 MATERIAL REQUISITIONS
1.2.2.6 TECHNICAL BID EVALUATION (TBE)
1.2.2.7 VENDOR DOCUMENTS
1.2.2.8 HAZOP REVIEW
1.2.3 STRUCTURAL
1.2.3.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.3.2 CALCULATIONS
1.2.3.3 DATA SHEETS
1.2.3.4 DRAWINGS
1.2.3.5 MATERIAL REQUISITIONS
1.2.3.6 TECHNICAL BID EVALUATION (TBE)
1.2.3.7 VENDOR DOCUMENTS
1.2.4 MECHANICAL
1.2.4.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.4.2 CALCULATIONS
1.2.4.3 DATA SHEETS
1.2.4.4 DRAWINGS
1.2.4.5 MATERIAL REQUISITIONS
1.2.4.6 TECHNICAL BID EVALUATION (TBE)
1.2.4.7 VENDOR DOCUMENTS
1.2.5 PIPING
1.2.5.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.5.2 MODELLING AND MODEL REVIEW
1.2.5.3 CALCULATIONS
1.2.5.4 DATA SHEETS
1.2.5.5 DRAWINGS
1.2.5.6 MATERIAL REQUISITIONS
1.2.5.7 TECHNICAL BID EVALUATION (TBE)
1.2.5.8 VENDOR DOCUMENTS
1.2.5.9 MTO
1.2.6 ELECTRICAL
1.2.6.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.6.2 CALCULATIONS
1.2.6.3 DATA SHEETS
1.2.6.4 DRAWINGS
1.2.6.5 MATERIAL REQUISITIONS
1.2.6.6 TECHNICAL BID EVALUATION (TBE)
1.2.6.7 VENDOR DOCUMENTS
1.2.7 INSTRUMENT AND TELECOMMUNICATION
1.2.7.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.7.2 CALCULATIONS
1.2.7.3 DATA SHEETS
1.2.7.4 DRAWINGS
1.2.7.5 MATERIAL REQUISITIONS
1.2.7.6 TECHNICAL BID EVALUATION (TBE)
1.2.7.7 VENDOR DOCUMENTS
1.2.8 CIVIL
1.2.8.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.8.2 CALCULATIONS
1.2.8.3 DATA SHEETS
1.2.8.4 DRAWINGS
1.2.8.5 MATERIAL REQUISITIONS
1.2.8.6 TECHNICAL BID EVALUATION (TBE)
1.2.8.7 VENDOR DOCUMENTS
1.2.9 PIPELINES
1.2.9.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.9.2 CALCULATIONS
1.2.9.3 DATA SHEETS
1.2.9.4 DRAWINGS
1.2.9.5 MATERIAL REQUISITIONS
1.2.9.6 TECHNICAL BID EVALUATION (TBE)
1.2.9.7 VENDOR DOCUMENTS
1.2.10 ARCHITECTURE
1.2.1O.1 SPECIFICATION/ PROCEDURES / REPORTS
1.2.1O.2 CALCULATIONS
1.2.1O.3 DATA SHEETS
1.2.1O.4 DRAWINGS
1.2.1O.5 MATERIAL REQUISITIONS
1.2.1O.6 TECHNICAL BID EVALUATION (TBE)
1.2.1O.7 VENDOR DOCUMENTS
1.2.11 HSE (FIRE AND SAFETY)
1.2.12 FINAL DOCUMENTATION
1.2.13 OTHERS
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4
REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4
1.3 PROCUREMENT
1.3.1 MECHANICAL
MECHANICAL EQUIPMENT
1.3.1.1 COLUMN, VESSELS, DRUMS
1.3.1.2 HEAT EXCHANGER, CONDENSER
1.3.1.3 BOILER, HEATER & FURNACES
1.3.1.4 TANKS
1.3.1.5 GAS TURBINE DRIVEN BOOSTER COMPRESSOR
1.3.1.6 OTHER COMPRESSORS, FAN AND BLOWERS
1.3.1.7 PUMPS
1.3.1.8 FILTER/ COALESCER
1.3.1.9 PIG LAUNCHER/RECEIVER
1.3.1.10 HOIST /CRANE
1.3.1.11 OTHER MECHANICAL EQUIPMENT
MECHANICAL PACKAGE
1.3.1.12 FLARE PACKAGE
1.3.1.13 NITROGEN PACKAGE
1.3.1.14 CHEMICAL INJECTION PACKAGE
1.3.1.15 MEG REGENERATION PACKAGE
1.3.1.16 ACID GAS REMOVAL UNIIT
1.3.1.17 GAS TURBINE GENERATOR
1.3.1.18 MICRO TURBINE GENERATOR
1.3.1.19 EFFLUENT TREATMENT PACKAGE
1.3.1.20 DEHYDRATION PACKAGE
1.3.1.21 WATER TREATMENT PACKAGE
1.3.1.22 HVAC EQUIPMENT PACKAGE
1.3.1.23 CONDENSATE DESALTER
1.3.1.24 SULPHUR RECOVERY PACKAGE
1.3.1.25 OTHER PACKAGE EQUIPMENT
1.3.2 PIPING AND VALVES
1.3.2.1 PIPES
1.3.2.2 FITTING & FLANGES
1.3.2.3 BALL VALVE
1.3.2.4 BUTTERFLY VALVE
1.3.2.5 CHECK VALVE
1.3.2.6 CHOKE VALVE
1.3.2.7 GATE VALVE
1.3.2.8 OTHER MANUAL VALVES
1.3.2.9 PIPE SUPPORT
1.3.2.10 OTHER PIPING MATERIALS
1.3.3 ELECTRICAL
1.3.3.1 HV, MV & LV Switchgears
1.3.3.2 Power Transformers
1.3.3.3 Distribution Board
1.3.3.4 MCC
1.3.3.5 Cabling System
