Building Predictability
in Project Performance
using Applied Statistics




Rajeev Andharia, PMP
BTP Technologies Pvt Ltd


Shital Andharia
BTP Technologies Pvt Ltd
Contents

   1.1    Abstract                                                                             3
   1.2    Keywords                                                                             3
   1.3    Introduction                                                                         3
   1.4    Scenario-1: Predicting Critical Activities on the schedule using Criticality Index   4
   1.5    Criticality index                                                                    6
   1.6    Benefits of calculating activity criticality index                                   6
   1.7    Scenario 2: Estimating the Project Schedule & Cost using Monte Carlo                 6
   1.8    Scenario 3: Building an Early Warning System for Project Monitoring & Control        9
   1.9    Impact of assumptions on the inferences derived using statistical techniques         9
   1.10   Conclusion                                                                           9
   1.11   Author’s Profiles                                                                    10




2|Page
1.1 Abstract
         Objective: Explore the possibility of using “applied statistics” to improve predictability
         in project performance.

         Scope: Usage of statistical techniques within the 9 knowledge areas of PMBOK

         Result: Paper would state the specific areas within the PMBOK where statistics can be
         used to improve predictability of project performance. For example how statistics can
         be used to improve predictability in

         Project Planning (Estimation)

         Monitoring & Control (Building an Early Warning System)

         Business Value: Projects by definition have an element of uniqueness in the outcome.
         Project Performance Management is the art & science of increasing the “probability of
         success (performance)” of achieving the unique outcome within the given constraints
         (i.e. scope, time, cost, quality, risk & resource).

         Usage of statistical techniques in association with PMBOK can facilitate increased
         project performance & hence business benefits associated with the project.

         Key Differentiator: Focused effort on improving predictability in project performance
         using proven practices in “applied statistics” & project management.

         The paper would be focused on “applied project management” with examples &
         scenarios.


         1.2 Keywords
         Predictability, Performance, Statistics,


         1.3 Introduction
                       Would you go to an orthopaedist who did not use X-rays?

                                                                      J.M. Furbringer

         A project manager not using proven tools to develop estimates would be at an
         inherent disadvantage of being inaccurate beyond acceptable limits.

         Project management is the art & science of using tools to increase the probability of
         success for the unique outcomes to be produced by projects. Project manager have to
         forecast the estimated completion date& cost. In fact the credibility of the project
         manager is based on the individualsability to forecast the estimates along with the
         associated accuracy.

         Quantitative techniques based on statistics help the project manager to quantify the
         project performance & hence manage projects with improved predictability.


3|Page
What is Statistics?
         Statistics is set of tools for collecting, organizing, presenting and analysing numerical
         facts or observations. Statistics has empirical roots and provides tools for forecasting
         using data & models.

         Progressive elaboration is an essential characteristic of projects and hence estimates
         have to get refined in accuracy with additional availability of information. This is only
         possible if the project team uses pre-defined scientific models to develop the
         estimates.

         There are no facts about the future—everything that hasn’t happened is only an
         estimate.

                          “If you are going to predict, predict often
”
                                                           Milton Friedman, Nobel laureate

         There is a need to explore statistical techniques that can be used to predict project
         quality, time & cost estimates with acceptable accuracy & confidence levels.

         The paper illustrates through selected scenarios the relevance of statistical techniques
         in project estimation & performance management. The paper is not a primer on
         statistical techniques or project management. The contents of the paper are neither
         exhaustive nor definitive.


         1.4 Scenario-1: Predicting Critical Activities on
         the schedule using Criticality Index
         Lets take a scenario where a project with 5 activities as mentioned in figure:1 have to
         be completed. The project manager uses 3 point estimation for the duration to arrive
         at Optimistic (O), Pessimistic (P) & Most Likely (ML) values.




                                              Figure:1

         The project manager can prepare a schedule using any popular scheduling tool, which
         uses the critical path method as the algorithm.The project manager would
         communicate the scenario 1 of 3 as shown in figure:2.

         One of the purposes for communicating the schedule is to know where should the
         project manager & team focus attention in order to better manage the project critical
         activities i.e. the critical path.

4|Page
A static view of the critical path considering the most likely estimate assumes that no
         activity would start before or latter than estimated.

