Histogram
Pareto Diagram
Ishikawa Diagram
Control Chart
Nicola Ergo
AGH University of Science and Technology
Operational research in engineering
Histogram
A histogram is a graphical representation of the distribution of numerical data. It
is an estimate of the probability distribution of a continuous variable
(quantitative variable).
Purpose: to roughly assess the probability distribution of a given variable by
depicting the frequencies of observations occurring in certain ranges
of values.
Slide 1
Histogram
The vertical axis represents the frequency, that is the number of cases per unit of
the variable on the horizontal axis.
The horizontal axis represents the different variables that characterize the entire
range of values.
0
1
2
3
4
5
x1 x2 x3 x4 x5 x6
Frequency
Variables
Slide 2
Histogram
To construct a histogram:
• the first step is to divide the entire range of values into a series of intervals
and then count how many values fall into each interval; the intervals are
usually specified as consecutive, non-overlapping, they must be adjacent and
are usually equal size;
• the second step is to erect a rectangle over the interval with height
proportional to the frequency, so as to show the number of cases in each
interval.
Slide 3
Histogram
Example:
You measure the height of every tree in the orchard in centimeters (cm).
The heights vary from 100 cm to 340 cm.
You decide to put the results into groups of 50 cm:
• the 100 to just below 150 cm range;
• the 150 to just below 200 cm range;
• etc...
So a tree that is 260 cm tall is added to the "250-300" range.
And here is the result:
Slide 4
ParetoDiagram
A Pareto Diagram is a type of chart that contains both bars and a line graph,
where individual values are represented in descending order by bars, and the
cumulative total is represented by the line.
Purpose: highlight the most important among a set of factors.
Slide 5
The left vertical axis is the frequency of occurrence, but it can alternatively
represent cost or another important unit of measure.
The right vertical axis is the cumulative percentage of the total number of
occurrences, total cost, or total of the particular unit of measure.
The horizontal axis represent the
variables.
The line shows the cumulative
relative frequency. Due to the
values of the statistical variables
are placed in order of relative
frequency, the graph clearly
reveals which factors have the
greatest impact and where
attention is likely to yield the
greatest benefit.
Pareto Diagram
Slide 6
Example:
XYZ Clothing Store was seeing a steady decline in business. Before the manager
did a customer survey.
By collecting data and displaying it in a Pareto chart, the manager could see
which variables were having the most influence.
Pareto Diagram
Slide 7
0%
20%
40%
60%
80%
100%
120%
Percent of total
Commulative percentage
Horizontal 80% line value
Following the Pareto Principle, those
are the areas where he should focus his
attention to build his business back up.
In this example,
parking difficulties,
rude sales people and
poor lighting were
hurting his business
most.
Pareto Diagram
Slide 8
Ishikawa Diagram
Ishikawa diagram (also called fishbone diagram, herringbone diagram, cause-
and-effect diagram, or Fishikawa) is causal diagram that show the causes of a
specific event or problem.
Purpose: to break down (in successive layers of detail) root causes that
potentially contribute to a particular effect.
Slide 9
Common uses of the Ishikawa diagram are product design and quality defect
prevention to identify potential factors causing an overall effect. Each cause or
reason for imperfection is a source of variation. Causes are usually grouped into
major categories to identify these sources of variation.
The categories typically include:
• people: anyone involved with the process;
• methods: how the process is performed and the specific requirements for
doing it, such as policies, procedures, rules, regulations and laws;
• machines: any equipment, computers, tools, etc. required to accomplish the
job;
• materials: raw materials, parts, pens, paper, etc. used to produce the final
product;
• measurements: data generated from the process that are used to evaluate its
quality;
• environment: the conditions, such as location, time, temperature, and culture
in which the process operates.
Ishikawa Diagram
Slide 10
How to create a “fish diagram”:
• create a head, which lists the problem or issue to be studied;
• create a backbone for the fish (straight line which leads to the head);
• identify at least four “causes” that contribute to the problem; connect these
four causes with arrows to the spine; these will create the first bones of the
fish;