1.3.3.6 Lighting System
1.3.3.7 Grounding System
1.3.3.8 Cathodic Protection
1.3.3.9 Batteries
1.3.3.10 Electrical Motors
1.3.3.11 Electrical Generators
1.3.3.12 Electrical Bulk Material
1.3.3.13 Other Electrical Equipment
1.3.4 INSTRUMENT
1.3.4.1 GAUGES
1.3.4.2 CONTROL VALVE
1.3.4.3 OTHER ACTUATED VALVES
1.3.4.4 GAS & CONDENSATE METERING SYSTEM
1.3.4.5 WELL HEAD CONTROL PANEL
1.3.4.6 MULTIPHASE FLOW METER
1.3.4.7 FIELD INSTRUMENTS & TUBING
1.3.4.8 SHUTDOWN SYSTEM
1.3.4.9 CONTROL SYSTEM
1.3.4.10 TELEMETRY SYSTEM
1.3.4.11 DCS & SCADA SYSTEM
1.3.4.12 CABLING SYSTEM (INCL. FIBER OPTIC)
1.3.4.13 TRANSMITTERS
1.3.4.14 INSTRUMENT BULK MATERIAL
1.3.4.15 OTHER INSTRUMENT EQUIPMENT
1.3.5 TELECOMMUNICATION
1.3.5.1 TELEPHONE & FAX SYSTEM
1.3.5.2 RADIO & RADAR SYSTEM
1.3.5.3 SATELLITE SYSTEM
1.3.5.4 PUBLIC ADDRESS, SIGNALING, ALARM & SECURITY SYSTEM
1.3.5.5 CABLING SYSTEM
1.3.5.6 OTHER TELECOMM. EQUIPMENT
1.3.6 SUBSEA
1.3.6.1 CHRISTMAS TREE
1.3.6.2 MANIFOLD / PLEM
1.3.6.3 UMBILICAL SYSTEM
1.3.6.4 HFL SYSTEM
1.3.6.5 EFL SYSTEM
1.3.6.6 OTHER MECHANICAL EQUIPMENT
1.3.6.7 OTHER E&I EQUIPMENT
1.3.7 CIVIL
1.3.7.1 BUILDING MATERIALS
1.3.7.2 PILING / FOUNDATION MATERIALS
1.3.7.3 OTHER CIVIL BULK MATERIALS
1.3.8 STRUCTURAL STEEL
1.3.8.1 STRUCTURAL BEAM
1.3.8.2 STRUCTURAL PLATE
1.3.8.3 STRUCTURAL TUBULAR
1.3.8.4 OTHER STEEL STRUCTURE MATERIALS
1.3.9 PAINTING AND COATING
1.3.9.1 PAINT AND COATING
1.3.9.2 OTHER COATIG MATERIAL
REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4
1.4
FABRICATION /
CONSTRUCTION
1.4.1 FRONT END ACTIVITIES /MOBILIZATION
1.1.1.1 YARD PREPARATIONS (OFFICE,AMENITIES, ETC)
1.1.1.2 FABRICATION OF FRAMING/SUPPORT FOUNDATION
1.1.1.3 MOBILIZATION OF PROJECT MANAGEMENT TEAM
1.1.1.4 MOBILIZATION OF PROJECT MANAGEMENT TEAM
1.1.1.5 MOBILIZATION OF NDT SOURCE INSPECTION
1.1.1.6 MOBILIZATION OF STRUCTURAL SUB-CONTRACTOR
1.1.1.7 MOBILIZATION OF PIPING/PLUMBING SUB-CONTRACTOR
1.1.1.8 MOBILIZATION OF PIPING/PLUMBING SUB-CONTRACTOR
1.1.1.9 MOBILIZATION OF PAINTING SUB-CONTRACTOR
1.1.1.10 MOBILIZATION OF E&I SUB-CONTRACTOR
1.1.1.11 MOBILIZATION OF E&I HVAC/DUCTING SUB-CONTRACTOR
` 1.1.1.12 MOBILIZATION OF ARCHITECTURAL SUB-CONTRACTOR
1.1.1.13 PROJECT PLANNING AND MONITORING CHART
1.1.1.14
WQT/WPS (NUMBER OF WELDERS/WED(NUMBER OF WELDERS/WELDING
OPERATORS/WPS)
1.1.1.15 TEST PANEL/COATING SYSTEM QUALIFICATION TEST(NUMBER OF TEST PANELS)
1.4.2 PREPARATION
1.1.1.1 YARD PREPARATIONS (OFFICE,AMENITIES, ETC)
1.4.3 ENGINEERING (SHOP DRAWING)
1.4.3.1 GENERAL
1.4.3.2 STRUCTURAL
1.4.3.3 MECHANICAL
1.4.3.4 PIPING
1.4.3.5 ELECTRICAL
1.4.3.6 INSTRUMENT AND TELECOMMUNICATION
1.4.3.7 CIVIL
1.4.3.8 PIPELINES
1.4.3.9 ARCHITECTURE
1.4.3.10 HVAC / DUCTING
1.4.4 YARD PRELIMINARIES / FABRICATION / CONSTRUCTION
1.4.4.1 STRUCTURAL
FABRICATION OF STRUCTURAL MEMBERS
FABRICATION OF MEMBERS
ERECTION
TRIAL FIT/WEIGHING
OTHER STRUCTURAL WORK
1.4.4.2 MECHANICAL
MECHANICAL EQUIPMENT SUPPORT
MECHANICAL EQUIPMENT INSTALLATION
1.4.4.3 PIPING
PIPE SUPPORT FABRICATION
PIPE FABRICATION
PIPE SUPPORT INSTALLATION
LEAK TEST VALVE
VALVE INSTALLATON
FLUSHING, HYDROTEST AND ACID CLEANING
1.4.4.4 PIPELINE
PIPE COATING
PIPE FABRICATION
1.4.4.5 ELECTRICAL
FABRICATION OF ELECTRICAL SUPPORT
INSTALLATION OF ELECTRICAL SUPPORT
CABLE TRAY/CABLE LADDER INSTALLATION
CABLE PULLING
FIELD ELECTRICAL DEVICE INSTALLATION
ELECTRICAL EQUIPMENT INSTALLATION
CALIBRATE ELECTRICAL EQUIPMENT
DRESSING/GLANDING/TAGGING