         As seen in the figure:2 scenario 1, 2 & 3, depending on the variation in the duration
         estimates the list of critical activities identified changes. Most projectsreality is that
         each activity has a different likelihood with respect to duration. It is the dynamic impact
         of the individual activity likelihoods that should be factored to be able to predict the
         critical activities on the schedule.

         With the additional information of 3-point estimate for each activity duration the project
         manager can perform a sensitivity analysis to arrive at the activity criticality index as
         shown in figure:3




                               Figure:2 Project Schedule using CPM

         Sensitivity analysis is the study of how the variation (uncertainty) in the output of a
         mathematical model can be apportioned, qualitatively or quantitatively, to different
         sources of variation in the input of the model.It is a technique for systematically
         changing parameters in a model to determine the effects of such changes.

         Sensitivity analysis can be useful to project manager for a range of purposes,
         including:

             Support decision making (e.g. testing the robustness of an estimate);
             Enhancing communication from project manager to key stakeholders (e.g. by
             making recommendations more credible, understandable, compelling or
             persuasive);
             Increased understanding or quantification of the system (e.g. understanding
             relationships between project variables)

5|Page
Figure:3 Activity Criticality Index derived after a Sensitivity analysis


         1.5 Criticality index
         Criticality Index is mainly used in risk analysis. The Criticality Index of an activity (task)
         can be expressed as a ratio (between 0 and 1) but is more often expressed as a
         percentage. During a ( e.g. Monte Carlo) simulation tasks can join or leave the critical
         path for any given iteration. The Criticality Index expresses how often a particular task
         was on the Critical Path during the analysis. Tasks with a high Criticality Index are
         more likely to cause delay to the project as they are more likely to be on the Critical
         Path. If a task does not exist for some iterations (e.g. it is probabilistic) then it is
         marked as not being critical. For example a task that existed for 50% of the iterations
         and was critical 50% of the time it existed would have a Criticality Index of 25%.


         1.6 Benefits of calculating activity criticality index
         The Criticality Index allows you to identify tasks that are likely to cause delays to the
         project. By monitoring tasks with a high Criticality Index a project is less likely to be
         late. If a task has a 100% Criticality Index it means that during the analysis no matter
         how the task durations varied, the critical path always included the task. The task is
         therefore likely to be key in completing the project on time. Conversely tasks with a
         low or zero Criticality Index are much less likely to cause a delay in the project finish
         date.


         1.7 Scenario 2: Estimating the Project Schedule &
         Cost using Monte Carlo
         What is the Project Completion date?
         What is the BAC / EAC?
         All project managers would be expected to respond to the above questions& more
         often the project manager would respond back based on

             Rolled-up figures from a bottom-up estimation or
              Analogous figures from past experience or
              Combination of 3-point technique & one of the above estimation techniques

6|Page
The inherent limitation of the above estimation techniques is they do not take into
         account the statistical likelihood that each activity’s duration / cost will be somewhere
         on the continuum between the three estimates. The response to the above questions
         cannot be a definitive answer in the form of a fixed date or amount. A mature project
         manager would prefer to state the estimated date or amount along with the associated
         confidence or accuracy levels.

         Example response: “based on the individual activity duration estimates, there is X%
         chance that the project will be complete on or before date Y”.

         So the challenge the project manager has is how to make deterministic predictions on
         time & cost after factoring variations in time & cost for the individual activities on the
         project schedule?

         The Monte Carlo method is one of many methods for analyzing uncertainty
         propagation, where the goal is to determine how random variation; lack of knowledge,
         or error affects the sensitivity, performance, or reliability of the schedule that is being
         modelled. Monte Carlo simulation is categorized as a sampling method because the
         inputs are randomly generated from probability distributions to simulate the process of
         sampling from an actual population. So, we try to choose a distribution for the inputs
         that most closely matches data we already have, or best represents our current state
         of knowledge.

         The data generated from the simulation can be represented as probability distributions
         (or histograms) or converted to error bars, reliability predictions, tolerance zones, and
         confidence intervals

         Figure:4 illustrates the output from a simulation. It can be inferred from the illustration
         that the project has 80% chance to complete on 21st Dec.




               Figure:4 Simulation output used to draw project schedule inferences


7|Page
Monte Carlo methods are useful for modelling phenomena with significant uncertainty
         in inputs, such as the calculation of risk in project. It is a widely successful method in
         risk analysis when compared with alternative methods or human intuition. Compared
         to human intuition, Monte Carlo simulations can better predict risks to schedule & cost
         when applied in projects.

