Monday 28 November, 2016
Powering Sydney’s Future
Workshop
1
Welcome
Gerard Reiter
Executive General Manager, Asset Management
TransGrid
2
Powering Sydney’s Future - Introduction
 Sydney is the most
important load in the
country and it is growing
 TransGrid and Ausgrid’s
electricity networks are
critical to support this growth
3
High load areas
• CBD
• Inner suburbs
• Transport corridors
Key customers
• Sydney CBD
• Sydney Airport
• Port Botany
• Major rail and road links.
Powering Sydney’s Future - Introduction
Powering Sydney’s Future - Introduction
 Complex network built in the 60s and 70s
 Networks’ abilities to meet growing need is
degrading
 Timing is critical. To have a solution in
place to meet the need we have to act
now
 TransGrid and Ausgrid are committed to
an open and open-minded process to find a
reliable and efficient solution
5
Powering Sydney’s Future – 2014 consultation
• 400 stakeholders representing the public, researchers, industry, government and
regulators participated in a workshop.
• TransGrid and Ausgrid committed to:
o Developing responsive network options – in the PSCR
o Grow demand management using non-network options - in the PSCR and EOI
o Playing active roles in the refinement of standards for a reliable supply at an
efficient cost - engaged with IPART
o Continue to engage and collaborate – we have and continue to do so today
6
Powering Sydney’s Future
Ausgrid drivers
Matthew Webb
Manager Network Risk and Planning
Ausgrid
• Approx. 200MW load
from new large
customers
• Estimated 150 ~250MW
from future large scale
redevelopment
Powering Sydney’s Future – Ausgrid drivers
Sydney – growth and additional loads
Powering Sydney’s Future – Ausgrid drivers
Sydney – growth
Forecast demand
growth peak
• Return to demand
forecast growth seen
in 2015 and 2016
• New large customer
loads driving future
growth
• Ausgrid base forecast
is consistent with BIS
Shrapnel forecast
Powering Sydney’s Future – Ausgrid drivers
Deteriorating fluid filled cables
• Ausgrid’s 132kV fluid filled
cables mostly installed in
1960’s and 1970’s
• Ausgrid has approx. 350km
• Repairs are complex and
time consuming
• Ausgrid has an MOU with
the EPA for reducing fluid
leaks over time
Failure
history
Leaks
Test
Results
Predictive unavailability model
- History of cable failures with repair times getting longer
- Consistent leaks and poor test results requiring repairs
- All contributing to poor cable availability
Repair
Times
Powering Sydney’s Future – Ausgrid drivers
Deteriorating fluid filled cables
• Total cable unavailability
over past 4 years of
approximately 17%
• Cable fluid loss from leaks
has been significant
• Maintenance
requirements continue to
increase
Powering Sydney’s Future – Ausgrid drivers
Deteriorating fluid filled cables
Powering Sydney’s Future – Ausgrid drivers
Planning based on community benefit
• Network energy delivery
capacity is declining
• Customer demand for
energy is increasing
• Shortfall is expected
unserved energy (EUE)
• Trigger point - where
accumulated value of
EUE is greater than cost
of project
Project Trigger Point
TransGrid driver, proposed
reliability standard and this
process
Anthony Englund
Group Manager, Investment Strategy and Solutions
TransGrid
14
Powering Sydney’s Future – TransGrid driver, proposed standard and process
• Not operating to its full capacity
o Cable 42 CMS showed higher TR (2000s)
o Backfill sampling (to 2009)
o 1st derating - Anders & Orton review (2011)
o Full backfill sampling program (to 2016)
o 2nd derating – Anders (2016)
o Cable and joint sampling (now)
15
Driver 3: Cable 41
• One of two 330kV cables, 20 km long,
built in 1970s, 40 year nominal life
Powering Sydney’s Future – TransGrid driver, proposed standard and process
Proposed new reliability standard
• About fine-tuning price/service level balance
• IPART: ‘Modified n-2 + 0.6 minutes EUSE per year at average demand’
• EUSE equivalent of 20MW (UNSW or Kensington) one hour per year
• An important, evolutionary change but…
• Capacity reductions and load growth put us in deficit from 2017
• Challenge to supply energy, major challenge to supply appropriate capacity
• Key message: we need to know what non-network solutions can deliver
16
Powering Sydney’s Future – TransGrid driver, proposed standard and process
Project trigger point
Energy shortfall (MWh)
Powering Sydney’s Future – TransGrid driver, proposed standard and process
Capacity shortfall (MW)
Powering Sydney’s Future – TransGrid driver, proposed standard and process
Process
2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
RIT-T process
Environmental planning process