1.4.4.6 INSTRUMENT AND TELECOMMUNICATION
FABRICATION O F INSTRUMENT SUPPORT
INSTRUMENT CABLE TRAY/LADDER/CONDUITS
INSTALLATION
INSTRUMENT CABLE PULLING
INSTRUMENT LIGHTING AND FIXTURES
INSTRUMENT EQUIPMENT INSTALLATION
INSTALLATION OF PIPE SUPPORT
INSTALLATION OF TUBING/AIR SUPPL
INSTRUMENT TUBING / LEAK TEST
TELEPHONE AND LAN INSTALLATION
CCTV
RADIO SYS
DRESSING / GLANDING / TAGGING/ TERMINATION
CALIBRATE INSTRUMENT
1.4.4.7 ARCHITECTURE
WALL PARTITION AND PANEL INSTALLATION
DOORS AND WINDOW
INSTALL FLOOR PEDESTAL
INSTALL HANGERS AND FALSE CEILING
REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4
1.4.4.8 HVAC / DUCTING
FABRICATION OF DUCTING SUPPORT
INSTALLATION OF DUCTING SUPPORT
HVAC DUCTING FABRICATION AND INSTALLATION
FABRICATION OF ELECTRICAL / INSTRUMENT
SUPPORT
INSTALLATION OF ELECTRICAL / INSTRUMENT
SUPPORT
TUBING TRAY/ CABLE TRAY/ LADDER
INSTALLATION
FIELD HVAC DEVICE INSTALLATION
HVAC EQUIPMENT INSTALLATION
CALIBRATE HVAC EQUIPMENT
DRESSING, GLANDING, TAGGING AND
TERMINATION
1.4.4.9 BLAST AND PAINTING
EQUIPMENT PAINTING
PIPE BLASTING AND PAINTING
1.4.4.10 INSULATION EQUIPMENT INSULATION
PIPE INSULATION
1.4.5 TESTING AND COMMISSIONING
1.4.5.1 ELECTRICAL *NUMBER OF SYSTEMS
1.4.5.2 INSTRUMENT AND COMMUNICATION *NUMBER OF SYSTEMS
1.4.5.3 PIPING AND PLUMBING *NUMBER OF SYSTEMS
1.4.5.4 PIPELINE *NUMBER OF SYSTEMS
1.4.5.5 MECHANICAL *NUMBER OF SYSTEMS
1.4.5.6 HVAC *NUMBER OF SYSTEMS
1.4.5.7 SYSTEM TESTING *NUMBER OF SYSTEMS
1.4.6 LOAD-OUT AND SEA FASTEING
1.4.6.1 DRAWINGS
1.4.6.2 MATERIALS
1.4.6.3 WEIGHING
1.4.6.4 SEA FASTENING FABRICAION
1.4.6.5 LOAD-OUT AND POSITIONING
1.4.6.6 TIE-DOWN ARRANGEMENT
1.4.7 FINAL DOCUMENTATION
1.4.7.1 QA/QC DOCUMENTS
1.4.7.2 EQUIPMENT DOSSIER
1.4.7.3 MATERIAL DOCUMENTS
1.4.7.4 TESTING AND PRE-COMMISSIONING DOCUMENTS
1.4.7.5 DESIGN DATA
1.4.7.6 AS-BUILT DRAWING
1.4.7.7 NDT RECORDS AND RADIOGRAPHS
1.5 INSTALLATION
1.5.1 PRE-INSTALL ENGINEERING AND PROCUREMENT
1.5.1.1 SHOP DRAWING
1.5.1.2 PROCEDURE
1.5.1.3 PROCUREMENT OF INSTALLATION MATERIALS
1.5.2 MARINE SPREAD MOBILIZATION
1.5.2.1 PREPARATION ACTIVITIES
1.5.2.2 MOBILIZATION OF BARGE AT YARD
1.5.3 TRANSPORTATION
1.5.3.1 SAIL AWAY AND ARRIVE AT SITE
1.5.4 INSTALLATION
1.5.4.1 PREPARATION ACTIVITIES
1.5.4.2 TOPSIDE INSTALLATION (TOPSIDE AS EX)
1.5.4.3 WELD AND NDT OF TOPSIDE
1.5.5 MARINE SPREAD DEMOB
1.5.5.1 DEMOB OF MARINE SPREAD
1.5.5.2 FINAL DOCUMENTATION
LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4
1.6
HUC (HOOK-UP AND
COMMISSIONING)
1.6.1 COMMISSIONING ENGINERING
1.6.1.1 SHOP DRAWING
1.6.1.2 PROCEDURE
1.6.2 COMMISSIONING PROCUREMENT
1.6.2.1 PROCUREMENT FOR HUC MATERIALS
1.6.3 PRE-FABRICATION
1.6.3.1 PREPARATION ACTIVITIES
1.6.3.2 PRE-FABRICATION
1.6.4 OFSHORE-HUC
PREPARATION ACTIVITIES
MOBILIZATION OF WORK BOAT
SET-UP ANCHOR
FACILITIES HOOK-UP
POST-DRILLING HOOK-UP
FLOW LINE TIE-IN
REINSTATEMENT WORKS
HOST TIE-IN
COMMISSIONING SYSTEM #1
WORKBOAT DEMOB
FINAL DOCUMENTATION
ON-SHORE COMMISSIONING
COMMISSIONING OF SYSTEM #1
DEMOBILIZATION OF EQUIPMENT
FINAL DOCUMENTATION
PRE-SHUTDOWN ACTIVITIES
STRUCTURAL AND CIVIL
PIPING
PIPELINE
MECHANICAL
ELECTRICAL
INSTRUMENT AND COMMUNICATION
HVAC AND DUCTING
ARCHITECTURAL
BLAST AND PAINTING
SHUT-DOWN ACTIVITIES
STRUCTURAL AND CIVIL
PIPING
PIPELINE
MECHANICAL
ELECTRICAL
INSTRUMENT AND COMMUNICATION
HVAC AND DUCTING
ARCHITECTURAL
BLAST AND PAINTING
POST SHUT-DOWN ACTIVITIES

