Production System
Production Planning Items
Controlling Items
Nature of MRP
PRODUCTION…
PRODUCTION PLANNING
AND CONTROL (PPC)
 PRODUCTION: that transformation of raw
materials to finished goods.
 PLANNING: looks ahead, anticipates possible
difficulties and decides in advance as to how the
production, best, be carried out.
 CONTROL: phase makes sure that the
programmed production is constantly maintained.
PRODUCTION SYSTEM
 System is a whose function is to convert a
set of inputs into a set of desired outputs.
PRODUCTION PLANNING
 Given a specific process planning, process
technologies and production conditions
 predetermine varieties, quantities, qualitiy, and
scheduled of products to be produced according
to market demand of products..
TIME DIMENSIONS
 Long Range Planning; is done annually and
focus on a planning horizon greater than one year.
 Medium Range Planning; usually covers a
period from 6 months to 18 months, with monthly
or sometimes quarterly time increments.
 Short Range Planning; covers a period from one
day or less to six months, with weekly time
increment usually.
PRODUCTION PLANNING
PLANNING
ROUTING
SCHEDULING
LOADING
PRODUCTION PLANNING
PLANNING
 That may be defined as the technique of
foreseeing every step in a long series of seperate
operations.
 Each step to be taken at the right time, and in the
right place and each operation to be performed in
maximum efficiency.
PRODUCTION PLANNING
ROUTING
 Under this operations , their path and sequence are
established.
 The main aim of routing; determine the best and
cheapest sequence of operations and to ensure that
this sequence is strictly followed.
PRODUCTION PLANNING
Routing procedure involves following different
activities;
 An analysis of the article to determine what to
make and what to buy
 To determine the quality and type of material
 Determining the manufacturing operations and
their sequence
 An analysis of cost of the article
 Determination of scrap factors
PRODUCTION PLANNING
SCHEDULING
 It mainly concerns with time element and
priorities of a job.
 The pattern of scheduling differs from one job to
another which is explained as below:
Production Schedule
Master Schedule
Manufacturing Schedule
PRODUCTION PLANNING
LOADING
 Defined as the relationship between load and
capacity, so as to assign the work for the
production.
Capacity: the time available for work at work
centres expressed in machine hours or in man
hours.
Load: to assign work to the capacity available at
particular work centres.
 It includes the assignment of the work to the
operators at their machines or work places.
PRODUCTION PLANNING
 Loading determines; who will do the work as
routing determines; where and scheduling
determines; when it shall be done.
PLANNING PHASE
PRIOR PLANNING
Forecasting
 Type, Quantitiy,Quality
Product Design
 Specifications,Bill of Materials
Order Writing
 To undertake a particular job.
PLANNING PHASE
ACTIVE PLANNING
Process Planning and Routing
 Economic Process, How to do, Where to Work
Materials and Tools Control
 Requirements, Controls
Loading
 Assignment of Work, Manpower, Machinery
Scheduling
 Time Phase, Sequence of Work
PLANNING PHASE
ACTION PHASE
Dispatching
 Ordering to start the working
CONTROL PHASE
Progress Reporting
 Data Reporting, Performance Comparison
Corrective Phase
 Expediting, Replanning
PRODUCTION CONTROL
DISPATCHING
FOLLOWING UP
INSPECTION
CORRECTIVE
PRODUCTION CONTROL
 Production control; is the process of planning
production in advance of operations, establishing
the extract route of each individual item part or
assembly, setting, starting and finishing for each
important item, assembly
 the finishing production and releasing the
necessary orders as well as initiating the necessary
follow-up to have the smooth function of the
enterprise.
PRODUCTION CONTROL
DISPATCHING
Involves issue of production orders for starting the
operations.
 Movement of materials to different workstations
 Movement of tools and fixtures necessary for each
operation
 Beginning of work on each operation
PRODUCTION CONTROL
DISPATCHING
 Recording of time and cost involved in each
operation
 Movement of work from one operation to another
in accordance with the route sheet
 Inspecting or supervision of work
PRODUCTION CONTROL
FOLLOW UP
 It includes delays or deviations from the
production plans.
 It helps to reveal detects in routing and
scheduling, misunderstanding of orders and
instruction, under loading or overloading of work.
PRODUCTION CONTROL
INSPECTION
 To ensure the quality of goods. It can be required
as effective agency of production
CORRECTIVE MEASURES
 involve any of those activities of adjusting the
route, rescheduling of work changing the
workloads, repairs and maintenance of machinery
or equipment, control over inventories of the cause
of deviation is the poor performance of the
employees
MATERIAL REQUIREMENT
PLANNING (MRP)
PHILOSOPHY MRP- Materials should be
expedited when their lack would delay the overall
production schedule.
AIM of MRP
 Renawal of products inventory
 To meet customer orders
FACTORS OF MRP
Main Production Plan
Product Tree
Inventory Situation Folder
Performance Report
Planned Order Schedule
Special Situation Report
ADVANTAGES OF MRP
 Ability to price more competitively
 Reduced inventory
 Reduced price
 Better customer service
 Better response to market demand
 Ability to change master schedule
 Reduced idle time