         So what are the key steps to carry out a Monte Carlo?




                     Figure: 5 Sample Steps to carry out Monte Carlo analysis

         Step 1: Create a parametric model, y = f(x1, x2, ..., xq).

         The question would be project completion date & cost? The model answering
         the question would be the network diagram, expected value of key risks, 3-point
         estimates.

         Step 2: Generate a set of random inputs, xi1, xi2, ..., xiq.

         Associate the activity estimates in step 1 to a probability distribution (such as
         Normal, Beta, Triangular, etc.);

         Step 3: Evaluate the model and store the results as yi.

         This are the possible outcomes under the scenarios simulated

         Step 4: Repeat steps 2 and 3 for i = 1 to n.

         Perform at least 1000 iterations to get a good representation

         Step 5: Analyze the results using histograms, summary statistics, confidence intervals,
         etc.

         Allows the project manager to predict estimates for project time & cost based
         on a proven deterministic model.



8|Page
1.8 Scenario 3: Building an Early Warning System
         for Project Monitoring & Control
         During project planning the various statistical techniques can help develop more
         accurate estimates.

         As additional information becomes available during execution, same should be
         processed through the monitoring & control processes to improve project performance
         management. A project early warning system based on statistical techniques can help
         the project manager to respond to project risks. It also improves the stakeholder
         communication.

         Incorporating the relevant efficiency & effectiveness project performance metrics on a
         dashboard with appropriate threshold definition for Red, Amber, Green (RAG)
         statuses can demonstrate mature project management without getting lost in the maze
         of statistical jargons & information overload.


         1.9 Impact of assumptions on the inferences
         derived using statistical techniques
         In uncertainty and sensitivity analysis there is a crucial trade off between how
         meticulous an analyst is in exploring the input assumptions and how wide the resulting
         inference may be. The point is illustrated by:

         “I have proposed a form of organized sensitivity analysis that I call ‘global sensitivity
         analysis’ in which a neighbourhood of alternative assumptions is selected and the
         corresponding interval of inferences is identified. Conclusions are judged to be sturdy
         only if the neighbourhood of assumptions is wide enough to be credible and the
         corresponding interval of inferences is narrow enough to be useful.”

                                                            Edward E. Leamer (econometrician)


         1.10 Conclusion
         Decision theory, expected value, earned value management, decision &probability
         trees, probability distributions, sampling, control charts, quality management tools,
         simulation, sensitivity analysis and other statistical techniques can be used to improve
         project performance predictability.

         Stakeholder management can be significantly improved by increased accuracy in
         communicating project estimates (during planning) & project performance (during
         monitoring).




9|Page
1.11 Author’s Profiles

               1.12




               Rajeev Andharia, PMP, CISA, CISSP, ITIL V3 Expert, Six Sigma (GreenBelt)


               Co-Author of ITSM library book “Six Sigma for IT Management” published by
               itSMF, Netherland

               Specializes in delivery of learning & advisory services to help customers
               understand, architect, implement & manage technology enabled business services.

               Delivers Business excellence by demystifying and re-engineering processes using
               good practices, standards and automation tools to help clients achieve measurable
               maturity enhancement and business benefits.

               15+ Years in delivering solutions for Project Management, IT Governance & Service
               Management, Information Security & Risk Management.

               E-mail: rajeev@myBTP.in




10 | P a g e
Shital Rajeev Andharia MBA, ITILv3 Expert, Six Sigma (GreenBelt),
               ISO 27001 LA

               10+ years in training &consulting with organizations like BTP, Bayer Business
               Services, NIIT, SafeScrypt (Sify) & e-Serve.

               Regularly delivers corporate workshops on ITILv3 (Foundation & Advanced),
               Project Management & Personal Effectiveness for Professionals.

               Delivers business excellence and compliance by providing world class Learning
               & Advisory services on “how-to” achieve measurable improvements through
               People, Process and Tools.

               E-mail: shital@myBTP.in




11 | P a g e

Weitere Àhnliche Inhalte

Was ist angesagt?