Implementation phase
Design phase
19
• PSCR subs due 13 Jan 2017
• PADR Mar/April 2017
• PADR subs due May/June 2017 (6 weeks)
• PACR July/Aug 2017
Considering all
options
Nalin Pahalawaththa
Group Manager, Power System Analysis
TransGrid
20
Powering Sydney’s Future – Considering all options
The planning process considers:
 Reliability
 Cost
 Environment
21
Powering Sydney’s Future – Considering all options
In situ replacement of cables
330 kV cable replacement:
• Cable Outage – up to 2-5 years
• High costs – similar to new cable
development
• Access issues
• 4 x the capacity of 132 kV cable
132 kV cable replacement:
• Environmental risk – crossing harbour
• High costs – similar to new cable
development
• Limited improvement to network capability
22
Powering Sydney’s Future – Considering all options
23
New Cables – 330 kV Vs 132 kV
• Limited Capability enhancement from
132 kV option
 load growth
 Network Development flexibility
• 132 kV = higher costs ($/MW)
• 132 kV = higher community &
environmental impact
132 kV Option
330 kV Option
Powering Sydney’s Future – Considering all options
New cables – 330 kV vs 132 kV
• Limited Capability enhancement from
132 kV option:
o Load growth
o Network development flexibility
• High costs ($/MW)
• Community and environmental impact
24
Powering Sydney’s Future – Considering all options
Route selection: Sydney’s East
• 3 out of 6 possible route options were
considered feasible (approx. 26km)
• Environmental impact on national parks
and harbour crossing
• Significant high costs due to the
geography of the area.
• Network limitations: overloading
Sydney’s North to East via 330 kV lines
Sydney
East
Sydney
North
Rookwood
Road
Sydney
West
Sydney
South
Beaconsfield
Haymarket
25
Powering Sydney’s Future – Considering all options
Route selection: Sydney’s North
• 4 out of 7 possible route options
were considered feasible (tunnels,
overhead lines, combinations)
• Environmental impact on national
parks and harbour crossing
• Significant costs due to the
geography of the area and the
length of the route
Sydney
East
Sydney
North
Rookwood
Road
Sydney
West
Sydney
South
Beaconsfield
Haymarket
26
Powering Sydney’s Future – Considering all options
Route selection: Sydney’s South
• 3 out of 9 possible route options were
considered feasible (tunnels, overhead
lines, combinations)
• Diversity issue:
o Concentrate of 330 kV supply to
CBD from one location
o Part of route is along existing 330kV
cables
• Environmental and community impact on
Georges River National Park and high
density residential area
• Similar costs to Rookwood Road option
Sydney
East
Sydney
North
Rookwood
Road
Sydney
West
Sydney
South
Beaconsfield
Haymarket
27
Powering Sydney’s Future – Considering all options
Route selection: Rookwood Road
• 13 possible route options were considered
feasible (tunnels, overhead lines,
combinations)
• Provided diversity to supply CBD area
• Utilised existing 330 kV supply capacity from
Sydney’s West to Rookwood Road
• Low costs compared with the Sydney North
and East options
• Relatively low community and environmental
impact
Sydney
East
Sydney
North
Rookwood
Road
Sydney
West
Sydney
South
Beaconsfield
Haymarket
28
Powering Sydney’s Future – Considering all options
Rookwood
Road
Options
Options
2 x 330kV
cables in
stages
2 x 330kV
cables at
once
Remediate
Cable 41
Retire
Cable 41
Operate
Cable 41
at 132kV
Decommission
Ausgrid cables
– 2 stages
Decommission
Ausgrid cables
– 1 stage
1
2
3
4
5
6
29
Powering Sydney’s Future – Considering all options
Storage Curtailment of load
Embedded
generation
Alternatives to network augmentation which address a potential shortage in electricity supply
Network Solution
Non-Network Solutions
30
The possiblity of non-network
David Bones
Service Group Manager – Power Strategy and Economics
GHD
31
Powering Sydney’s Future – The possibility of non-network
Non-network comprises of:
• Generation
• Storage
• Demand Management
Non-network components are
1. Unserved energy at risk
2. Project deferral
3. Part of the integrated project solution
32
Powering Sydney’s Future – The possibility of non-network
Inner Sydney’s daily
demand profile
33
Powering Sydney’s Future – The possibility of non-network
Expected
unserved energy
in 2020-23
without Powering
Sydney’s Future
project
34
Powering Sydney’s Future – The possibility of non-network
Examples of
non-network
options
35
Powering Sydney’s Future – The possibility of non-network
36
Non-network case study – 60MW, 12 Hr, 8 week options
Existing Standby Generation Central Battery Central Power Station
Powering Sydney’s Future
Workshop
37

