AWS Community Day CPH - Three problems of Terraform
Engineering for Performance Improving
1. Engineering for Performance
Improvement
Kevin Taylor - Research Program Chair
Colin Cole - Research Program Leader
R3 –Engineering and Safety Program
CRC for Rail Innovation
Established and Supported under Australia’s
Cooperative Research Centres Programme
4. Railway Level Crossings
R3 associated projects include:
Evaluating Cost-effective Railway
Cost-
Level Crossing (RLX) Protection
Systems
Future Projects to include:
Video Camera Trials
Safety Database with RLX
compartment
5. Affordable Railway Level Crossing
(RLX) Protection Systems
Active protection: AUD$200,000 -
AUD$300,000 per RLX
, p
Upgrades = AUD$1.2 to AUD$1.8
billion
billi
Alternative low cost protection
systems available worldwide
Potentially
P t ti ll 50 systems th t meet
t that t
requirements but need evaluation
6. Video Cameras
Visual data available from train
driver perspective
p p
Video cameras will be placed on
trains th t transit hi h d
t i that t it high density
it
RLX
Images will be used to assess
behaviours
Leads to protective measures
7. National Rail Safety Database
Demand for a national Rail
Industry Safety database
RLX incidents will be included
Senior Industry working group
formed to shape database future
Two preferred options
CRC working closely with
Industry to determine
requirements.
i t
8. New Methods and Products
Improved Insulated Rail Joints
Rail Squat Management
Best Practice Rail Grinding
9. Improved Insulated Joints
Deliverables
D li bl
New G
N Generation IRJ A
ti Average
life 50%, Variability 50%
Railways in Australia Spend
approx $35million per year
associated with rail joint
maintenance and inspection
10. Improved Insulated Joints
Deliverables
D li bl
New G
N Generation IRJ A
ti Average
life 50%, Variability 50%
Railways in Australia Spend
approx $35million per year
associated with rail joint
maintenance and inspection
11. Rail Squat Management
Deliverables
D li bl
Rules for
R l f avoiding conditions of
idi diti f
squat formation ,Models for
predicting initiation and growth
growth,
Manuals, NDI methods,
Management strategies
Costs associated with Rail Squats
Railways in Australia Spend are
approx $5million per year with
problems escalating
13. Best Practice Rail Grinding
Deliverables
D li bl
Intelligent combining of i
I t lli t bi i f inspection
ti
data, Automated grinding decision
making,
making Predicting the RCF crack
depth and patterns
Estimated savings of $25million per
year may be possible from better
management of rail grinding.
14. Best Practice Rail Grinding
Deliverables
D li bl
Intelligent combining of i
I t lli t bi i f inspection
ti
data, Automated grinding decision
making,
making Predicting the RCF crack
depth and patterns
Estimated savings of $25million per
year may be possible from better
management of rail grinding.
15. Condition Based Maintenance
Deliverables
D li bl
Non-destructive assessment of ballast
on-
condition
Making available technologies usable
Short Rail Defects
Defects measured and prioritised –
value adding to existing measurement
systems
16. Condition Based Maintenance
Deliverables
D li bl
Non-destructive assessment of ballast
on-
condition
Making available technologies usable
Short Rail Defects
Defects measured and prioritised –
value adding to existing measurement
systems
17. Future Projects
More Emphasis o Energy a d
oe p as s on e gy and
Emissions
Hybrid locomotive options,
H brid locomoti e options Train
Energy optimisation
Continued Emphasis on
Maintenance and Asset issues
Concrete sleeper life, Condition
monitoring, Life cycle costs
18. Future Projects
j
Continued Emphasis on safety
Wayside worker safety RLX
safety, RLX,
Crashworthiness
More Suburban Rail Projects
o e Subu ba a ojects
Passenger access design
19. End f P
E d of Presentation
t ti
Questions
and
Discussion