Ministry of Technical Education and Vocational
Training (Yemen)
One Target Institute
Relay Logic Control
Classic Control
Eng.Waleed A.S Al-Akwa’a Sep 2019-22
Introduction to classic control
*The first invented relay.
• Joseph Henry 1835
The improvement of the industry and
manufacturing obligated to look for
new technologies like classic control.
Introduction to classic control
• Components of system that
mounted in a panel which is
called control panel
1-Circuit Breaker
2-Contactor
3-Overload
4-Switches
5-Connection Points
6-Timers
7-Cables
8-Ducts
9-Counters
Introduction to classic control
Relay is: A switch whose operation is activated
by an electromagnet is called a "relay“.
contact
coil
input
Introduction to classic control
• Circuit Breaker
• Contactor
*Electric device that protect
circuits from increased current.
*Works as a relay but with high
rates of current.
Introduction to classic control
• Overload
It is a tool was designed to protect loads(motors) in case of increasing the electric
current over the rated current.
Introduction to classic control
• Switches
• Indicator Lamps
• Connection points
Introduction to classic control
• Timers
A timer consists of an internal clock, a count value register, and an
accumulator. It is used for or some timing purpose.
Clock
Accumulator
contact
reset
output
Register
Contact
Digital counters output in the form of a relay contact when
a preassigned count value is reached.
• Counter
Register
Accumulator
contact
input
reset
output
Introduction to classic control
• Cables
• Ducts
Introduction to classic control
• Loads
IEC 60947 Standards
Introduction to classic control
Loads, Circuit Breakers and
Cables
After this section, you should be able to:
• Estimate the induction motors loads and compute the overall panel
power.
• Select proper circuit breaker(CB) for each load and panel.
• Select proper cable.
• Read and understand the name-plates.
Induction motors loads have important parameters must be
known:
• Power factor.
• Voltage.
• Rated current.
• Nominal current.
• RPM Speed.
*How can we calculate the rated current?
-Actually there are three ways to do that:
1-Electric power law. [P=V*Ir*p.f].
2-General Equation.([Ir=S*1.5], S=P/p.f).
3-Standarized schedules.
Loads differs in three aspects:
1-Selection of suitable conductor.
2-Selection of suitable circuit breaker.
3-Selection of other panel components.
Here are some standards of load types:
IEC 60947 Standards
Standardized schedules:
Ex/ If we have p=4kw and voltage with 390 V ?
-from the schedule, we see that rated current is 9.7 A.
• computing the overall panel power
-We will not go through that deeply, but if you want, you should read about electrical distribution.
*Here is an example to calculate the overall panel power.
If we have 3 motors, one is in use, other two motors are not and one is standby for the other.
First motor is 37 kw ,second is 30 kw and the third one is 30 kw.
*Note: we neglected one of the motors, due to work with only one motor.
• Circuit Breaker
Electric device that protect circuits from increased current.
-Types of Circuit Breaker in terms of structure:
1-One pole CB.
2-Three Pole CB.
-Types of Circuit Breaker in terms of characteristics:
1-MCB (Miniature CB).
-Fixed default value.
-Type of low voltage and current(100A-15KA).
-Certain value.
2-MCCB (Molded Case CB).
-Larger and higher short circuit capacity than MCB(3200A-100KA).
-Can be adjusted.
-used for main circuits and panels.
*three poles *two poles
MCB Types
MCCB Type
• Circuit Breaker
*How can we select the circuit breaker?
-Selection of circuit breaker depends on:
1-Calculation of rated current.
2-Calculation of short circuit current.
*What Next !!!!
-After we know the value of the short circuit current after the breaker, then we multiply it
by 1.25 which is a safety factor.
-Then we choose the nearest value of the standard values.
-We also choose the nearest value of the rated current from the standard values.
Ex
Short Circuit current(Isc): (5, 10, 15, 20, 25, 30, ………..130)KA standard values.
Rated current(I rated): (1, 2, 6, 16, 40, 50, 80, 120, 160, ……3200)A standard values.
short circuit current after the breaker:10KA
the value of the current:81.6A
Ans:
10KA*1.25=12.5KA =15KA
Rated current from the standards will be 80A.
Rated maximum current:
-Rated maximum current which can flow through the breaker continuously without any damage.