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and controlMohanKirthik
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlNishant Agrawal
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL AttiMurugan
 
Presentation on Production Planning and Control
Presentation on Production Planning and ControlPresentation on Production Planning and Control
Presentation on Production Planning and ControlMd. Sirajul Islam
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & controlFaizan Akhtar
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aRai University
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlBalaji Naik
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning pptGagan bhati
 
Production of Planning & control
Production of Planning & controlProduction of Planning & control
Production of Planning & controlVishal Kanthali
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Production planning
Production planningProduction planning
Production planningSarkar Jayo
 
Production control presentation
Production control presentationProduction control presentation
Production control presentationkieran122
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 

Was ist angesagt? (20)

Introduction to production planning and control
Introduction to production planning and controlIntroduction to production planning and control
Introduction to production planning and control
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Presentation on Production Planning and Control
Presentation on Production Planning and ControlPresentation on Production Planning and Control
Presentation on Production Planning and Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control a
 
PPC
PPCPPC
PPC
 
Production planning and_control-an_introduction
Production planning and_control-an_introductionProduction planning and_control-an_introduction
Production planning and_control-an_introduction
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Capacity planning ppt
Capacity planning pptCapacity planning ppt
Capacity planning ppt
 
Production of Planning & control
Production of Planning & controlProduction of Planning & control
Production of Planning & control
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Production planning
Production planningProduction planning
Production planning
 
Production control presentation
Production control presentationProduction control presentation
Production control presentation
 
Types of layout
Types of layoutTypes of layout
Types of layout
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 

Ähnlich wie PPC

Objectives and function of Production Planning and Control
Objectives and function of Production Planning and ControlObjectives and function of Production Planning and Control
Objectives and function of Production Planning and Controlmadhannaveen
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptxdharma raja`
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptxShubhendu S. Shukla
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011honeysethi
 
Unit structure
Unit structureUnit structure
Unit structurejhakku
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2Abu Bashar
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & controlamirthakarthi
 
Introduction to Production Planning by Jasmin Dalal
Introduction to Production Planning  by Jasmin DalalIntroduction to Production Planning  by Jasmin Dalal
Introduction to Production Planning by Jasmin Dalaljasmindalal
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & ForecastingJenıstön Delımä
 
Operations Research
Operations ResearchOperations Research
Operations Researchmini244
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planningVenu Yadav
 
Productionplanning control power point presentation
Productionplanning control power point presentationProductionplanning control power point presentation
Productionplanning control power point presentationmahadeopg
 
Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02prashant arora
 

Ähnlich wie PPC (20)

Production planning-and-control
Production planning-and-controlProduction planning-and-control
Production planning-and-control
 