Weitere ähnliche Inhalte

Was ist angesagt?

Flinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western Power
Flinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western PowerFlinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western Power
Flinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western Power
james hamilton
 
Achieving Energy Security and the Role of Clean Energy 20151008a
Achieving Energy Security and the Role of Clean Energy 20151008aAchieving Energy Security and the Role of Clean Energy 20151008a
Achieving Energy Security and the Role of Clean Energy 20151008a
Chrysogonus Herrera
 

Was ist angesagt? (18)

Flinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western Power
Flinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western PowerFlinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western Power
Flinders Island Isolated Power System (IPS) Connect 2016 T MAHMOUD Western Power
 
Electricity Storage Forum 2016
Electricity Storage Forum 2016Electricity Storage Forum 2016
Electricity Storage Forum 2016
 
CTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsCTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissions
 
Smart grids More efficient and reliable grids
Smart grids More efficient and reliable gridsSmart grids More efficient and reliable grids
Smart grids More efficient and reliable grids
 
Island Power Generation and Demand Side Purchasing and Selling
Island Power Generation and Demand Side Purchasing and SellingIsland Power Generation and Demand Side Purchasing and Selling
Island Power Generation and Demand Side Purchasing and Selling
 
How ACCC Conductor can help meet the Clean Power Plan mandate
How ACCC Conductor can help meet the Clean Power Plan mandateHow ACCC Conductor can help meet the Clean Power Plan mandate
How ACCC Conductor can help meet the Clean Power Plan mandate
 
The pan arab interconnection project latest update
The pan arab interconnection project latest updateThe pan arab interconnection project latest update
The pan arab interconnection project latest update
 
DEPU Successor Programme
DEPU Successor ProgrammeDEPU Successor Programme
DEPU Successor Programme
 
Market Analysis - Current US Energy Storage Market
Market Analysis - Current US Energy Storage MarketMarket Analysis - Current US Energy Storage Market
Market Analysis - Current US Energy Storage Market
 
Sgcp14clark
Sgcp14clarkSgcp14clark
Sgcp14clark
 
What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?
 
Achieving Energy Security and the Role of Clean Energy 20151008a
Achieving Energy Security and the Role of Clean Energy 20151008aAchieving Energy Security and the Role of Clean Energy 20151008a
Achieving Energy Security and the Role of Clean Energy 20151008a
 
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
Driving Plug-in Electric Vehicle Adoption with Green Building Codes by Ed Pik...
 