• brainstorm around each “cause” to document those things that contributed
to the cause; use the 5 Whys or another questioning process such as the 4P’s
(Policies, Procedures, People and Plant) to keep the conversation focused;
• continue breaking down each cause until the root causes have been
identified.
Ishikawa Diagram
Slide 11
Example:
this example illustrates how a group might begin a “fish diagram” to identify all
the possible reasons a web site went down in order to discover the root cause.
Ishikawa Diagram
Slide 12
Control Chart
The control chart is a graph used to study how a process changes over time.
Data are plotted in time order. A control chart always has:
• a central line for the average;
• an upper line for the upper control limit UCL;
• a lower line for the lower control limit LCL;
• points representing a statistic (mean, range, proportion) of measurements of
a quality characteristic in samples taken from the process at different times.
By comparing current data to
these lines, you can draw
conclusions about whether the
process variation is consistent (in
control) or is unpredictable (out
of control, affected by special
causes of variation).
These lines are determined
from historical data.
Slide 13
When to Use a Control Chart:
• When controlling ongoing processes by finding and correcting problems as
they occur;
• When determining whether a process is stable (in statistical control);
• When analyzing patterns of process variation from special causes (non-
routine events) or common causes (built into the process);
• When determining whether your quality improvement project should aim to
prevent specific problems or to make fundamental changes to the process.
Control Chart
Slide 14
Control Chart Basic Procedure:
1. determine the appropriate time period for collecting and plotting data;
2. collect data, construct your chart and analyze the data;
3. look for “out-of-control signals” on the control chart.
When one is identified, mark it on
the chart and investigate the
cause. Document how you
investigated, what you learned,
the cause and how it was
corrected.
Control Chart
Slide 15
Controlled Variation
Controlled variation is characterized by a
stable and consistent pattern of
variation over time, and is associated
with common causes. A process
operating with controlled variation has
an outcome that is predictable within
the bounds of the control limits.
Uncontrolled Variation
Uncontrolled variation is characterized
by variation that changes over time and
is associated with special causes. The
outcomes of this process are
unpredictable.
Control Chart
Slide 16
Example:
A team in an accounting group has been working on improving the processing
of invoices. The team is trying to reduce the cost of processing invoices by
decreasing the fraction of invoices with errors. The team developed the
following operational definition for a defective invoice: an invoice is defective if
it has incorrect price, incorrect quantity, incorrect coding, incorrect address, or
incorrect name. The team decided to pull a random sample of 100 invoices per
day. If the invoice had one or more errors it was defective. The data from the
last 10 days are given in the table.
Control Chart
Slide 17
The next step is to calculate the average fraction defective p̄. To determine the
average, we add up all the np values and divide by the sum of all the n values.
The sum of the np values is 239; the sum of the n values is 1000. The average is
then calculated as shown below.
The next step is to determine the average subgroup size n̄. Since the subgroup
size is constant, the average subgroup size is 100. This average calculation is
shown in the second equation where k is the number of subgroups. The next
step is to calculate the control limits. The control limits calculations are shown
below.
Control Chart
Slide 18
Control Chart
Slide 19
Conclusion:
We have examined the variation in the % of invoices with errors from day to
day.
• On average, each day will have about 24% of the invoices with errors. Some
days it may be as high as 30% or as low as 20%. Only common causes of
variation are present.
• The process is in statistical control because all the values are within the UCL
and the LCL. This means that the process is consistent and predictable.
Note that this does not mean that the process is acceptable. Having 24% of
invoices with errors is not acceptable. The next step is to apply a problem-
solving model to reduce the number of errors. You should be using a Pareto
diagram with this control chart. The Pareto diagram is used to determine the
reason for errors and the frequency with which they occur.
Control Chart
Slide 20