-The rated current of the line or system (on which breaker is installed) must be equal or less than the rated
current of the breaker.
Rated Short circuit breaking current:
-It is the maximum current which the breaker can break without any damage
• Circuit Breaker
• Cables
*Selection of the cable depend on the circuit breaker? Why!!?
-To make the breaker protect the cable not the opposite, that means if I have a 60A circuit breaker
and a 40A cable.
-After that if the current increased to 56A in the case of the overload’s absence, the cable will not be
able to carry that for long period so the cable will be cut.
-But if I brought a 80A cable, when the current increased to any value bigger than 60A and smaller
than 80A, the circuit breaker will break the circuit and the cable will stay operating.
Contactor
A magnetic contactor is an electrically controlled switch
used for switching a power circuit. It has main contacts
used for power circuit and auxiliary contact used for
control circuit.
main contacts
Auxiliary
contact(s)
Supply
terminals
Definition
HOLDING COIL
STATIONARY
CONTACTS
STATIONARY
CONTACTS
MOVABLE
CONTACTS AND
ARMATURE
COIL
CONNECTIONS
Structure
The principle of operation is similar to that of the relay
but differs in application.
State-off State-on
Way of connection
• Method of contactor selection:
-you have to focus on such things when you want to select a contactor:
a-Current and power of the load.
b-Number of the contact points.
c-Voltage of the control circuit.
*usually contacts are available with(9,12,16,20,25,…etc)A.
-Using catalogs:
Computational method
P=VI (watt)
Catalogs methods
Testing
-How to test the contactor:
1-By using Avometer(switch it to the alarm).
2-By using Omhometer(show 1 when on ,show 0 when off).
3-You must test it before you begin using it.
Damages
What should be done when any component of the contactor was damaged
1-If the coil was burnt out , windings must be rolled up again.
2-If the contact points were corroded, they must be changed.
3-If there was a layer of carbon on the contact points, they must be polished.
THERMAL OVERLOAD RELAY
• Agenda
 Definition.
 Structure.
 Idea of operation.
 Way of connection.
 Selection.
 Testing.
Thermal overload relay is an electrical component used
in motor control applications which provide protection
for motor against excessive current.
Definition
Structure
Line
terminals
reset
Set value dial
Auxiliary contact(s)
Principles of operation:
This component has a bimetal
strip that is made of two
dissimilar metals bonded
together. The two metals have
different thermal expansion
characteristics, so the bimetal
strip bends at a given rate
when heated.
As current rises, heat also rises. The hotter the
bimetal strip becomes, the more it bends. In
an overload condition, the heat generated
from the heater will cause the bimetal strip to
bend until the mechanism is tripped, stopping
the motor.
36
Way Of Connection:
Typical set-up of contactor and overload relay
37
Characteristics:
1. Allow harmless temporary overloads (such as motor
starting) without disrupting the circuit.
2. Trip and open a circuit if current is high enough to cause
motor damage over a period of time.
3. Can be reset once the overload is removed.
38
• Methods of overload selection:
-Using catalogs:
Catalogs methods
 Important note :set the overload current to the actual pulled value of the load not to full load
current.
Testing
-How to test the overload:
1-By using Avometer(switch it to the alarm).
2-You must test it before you begin using it.
Timers
• Agenda
 Definition.
 Structure.
 Idea of operation.
 Way of connection.
 Selection.
 Testing.
TIMER
A timer consists of an internal clock, a count value register,
and an accumulator. It is used for some timing purposes.
Clock
Accumulator
contact
reset
output
Register
Contact
Time 5 seconds.
Clock
Reset
Output
Count 1 2 3 40 5
Definition
Structure
 ON Delay
 OFF Delay
Main types of timers
Way Of Connection:
• Methods of timer selection:
Testing
-How to test timers:
1-By using Avometer(switch it to the alarm).
2-You must test it before you begin using it.
Counter
COUNTER
Digital counters output in the form of a relay contact when a
pre-assigned count value is reached.
Register
Accumulator
contact
input
reset
output
Input
Reset
Output
Count 0 1 2 3 4 5 0 1
5
Thank u
^_^
You can find me at:
waleed0alakwaa@gmail.com
Phone774275408

