Prof. Dominic Cooper C. Psychol CFIOSH Safety Leadership in Oil & Gas Construction: A Case Study B-Safe Management Solutions Inc 6648 East State Road 44,  Franklin, Indiana, USA Tel: +1 (317) 736 8980 E-mail: info@bsms-inc.com www.behavioral-safety.com
Location: Middle East Activity: Construction of 2 X  LNG Trains, Camp, Storage Tanks, &  Jetty Number of Personnel: 47,000 Third-Party Nationals - India, Indonesia, Malaysia, Nepal, Philippines, Sri Lanka, Turkey, UAE,  Two Main Contractors: French/ Japanese JV, USA  Fourteen Sub-contractors: India, Ireland, Italy, UAE, USA Project Background
Implemented BBS Process ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Behavioral Safety Checklist Example Completed by observers once a day
Visible Ongoing Support  Checklist Example Completed by observers once per week
Safety Leadership Checklist Example Completed by managers once per week
Scope of Construction Works Issues ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Key Performance Indicators Incident Rates per 200,000hrs worked Total Recordable Incident Rate (TRIR) Year 1 = 0.09   Man-hours  41,826,852 Total Recordable Incident Rate (TRIR) Year 2 = 0.18  Man-hours  76,369,295 Total Recordable Incident Rate (TRIR) Year 3 = 0.11  Man-hours  120,860,975 Safety Observations  = 2.3 million  84.67 Visible Ongoing Support checklists  = 36,215     86.91 completed by observers Front-line Management Leadership Checklists  = 58,659  90.15 Middle Managers Leadership Checklists  = 83,731  87.58 Senior Managers Leadership Checklists  = 36, 215  90.36 Corrective Actions Completed =  2,973   88.8 Observer to Worker ratio (2% target)   3.13% Number Completed  Indicator % Rate Longest Run without an LTI = 121 Million man-hours
Safety Behavior Improvement (Percent Safe Results) Data is aligned in ‘real-time’ for all contractors on site over a 25 month period Longest LTI Free Period  = 121 Million Man-hours
Example from part of the project, which shows Incident Rates dropped while manpower increased from 1600 - 4,500! Behavior Change and Incident Reduction
Project factors that are associated with Behavioral Improvement Results show Corrective Action Rates and Safety Leadership are very important to improve employee safety behavior.  Observation + Feedback not sufficient on its own!! Stepwise Multiple Regression Results +85.6% +80.1% +73.4% +53.9% +21.5% Strength of Association Variables Statistical Significance P<  Corrective Actions .01 Corrective Actions + Visible Ongoing Support .001 Corrective Actions + Visible Ongoing Support + Front-line Managers Leadership .001 Corrective Actions + Visible Ongoing Support + Safety leadership of Front-line and Middle Managers .01 Corrective Actions + Visible Ongoing Support + Safety leadership of Front-line, Middle and Senior Managers .01
Project factors that are associated with Reducing Incident Rates Results show Observation Rate, Corrective Actions and workers recording of Visible Ongoing Support by Safety leaders are very important for reducing Incident Rates Stepwise Multiple Regression results (TRIR) Stepwise Multiple Regression results (LTIR) +37.8% +35% Strength of Association Variables Statistical Significance P< Observation Rate .01 Observation Rate + Corrective Actions + Visible Ongoing Support .01 +34% +11.8% Strength of Association Variables Statistical Significance P< Observation Rate n.s. Observation Rate + Corrective Actions + Visible Ongoing Support .01
Summary ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],According to the International Association of Oil & Gas Producers' (OGP) reports in 2007 & 2008 this company was the safest upstream facility in the world for two years running.  Such results are an 'independent' indicator of the impact that can be exerted by a well designed and run Behavioural Safety process.
[object Object],[object Object],[object Object],+1 (317) 736 8980

Weitere ähnliche Inhalte

Was ist angesagt?

Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Indohaan Technology
 
Behavior based safety how thinking safe leads to acting safe
Behavior based safety   how thinking safe leads to acting safeBehavior based safety   how thinking safe leads to acting safe
Behavior based safety how thinking safe leads to acting safe
HNI Risk Services
 

Was ist angesagt? (20)

BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
 
BBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshBBS Presentation by Uma Mahesh
BBS Presentation by Uma Mahesh
 
BBS Overview
BBS OverviewBBS Overview
BBS Overview
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
Behavioural base safety
Behavioural base safetyBehavioural base safety
Behavioural base safety
 
The Keys to Unlocking Safety Culture
The Keys to Unlocking Safety CultureThe Keys to Unlocking Safety Culture
The Keys to Unlocking Safety Culture
 
Behaviour based safety and prevention of accidents in industries
Behaviour based safety and prevention of accidents in industriesBehaviour based safety and prevention of accidents in industries
Behaviour based safety and prevention of accidents in industries
 
Tool box talk : why accident occures
Tool box talk : why accident occuresTool box talk : why accident occures
Tool box talk : why accident occures
 
7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
An overview on Behavior Based Safety
An overview on Behavior Based SafetyAn overview on Behavior Based Safety
An overview on Behavior Based Safety
 
behavior based safety
behavior based safetybehavior based safety
behavior based safety
 
Behavior based safety how thinking safe leads to acting safe
Behavior based safety   how thinking safe leads to acting safeBehavior based safety   how thinking safe leads to acting safe
Behavior based safety how thinking safe leads to acting safe
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Defensive Driving
Defensive DrivingDefensive Driving
Defensive Driving
 
Safety Culture : An Overview
Safety Culture : An OverviewSafety Culture : An Overview
Safety Culture : An Overview
 
Behavior based safety
Behavior based safetyBehavior based safety
Behavior based safety
 
Health and Safety Policy
Health and Safety PolicyHealth and Safety Policy
Health and Safety Policy
 
Dropped Objects (DROPS) Prevention
Dropped Objects (DROPS) PreventionDropped Objects (DROPS) Prevention
Dropped Objects (DROPS) Prevention
 

Andere mochten auch

A Culture and Leadership Upholding Health and Safety at Work
A Culture and Leadership Upholding Health and Safety at WorkA Culture and Leadership Upholding Health and Safety at Work
A Culture and Leadership Upholding Health and Safety at Work
jovy88
 
safety supervision and leadership
safety supervision and leadershipsafety supervision and leadership
safety supervision and leadership
YAWAR HASSAN KHAN
 
Safety Leadership Training PPT
Safety Leadership Training PPTSafety Leadership Training PPT
Safety Leadership Training PPT
JoeTavs
 
Cen improving quality and safety of healthcare 2013 b
Cen improving quality and safety of healthcare 2013 bCen improving quality and safety of healthcare 2013 b
Cen improving quality and safety of healthcare 2013 b
ecupresident
 
Sample Home Inspection Report
Sample Home Inspection ReportSample Home Inspection Report
Sample Home Inspection Report
Karl Vanheyst
 

Andere mochten auch (20)

Introduction to oil & gas health safety environment
Introduction to oil & gas health safety environmentIntroduction to oil & gas health safety environment
Introduction to oil & gas health safety environment
 
A Culture and Leadership Upholding Health and Safety at Work
A Culture and Leadership Upholding Health and Safety at WorkA Culture and Leadership Upholding Health and Safety at Work
A Culture and Leadership Upholding Health and Safety at Work
 
The Practice of Safety Leadership
The Practice of Safety LeadershipThe Practice of Safety Leadership
The Practice of Safety Leadership
 
safety supervision and leadership
safety supervision and leadershipsafety supervision and leadership
safety supervision and leadership
 
The Challenge of Safety Leadership - Steve Skarke, Kaneka Texas Corporation
The Challenge of Safety Leadership - Steve Skarke, Kaneka Texas CorporationThe Challenge of Safety Leadership - Steve Skarke, Kaneka Texas Corporation
The Challenge of Safety Leadership - Steve Skarke, Kaneka Texas Corporation
 
Safety Leadership Training PPT
Safety Leadership Training PPTSafety Leadership Training PPT
Safety Leadership Training PPT
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
 
Health and Safety in Selected Industrial Sectors
Health and Safety in Selected Industrial SectorsHealth and Safety in Selected Industrial Sectors
Health and Safety in Selected Industrial Sectors
 
Attitudes
AttitudesAttitudes
Attitudes
 
Nervous System
Nervous SystemNervous System
Nervous System
 
NATIONAL CULTURE AND LEADERSHIP
NATIONAL CULTURE AND LEADERSHIPNATIONAL CULTURE AND LEADERSHIP
NATIONAL CULTURE AND LEADERSHIP
 
Improving Healthcare Quality and Safety while Reducing Costs through Clinical...
Improving Healthcare Quality and Safety while Reducing Costs through Clinical...Improving Healthcare Quality and Safety while Reducing Costs through Clinical...
Improving Healthcare Quality and Safety while Reducing Costs through Clinical...
 