Weitere ähnliche Inhalte

Was ist angesagt?

Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractProject Controls Expo
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW TW Carl
 
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01Philippe Porta
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesThe Vertex Companies, LLC
 
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02Mario Fonseca
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTSHossamNegidaPMPRMPPS
 
Project Control Practical Way by Herve Baron
Project Control Practical Way by Herve BaronProject Control Practical Way by Herve Baron
Project Control Practical Way by Herve Baronignitetribes
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedulesHatem Hegazi
 
Mega Project Management In The Oil &amp; Gas Industry
Mega Project Management In The Oil &amp; Gas IndustryMega Project Management In The Oil &amp; Gas Industry
Mega Project Management In The Oil &amp; Gas IndustryStephen_Forster
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesJoshua Render
 
The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)CliffordEgbomeade
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time AnalysisFarhan Moosa
 
Interface Management: A Systemic Approach for Projects and Organizations
Interface Management: A Systemic Approach for Projects and OrganizationsInterface Management: A Systemic Approach for Projects and Organizations
Interface Management: A Systemic Approach for Projects and OrganizationsDavid Tain, PMP
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationCCT International
 

Was ist angesagt? (20)

Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
 
WORKFLOW
WORKFLOW WORKFLOW
WORKFLOW
 
PMBOK processes schema by Ricardo Vargas
PMBOK processes schema by Ricardo VargasPMBOK processes schema by Ricardo Vargas
PMBOK processes schema by Ricardo Vargas
 
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule Analyses
 
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
 
Project Control Practical Way by Herve Baron
Project Control Practical Way by Herve BaronProject Control Practical Way by Herve Baron
Project Control Practical Way by Herve Baron
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
Avoiding unrealistic schedules
Avoiding unrealistic schedulesAvoiding unrealistic schedules
Avoiding unrealistic schedules
 
Mega Project Management In The Oil &amp; Gas Industry
Mega Project Management In The Oil &amp; Gas IndustryMega Project Management In The Oil &amp; Gas Industry
Mega Project Management In The Oil &amp; Gas Industry
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
Planning For Engineering
Planning For EngineeringPlanning For Engineering
Planning For Engineering
 
Interface Management: A Systemic Approach for Projects and Organizations
Interface Management: A Systemic Approach for Projects and OrganizationsInterface Management: A Systemic Approach for Projects and Organizations
Interface Management: A Systemic Approach for Projects and Organizations
 
Planning fundamentals - Project Management
Planning fundamentals - Project ManagementPlanning fundamentals - Project Management
Planning fundamentals - Project Management
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life Implementation
 

Ähnlich wie Sample wbs for_upstream_epcic_project

Arburg practical guide to injection moulding.pdf
Arburg practical guide to injection moulding.pdfArburg practical guide to injection moulding.pdf
Arburg practical guide to injection moulding.pdfMarufSaiyad
 
Pressure Relief Systems Vol 2
Pressure Relief Systems   Vol 2Pressure Relief Systems   Vol 2
Pressure Relief Systems Vol 2Gerard B. Hawkins
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guidelineEaswaran Kanason
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfRoshelleStahl1
 
GAS DISPERSION - A Definitive Guide to Accidental Releases of Heavy Gases
GAS DISPERSION -  A Definitive Guide to Accidental Releases of Heavy GasesGAS DISPERSION -  A Definitive Guide to Accidental Releases of Heavy Gases
GAS DISPERSION - A Definitive Guide to Accidental Releases of Heavy GasesGerard B. Hawkins
 
Manual 48GC-4-6-03SI.pdf
Manual 48GC-4-6-03SI.pdfManual 48GC-4-6-03SI.pdf
Manual 48GC-4-6-03SI.pdfDiego839645
 
Tunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdfTunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdfHugoPaulin1
 
Variable Area Flow Meters Basics and Practices
Variable Area Flow Meters Basics and PracticesVariable Area Flow Meters Basics and Practices
Variable Area Flow Meters Basics and PracticesThompson Equipment Company
 
2010 polaris 600 rush pro ride snowmobile service repair manual
2010 polaris 600 rush pro ride snowmobile service repair manual2010 polaris 600 rush pro ride snowmobile service repair manual
2010 polaris 600 rush pro ride snowmobile service repair manualfjjskejdmdn
 
2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual
2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual
2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manualplopoi drert
 
2002 polaris octane personal watercraft service repair manual
2002 polaris octane personal watercraft service repair manual2002 polaris octane personal watercraft service repair manual
2002 polaris octane personal watercraft service repair manualfjkskemmdmm
 

Ähnlich wie Sample wbs for_upstream_epcic_project (20)

OPS2
OPS2OPS2
OPS2
 
Arburg practical guide to injection moulding.pdf
Arburg practical guide to injection moulding.pdfArburg practical guide to injection moulding.pdf
Arburg practical guide to injection moulding.pdf
 