Weitere ähnliche Inhalte

Was ist angesagt?

AEMC Webinar: Why Monitor Electrical Energy and How
AEMC Webinar: Why Monitor Electrical Energy and HowAEMC Webinar: Why Monitor Electrical Energy and How
AEMC Webinar: Why Monitor Electrical Energy and HowTranscat
 
Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...
Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...
Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...IJMER
 
Simulation of Direct Torque Control of Induction motor using Space Vector Mo...
Simulation of Direct Torque Control of Induction motor using  Space Vector Mo...Simulation of Direct Torque Control of Induction motor using  Space Vector Mo...
Simulation of Direct Torque Control of Induction motor using Space Vector Mo...IJMER
 
Fundamentals of Smart Metering
Fundamentals of Smart MeteringFundamentals of Smart Metering
Fundamentals of Smart MeteringLiving Online
 
2017 Harmonic Analysis
2017 Harmonic Analysis2017 Harmonic Analysis
2017 Harmonic AnalysisKristin Allen
 
vector control of induction motor
vector control of induction motorvector control of induction motor
vector control of induction motorDwaraka Pilla
 
programmble logical control
programmble logical controlprogrammble logical control
programmble logical controlBig Apple Cafe
 
14. a variable speed, sensorless, induction motor drive
14. a variable speed, sensorless, induction motor drive14. a variable speed, sensorless, induction motor drive
14. a variable speed, sensorless, induction motor drivesatya_m
 
Battery charger for ev based on wpt
Battery charger for ev based on wptBattery charger for ev based on wpt
Battery charger for ev based on wptswathy nair
 
Application of electric and electronic drives in robotics
Application of electric and electronic drives in roboticsApplication of electric and electronic drives in robotics
Application of electric and electronic drives in roboticsAshutosh Shahi
 
Electrical measuring instruments
Electrical measuring instrumentsElectrical measuring instruments
Electrical measuring instrumentsVinod Adakkaputhur
 
electronics and robotics
electronics and roboticselectronics and robotics
electronics and roboticsRajat Dhiman
 
Position sensors
Position sensorsPosition sensors
Position sensorsusic123
 

Was ist angesagt? (20)

AEMC Webinar: Why Monitor Electrical Energy and How
AEMC Webinar: Why Monitor Electrical Energy and HowAEMC Webinar: Why Monitor Electrical Energy and How
AEMC Webinar: Why Monitor Electrical Energy and How
 
Fundamentals of Field Testing Meters
Fundamentals of Field Testing MetersFundamentals of Field Testing Meters
Fundamentals of Field Testing Meters
 
Mechatronics lab
Mechatronics labMechatronics lab
Mechatronics lab
 
Introduction to CTs and PTs
Introduction to CTs and PTsIntroduction to CTs and PTs
Introduction to CTs and PTs
 
2017 motor seminar
2017 motor seminar2017 motor seminar
2017 motor seminar
 
Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...
Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...
Indirect Vector Control of Induction Motor Using Pi Speed Controller and Neur...
 
EMI-SUBJEST-VBR
EMI-SUBJEST-VBREMI-SUBJEST-VBR
EMI-SUBJEST-VBR
 
Simulation of Direct Torque Control of Induction motor using Space Vector Mo...
Simulation of Direct Torque Control of Induction motor using  Space Vector Mo...Simulation of Direct Torque Control of Induction motor using  Space Vector Mo...
Simulation of Direct Torque Control of Induction motor using Space Vector Mo...
 