Ppc unit -1
Ppc  unit -1Ppc  unit -1
Ppc unit -1
 
Objectives and function of Production Planning and Control
Objectives and function of Production Planning and ControlObjectives and function of Production Planning and Control
Objectives and function of Production Planning and Control
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptx
 
Production-Planning-Control.pptx
Production-Planning-Control.pptxProduction-Planning-Control.pptx
Production-Planning-Control.pptx
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
 
Ppc New
Ppc NewPpc New
Ppc New
 
Unit structure
Unit structureUnit structure
Unit structure
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
material management-1.ppt
material management-1.pptmaterial management-1.ppt
material management-1.ppt
 
Introduction to Production Planning by Jasmin Dalal
Introduction to Production Planning  by Jasmin DalalIntroduction to Production Planning  by Jasmin Dalal
Introduction to Production Planning by Jasmin Dalal
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
MMS PRESENTAION.pptx
MMS PRESENTAION.pptxMMS PRESENTAION.pptx
MMS PRESENTAION.pptx
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
Productionplanning control power point presentation
Productionplanning control power point presentationProductionplanning control power point presentation
Productionplanning control power point presentation
 
Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02
 

Mehr von D. Palani Kumar / Kamaraj College of Engineering & Technology

Mehr von D. Palani Kumar / Kamaraj College of Engineering & Technology (20)

6 categories of workplace hazards in industries
6 categories of workplace hazards in industries6 categories of workplace hazards in industries
6 categories of workplace hazards in industries
 
Disaster Management
Disaster ManagementDisaster Management
Disaster Management
 
Industrial Safety mechanical
Industrial Safety mechanicalIndustrial Safety mechanical
Industrial Safety mechanical
 
Process Planning and Cost Estimation
Process Planning and Cost EstimationProcess Planning and Cost Estimation
Process Planning and Cost Estimation
 
Industrial Safety mech.PPT
Industrial Safety mech.PPTIndustrial Safety mech.PPT
Industrial Safety mech.PPT
 
Unit - I .ppt
Unit - I .pptUnit - I .ppt
Unit - I .ppt
 
UNIT – IV.pptx
UNIT – IV.pptxUNIT – IV.pptx
UNIT – IV.pptx
 
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdfBALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
 
Additive_Manufacturing_Macro-and-Micro.pdf
Additive_Manufacturing_Macro-and-Micro.pdfAdditive_Manufacturing_Macro-and-Micro.pdf
Additive_Manufacturing_Macro-and-Micro.pdf
 
Laser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdfLaser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdf
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Line balancing
Line balancingLine balancing
Line balancing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Scope of CIM
Scope of CIMScope of CIM
Scope of CIM
 
Manufacturing models and metrics costs
Manufacturing models and metrics costsManufacturing models and metrics costs
Manufacturing models and metrics costs
 
Geometric Modelling approaches
Geometric Modelling approachesGeometric Modelling approaches
Geometric Modelling approaches
 
Solid modelling
Solid modellingSolid modelling
Solid modelling
 
CAPP
CAPPCAPP
CAPP
 
Benefits of GT
Benefits of GTBenefits of GT
Benefits of GT
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 