Pressure Relief Systems Vol 2
Pressure Relief Systems   Vol 2Pressure Relief Systems   Vol 2
Pressure Relief Systems Vol 2
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
Interior coating of welded steel water tanks
Interior coating of welded steel water tanksInterior coating of welded steel water tanks
Interior coating of welded steel water tanks
 
GAS DISPERSION - A Definitive Guide to Accidental Releases of Heavy Gases
GAS DISPERSION -  A Definitive Guide to Accidental Releases of Heavy GasesGAS DISPERSION -  A Definitive Guide to Accidental Releases of Heavy Gases
GAS DISPERSION - A Definitive Guide to Accidental Releases of Heavy Gases
 
UC-0212-FCR
UC-0212-FCRUC-0212-FCR
UC-0212-FCR
 
Manual 48GC-4-6-03SI.pdf
Manual 48GC-4-6-03SI.pdfManual 48GC-4-6-03SI.pdf
Manual 48GC-4-6-03SI.pdf
 
Acetic Acid Process Plant Design
Acetic Acid Process Plant DesignAcetic Acid Process Plant Design
Acetic Acid Process Plant Design
 
Tunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdfTunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdf
 
Variable Area Flow Meters Basics and Practices
Variable Area Flow Meters Basics and PracticesVariable Area Flow Meters Basics and Practices
Variable Area Flow Meters Basics and Practices
 
Patel dhaval
Patel dhaval Patel dhaval
Patel dhaval
 
2010 polaris 600 rush pro ride snowmobile service repair manual
2010 polaris 600 rush pro ride snowmobile service repair manual2010 polaris 600 rush pro ride snowmobile service repair manual
2010 polaris 600 rush pro ride snowmobile service repair manual
 
2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual
2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual
2010 POLARIS 600 RUSH PRO-RIDE SNOWMOBILE Service Repair Manual
 
Scope of work
Scope of workScope of work
Scope of work
 
2002 polaris octane personal watercraft service repair manual
2002 polaris octane personal watercraft service repair manual2002 polaris octane personal watercraft service repair manual
2002 polaris octane personal watercraft service repair manual
 
3404 tm workshop
3404 tm workshop3404 tm workshop
3404 tm workshop
 
Ufgs 33 11 23
Ufgs 33 11 23Ufgs 33 11 23
Ufgs 33 11 23
 
Inspection and Test Plan_D.pdf
Inspection and Test Plan_D.pdfInspection and Test Plan_D.pdf
Inspection and Test Plan_D.pdf
 

Mehr von ignitetribes

Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Codingignitetribes
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draftignitetribes
 
Headed Towards Burnout
Headed Towards BurnoutHeaded Towards Burnout
Headed Towards Burnoutignitetribes
 
The Leadership Qualities of Elon Musk
The Leadership Qualities of Elon MuskThe Leadership Qualities of Elon Musk
The Leadership Qualities of Elon Muskignitetribes
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganignitetribes
 
101 toughest interviews_questions
101 toughest interviews_questions101 toughest interviews_questions
101 toughest interviews_questionsignitetribes
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technipignitetribes
 
Technip case study
Technip case studyTechnip case study
Technip case studyignitetribes
 
Project planning and control training with lego
Project planning and control training with legoProject planning and control training with lego
Project planning and control training with legoignitetribes
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoignitetribes
 

Mehr von ignitetribes (10)

Primavera Activity ID Coding
Primavera Activity ID CodingPrimavera Activity ID Coding
Primavera Activity ID Coding
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
 
Headed Towards Burnout
Headed Towards BurnoutHeaded Towards Burnout
Headed Towards Burnout
 
The Leadership Qualities of Elon Musk
The Leadership Qualities of Elon MuskThe Leadership Qualities of Elon Musk
The Leadership Qualities of Elon Musk
 
Improving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dunganImproving engineering productivity_loss_zhao-dungan
Improving engineering productivity_loss_zhao-dungan
 
101 toughest interviews_questions
101 toughest interviews_questions101 toughest interviews_questions
101 toughest interviews_questions
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
 
Technip case study
Technip case studyTechnip case study
Technip case study
 
Project planning and control training with lego
Project planning and control training with legoProject planning and control training with lego
Project planning and control training with lego
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 