Continuous Risk Management
Continuous Risk ManagementContinuous Risk Management
Continuous Risk ManagementGlen Alleman
 
Monte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisMonte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisIntaver Insititute
 
Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018
Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018
Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018Association for Project Management
 
Increasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk ManagementIncreasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk ManagementGlen Alleman
 
Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)Glen Alleman
 
Big data meets evm (submitted)
Big data meets evm (submitted)Big data meets evm (submitted)
Big data meets evm (submitted)Glen Alleman
 
Assessing Enterprise Project Risk
Assessing Enterprise Project RiskAssessing Enterprise Project Risk
Assessing Enterprise Project RiskGlen Alleman
 
Improved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentImproved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentAcumen
 
What Does Done Look Like?
What Does Done Look Like?What Does Done Look Like?
What Does Done Look Like?Glen Alleman
 
Cure for Cost and Schedule Growth
Cure for Cost and Schedule GrowthCure for Cost and Schedule Growth
Cure for Cost and Schedule GrowthGlen Alleman
 
Using Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project ManagementUsing Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project ManagementMike Tulkoff
 
Baseline Compliance Analysis
Baseline Compliance AnalysisBaseline Compliance Analysis
Baseline Compliance AnalysisAcumen
 
Risk management using risk+ (v5)
Risk management using risk+ (v5)Risk management using risk+ (v5)
Risk management using risk+ (v5)Glen Alleman
 
Risk adjusted engineering management
Risk adjusted engineering managementRisk adjusted engineering management
Risk adjusted engineering managementGlen Alleman
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slideshenry KKK
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 

Was ist angesagt? (20)

Shewhart
ShewhartShewhart
Shewhart
 
Continuous Risk Management
Continuous Risk ManagementContinuous Risk Management
Continuous Risk Management
 
Monte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisMonte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk Analysis
 
Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018
Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018
Adam Suchley - Predictive Delivery Assurance - APM Assurance SIG Conference 2018
 
RiskyProject Software
RiskyProject SoftwareRiskyProject Software
RiskyProject Software
 
Increasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk ManagementIncreasing the Probability of Success with Continuous Risk Management
Increasing the Probability of Success with Continuous Risk Management
 
Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)Programmatic risk management workshop (handbook)
Programmatic risk management workshop (handbook)
 
Big data meets evm (submitted)
Big data meets evm (submitted)Big data meets evm (submitted)
Big data meets evm (submitted)
 
Assessing Enterprise Project Risk
Assessing Enterprise Project RiskAssessing Enterprise Project Risk
Assessing Enterprise Project Risk
 
Improved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric AssessmentImproved Schedule Risk Analysis through Metric Assessment
Improved Schedule Risk Analysis through Metric Assessment
 
What Does Done Look Like?
What Does Done Look Like?What Does Done Look Like?
What Does Done Look Like?
 
Cure for Cost and Schedule Growth
Cure for Cost and Schedule GrowthCure for Cost and Schedule Growth
Cure for Cost and Schedule Growth
 
Using Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project ManagementUsing Risk Analysis and Simulation in Project Management
Using Risk Analysis and Simulation in Project Management
 
Baseline Compliance Analysis
Baseline Compliance AnalysisBaseline Compliance Analysis
Baseline Compliance Analysis
 
Agile EVMS
Agile EVMSAgile EVMS
Agile EVMS
 
Risk management using risk+ (v5)
Risk management using risk+ (v5)Risk management using risk+ (v5)
Risk management using risk+ (v5)
 
Risk adjusted engineering management
Risk adjusted engineering managementRisk adjusted engineering management
Risk adjusted engineering management
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
 
The art of project estimation
The art of project estimationThe art of project estimation
The art of project estimation
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 

Andere mochten auch (7)

Rsc 07
Rsc 07Rsc 07
Rsc 07
 
Rsc 02
Rsc 02Rsc 02
Rsc 02
 
Gvt 01
Gvt 01Gvt 01
Gvt 01
 
Rsc 03
Rsc 03Rsc 03
Rsc 03
 
Trn 12
Trn 12Trn 12
Trn 12
 
Sft 02
Sft 02Sft 02
Sft 02
 
Sft 01
Sft 01Sft 01
Sft 01
 

Ähnlich wie Rsc 04

significance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsignificance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsarah david
 
significance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsignificance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsarah david
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...IRJET Journal
 
significance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdfsignificance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdfsarah david
 
Running head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticRunning head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticDIPESH30
 
significance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdfsignificance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdfsarah david
 