150819 Reliability Webinar presentation
150819 Reliability Webinar presentation150819 Reliability Webinar presentation
150819 Reliability Webinar presentation
 
CTC Global ACCC Conductor efficiency presentation 2016
CTC Global ACCC Conductor efficiency presentation 2016CTC Global ACCC Conductor efficiency presentation 2016
CTC Global ACCC Conductor efficiency presentation 2016
 
South Africa is a top-5 market for BESS in the world
South Africa is a top-5 market for BESS in the worldSouth Africa is a top-5 market for BESS in the world
South Africa is a top-5 market for BESS in the world
 
Why Africa stands to benefit the most from energy storage
Why Africa stands to benefit the most from energy storage Why Africa stands to benefit the most from energy storage
Why Africa stands to benefit the most from energy storage
 
Flinders Island Isolated Power System (IPS) Connect 2016 MASDAR
Flinders Island Isolated Power System (IPS) Connect 2016 MASDARFlinders Island Isolated Power System (IPS) Connect 2016 MASDAR
Flinders Island Isolated Power System (IPS) Connect 2016 MASDAR
 

Ähnlich wie Powering sydneys future workshop

Powering Sydney's Future Forum June 2014 - The Situation - Neil Gordon
Powering Sydney's Future Forum June 2014 - The Situation - Neil GordonPowering Sydney's Future Forum June 2014 - The Situation - Neil Gordon
Powering Sydney's Future Forum June 2014 - The Situation - Neil Gordon
TransGrid AU
 
Resourcing Solutions Power Networks 2015 PDF
Resourcing Solutions Power Networks 2015 PDFResourcing Solutions Power Networks 2015 PDF
Resourcing Solutions Power Networks 2015 PDF
garethbone
 
Show and Tell - Renewable Energy integration and Circular Economy.pdf
Show and Tell - Renewable Energy integration and Circular Economy.pdfShow and Tell - Renewable Energy integration and Circular Economy.pdf
Show and Tell - Renewable Energy integration and Circular Economy.pdf
SIFOfgem
 

Ähnlich wie Powering sydneys future workshop (20)

Show and Tell - Zero Emission Transport.pdf
Show and Tell - Zero Emission Transport.pdfShow and Tell - Zero Emission Transport.pdf
Show and Tell - Zero Emission Transport.pdf
 
Powering Sydney's Future Forum June 2014 - The Situation - Neil Gordon
Powering Sydney's Future Forum June 2014 - The Situation - Neil GordonPowering Sydney's Future Forum June 2014 - The Situation - Neil Gordon
Powering Sydney's Future Forum June 2014 - The Situation - Neil Gordon
 
Engage with...Network Rail
Engage with...Network RailEngage with...Network Rail
Engage with...Network Rail
 
Network Planning Workshop - Powering Sydney
Network Planning Workshop - Powering SydneyNetwork Planning Workshop - Powering Sydney
Network Planning Workshop - Powering Sydney
 
Hvdc
HvdcHvdc
Hvdc
 
Resourcing Solutions Power Networks 2015 PDF
Resourcing Solutions Power Networks 2015 PDFResourcing Solutions Power Networks 2015 PDF
Resourcing Solutions Power Networks 2015 PDF
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the future
 
Grid Connections for Solar PV by TNEI Services
Grid Connections for Solar PV by TNEI ServicesGrid Connections for Solar PV by TNEI Services
Grid Connections for Solar PV by TNEI Services
 
Metering and Regulating the Electricity Grid
Metering and Regulating the Electricity GridMetering and Regulating the Electricity Grid
Metering and Regulating the Electricity Grid
 