Fundamentals of Smart Metering
Fundamentals of Smart MeteringFundamentals of Smart Metering
Fundamentals of Smart Metering
 
2017 Harmonic Analysis
2017 Harmonic Analysis2017 Harmonic Analysis
2017 Harmonic Analysis
 
vector control of induction motor
vector control of induction motorvector control of induction motor
vector control of induction motor
 
programmble logical control
programmble logical controlprogrammble logical control
programmble logical control
 
14. a variable speed, sensorless, induction motor drive
14. a variable speed, sensorless, induction motor drive14. a variable speed, sensorless, induction motor drive
14. a variable speed, sensorless, induction motor drive
 
Battery charger for ev based on wpt
Battery charger for ev based on wptBattery charger for ev based on wpt
Battery charger for ev based on wpt
 
Application of electric and electronic drives in robotics
Application of electric and electronic drives in roboticsApplication of electric and electronic drives in robotics
Application of electric and electronic drives in robotics
 
The art of meter testing on site 2019
The art of meter testing on site 2019The art of meter testing on site 2019
The art of meter testing on site 2019
 
Electrical measuring instruments
Electrical measuring instrumentsElectrical measuring instruments
Electrical measuring instruments
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
electronics and robotics
electronics and roboticselectronics and robotics
electronics and robotics
 
Position sensors
Position sensorsPosition sensors
Position sensors
 

Ähnlich wie Introduction to PLC

LOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODS
LOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODSLOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODS
LOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODSJayant Suthar
 
Chapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfChapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfLiewChiaPing
 
Topic 9- Electronic Symbols.ppt
Topic 9- Electronic Symbols.pptTopic 9- Electronic Symbols.ppt
Topic 9- Electronic Symbols.pptMartMantilla1
 
Measurement ee101
Measurement ee101Measurement ee101
Measurement ee101leena leena
 
Qasim Pur colony Grid Station Multan
Qasim Pur colony Grid Station MultanQasim Pur colony Grid Station Multan
Qasim Pur colony Grid Station MultanBilal Mayo
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurementBishal Rimal
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
CHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.pptCHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.pptnassim46
 
CHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.pptCHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.pptssuser28b150
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
Electricitywirings and its component.ppt
Electricitywirings and its component.pptElectricitywirings and its component.ppt
Electricitywirings and its component.pptNoelJoseMalanum1
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxVenkataLokeshMamidis
 
Extra high voltage long ac transmission lines
Extra high voltage long ac transmission linesExtra high voltage long ac transmission lines
Extra high voltage long ac transmission linesShivagee Raj
 
Be lab-1st sem cse
Be lab-1st sem cseBe lab-1st sem cse
Be lab-1st sem csepjay1120
 
Transformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyTransformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyKartik Patel
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 

Ähnlich wie Introduction to PLC (20)

LOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODS
LOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODSLOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODS
LOW VOLTAGE CONTROL PANEL, SWITHGEAR, OVERLOAD PROTECTION, STARTING METHODS
 
Chapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfChapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdf
 
Topic 9- Electronic Symbols.ppt
Topic 9- Electronic Symbols.pptTopic 9- Electronic Symbols.ppt
Topic 9- Electronic Symbols.ppt
 
Relays
RelaysRelays
Relays
 
Measurement ee101
Measurement ee101Measurement ee101
Measurement ee101
 
Qasim Pur colony Grid Station Multan
Qasim Pur colony Grid Station MultanQasim Pur colony Grid Station Multan
Qasim Pur colony Grid Station Multan
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurement
 
SMPS
SMPSSMPS
SMPS
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
CHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.pptCHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.ppt
 
CHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.pptCHAPTER 1 ELEC TP.ppt
CHAPTER 1 ELEC TP.ppt
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Contactors relays
Contactors  relaysContactors  relays
Contactors relays
 
Electricitywirings and its component.ppt
Electricitywirings and its component.pptElectricitywirings and its component.ppt
Electricitywirings and its component.ppt
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
 
Extra high voltage long ac transmission lines
Extra high voltage long ac transmission linesExtra high voltage long ac transmission lines
Extra high voltage long ac transmission lines
 
Experiment 3.pptx
Experiment 3.pptxExperiment 3.pptx
Experiment 3.pptx
 
Be lab-1st sem cse
Be lab-1st sem cseBe lab-1st sem cse
Be lab-1st sem cse
 
Transformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technologyTransformer protection using microcontroller and gsm technology
Transformer protection using microcontroller and gsm technology
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 