DPPM1
DPPM1DPPM1
DPPM1PMI2011
 
A Greedy Heuristic Approach for Sprint Planning in Agile Software Development
A Greedy Heuristic Approach for Sprint Planning in Agile Software DevelopmentA Greedy Heuristic Approach for Sprint Planning in Agile Software Development
A Greedy Heuristic Approach for Sprint Planning in Agile Software DevelopmentIJTET Journal
 
Forecasting cost and schedule performance
Forecasting cost and schedule performanceForecasting cost and schedule performance
Forecasting cost and schedule performanceGlen Alleman
 
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...IJMIT JOURNAL
 
Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Mihai Buta
 
Building Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and ScheduleBuilding Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and ScheduleGlen Alleman
 
project management
project managementproject management
project managementShashank Soni
 
Estimation sharbani bhattacharya
Estimation sharbani bhattacharyaEstimation sharbani bhattacharya
Estimation sharbani bhattacharyaSharbani Bhattacharya
 
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...Aravind NC
 
Earning Value from Earned Value Management
Earning Value from Earned Value ManagementEarning Value from Earned Value Management
Earning Value from Earned Value ManagementGlen Alleman
 
Building a risk tolerant integrated master schedule
Building a risk tolerant integrated master scheduleBuilding a risk tolerant integrated master schedule
Building a risk tolerant integrated master scheduleGlen Alleman
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET Journal
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk ManagementSAJJAD KHUDHUR ABBAS
 

Ähnlich wie Rsc 04 (20)

significance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsignificance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptx
 
significance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsignificance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptx
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
 
significance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdfsignificance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdf
 
Running head critical path method1 critical path method7critic
Running head critical path method1 critical path method7criticRunning head critical path method1 critical path method7critic
Running head critical path method1 critical path method7critic
 
significance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdfsignificance_of_test_estimating_in_the_software_development.pdf
significance_of_test_estimating_in_the_software_development.pdf
 
DPPM1
DPPM1DPPM1
DPPM1
 
A Greedy Heuristic Approach for Sprint Planning in Agile Software Development
A Greedy Heuristic Approach for Sprint Planning in Agile Software DevelopmentA Greedy Heuristic Approach for Sprint Planning in Agile Software Development
A Greedy Heuristic Approach for Sprint Planning in Agile Software Development
 
Forecasting cost and schedule performance
Forecasting cost and schedule performanceForecasting cost and schedule performance
Forecasting cost and schedule performance
 
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
 
Primavera Monte Carlo[1]
Primavera Monte Carlo[1]Primavera Monte Carlo[1]
Primavera Monte Carlo[1]
 
Building Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and ScheduleBuilding Risk Tolerance into the Program Plan and Schedule
Building Risk Tolerance into the Program Plan and Schedule
 
project management
project managementproject management
project management
 
Estimation sharbani bhattacharya
Estimation sharbani bhattacharyaEstimation sharbani bhattacharya
Estimation sharbani bhattacharya
 
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
 
Earning Value from Earned Value Management
Earning Value from Earned Value ManagementEarning Value from Earned Value Management
Earning Value from Earned Value Management
 
Building a risk tolerant integrated master schedule
Building a risk tolerant integrated master scheduleBuilding a risk tolerant integrated master schedule
Building a risk tolerant integrated master schedule
 
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-ProjectIRJET-  	  Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 

Mehr von PMInstituteIndia (20)

Piyush govil archana_sharma
Piyush govil  archana_sharmaPiyush govil  archana_sharma
Piyush govil archana_sharma
 