Kürzlich hochgeladen (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 

PPC

  • 3. CONTENT Production System Production Planning Items Controlling Items Nature of MRP
  • 5. PRODUCTION PLANNING AND CONTROL (PPC)  PRODUCTION: that transformation of raw materials to finished goods.  PLANNING: looks ahead, anticipates possible difficulties and decides in advance as to how the production, best, be carried out.  CONTROL: phase makes sure that the programmed production is constantly maintained.
  • 6. PRODUCTION SYSTEM  System is a whose function is to convert a set of inputs into a set of desired outputs.
  • 7. PRODUCTION PLANNING  Given a specific process planning, process technologies and production conditions  predetermine varieties, quantities, qualitiy, and scheduled of products to be produced according to market demand of products..
  • 8.
  • 9. TIME DIMENSIONS  Long Range Planning; is done annually and focus on a planning horizon greater than one year.  Medium Range Planning; usually covers a period from 6 months to 18 months, with monthly or sometimes quarterly time increments.  Short Range Planning; covers a period from one day or less to six months, with weekly time increment usually.
  • 11. PRODUCTION PLANNING PLANNING  That may be defined as the technique of foreseeing every step in a long series of seperate operations.  Each step to be taken at the right time, and in the right place and each operation to be performed in maximum efficiency.
  • 12. PRODUCTION PLANNING ROUTING  Under this operations , their path and sequence are established.  The main aim of routing; determine the best and cheapest sequence of operations and to ensure that this sequence is strictly followed.
  • 13. PRODUCTION PLANNING Routing procedure involves following different activities;  An analysis of the article to determine what to make and what to buy  To determine the quality and type of material  Determining the manufacturing operations and their sequence  An analysis of cost of the article  Determination of scrap factors
  • 14. PRODUCTION PLANNING SCHEDULING  It mainly concerns with time element and priorities of a job.  The pattern of scheduling differs from one job to another which is explained as below: Production Schedule Master Schedule Manufacturing Schedule
  • 15. PRODUCTION PLANNING LOADING  Defined as the relationship between load and capacity, so as to assign the work for the production. Capacity: the time available for work at work centres expressed in machine hours or in man hours. Load: to assign work to the capacity available at particular work centres.  It includes the assignment of the work to the operators at their machines or work places.
  • 16. PRODUCTION PLANNING  Loading determines; who will do the work as routing determines; where and scheduling determines; when it shall be done.
  • 17. PLANNING PHASE PRIOR PLANNING Forecasting  Type, Quantitiy,Quality Product Design  Specifications,Bill of Materials Order Writing  To undertake a particular job.
  • 18. PLANNING PHASE ACTIVE PLANNING Process Planning and Routing  Economic Process, How to do, Where to Work Materials and Tools Control  Requirements, Controls Loading  Assignment of Work, Manpower, Machinery Scheduling  Time Phase, Sequence of Work
  • 19. PLANNING PHASE ACTION PHASE Dispatching  Ordering to start the working CONTROL PHASE Progress Reporting  Data Reporting, Performance Comparison Corrective Phase  Expediting, Replanning
  • 21.
  • 22. PRODUCTION CONTROL  Production control; is the process of planning production in advance of operations, establishing the extract route of each individual item part or assembly, setting, starting and finishing for each important item, assembly  the finishing production and releasing the necessary orders as well as initiating the necessary follow-up to have the smooth function of the enterprise.
  • 23. PRODUCTION CONTROL DISPATCHING Involves issue of production orders for starting the operations.  Movement of materials to different workstations  Movement of tools and fixtures necessary for each operation  Beginning of work on each operation
  • 24. PRODUCTION CONTROL DISPATCHING  Recording of time and cost involved in each operation  Movement of work from one operation to another in accordance with the route sheet  Inspecting or supervision of work
  • 25. PRODUCTION CONTROL FOLLOW UP  It includes delays or deviations from the production plans.  It helps to reveal detects in routing and scheduling, misunderstanding of orders and instruction, under loading or overloading of work.
  • 26. PRODUCTION CONTROL INSPECTION  To ensure the quality of goods. It can be required as effective agency of production CORRECTIVE MEASURES  involve any of those activities of adjusting the route, rescheduling of work changing the workloads, repairs and maintenance of machinery or equipment, control over inventories of the cause of deviation is the poor performance of the employees
  • 27. MATERIAL REQUIREMENT PLANNING (MRP) PHILOSOPHY MRP- Materials should be expedited when their lack would delay the overall production schedule. AIM of MRP  Renawal of products inventory  To meet customer orders
  • 28. FACTORS OF MRP Main Production Plan Product Tree Inventory Situation Folder Performance Report Planned Order Schedule Special Situation Report
  • 29. ADVANTAGES OF MRP  Ability to price more competitively  Reduced inventory  Reduced price  Better customer service  Better response to market demand  Ability to change master schedule  Reduced idle time