Weitere ähnliche Inhalte

Was ist angesagt?

TAGUCHI- QUALITY GURU
TAGUCHI- QUALITY GURUTAGUCHI- QUALITY GURU
TAGUCHI- QUALITY GURURajeev Sharan
 
Control chart ppt
Control chart pptControl chart ppt
Control chart pptDeepak Sarangi
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control ChartAshish Gupta
 
Cause and effect diagram
Cause and effect diagramCause and effect diagram
Cause and effect diagramLizzette Danan
 
Tools and techniques used in tqm ppt
Tools and techniques used in tqm pptTools and techniques used in tqm ppt
Tools and techniques used in tqm pptabhandary
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlANOOPA NARAYANAN
 
Control charts in statistical quality control
Control charts in statistical quality controlControl charts in statistical quality control
Control charts in statistical quality controlrakheechhibber1971
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality ControlDr. Rana Singh
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process ControlMahmudul Hasan
 
Check Sheets
Check SheetsCheck Sheets
Check SheetsCIToolkit
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsDr. John V. Padua
 
Control charts
Control chartsControl charts
Control chartsSutha Vincent
 
Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsMadeleine Lee
 
Control charts
Control chartsControl charts
Control chartsSahul Hameed
 

Was ist angesagt? (20)

TAGUCHI- QUALITY GURU
TAGUCHI- QUALITY GURUTAGUCHI- QUALITY GURU
TAGUCHI- QUALITY GURU
 
Control chart ppt
Control chart pptControl chart ppt
Control chart ppt
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control Chart
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Cause and effect diagram
Cause and effect diagramCause and effect diagram
Cause and effect diagram
 
Tools and techniques used in tqm ppt
Tools and techniques used in tqm pptTools and techniques used in tqm ppt
Tools and techniques used in tqm ppt
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Control charts in statistical quality control
Control charts in statistical quality controlControl charts in statistical quality control
Control charts in statistical quality control
 
PDCA & Tools
PDCA & ToolsPDCA & Tools
PDCA & Tools
 
8D Problem Solving Poster
8D Problem Solving Poster8D Problem Solving Poster
8D Problem Solving Poster
 
Statistical Quality Control
Statistical Quality ControlStatistical Quality Control
Statistical Quality Control
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process Control
 
Check Sheets
Check SheetsCheck Sheets
Check Sheets
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 
Tqm taguchi
Tqm taguchiTqm taguchi
Tqm taguchi
 
Taguchi method
Taguchi methodTaguchi method
Taguchi method
 
Production and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality ToolsProduction and Quality Tools: The 7 Basic Quality Tools
Production and Quality Tools: The 7 Basic Quality Tools
 
Control charts
Control chartsControl charts
Control charts
 
Statistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic ToolsStatistical Process Control (SPC) Tools - 7 Basic Tools
Statistical Process Control (SPC) Tools - 7 Basic Tools
 
Control charts
Control chartsControl charts
Control charts
 

Andere mochten auch

Quality Control Tools for Problem Solving
Quality Control Tools for Problem SolvingQuality Control Tools for Problem Solving
Quality Control Tools for Problem SolvingD&H Engineers
 
Pareto diagram
Pareto diagramPareto diagram
Pareto diagramHina
 
Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]
Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]
Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]Bharti Yadav
 
Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]
Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]
Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]TeamADP
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagramkerviy
 
Diabetes care related process modelling using Process Mining techniques. Less...
Diabetes care related process modelling using Process Mining techniques. Less...Diabetes care related process modelling using Process Mining techniques. Less...
Diabetes care related process modelling using Process Mining techniques. Less...Universitat Politècnica de València
 
Understanding Mobile Web Performance
Understanding Mobile Web PerformanceUnderstanding Mobile Web Performance
Understanding Mobile Web Performancevrajivk
 
Browser based mobile applications - or how to reach 375x more devices than iP...
Browser based mobile applications - or how to reach 375x more devices than iP...Browser based mobile applications - or how to reach 375x more devices than iP...
Browser based mobile applications - or how to reach 375x more devices than iP...Roland Sigmond
 
Lesson 1 pareto analysis
Lesson 1 pareto analysisLesson 1 pareto analysis
Lesson 1 pareto analysisBronwyn Cloete
 
QCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAIN
QCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAINQCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAIN
QCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAINRashi Jain
 
Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]
Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]
Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]Deepak Singh
 
Lean: Scatter Diagram Quality Tools Series
Lean: Scatter Diagram Quality Tools Series Lean: Scatter Diagram Quality Tools Series
Lean: Scatter Diagram Quality Tools Series College/University
 
Ishikawa chart of quality control
Ishikawa chart of quality controlIshikawa chart of quality control
Ishikawa chart of quality controlRavindra Sharma
 
Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]
Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]
Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]Suyashi Rastogi
 
Cost of software quality ( software quality assurance )
Cost of software quality ( software quality assurance )Cost of software quality ( software quality assurance )
Cost of software quality ( software quality assurance )Kiran Hanjar
 
Seven QC Tools Training; Scatter Diagram
Seven QC Tools Training; Scatter DiagramSeven QC Tools Training; Scatter Diagram
Seven QC Tools Training; Scatter DiagramShakehand with Life
 

Andere mochten auch (20)

Quality Control Tools for Problem Solving
Quality Control Tools for Problem SolvingQuality Control Tools for Problem Solving
Quality Control Tools for Problem Solving
 
Pareto diagram
Pareto diagramPareto diagram
Pareto diagram
 
Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]
Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]
Qcl 14-v3 [pareto diagram]-[nitie mumbai]_[pramesh anuragi]
 
Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]
Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]
Qcl-14-v3_[pareto diagram]_[banasthali university]_[Anu Vashisth]
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagram
 
Histogram
HistogramHistogram
Histogram
 
Diabetes care related process modelling using Process Mining techniques. Less...
Diabetes care related process modelling using Process Mining techniques. Less...Diabetes care related process modelling using Process Mining techniques. Less...
Diabetes care related process modelling using Process Mining techniques. Less...
 
Understanding Mobile Web Performance
Understanding Mobile Web PerformanceUnderstanding Mobile Web Performance
Understanding Mobile Web Performance
 
Browser based mobile applications - or how to reach 375x more devices than iP...
Browser based mobile applications - or how to reach 375x more devices than iP...Browser based mobile applications - or how to reach 375x more devices than iP...
Browser based mobile applications - or how to reach 375x more devices than iP...
 
Lesson 1 pareto analysis
Lesson 1 pareto analysisLesson 1 pareto analysis
Lesson 1 pareto analysis
 
QCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAIN
QCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAINQCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAIN
QCL-14-V3- PARETO DIAGRAM- BANASTHALI VIDYAPITH- RASHI JAIN
 
Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]
Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]
Qcl 14-v3 [pareto diagram]-[nitie]_[chappa kishore]
 
Kaoru ishikawa
Kaoru ishikawaKaoru ishikawa
Kaoru ishikawa
 
Lean: Scatter Diagram Quality Tools Series
Lean: Scatter Diagram Quality Tools Series Lean: Scatter Diagram Quality Tools Series
Lean: Scatter Diagram Quality Tools Series
 
Ishikawa chart of quality control
Ishikawa chart of quality controlIshikawa chart of quality control
Ishikawa chart of quality control
 
Stratification anshul
Stratification anshulStratification anshul
Stratification anshul
 
Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]
Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]
Qcl 14-v3 [pareto diagram]-[banathali_university]_[suyashi_rastogi]
 
Cost of software quality ( software quality assurance )
Cost of software quality ( software quality assurance )Cost of software quality ( software quality assurance )
Cost of software quality ( software quality assurance )
 
Kaoru Ishikawa
Kaoru IshikawaKaoru Ishikawa
Kaoru Ishikawa
 
Seven QC Tools Training; Scatter Diagram
Seven QC Tools Training; Scatter DiagramSeven QC Tools Training; Scatter Diagram
Seven QC Tools Training; Scatter Diagram
 

Ähnlich wie Histogram, Pareto Diagram, Ishikawa Diagram, and Control Chart

Software for quality management
Software for quality managementSoftware for quality management
Software for quality managementselinasimpson341
 