D john peter
D john peterD john peter
D john peter
 
Trn 10
Trn 10Trn 10
Trn 10
 
Trn 11
Trn 11Trn 11
Trn 11
 
Trn 09
Trn 09Trn 09
Trn 09
 
Trn 08
Trn 08Trn 08
Trn 08
 
Trn 07
Trn 07Trn 07
Trn 07
 
Trn 06
Trn 06Trn 06
Trn 06
 
Trn 05
Trn 05Trn 05
Trn 05
 
Trn 04
Trn 04Trn 04
Trn 04
 
Trn 03
Trn 03Trn 03
Trn 03
 
Trn 02
Trn 02Trn 02
Trn 02
 
Trn 01
Trn 01Trn 01
Trn 01
 
Sps 01
Sps 01Sps 01
Sps 01
 
Sft 03
Sft 03Sft 03
Sft 03
 
Sft 04
Sft 04Sft 04
Sft 04
 
Rsc 06
Rsc 06Rsc 06
Rsc 06
 
Rsc 05
Rsc 05Rsc 05
Rsc 05
 
Rsc 01
Rsc 01Rsc 01
Rsc 01
 
Pmt 05
Pmt 05Pmt 05
Pmt 05
 

KĂŒrzlich hochgeladen

8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Call Us đŸ“Č8800102216📞 Call Girls In DLF City Gurgaon
Call Us đŸ“Č8800102216📞 Call Girls In DLF City GurgaonCall Us đŸ“Č8800102216📞 Call Girls In DLF City Gurgaon
Call Us đŸ“Č8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

KĂŒrzlich hochgeladen (20)

8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Call Us đŸ“Č8800102216📞 Call Girls In DLF City Gurgaon
Call Us đŸ“Č8800102216📞 Call Girls In DLF City GurgaonCall Us đŸ“Č8800102216📞 Call Girls In DLF City Gurgaon
Call Us đŸ“Č8800102216📞 Call Girls In DLF City Gurgaon
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀8860477959 Escorts...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❀88604**77959_Russian 100% Genuine Escor...
 