Kürzlich hochgeladen

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 

Kürzlich hochgeladen (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 

Sample wbs for_upstream_epcic_project

  • 1. www.ignitetribes.com LEVEL 5 LEVEL 6 UPSTREAM WBS EXAMPLE < WELL HEAD PLATFORM,RISER PLATFORM,FPSO,FLNG,SUBSEA FACITIY > ENGINEERING 1.2.1 GENERAL 1.2.1.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.1.2 CALCULATIONS 1.2.1.3 DATA SHEETS 1.2.1.4 DRAWINGS 1.2.1.5 MATERIAL REQUISITIONS 1.2.1.6 TECHNICAL BID EVALUATION (TBE) 1.2.1.7 VENDOR DOCUMENTS 1.2.2 PROCESS 1.2.2.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.2.2 CALCULATIONS 1.2.2.3 DATA SHEETS 1.2.2.4 DRAWINGS 1.2.2.5 MATERIAL REQUISITIONS 1.2.2.6 TECHNICAL BID EVALUATION (TBE) 1.2.2.7 VENDOR DOCUMENTS 1.2.2.8 HAZOP REVIEW 1.2.3 STRUCTURAL 1.2.3.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.3.2 CALCULATIONS 1.2.3.3 DATA SHEETS 1.2.3.4 DRAWINGS 1.2.3.5 MATERIAL REQUISITIONS 1.2.3.6 TECHNICAL BID EVALUATION (TBE) 1.2.3.7 VENDOR DOCUMENTS 1.2.4 MECHANICAL 1.2.4.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.4.2 CALCULATIONS 1.2.4.3 DATA SHEETS 1.2.4.4 DRAWINGS 1.2.4.5 MATERIAL REQUISITIONS 1.2.4.6 TECHNICAL BID EVALUATION (TBE) 1.2.4.7 VENDOR DOCUMENTS 1.2.5 PIPING 1.2.5.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.5.2 MODELLING AND MODEL REVIEW 1.2.5.3 CALCULATIONS 1.2.5.4 DATA SHEETS 1.2.5.5 DRAWINGS 1.2.5.6 MATERIAL REQUISITIONS 1.2.5.7 TECHNICAL BID EVALUATION (TBE) 1.2.5.8 VENDOR DOCUMENTS 1.2.5.9 MTO 1.2.6 ELECTRICAL 1.2.6.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.6.2 CALCULATIONS 1.2.6.3 DATA SHEETS 1.2.6.4 DRAWINGS 1.2.6.5 MATERIAL REQUISITIONS 1.2.6.6 TECHNICAL BID EVALUATION (TBE) 1.2.6.7 VENDOR DOCUMENTS 1.2.7 INSTRUMENT AND TELECOMMUNICATION 1.2.7.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.7.2 CALCULATIONS 1.2.7.3 DATA SHEETS 1.2.7.4 DRAWINGS 1.2.7.5 MATERIAL REQUISITIONS 1.2.7.6 TECHNICAL BID EVALUATION (TBE) 1.2.7.7 VENDOR DOCUMENTS 1.2.8 CIVIL 1.2.8.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.8.2 CALCULATIONS 1.2.8.3 DATA SHEETS 1.2.8.4 DRAWINGS 1.2.8.5 MATERIAL REQUISITIONS 1.2.8.6 TECHNICAL BID EVALUATION (TBE) 1.2.8.7 VENDOR DOCUMENTS 1.2.9 PIPELINES 1.2.9.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.9.2 CALCULATIONS 1.2.9.3 DATA SHEETS 1.2.9.4 DRAWINGS 1.2.9.5 MATERIAL REQUISITIONS 1.2.9.6 TECHNICAL BID EVALUATION (TBE) 1.2.9.7 VENDOR DOCUMENTS 1.2.10 ARCHITECTURE 1.2.1O.1 SPECIFICATION/ PROCEDURES / REPORTS 1.2.1O.2 CALCULATIONS 1.2.1O.3 DATA SHEETS 1.2.1O.4 DRAWINGS 1.2.1O.5 MATERIAL REQUISITIONS 1.2.1O.6 TECHNICAL BID EVALUATION (TBE) 1.2.1O.7 VENDOR DOCUMENTS 1.2.11 HSE (FIRE AND SAFETY) 1.2.12 FINAL DOCUMENTATION 1.2.13 OTHERS LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
  • 2. LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 1.3 PROCUREMENT 1.3.1 MECHANICAL MECHANICAL EQUIPMENT 1.3.1.1 COLUMN, VESSELS, DRUMS 1.3.1.2 HEAT EXCHANGER, CONDENSER 1.3.1.3 BOILER, HEATER & FURNACES 1.3.1.4 TANKS 1.3.1.5 GAS TURBINE DRIVEN BOOSTER COMPRESSOR 1.3.1.6 OTHER COMPRESSORS, FAN AND BLOWERS 1.3.1.7 PUMPS 1.3.1.8 FILTER/ COALESCER 1.3.1.9 PIG LAUNCHER/RECEIVER 1.3.1.10 HOIST /CRANE 1.3.1.11 OTHER MECHANICAL EQUIPMENT MECHANICAL PACKAGE 1.3.1.12 FLARE PACKAGE 1.3.1.13 NITROGEN PACKAGE 1.3.1.14 CHEMICAL INJECTION PACKAGE 1.3.1.15 MEG REGENERATION PACKAGE 1.3.1.16 ACID GAS REMOVAL UNIIT 1.3.1.17 GAS TURBINE GENERATOR 1.3.1.18 MICRO TURBINE GENERATOR 1.3.1.19 EFFLUENT TREATMENT PACKAGE 1.3.1.20 DEHYDRATION PACKAGE 1.3.1.21 WATER TREATMENT PACKAGE 1.3.1.22 HVAC EQUIPMENT PACKAGE 1.3.1.23 CONDENSATE DESALTER 1.3.1.24 SULPHUR RECOVERY PACKAGE 1.3.1.25 