Lean quality management
Lean quality managementLean quality management
Lean quality managementselinasimpson1001
 
Ukas iso 9001
Ukas iso 9001Ukas iso 9001
Ukas iso 9001jomjenguta
 
Get iso 9001 certification
Get iso 9001 certificationGet iso 9001 certification
Get iso 9001 certificationtagujomri
 
Iso 9001 internal auditor training
Iso 9001 internal auditor trainingIso 9001 internal auditor training
Iso 9001 internal auditor trainingjomharipe
 
Tuv iso 9001
Tuv iso 9001Tuv iso 9001
Tuv iso 9001karedutip
 
Iso 9001 quality assurance
Iso 9001 quality assuranceIso 9001 quality assurance
Iso 9001 quality assurancejintrajom
 
Quality driven management
Quality driven managementQuality driven management
Quality driven managementselinasimpson1201
 
Certified quality management professional
Certified quality management professionalCertified quality management professional
Certified quality management professionalselinasimpson2901
 
Requirement of iso 9001
Requirement of iso 9001Requirement of iso 9001
Requirement of iso 9001jintrajom
 
Functions of quality management
Functions of quality managementFunctions of quality management
Functions of quality managementselinasimpson2901
 
Quality management certificate
Quality management certificateQuality management certificate
Quality management certificateselinasimpson1401
 
Quality management careers
Quality management careersQuality management careers
Quality management careersselinasimpson2701
 
Quality management activities
Quality management activitiesQuality management activities
Quality management activitiesselinasimpson1801
 
Quality assurance project management
Quality assurance project managementQuality assurance project management
Quality assurance project managementselinasimpson0901
 
Supplier quality management process
Supplier quality management processSupplier quality management process
Supplier quality management processselinasimpson2801
 
Quality management software reviews
Quality management software reviewsQuality management software reviews
Quality management software reviewsselinasimpson311
 
Why iso 9001
Why iso 9001Why iso 9001
Why iso 9001jengutajom
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)Bindutesh Saner
 
Call center quality management
Call center quality managementCall center quality management
Call center quality managementselinasimpson2601
 

Ähnlich wie Histogram, Pareto Diagram, Ishikawa Diagram, and Control Chart (20)

Software for quality management
Software for quality managementSoftware for quality management
Software for quality management
 
Lean quality management
Lean quality managementLean quality management
Lean quality management
 
Ukas iso 9001
Ukas iso 9001Ukas iso 9001
Ukas iso 9001
 
Get iso 9001 certification
Get iso 9001 certificationGet iso 9001 certification
Get iso 9001 certification
 
Iso 9001 internal auditor training
Iso 9001 internal auditor trainingIso 9001 internal auditor training
Iso 9001 internal auditor training
 
Tuv iso 9001
Tuv iso 9001Tuv iso 9001
Tuv iso 9001
 
Iso 9001 quality assurance
Iso 9001 quality assuranceIso 9001 quality assurance
Iso 9001 quality assurance
 
Quality driven management
Quality driven managementQuality driven management
Quality driven management
 
Certified quality management professional
Certified quality management professionalCertified quality management professional
Certified quality management professional
 
Requirement of iso 9001
Requirement of iso 9001Requirement of iso 9001
Requirement of iso 9001
 
Functions of quality management
Functions of quality managementFunctions of quality management
Functions of quality management
 
Quality management certificate
Quality management certificateQuality management certificate
Quality management certificate
 
Quality management careers
Quality management careersQuality management careers
Quality management careers
 
Quality management activities
Quality management activitiesQuality management activities
Quality management activities
 
Quality assurance project management
Quality assurance project managementQuality assurance project management
Quality assurance project management
 
Supplier quality management process
Supplier quality management processSupplier quality management process
Supplier quality management process
 
Quality management software reviews
Quality management software reviewsQuality management software reviews
Quality management software reviews
 