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

Rsc 04

  • 1. Aum gam ganapataye namya. Building Predictability in Project Performance using Applied Statistics Rajeev Andharia, PMP BTP Technologies Pvt Ltd Shital Andharia BTP Technologies Pvt Ltd
  • 2. Contents 1.1 Abstract 3 1.2 Keywords 3 1.3 Introduction 3 1.4 Scenario-1: Predicting Critical Activities on the schedule using Criticality Index 4 1.5 Criticality index 6 1.6 Benefits of calculating activity criticality index 6 1.7 Scenario 2: Estimating the Project Schedule & Cost using Monte Carlo 6 1.8 Scenario 3: Building an Early Warning System for Project Monitoring & Control 9 1.9 Impact of assumptions on the inferences derived using statistical techniques 9 1.10 Conclusion 9 1.11 Author’s Profiles 10 2|Page
  • 3. 1.1 Abstract Objective: Explore the possibility of using “applied statistics” to improve predictability in project performance. Scope: Usage of statistical techniques within the 9 knowledge areas of PMBOK Result: Paper would state the specific areas within the PMBOK where statistics can be used to improve predictability of project performance. For example how statistics can be used to improve predictability in Project Planning (Estimation) Monitoring & Control (Building an Early Warning System) Business Value: Projects by definition have an element of uniqueness in the outcome. Project Performance Management is the art & science of increasing the “probability of success (performance)” of achieving the unique outcome within the given constraints (i.e. scope, time, cost, quality, risk & resource). Usage of statistical techniques in association with PMBOK can facilitate increased project performance & hence business benefits associated with the project. Key Differentiator: Focused effort on improving predictability in project performance using proven practices in “applied statistics” & project management. The paper would be focused on “applied project management” with examples & scenarios. 1.2 Keywords Predictability, Performance, Statistics, 1.3 Introduction Would you go to an orthopaedist who did not use X-rays? J.M. Furbringer A project manager not using proven tools to develop estimates would be at an inherent disadvantage of being inaccurate beyond acceptable limits. Project management is the art & science of using tools to increase the probability of success for the unique outcomes to be produced by projects. Project manager have to forecast the estimated completion date& cost. In fact the credibility of the project manager is based on the individualsability to forecast the estimates along with the associated accuracy. Quantitative techniques based on statistics help the project manager to quantify the project performance & hence manage projects with improved predictability. 3|Page
  • 4. What is Statistics? Statistics is set of tools for collecting, organizing, presenting and analysing numerical facts or observations. Statistics has empirical roots and provides tools for forecasting using data & models. Progressive elaboration is an essential characteristic of projects and hence estimates have to get refined in accuracy with additional availability of information. This is only possible if the project team uses pre-defined scientific models to develop the estimates. There are no facts about the future—everything that hasn’t happened is only an estimate. “If you are going to predict, predict often
” Milton Friedman, Nobel laureate There is a need to explore statistical techniques that can be used to predict project quality, time & cost estimates with acceptable accuracy & confidence levels. The paper illustrates through selected scenarios the relevance of statistical techniques in project estimation & performance management. The paper is not a primer on statistical techniques or project management. The contents of the paper are neither exhaustive nor definitive. 1.4 Scenario-1: Predicting Critical Activities on the schedule using Criticality Index Lets take a scenario where a project with 5 activities as mentioned in figure:1 have to be completed. The project manager uses 3 point estimation for the duration to arrive at Optimistic (O), Pessimistic (P) & Most Likely (ML) values. Figure:1 The project manager can prepare a schedule using any popular scheduling tool, which uses the critical path method as the algorithm.The project manager would communicate the scenario 1 of 3 as shown in figure:2. One of the purposes for communicating the schedule is to know where should the project manager & team focus attention in order to better manage the project critical activities i.e. the critical path. 4|Page
  • 5. A static view of the critical path considering the most likely estimate assumes that no activity would start before or latter than estimated. As seen in the figure:2 scenario 1, 2 & 3, depending on the variation in the duration estimates the list of critical activities identified changes. Most projectsreality is that each activity has a different likelihood with respect to duration. It is the dynamic impact of the individual activity likelihoods that should be factored to be able to predict the critical activities on the schedule. With the additional information of 3-point estimate for each activity duration the project manager can perform a sensitivity analysis to arrive at the activity criticality index as shown in figure:3 Figure:2 Project Schedule using CPM Sensitivity analysis is the study of how the variation (uncertainty) in the output of a mathematical model can be apportioned, qualitatively or quantitatively, to different sources of variation in the input of the model.It is a technique for systematically changing parameters in a model to determine the effects of such changes. Sensitivity analysis can be useful to project manager for a range of purposes, including: Support decision making (e.g. testing the robustness of an estimate); Enhancing communication from project manager to key stakeholders (e.g. by making recommendations more credible, understandable, compelling or persuasive); Increased understanding or quantification of the system (e.g. understanding relationships between project variables) 5|Page
  • 6. Figure:3 Activity Criticality Index derived after a Sensitivity analysis 1.5 Criticality index Criticality Index is mainly used in risk analysis. The Criticality Index of an activity (task) can be expressed as a ratio (between 0 and 1) but is more often expressed as a percentage. During a ( e.g. Monte Carlo) simulation tasks can join or leave the critical path for any given iteration. The Criticality Index expresses how often a particular task was on the Critical Path during the analysis. Tasks with a high Criticality Index are more likely to cause delay to the project as they are more likely to be on the Critical Path. If a task does not exist for some iterations (e.g. it is probabilistic) then it is marked as not being critical. For example a task that existed for 50% of the iterations and was critical 50% of the time it existed would have a Criticality Index of 25%. 1.6 Benefits of calculating activity criticality index The Criticality Index allows you to identify tasks that are likely to cause delays to the project. By monitoring tasks with a high Criticality Index a project is less likely to be late. If a task has a 100% Criticality Index it means that during the analysis no matter how the task durations varied, the critical path always included the task. The task is therefore likely to be key in completing the project on time. Conversely tasks with a low or zero Criticality Index are much less likely to cause a delay in the project finish date. 1.7 Scenario 2: Estimating the Project Schedule & Cost using Monte Carlo What is the Project Completion date? What is the BAC / EAC? All project managers would be expected to respond to the above questions& more often the project manager would respond back based on Rolled-up figures from a bottom-up estimation or Analogous figures from past experience or Combination of 3-point technique & one of the above estimation techniques 6|Page