Kürzlich hochgeladen

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Kürzlich hochgeladen (20)

What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Introduction to PLC

  • 1. Ministry of Technical Education and Vocational Training (Yemen) One Target Institute Relay Logic Control Classic Control Eng.Waleed A.S Al-Akwa’a Sep 2019-22
  • 2. Introduction to classic control *The first invented relay. • Joseph Henry 1835 The improvement of the industry and manufacturing obligated to look for new technologies like classic control.
  • 3. Introduction to classic control • Components of system that mounted in a panel which is called control panel 1-Circuit Breaker 2-Contactor 3-Overload 4-Switches 5-Connection Points 6-Timers 7-Cables 8-Ducts 9-Counters
  • 4. Introduction to classic control Relay is: A switch whose operation is activated by an electromagnet is called a "relay“. contact coil input
  • 5. Introduction to classic control • Circuit Breaker • Contactor *Electric device that protect circuits from increased current. *Works as a relay but with high rates of current.
  • 6. Introduction to classic control • Overload It is a tool was designed to protect loads(motors) in case of increasing the electric current over the rated current.
  • 7. Introduction to classic control • Switches • Indicator Lamps • Connection points
  • 8. Introduction to classic control • Timers A timer consists of an internal clock, a count value register, and an accumulator. It is used for or some timing purpose. Clock Accumulator contact reset output Register Contact
  • 9. Digital counters output in the form of a relay contact when a preassigned count value is reached. • Counter Register Accumulator contact input reset output Introduction to classic control
  • 10. • Cables • Ducts Introduction to classic control
  • 11. • Loads IEC 60947 Standards Introduction to classic control
  • 13. After this section, you should be able to: • Estimate the induction motors loads and compute the overall panel power. • Select proper circuit breaker(CB) for each load and panel. • Select proper cable. • Read and understand the name-plates.
  • 14. Induction motors loads have important parameters must be known: • Power factor. • Voltage. • Rated current. • Nominal current. • RPM Speed. *How can we calculate the rated current? -Actually there are three ways to do that: 1-Electric power law. [P=V*Ir*p.f]. 2-General Equation.([Ir=S*1.5], S=P/p.f). 3-Standarized schedules.
  • 15. Loads differs in three aspects: 1-Selection of suitable conductor. 2-Selection of suitable circuit breaker. 3-Selection of other panel components. Here are some standards of load types: IEC 60947 Standards
  • 16. Standardized schedules: Ex/ If we have p=4kw and voltage with 390 V ? -from the schedule, we see that rated current is 9.7 A.
  • 17. • computing the overall panel power -We will not go through that deeply, but if you want, you should read about electrical distribution. *Here is an example to calculate the overall panel power. If we have 3 motors, one is in use, other two motors are not and one is standby for the other. First motor is 37 kw ,second is 30 kw and the third one is 30 kw. *Note: we neglected one of the motors, due to work with only one motor.
  • 18.
  • 19. • Circuit Breaker Electric device that protect circuits from increased current. -Types of Circuit Breaker in terms of structure: 1-One pole CB. 2-Three Pole CB. -Types of Circuit Breaker in terms of characteristics: 1-MCB (Miniature CB). -Fixed default value. -Type of low voltage and current(100A-15KA). -Certain value. 2-MCCB (Molded Case CB). -Larger and higher short circuit capacity than MCB(3200A-100KA). -Can be adjusted. -used for main circuits and panels. *three poles *two poles MCB Types MCCB Type
  • 20. • Circuit Breaker *How can we select the circuit breaker? -Selection of circuit breaker depends on: 1-Calculation of rated current. 2-Calculation of short circuit current. *What Next !!!! -After we know the value of the short circuit current after the breaker, then we multiply it by 1.25 which is a safety factor. -Then we choose the nearest value of the standard values. -We also choose the nearest value of the rated current from the standard values. Ex Short Circuit current(Isc): (5, 10, 15, 20, 25, 30, ………..130)KA standard values. Rated current(I rated): (1, 2, 6, 16, 40, 50, 80, 120, 160, ……3200)A standard values. short circuit current after the breaker:10KA the value of the current:81.6A Ans: 10KA*1.25=12.5KA =15KA Rated current from the standards will be 80A.