OTHER PACKAGE EQUIPMENT 1.3.2 PIPING AND VALVES 1.3.2.1 PIPES 1.3.2.2 FITTING & FLANGES 1.3.2.3 BALL VALVE 1.3.2.4 BUTTERFLY VALVE 1.3.2.5 CHECK VALVE 1.3.2.6 CHOKE VALVE 1.3.2.7 GATE VALVE 1.3.2.8 OTHER MANUAL VALVES 1.3.2.9 PIPE SUPPORT 1.3.2.10 OTHER PIPING MATERIALS 1.3.3 ELECTRICAL 1.3.3.1 HV, MV & LV Switchgears 1.3.3.2 Power Transformers 1.3.3.3 Distribution Board 1.3.3.4 MCC 1.3.3.5 Cabling System 1.3.3.6 Lighting System 1.3.3.7 Grounding System 1.3.3.8 Cathodic Protection 1.3.3.9 Batteries 1.3.3.10 Electrical Motors 1.3.3.11 Electrical Generators 1.3.3.12 Electrical Bulk Material 1.3.3.13 Other Electrical Equipment 1.3.4 INSTRUMENT 1.3.4.1 GAUGES 1.3.4.2 CONTROL VALVE 1.3.4.3 OTHER ACTUATED VALVES 1.3.4.4 GAS & CONDENSATE METERING SYSTEM 1.3.4.5 WELL HEAD CONTROL PANEL 1.3.4.6 MULTIPHASE FLOW METER 1.3.4.7 FIELD INSTRUMENTS & TUBING 1.3.4.8 SHUTDOWN SYSTEM 1.3.4.9 CONTROL SYSTEM 1.3.4.10 TELEMETRY SYSTEM 1.3.4.11 DCS & SCADA SYSTEM 1.3.4.12 CABLING SYSTEM (INCL. FIBER OPTIC) 1.3.4.13 TRANSMITTERS 1.3.4.14 INSTRUMENT BULK MATERIAL 1.3.4.15 OTHER INSTRUMENT EQUIPMENT 1.3.5 TELECOMMUNICATION 1.3.5.1 TELEPHONE & FAX SYSTEM 1.3.5.2 RADIO & RADAR SYSTEM 1.3.5.3 SATELLITE SYSTEM 1.3.5.4 PUBLIC ADDRESS, SIGNALING, ALARM & SECURITY SYSTEM 1.3.5.5 CABLING SYSTEM 1.3.5.6 OTHER TELECOMM. EQUIPMENT 1.3.6 SUBSEA 1.3.6.1 CHRISTMAS TREE 1.3.6.2 MANIFOLD / PLEM 1.3.6.3 UMBILICAL SYSTEM 1.3.6.4 HFL SYSTEM 1.3.6.5 EFL SYSTEM 1.3.6.6 OTHER MECHANICAL EQUIPMENT 1.3.6.7 OTHER E&I EQUIPMENT 1.3.7 CIVIL 1.3.7.1 BUILDING MATERIALS 1.3.7.2 PILING / FOUNDATION MATERIALS 1.3.7.3 OTHER CIVIL BULK MATERIALS 1.3.8 STRUCTURAL STEEL 1.3.8.1 STRUCTURAL BEAM 1.3.8.2 STRUCTURAL PLATE 1.3.8.3 STRUCTURAL TUBULAR 1.3.8.4 OTHER STEEL STRUCTURE MATERIALS 1.3.9 PAINTING AND COATING 1.3.9.1 PAINT AND COATING 1.3.9.2 OTHER COATIG MATERIAL REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
  • 3. LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 1.4 FABRICATION / CONSTRUCTION 1.4.1 FRONT END ACTIVITIES /MOBILIZATION 1.1.1.1 YARD PREPARATIONS (OFFICE,AMENITIES, ETC) 1.1.1.2 FABRICATION OF FRAMING/SUPPORT FOUNDATION 1.1.1.3 MOBILIZATION OF PROJECT MANAGEMENT TEAM 1.1.1.4 MOBILIZATION OF PROJECT MANAGEMENT TEAM 1.1.1.5 MOBILIZATION OF NDT SOURCE INSPECTION 1.1.1.6 MOBILIZATION OF STRUCTURAL SUB-CONTRACTOR 1.1.1.7 MOBILIZATION OF PIPING/PLUMBING SUB-CONTRACTOR 1.1.1.8 MOBILIZATION OF PIPING/PLUMBING SUB-CONTRACTOR 1.1.1.9 MOBILIZATION OF PAINTING SUB-CONTRACTOR 1.1.1.10 MOBILIZATION OF E&I SUB-CONTRACTOR 1.1.1.11 MOBILIZATION OF E&I HVAC/DUCTING SUB-CONTRACTOR ` 1.1.1.12 MOBILIZATION OF ARCHITECTURAL SUB-CONTRACTOR 1.1.1.13 PROJECT PLANNING AND MONITORING CHART 1.1.1.14 WQT/WPS (NUMBER OF WELDERS/WED(NUMBER OF WELDERS/WELDING OPERATORS/WPS) 1.1.1.15 TEST PANEL/COATING SYSTEM QUALIFICATION TEST(NUMBER OF TEST PANELS) 1.4.2 PREPARATION 1.1.1.1 YARD PREPARATIONS (OFFICE,AMENITIES, ETC) 1.4.3 ENGINEERING (SHOP DRAWING) 1.4.3.1 GENERAL 1.4.3.2 STRUCTURAL 1.4.3.3 MECHANICAL 1.4.3.4 PIPING 1.4.3.5 ELECTRICAL 1.4.3.6 INSTRUMENT AND TELECOMMUNICATION 1.4.3.7 CIVIL 1.4.3.8 PIPELINES 1.4.3.9 ARCHITECTURE 1.4.3.10 HVAC / DUCTING 1.4.4 YARD PRELIMINARIES / FABRICATION / CONSTRUCTION 1.4.4.1 STRUCTURAL FABRICATION OF STRUCTURAL MEMBERS FABRICATION OF MEMBERS ERECTION TRIAL FIT/WEIGHING OTHER STRUCTURAL WORK 1.4.4.2 MECHANICAL MECHANICAL EQUIPMENT SUPPORT MECHANICAL EQUIPMENT INSTALLATION 1.4.4.3 PIPING PIPE SUPPORT FABRICATION PIPE FABRICATION PIPE SUPPORT INSTALLATION LEAK TEST VALVE VALVE INSTALLATON FLUSHING, HYDROTEST AND ACID CLEANING 1.4.4.4 PIPELINE PIPE COATING PIPE FABRICATION 1.4.4.5 ELECTRICAL FABRICATION OF ELECTRICAL SUPPORT