Why iso 9001
Why iso 9001Why iso 9001
Why iso 9001
 
process monitoring (statistical process control)
process monitoring (statistical process control)process monitoring (statistical process control)
process monitoring (statistical process control)
 
Call center quality management
Call center quality managementCall center quality management
Call center quality management
 

KĂźrzlich hochgeladen

How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxssuserf63bd7
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.aruny7087
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 

KĂźrzlich hochgeladen (14)

How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 

Histogram, Pareto Diagram, Ishikawa Diagram, and Control Chart

  • 1. Histogram Pareto Diagram Ishikawa Diagram Control Chart Nicola Ergo AGH University of Science and Technology Operational research in engineering
  • 2. Histogram A histogram is a graphical representation of the distribution of numerical data. It is an estimate of the probability distribution of a continuous variable (quantitative variable). Purpose: to roughly assess the probability distribution of a given variable by depicting the frequencies of observations occurring in certain ranges of values. Slide 1
  • 3. Histogram The vertical axis represents the frequency, that is the number of cases per unit of the variable on the horizontal axis. The horizontal axis represents the different variables that characterize the entire range of values. 0 1 2 3 4 5 x1 x2 x3 x4 x5 x6 Frequency Variables Slide 2
  • 4. Histogram To construct a histogram: • the first step is to divide the entire range of values into a series of intervals and then count how many values fall into each interval; the intervals are usually specified as consecutive, non-overlapping, they must be adjacent and are usually equal size; • the second step is to erect a rectangle over the interval with height proportional to the frequency, so as to show the number of cases in each interval. Slide 3
  • 5. Histogram Example: You measure the height of every tree in the orchard in centimeters (cm). The heights vary from 100 cm to 340 cm. You decide to put the results into groups of 50 cm: • the 100 to just below 150 cm range; • the 150 to just below 200 cm range; • etc... So a tree that is 260 cm tall is added to the "250-300" range. And here is the result: Slide 4
  • 6. ParetoDiagram A Pareto Diagram is a type of chart that contains both bars and a line graph, where individual values are represented in descending order by bars, and the cumulative total is represented by the line. Purpose: highlight the most important among a set of factors. Slide 5
  • 7. The left vertical axis is the frequency of occurrence, but it can alternatively represent cost or another important unit of measure. The right vertical axis is the cumulative percentage of the total number of occurrences, total cost, or total of the particular unit of measure. The horizontal axis represent the variables. The line shows the cumulative relative frequency. Due to the values of the statistical variables are placed in order of relative frequency, the graph clearly reveals which factors have the greatest impact and where attention is likely to yield the greatest benefit. Pareto Diagram Slide 6
  • 8. Example: XYZ Clothing Store was seeing a steady decline in business. Before the manager did a customer survey. By collecting data and displaying it in a Pareto chart, the manager could see which variables were having the most influence. Pareto Diagram Slide 7
  • 9. 0% 20% 40% 60% 80% 100% 120% Percent of total Commulative percentage Horizontal 80% line value Following the Pareto Principle, those are the areas where he should focus his attention to build his business back up. In this example, parking difficulties, rude sales people and poor lighting were hurting his business most. Pareto Diagram Slide 8
  • 10. Ishikawa Diagram Ishikawa diagram (also called fishbone diagram, herringbone diagram, cause- and-effect diagram, or Fishikawa) is causal diagram that show the causes of a specific event or problem. Purpose: to break down (in successive layers of detail) root causes that potentially contribute to a particular effect. Slide 9
  • 11. Common uses of the Ishikawa diagram are product design and quality defect prevention to identify potential factors causing an overall effect. Each cause or reason for imperfection is a source of variation. Causes are usually grouped into major categories to identify these sources of variation. The categories typically include: • people: anyone involved with the process; • methods: how the process is performed and the specific requirements for doing it, such as policies, procedures, rules, regulations and laws; • machines: any equipment, computers, tools, etc. required to accomplish the job; • materials: raw materials, parts, pens, paper, etc. used to produce the final product; • measurements: data generated from the process that are used to evaluate its quality; • environment: the conditions, such as location, time, temperature, and culture in which the process operates. Ishikawa Diagram Slide 10