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
 
Show and Tell - Renewable Energy integration and Circular Economy.pdf
Show and Tell - Renewable Energy integration and Circular Economy.pdfShow and Tell - Renewable Energy integration and Circular Economy.pdf
Show and Tell - Renewable Energy integration and Circular Economy.pdf
 
ACCC conductor overview December 2016
ACCC conductor overview December 2016ACCC conductor overview December 2016
ACCC conductor overview December 2016
 
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
10.6_Utility Microgrids_Reid_EPRI/SNL Microgrid Symposium
 
Supply system (Electrical Power System)
Supply system (Electrical Power System)Supply system (Electrical Power System)
Supply system (Electrical Power System)
 
Renewable energy resources for highway lighting
Renewable energy resources for highway lightingRenewable energy resources for highway lighting
Renewable energy resources for highway lighting
 
Wireless charge - Steven Mitchell
Wireless charge - Steven MitchellWireless charge - Steven Mitchell
Wireless charge - Steven Mitchell
 
Network Theory Integrated Life Cycle Assessment for an Electric Power System
Network Theory Integrated Life Cycle Assessment for an Electric Power SystemNetwork Theory Integrated Life Cycle Assessment for an Electric Power System
Network Theory Integrated Life Cycle Assessment for an Electric Power System
 
Status of hvdc links
Status of hvdc linksStatus of hvdc links
Status of hvdc links
 
PLS 2018: Newport Bridge Feature Lighting Case Study
PLS 2018: Newport Bridge Feature Lighting Case StudyPLS 2018: Newport Bridge Feature Lighting Case Study
PLS 2018: Newport Bridge Feature Lighting Case Study
 
Energy, Nuclear & Sustainable Power: Christopher Bowes, Nabarro
Energy, Nuclear & Sustainable Power: Christopher Bowes, NabarroEnergy, Nuclear & Sustainable Power: Christopher Bowes, Nabarro
Energy, Nuclear & Sustainable Power: Christopher Bowes, Nabarro
 

Mehr von TransGrid AU

2014 Transmission Annual Planning Report - Consumer engagement
2014 Transmission Annual Planning Report - Consumer engagement2014 Transmission Annual Planning Report - Consumer engagement
2014 Transmission Annual Planning Report - Consumer engagement
TransGrid AU
 

Mehr von TransGrid AU (20)

Unlocking Australia's Renewable Energy Future
Unlocking Australia's Renewable Energy Future Unlocking Australia's Renewable Energy Future
Unlocking Australia's Renewable Energy Future
 
All Energy 2017_TransGrid
All Energy 2017_TransGridAll Energy 2017_TransGrid
All Energy 2017_TransGrid
 
Power Safety System Rules: Revisions effective in version 5.3
Power Safety System Rules: Revisions effective in  version 5.3Power Safety System Rules: Revisions effective in  version 5.3
Power Safety System Rules: Revisions effective in version 5.3
 
Local Energy & Microgrids Conference 2016
Local Energy & Microgrids Conference  2016 Local Energy & Microgrids Conference  2016
Local Energy & Microgrids Conference 2016
 
CommsDay 2016 Sydney Summit
CommsDay 2016 Sydney SummitCommsDay 2016 Sydney Summit
CommsDay 2016 Sydney Summit
 
TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub
 
TransGrid Energy Storage Australia 2015
TransGrid Energy Storage Australia 2015TransGrid Energy Storage Australia 2015
TransGrid Energy Storage Australia 2015
 
Webinar - December Revenue Proposal Update
Webinar - December Revenue Proposal UpdateWebinar - December Revenue Proposal Update
Webinar - December Revenue Proposal Update
 
Powering Sydney's Future - end of year briefing
Powering Sydney's Future - end of year briefing Powering Sydney's Future - end of year briefing
Powering Sydney's Future - end of year briefing
 
TransGrid's December 2014 Engagement Workshop
TransGrid's December 2014 Engagement WorkshopTransGrid's December 2014 Engagement Workshop
TransGrid's December 2014 Engagement Workshop
 