  • 21. Rated maximum current: -Rated maximum current which can flow through the breaker continuously without any damage. -The rated current of the line or system (on which breaker is installed) must be equal or less than the rated current of the breaker. Rated Short circuit breaking current: -It is the maximum current which the breaker can break without any damage • Circuit Breaker
  • 22. • Cables *Selection of the cable depend on the circuit breaker? Why!!? -To make the breaker protect the cable not the opposite, that means if I have a 60A circuit breaker and a 40A cable. -After that if the current increased to 56A in the case of the overload’s absence, the cable will not be able to carry that for long period so the cable will be cut. -But if I brought a 80A cable, when the current increased to any value bigger than 60A and smaller than 80A, the circuit breaker will break the circuit and the cable will stay operating.
  • 24. A magnetic contactor is an electrically controlled switch used for switching a power circuit. It has main contacts used for power circuit and auxiliary contact used for control circuit. main contacts Auxiliary contact(s) Supply terminals Definition
  • 26. The principle of operation is similar to that of the relay but differs in application. State-off State-on
  • 28. • Method of contactor selection: -you have to focus on such things when you want to select a contactor: a-Current and power of the load. b-Number of the contact points. c-Voltage of the control circuit. *usually contacts are available with(9,12,16,20,25,…etc)A. -Using catalogs: Computational method P=VI (watt) Catalogs methods
  • 29. Testing -How to test the contactor: 1-By using Avometer(switch it to the alarm). 2-By using Omhometer(show 1 when on ,show 0 when off). 3-You must test it before you begin using it.
  • 30. Damages What should be done when any component of the contactor was damaged 1-If the coil was burnt out , windings must be rolled up again. 2-If the contact points were corroded, they must be changed. 3-If there was a layer of carbon on the contact points, they must be polished.
  • 32.
  • 33. • Agenda  Definition.  Structure.  Idea of operation.  Way of connection.  Selection.  Testing.
  • 34. Thermal overload relay is an electrical component used in motor control applications which provide protection for motor against excessive current. Definition
  • 36. Principles of operation: This component has a bimetal strip that is made of two dissimilar metals bonded together. The two metals have different thermal expansion characteristics, so the bimetal strip bends at a given rate when heated. As current rises, heat also rises. The hotter the bimetal strip becomes, the more it bends. In an overload condition, the heat generated from the heater will cause the bimetal strip to bend until the mechanism is tripped, stopping the motor. 36
  • 37. Way Of Connection: Typical set-up of contactor and overload relay 37
  • 38. Characteristics: 1. Allow harmless temporary overloads (such as motor starting) without disrupting the circuit. 2. Trip and open a circuit if current is high enough to cause motor damage over a period of time. 3. Can be reset once the overload is removed. 38
  • 39. • Methods of overload selection: -Using catalogs: Catalogs methods  Important note :set the overload current to the actual pulled value of the load not to full load current.
  • 40. Testing -How to test the overload: 1-By using Avometer(switch it to the alarm). 2-You must test it before you begin using it.
  • 42. • Agenda  Definition.  Structure.  Idea of operation.  Way of connection.  Selection.  Testing.
  • 43.
  • 44. TIMER A timer consists of an internal clock, a count value register, and an accumulator. It is used for some timing purposes. Clock Accumulator contact reset output Register Contact Time 5 seconds. Clock Reset Output Count 1 2 3 40 5 Definition
  • 46.  ON Delay  OFF Delay Main types of timers
  • 48. • Methods of timer selection:
  • 49.
  • 50. Testing -How to test timers: 1-By using Avometer(switch it to the alarm). 2-You must test it before you begin using it.
  • 52. COUNTER Digital counters output in the form of a relay contact when a pre-assigned count value is reached. Register Accumulator contact input reset output Input Reset Output Count 0 1 2 3 4 5 0 1 5
  • 53.
  • 54.
  • 55.
  • 56. Thank u ^_^ You can find me at: waleed0alakwaa@gmail.com Phone774275408