  • 7. The inherent limitation of the above estimation techniques is they do not take into account the statistical likelihood that each activity’s duration / cost will be somewhere on the continuum between the three estimates. The response to the above questions cannot be a definitive answer in the form of a fixed date or amount. A mature project manager would prefer to state the estimated date or amount along with the associated confidence or accuracy levels. Example response: “based on the individual activity duration estimates, there is X% chance that the project will be complete on or before date Y”. So the challenge the project manager has is how to make deterministic predictions on time & cost after factoring variations in time & cost for the individual activities on the project schedule? The Monte Carlo method is one of many methods for analyzing uncertainty propagation, where the goal is to determine how random variation; lack of knowledge, or error affects the sensitivity, performance, or reliability of the schedule that is being modelled. Monte Carlo simulation is categorized as a sampling method because the inputs are randomly generated from probability distributions to simulate the process of sampling from an actual population. So, we try to choose a distribution for the inputs that most closely matches data we already have, or best represents our current state of knowledge. The data generated from the simulation can be represented as probability distributions (or histograms) or converted to error bars, reliability predictions, tolerance zones, and confidence intervals Figure:4 illustrates the output from a simulation. It can be inferred from the illustration that the project has 80% chance to complete on 21st Dec. Figure:4 Simulation output used to draw project schedule inferences 7|Page
  • 8. Monte Carlo methods are useful for modelling phenomena with significant uncertainty in inputs, such as the calculation of risk in project. It is a widely successful method in risk analysis when compared with alternative methods or human intuition. Compared to human intuition, Monte Carlo simulations can better predict risks to schedule & cost when applied in projects. So what are the key steps to carry out a Monte Carlo? Figure: 5 Sample Steps to carry out Monte Carlo analysis Step 1: Create a parametric model, y = f(x1, x2, ..., xq). The question would be project completion date & cost? The model answering the question would be the network diagram, expected value of key risks, 3-point estimates. Step 2: Generate a set of random inputs, xi1, xi2, ..., xiq. Associate the activity estimates in step 1 to a probability distribution (such as Normal, Beta, Triangular, etc.); Step 3: Evaluate the model and store the results as yi. This are the possible outcomes under the scenarios simulated Step 4: Repeat steps 2 and 3 for i = 1 to n. Perform at least 1000 iterations to get a good representation Step 5: Analyze the results using histograms, summary statistics, confidence intervals, etc. Allows the project manager to predict estimates for project time & cost based on a proven deterministic model. 8|Page
  • 9. 1.8 Scenario 3: Building an Early Warning System for Project Monitoring & Control During project planning the various statistical techniques can help develop more accurate estimates. As additional information becomes available during execution, same should be processed through the monitoring & control processes to improve project performance management. A project early warning system based on statistical techniques can help the project manager to respond to project risks. It also improves the stakeholder communication. Incorporating the relevant efficiency & effectiveness project performance metrics on a dashboard with appropriate threshold definition for Red, Amber, Green (RAG) statuses can demonstrate mature project management without getting lost in the maze of statistical jargons & information overload. 1.9 Impact of assumptions on the inferences derived using statistical techniques In uncertainty and sensitivity analysis there is a crucial trade off between how meticulous an analyst is in exploring the input assumptions and how wide the resulting inference may be. The point is illustrated by: “I have proposed a form of organized sensitivity analysis that I call ‘global sensitivity analysis’ in which a neighbourhood of alternative assumptions is selected and the corresponding interval of inferences is identified. Conclusions are judged to be sturdy only if the neighbourhood of assumptions is wide enough to be credible and the corresponding interval of inferences is narrow enough to be useful.” Edward E. Leamer (econometrician) 1.10 Conclusion Decision theory, expected value, earned value management, decision &probability trees, probability distributions, sampling, control charts, quality management tools, simulation, sensitivity analysis and other statistical techniques can be used to improve project performance predictability. Stakeholder management can be significantly improved by increased accuracy in communicating project estimates (during planning) & project performance (during monitoring). 9|Page
  • 10. 1.11 Author’s Profiles 1.12 Rajeev Andharia, PMP, CISA, CISSP, ITIL V3 Expert, Six Sigma (GreenBelt) Co-Author of ITSM library book “Six Sigma for IT Management” published by itSMF, Netherland Specializes in delivery of learning & advisory services to help customers understand, architect, implement & manage technology enabled business services. Delivers Business excellence by demystifying and re-engineering processes using good practices, standards and automation tools to help clients achieve measurable maturity enhancement and business benefits. 15+ Years in delivering solutions for Project Management, IT Governance & Service Management, Information Security & Risk Management. E-mail: rajeev@myBTP.in 10 | P a g e
  • 11. Shital Rajeev Andharia MBA, ITILv3 Expert, Six Sigma (GreenBelt), ISO 27001 LA 10+ years in training &consulting with organizations like BTP, Bayer Business Services, NIIT, SafeScrypt (Sify) & e-Serve. Regularly delivers corporate workshops on ITILv3 (Foundation & Advanced), Project Management & Personal Effectiveness for Professionals. Delivers business excellence and compliance by providing world class Learning & Advisory services on “how-to” achieve measurable improvements through People, Process and Tools. E-mail: shital@myBTP.in 11 | P a g e