141208 AER Public Forum - TransGrid Revenue Proposal
141208 AER Public Forum - TransGrid Revenue Proposal141208 AER Public Forum - TransGrid Revenue Proposal
141208 AER Public Forum - TransGrid Revenue Proposal
 
Local Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyLocal Generation Workshop - Powering Sydney
Local Generation Workshop - Powering Sydney
 
Energy Efficiency Workshop - Powering Sydney
Energy Efficiency Workshop - Powering SydneyEnergy Efficiency Workshop - Powering Sydney
Energy Efficiency Workshop - Powering Sydney
 
Demand Response workshop - Powering Sydney
Demand Response workshop - Powering SydneyDemand Response workshop - Powering Sydney
Demand Response workshop - Powering Sydney
 
Technology Trialing - TransGrid's 2014 Demand Management Innovation Forum
Technology Trialing - TransGrid's 2014 Demand Management Innovation ForumTechnology Trialing - TransGrid's 2014 Demand Management Innovation Forum
Technology Trialing - TransGrid's 2014 Demand Management Innovation Forum
 
Market Development and Understanding - 2014 Demand Management Innovation Forum
Market Development and Understanding - 2014 Demand Management Innovation ForumMarket Development and Understanding - 2014 Demand Management Innovation Forum
Market Development and Understanding - 2014 Demand Management Innovation Forum
 
Collaboration - TransGrid's 2014 Demand Management Innovation Forum
Collaboration - TransGrid's 2014 Demand Management Innovation ForumCollaboration - TransGrid's 2014 Demand Management Innovation Forum
Collaboration - TransGrid's 2014 Demand Management Innovation Forum
 
Wrestling Marshmallows - TransGrid's 2014 Demand Management Innovation Forum
Wrestling Marshmallows - TransGrid's 2014 Demand Management Innovation ForumWrestling Marshmallows - TransGrid's 2014 Demand Management Innovation Forum
Wrestling Marshmallows - TransGrid's 2014 Demand Management Innovation Forum
 
Introduction - TransGrid's 2014 Demand Management Innovation Forum
Introduction - TransGrid's 2014 Demand Management Innovation ForumIntroduction - TransGrid's 2014 Demand Management Innovation Forum
Introduction - TransGrid's 2014 Demand Management Innovation Forum
 
2014 Transmission Annual Planning Report - Consumer engagement
2014 Transmission Annual Planning Report - Consumer engagement2014 Transmission Annual Planning Report - Consumer engagement
2014 Transmission Annual Planning Report - Consumer engagement
 

Kürzlich hochgeladen

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 

Kürzlich hochgeladen (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Powering sydneys future workshop