Key note safety leadership
Key note safety leadershipKey note safety leadership
Key note safety leadership
 
Jane Murkin and Joanne Matthews collaborative launch
Jane Murkin and Joanne Matthews collaborative launchJane Murkin and Joanne Matthews collaborative launch
Jane Murkin and Joanne Matthews collaborative launch
 
Cen improving quality and safety of healthcare 2013 b
Cen improving quality and safety of healthcare 2013 bCen improving quality and safety of healthcare 2013 b
Cen improving quality and safety of healthcare 2013 b
 
Process Safety is a Leadership Issue -Sonya Lee Sept 2012
Process Safety is a Leadership Issue -Sonya Lee Sept 2012Process Safety is a Leadership Issue -Sonya Lee Sept 2012
Process Safety is a Leadership Issue -Sonya Lee Sept 2012
 
2016 Patient Safety & Quality Healthcare Magazine
2016 Patient Safety & Quality Healthcare Magazine2016 Patient Safety & Quality Healthcare Magazine
2016 Patient Safety & Quality Healthcare Magazine
 
Asset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process SafetyAsset Integrity Management approach to achieve excellence in Process Safety
Asset Integrity Management approach to achieve excellence in Process Safety
 
Sample Home Inspection Report
Sample Home Inspection ReportSample Home Inspection Report
Sample Home Inspection Report
 
Hse oil and gas management services
Hse oil and gas management servicesHse oil and gas management services
Hse oil and gas management services
 

Ähnlich wie Behavioral Safety Leadership in Oil & Gas construction

Key Safety Initiatives1
Key Safety Initiatives1Key Safety Initiatives1
Key Safety Initiatives1
wallstreet1
 
Key Safety Initiatives1
Key Safety Initiatives1Key Safety Initiatives1
Key Safety Initiatives1
wallstreet1
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
Thushan9
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
David McDonald
 
SPE Paper ARMS Ltd
SPE Paper ARMS LtdSPE Paper ARMS Ltd
SPE Paper ARMS Ltd
John Tucker
 
Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01
Yaowaluk Yuangsoi
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena Naidoo
Juvena Naidoo
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015
Ray Chapa
 
16295214 positive-performance-measurement
16295214 positive-performance-measurement16295214 positive-performance-measurement
16295214 positive-performance-measurement
Suad Bushi
 

Ähnlich wie Behavioral Safety Leadership in Oil & Gas construction (20)

Key Safety Initiatives1
Key Safety Initiatives1Key Safety Initiatives1
Key Safety Initiatives1
 
Key Safety Initiatives1
Key Safety Initiatives1Key Safety Initiatives1
Key Safety Initiatives1
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
 
Operation & Maintenance
Operation & MaintenanceOperation & Maintenance
Operation & Maintenance
 
Hse 6 revision_2
Hse 6 revision_2Hse 6 revision_2
Hse 6 revision_2
 
05 integrated management system telkom 2016 penanganan bencana - tanggap da...
05 integrated management system   telkom 2016 penanganan bencana - tanggap da...05 integrated management system   telkom 2016 penanganan bencana - tanggap da...
05 integrated management system telkom 2016 penanganan bencana - tanggap da...
 
3A - Turning Data into Decisions - Implementing a Cloud-based HSE Leading Ind...
3A - Turning Data into Decisions - Implementing a Cloud-based HSE Leading Ind...3A - Turning Data into Decisions - Implementing a Cloud-based HSE Leading Ind...
3A - Turning Data into Decisions - Implementing a Cloud-based HSE Leading Ind...
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
SPE Paper ARMS Ltd
SPE Paper ARMS LtdSPE Paper ARMS Ltd
SPE Paper ARMS Ltd
 
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
 
Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01Occupational Health & Safety Management System 01
Occupational Health & Safety Management System 01
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena Naidoo
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015
 
Electrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionElectrical Department Maintenance Management Vision
Electrical Department Maintenance Management Vision
 
16295214 positive-performance-measurement
16295214 positive-performance-measurement16295214 positive-performance-measurement
16295214 positive-performance-measurement
 
Measures for assurance - Introduction and user group experience webinar, 29 A...
Measures for assurance - Introduction and user group experience webinar, 29 A...Measures for assurance - Introduction and user group experience webinar, 29 A...
Measures for assurance - Introduction and user group experience webinar, 29 A...
 