  • 12. How to create a “fish diagram”: • create a head, which lists the problem or issue to be studied; • create a backbone for the fish (straight line which leads to the head); • identify at least four “causes” that contribute to the problem; connect these four causes with arrows to the spine; these will create the first bones of the fish; • brainstorm around each “cause” to document those things that contributed to the cause; use the 5 Whys or another questioning process such as the 4P’s (Policies, Procedures, People and Plant) to keep the conversation focused; • continue breaking down each cause until the root causes have been identified. Ishikawa Diagram Slide 11
  • 13. Example: this example illustrates how a group might begin a “fish diagram” to identify all the possible reasons a web site went down in order to discover the root cause. Ishikawa Diagram Slide 12
  • 14. Control Chart The control chart is a graph used to study how a process changes over time. Data are plotted in time order. A control chart always has: • a central line for the average; • an upper line for the upper control limit UCL; • a lower line for the lower control limit LCL; • points representing a statistic (mean, range, proportion) of measurements of a quality characteristic in samples taken from the process at different times. By comparing current data to these lines, you can draw conclusions about whether the process variation is consistent (in control) or is unpredictable (out of control, affected by special causes of variation). These lines are determined from historical data. Slide 13
  • 15. When to Use a Control Chart: • When controlling ongoing processes by finding and correcting problems as they occur; • When determining whether a process is stable (in statistical control); • When analyzing patterns of process variation from special causes (non- routine events) or common causes (built into the process); • When determining whether your quality improvement project should aim to prevent specific problems or to make fundamental changes to the process. Control Chart Slide 14
  • 16. Control Chart Basic Procedure: 1. determine the appropriate time period for collecting and plotting data; 2. collect data, construct your chart and analyze the data; 3. look for “out-of-control signals” on the control chart. When one is identified, mark it on the chart and investigate the cause. Document how you investigated, what you learned, the cause and how it was corrected. Control Chart Slide 15
  • 17. Controlled Variation Controlled variation is characterized by a stable and consistent pattern of variation over time, and is associated with common causes. A process operating with controlled variation has an outcome that is predictable within the bounds of the control limits. Uncontrolled Variation Uncontrolled variation is characterized by variation that changes over time and is associated with special causes. The outcomes of this process are unpredictable. Control Chart Slide 16
  • 18. Example: A team in an accounting group has been working on improving the processing of invoices. The team is trying to reduce the cost of processing invoices by decreasing the fraction of invoices with errors. The team developed the following operational definition for a defective invoice: an invoice is defective if it has incorrect price, incorrect quantity, incorrect coding, incorrect address, or incorrect name. The team decided to pull a random sample of 100 invoices per day. If the invoice had one or more errors it was defective. The data from the last 10 days are given in the table. Control Chart Slide 17
  • 19. The next step is to calculate the average fraction defective p̄. To determine the average, we add up all the np values and divide by the sum of all the n values. The sum of the np values is 239; the sum of the n values is 1000. The average is then calculated as shown below. The next step is to determine the average subgroup size n̄. Since the subgroup size is constant, the average subgroup size is 100. This average calculation is shown in the second equation where k is the number of subgroups. The next step is to calculate the control limits. The control limits calculations are shown below. Control Chart Slide 18
  • 21. Conclusion: We have examined the variation in the % of invoices with errors from day to day. • On average, each day will have about 24% of the invoices with errors. Some days it may be as high as 30% or as low as 20%. Only common causes of variation are present. • The process is in statistical control because all the values are within the UCL and the LCL. This means that the process is consistent and predictable. Note that this does not mean that the process is acceptable. Having 24% of invoices with errors is not acceptable. The next step is to apply a problem- solving model to reduce the number of errors. You should be using a Pareto diagram with this control chart. The Pareto diagram is used to determine the reason for errors and the frequency with which they occur. Control Chart Slide 20