  • 1. Monday 28 November, 2016 Powering Sydney’s Future Workshop 1
  • 2. Welcome Gerard Reiter Executive General Manager, Asset Management TransGrid 2
  • 3. Powering Sydney’s Future - Introduction  Sydney is the most important load in the country and it is growing  TransGrid and Ausgrid’s electricity networks are critical to support this growth 3
  • 4. High load areas • CBD • Inner suburbs • Transport corridors Key customers • Sydney CBD • Sydney Airport • Port Botany • Major rail and road links. Powering Sydney’s Future - Introduction
  • 5. Powering Sydney’s Future - Introduction  Complex network built in the 60s and 70s  Networks’ abilities to meet growing need is degrading  Timing is critical. To have a solution in place to meet the need we have to act now  TransGrid and Ausgrid are committed to an open and open-minded process to find a reliable and efficient solution 5
  • 6. Powering Sydney’s Future – 2014 consultation • 400 stakeholders representing the public, researchers, industry, government and regulators participated in a workshop. • TransGrid and Ausgrid committed to: o Developing responsive network options – in the PSCR o Grow demand management using non-network options - in the PSCR and EOI o Playing active roles in the refinement of standards for a reliable supply at an efficient cost - engaged with IPART o Continue to engage and collaborate – we have and continue to do so today 6
  • 7. Powering Sydney’s Future Ausgrid drivers Matthew Webb Manager Network Risk and Planning Ausgrid
  • 8. • Approx. 200MW load from new large customers • Estimated 150 ~250MW from future large scale redevelopment Powering Sydney’s Future – Ausgrid drivers Sydney – growth and additional loads
  • 9. Powering Sydney’s Future – Ausgrid drivers Sydney – growth Forecast demand growth peak • Return to demand forecast growth seen in 2015 and 2016 • New large customer loads driving future growth • Ausgrid base forecast is consistent with BIS Shrapnel forecast
  • 10. Powering Sydney’s Future – Ausgrid drivers Deteriorating fluid filled cables • Ausgrid’s 132kV fluid filled cables mostly installed in 1960’s and 1970’s • Ausgrid has approx. 350km • Repairs are complex and time consuming • Ausgrid has an MOU with the EPA for reducing fluid leaks over time
  • 11. Failure history Leaks Test Results Predictive unavailability model - History of cable failures with repair times getting longer - Consistent leaks and poor test results requiring repairs - All contributing to poor cable availability Repair Times Powering Sydney’s Future – Ausgrid drivers Deteriorating fluid filled cables
  • 12. • Total cable unavailability over past 4 years of approximately 17% • Cable fluid loss from leaks has been significant • Maintenance requirements continue to increase Powering Sydney’s Future – Ausgrid drivers Deteriorating fluid filled cables
  • 13. Powering Sydney’s Future – Ausgrid drivers Planning based on community benefit • Network energy delivery capacity is declining • Customer demand for energy is increasing • Shortfall is expected unserved energy (EUE) • Trigger point - where accumulated value of EUE is greater than cost of project Project Trigger Point
  • 14. TransGrid driver, proposed reliability standard and this process Anthony Englund Group Manager, Investment Strategy and Solutions TransGrid 14
  • 15. Powering Sydney’s Future – TransGrid driver, proposed standard and process • Not operating to its full capacity o Cable 42 CMS showed higher TR (2000s) o Backfill sampling (to 2009) o 1st derating - Anders & Orton review (2011) o Full backfill sampling program (to 2016) o 2nd derating – Anders (2016) o Cable and joint sampling (now) 15 Driver 3: Cable 41 • One of two 330kV cables, 20 km long, built in 1970s, 40 year nominal life
  • 16. Powering Sydney’s Future – TransGrid driver, proposed standard and process Proposed new reliability standard • About fine-tuning price/service level balance • IPART: ‘Modified n-2 + 0.6 minutes EUSE per year at average demand’ • EUSE equivalent of 20MW (UNSW or Kensington) one hour per year • An important, evolutionary change but… • Capacity reductions and load growth put us in deficit from 2017 • Challenge to supply energy, major challenge to supply appropriate capacity • Key message: we need to know what non-network solutions can deliver 16
  • 17. Powering Sydney’s Future – TransGrid driver, proposed standard and process Project trigger point Energy shortfall (MWh)
  • 18. Powering Sydney’s Future – TransGrid driver, proposed standard and process Capacity shortfall (MW)