INSTALLATION OF ELECTRICAL SUPPORT CABLE TRAY/CABLE LADDER INSTALLATION CABLE PULLING FIELD ELECTRICAL DEVICE INSTALLATION ELECTRICAL EQUIPMENT INSTALLATION CALIBRATE ELECTRICAL EQUIPMENT DRESSING/GLANDING/TAGGING 1.4.4.6 INSTRUMENT AND TELECOMMUNICATION FABRICATION O F INSTRUMENT SUPPORT INSTRUMENT CABLE TRAY/LADDER/CONDUITS INSTALLATION INSTRUMENT CABLE PULLING INSTRUMENT LIGHTING AND FIXTURES INSTRUMENT EQUIPMENT INSTALLATION INSTALLATION OF PIPE SUPPORT INSTALLATION OF TUBING/AIR SUPPL INSTRUMENT TUBING / LEAK TEST TELEPHONE AND LAN INSTALLATION CCTV RADIO SYS DRESSING / GLANDING / TAGGING/ TERMINATION CALIBRATE INSTRUMENT 1.4.4.7 ARCHITECTURE WALL PARTITION AND PANEL INSTALLATION DOORS AND WINDOW INSTALL FLOOR PEDESTAL INSTALL HANGERS AND FALSE CEILING REFERTODELIVERABLESLISTANDPROGRESSMEASUREMENTSYSTEM
  • 4. LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 1.4.4.8 HVAC / DUCTING FABRICATION OF DUCTING SUPPORT INSTALLATION OF DUCTING SUPPORT HVAC DUCTING FABRICATION AND INSTALLATION FABRICATION OF ELECTRICAL / INSTRUMENT SUPPORT INSTALLATION OF ELECTRICAL / INSTRUMENT SUPPORT TUBING TRAY/ CABLE TRAY/ LADDER INSTALLATION FIELD HVAC DEVICE INSTALLATION HVAC EQUIPMENT INSTALLATION CALIBRATE HVAC EQUIPMENT DRESSING, GLANDING, TAGGING AND TERMINATION 1.4.4.9 BLAST AND PAINTING EQUIPMENT PAINTING PIPE BLASTING AND PAINTING 1.4.4.10 INSULATION EQUIPMENT INSULATION PIPE INSULATION 1.4.5 TESTING AND COMMISSIONING 1.4.5.1 ELECTRICAL *NUMBER OF SYSTEMS 1.4.5.2 INSTRUMENT AND COMMUNICATION *NUMBER OF SYSTEMS 1.4.5.3 PIPING AND PLUMBING *NUMBER OF SYSTEMS 1.4.5.4 PIPELINE *NUMBER OF SYSTEMS 1.4.5.5 MECHANICAL *NUMBER OF SYSTEMS 1.4.5.6 HVAC *NUMBER OF SYSTEMS 1.4.5.7 SYSTEM TESTING *NUMBER OF SYSTEMS 1.4.6 LOAD-OUT AND SEA FASTEING 1.4.6.1 DRAWINGS 1.4.6.2 MATERIALS 1.4.6.3 WEIGHING 1.4.6.4 SEA FASTENING FABRICAION 1.4.6.5 LOAD-OUT AND POSITIONING 1.4.6.6 TIE-DOWN ARRANGEMENT 1.4.7 FINAL DOCUMENTATION 1.4.7.1 QA/QC DOCUMENTS 1.4.7.2 EQUIPMENT DOSSIER 1.4.7.3 MATERIAL DOCUMENTS 1.4.7.4 TESTING AND PRE-COMMISSIONING DOCUMENTS 1.4.7.5 DESIGN DATA 1.4.7.6 AS-BUILT DRAWING 1.4.7.7 NDT RECORDS AND RADIOGRAPHS 1.5 INSTALLATION 1.5.1 PRE-INSTALL ENGINEERING AND PROCUREMENT 1.5.1.1 SHOP DRAWING 1.5.1.2 PROCEDURE 1.5.1.3 PROCUREMENT OF INSTALLATION MATERIALS 1.5.2 MARINE SPREAD MOBILIZATION 1.5.2.1 PREPARATION ACTIVITIES 1.5.2.2 MOBILIZATION OF BARGE AT YARD 1.5.3 TRANSPORTATION 1.5.3.1 SAIL AWAY AND ARRIVE AT SITE 1.5.4 INSTALLATION 1.5.4.1 PREPARATION ACTIVITIES 1.5.4.2 TOPSIDE INSTALLATION (TOPSIDE AS EX) 1.5.4.3 WELD AND NDT OF TOPSIDE 1.5.5 MARINE SPREAD DEMOB 1.5.5.1 DEMOB OF MARINE SPREAD 1.5.5.2 FINAL DOCUMENTATION
  • 5. LEVEL 5 LEVEL 6LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 1.6 HUC (HOOK-UP AND COMMISSIONING) 1.6.1 COMMISSIONING ENGINERING 1.6.1.1 SHOP DRAWING 1.6.1.2 PROCEDURE 1.6.2 COMMISSIONING PROCUREMENT 1.6.2.1 PROCUREMENT FOR HUC MATERIALS 1.6.3 PRE-FABRICATION 1.6.3.1 PREPARATION ACTIVITIES 1.6.3.2 PRE-FABRICATION 1.6.4 OFSHORE-HUC PREPARATION ACTIVITIES MOBILIZATION OF WORK BOAT SET-UP ANCHOR FACILITIES HOOK-UP POST-DRILLING HOOK-UP FLOW LINE TIE-IN REINSTATEMENT WORKS HOST TIE-IN COMMISSIONING SYSTEM #1 WORKBOAT DEMOB FINAL DOCUMENTATION ON-SHORE COMMISSIONING COMMISSIONING OF SYSTEM #1 DEMOBILIZATION OF EQUIPMENT FINAL DOCUMENTATION PRE-SHUTDOWN ACTIVITIES STRUCTURAL AND CIVIL PIPING PIPELINE MECHANICAL ELECTRICAL INSTRUMENT AND COMMUNICATION HVAC AND DUCTING ARCHITECTURAL BLAST AND PAINTING SHUT-DOWN ACTIVITIES STRUCTURAL AND CIVIL PIPING PIPELINE MECHANICAL ELECTRICAL INSTRUMENT AND COMMUNICATION HVAC AND DUCTING ARCHITECTURAL BLAST AND PAINTING POST SHUT-DOWN ACTIVITIES