Kürzlich hochgeladen

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Kürzlich hochgeladen (20)

Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 

Behavioral Safety Leadership in Oil & Gas construction

  • 1. Prof. Dominic Cooper C. Psychol CFIOSH Safety Leadership in Oil & Gas Construction: A Case Study B-Safe Management Solutions Inc 6648 East State Road 44, Franklin, Indiana, USA Tel: +1 (317) 736 8980 E-mail: info@bsms-inc.com www.behavioral-safety.com
  • 2. Location: Middle East Activity: Construction of 2 X LNG Trains, Camp, Storage Tanks, & Jetty Number of Personnel: 47,000 Third-Party Nationals - India, Indonesia, Malaysia, Nepal, Philippines, Sri Lanka, Turkey, UAE, Two Main Contractors: French/ Japanese JV, USA Fourteen Sub-contractors: India, Ireland, Italy, UAE, USA Project Background
  • 3.
  • 4. Behavioral Safety Checklist Example Completed by observers once a day
  • 5. Visible Ongoing Support Checklist Example Completed by observers once per week
  • 6. Safety Leadership Checklist Example Completed by managers once per week
  • 7.
  • 8. Key Performance Indicators Incident Rates per 200,000hrs worked Total Recordable Incident Rate (TRIR) Year 1 = 0.09 Man-hours 41,826,852 Total Recordable Incident Rate (TRIR) Year 2 = 0.18 Man-hours 76,369,295 Total Recordable Incident Rate (TRIR) Year 3 = 0.11 Man-hours 120,860,975 Safety Observations = 2.3 million 84.67 Visible Ongoing Support checklists = 36,215 86.91 completed by observers Front-line Management Leadership Checklists = 58,659 90.15 Middle Managers Leadership Checklists = 83,731 87.58 Senior Managers Leadership Checklists = 36, 215 90.36 Corrective Actions Completed = 2,973 88.8 Observer to Worker ratio (2% target) 3.13% Number Completed Indicator % Rate Longest Run without an LTI = 121 Million man-hours
  • 9. Safety Behavior Improvement (Percent Safe Results) Data is aligned in ‘real-time’ for all contractors on site over a 25 month period Longest LTI Free Period = 121 Million Man-hours
  • 10. Example from part of the project, which shows Incident Rates dropped while manpower increased from 1600 - 4,500! Behavior Change and Incident Reduction
  • 11. Project factors that are associated with Behavioral Improvement Results show Corrective Action Rates and Safety Leadership are very important to improve employee safety behavior. Observation + Feedback not sufficient on its own!! Stepwise Multiple Regression Results +85.6% +80.1% +73.4% +53.9% +21.5% Strength of Association Variables Statistical Significance P< Corrective Actions .01 Corrective Actions + Visible Ongoing Support .001 Corrective Actions + Visible Ongoing Support + Front-line Managers Leadership .001 Corrective Actions + Visible Ongoing Support + Safety leadership of Front-line and Middle Managers .01 Corrective Actions + Visible Ongoing Support + Safety leadership of Front-line, Middle and Senior Managers .01
  • 12. Project factors that are associated with Reducing Incident Rates Results show Observation Rate, Corrective Actions and workers recording of Visible Ongoing Support by Safety leaders are very important for reducing Incident Rates Stepwise Multiple Regression results (TRIR) Stepwise Multiple Regression results (LTIR) +37.8% +35% Strength of Association Variables Statistical Significance P< Observation Rate .01 Observation Rate + Corrective Actions + Visible Ongoing Support .01 +34% +11.8% Strength of Association Variables Statistical Significance P< Observation Rate n.s. Observation Rate + Corrective Actions + Visible Ongoing Support .01