  • 19. Powering Sydney’s Future – TransGrid driver, proposed standard and process Process 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 RIT-T process Environmental planning process Implementation phase Design phase 19 • PSCR subs due 13 Jan 2017 • PADR Mar/April 2017 • PADR subs due May/June 2017 (6 weeks) • PACR July/Aug 2017
  • 20. Considering all options Nalin Pahalawaththa Group Manager, Power System Analysis TransGrid 20
  • 21. Powering Sydney’s Future – Considering all options The planning process considers:  Reliability  Cost  Environment 21
  • 22. Powering Sydney’s Future – Considering all options In situ replacement of cables 330 kV cable replacement: • Cable Outage – up to 2-5 years • High costs – similar to new cable development • Access issues • 4 x the capacity of 132 kV cable 132 kV cable replacement: • Environmental risk – crossing harbour • High costs – similar to new cable development • Limited improvement to network capability 22
  • 23. Powering Sydney’s Future – Considering all options 23 New Cables – 330 kV Vs 132 kV • Limited Capability enhancement from 132 kV option  load growth  Network Development flexibility • 132 kV = higher costs ($/MW) • 132 kV = higher community & environmental impact 132 kV Option 330 kV Option
  • 24. Powering Sydney’s Future – Considering all options New cables – 330 kV vs 132 kV • Limited Capability enhancement from 132 kV option: o Load growth o Network development flexibility • High costs ($/MW) • Community and environmental impact 24
  • 25. Powering Sydney’s Future – Considering all options Route selection: Sydney’s East • 3 out of 6 possible route options were considered feasible (approx. 26km) • Environmental impact on national parks and harbour crossing • Significant high costs due to the geography of the area. • Network limitations: overloading Sydney’s North to East via 330 kV lines Sydney East Sydney North Rookwood Road Sydney West Sydney South Beaconsfield Haymarket 25
  • 26. Powering Sydney’s Future – Considering all options Route selection: Sydney’s North • 4 out of 7 possible route options were considered feasible (tunnels, overhead lines, combinations) • Environmental impact on national parks and harbour crossing • Significant costs due to the geography of the area and the length of the route Sydney East Sydney North Rookwood Road Sydney West Sydney South Beaconsfield Haymarket 26
  • 27. Powering Sydney’s Future – Considering all options Route selection: Sydney’s South • 3 out of 9 possible route options were considered feasible (tunnels, overhead lines, combinations) • Diversity issue: o Concentrate of 330 kV supply to CBD from one location o Part of route is along existing 330kV cables • Environmental and community impact on Georges River National Park and high density residential area • Similar costs to Rookwood Road option Sydney East Sydney North Rookwood Road Sydney West Sydney South Beaconsfield Haymarket 27
  • 28. Powering Sydney’s Future – Considering all options Route selection: Rookwood Road • 13 possible route options were considered feasible (tunnels, overhead lines, combinations) • Provided diversity to supply CBD area • Utilised existing 330 kV supply capacity from Sydney’s West to Rookwood Road • Low costs compared with the Sydney North and East options • Relatively low community and environmental impact Sydney East Sydney North Rookwood Road Sydney West Sydney South Beaconsfield Haymarket 28
  • 29. Powering Sydney’s Future – Considering all options Rookwood Road Options Options 2 x 330kV cables in stages 2 x 330kV cables at once Remediate Cable 41 Retire Cable 41 Operate Cable 41 at 132kV Decommission Ausgrid cables – 2 stages Decommission Ausgrid cables – 1 stage 1 2 3 4 5 6 29
  • 30. Powering Sydney’s Future – Considering all options Storage Curtailment of load Embedded generation Alternatives to network augmentation which address a potential shortage in electricity supply Network Solution Non-Network Solutions 30
  • 31. The possiblity of non-network David Bones Service Group Manager – Power Strategy and Economics GHD 31
  • 32. Powering Sydney’s Future – The possibility of non-network Non-network comprises of: • Generation • Storage • Demand Management Non-network components are 1. Unserved energy at risk 2. Project deferral 3. Part of the integrated project solution 32
  • 33. Powering Sydney’s Future – The possibility of non-network Inner Sydney’s daily demand profile 33
  • 34. Powering Sydney’s Future – The possibility of non-network Expected unserved energy in 2020-23 without Powering Sydney’s Future project 34
  • 35. Powering Sydney’s Future – The possibility of non-network Examples of non-network options 35
  • 36. Powering Sydney’s Future – The possibility of non-network 36 Non-network case study – 60MW, 12 Hr, 8 week options Existing Standby Generation Central Battery Central Power Station