Visual
Management
Introduction
Thinkingwin, Win, WIN
Visual Management
Introduction
Marek Piatkowski – November 2016
Thinkingwin, Win, WIN
2Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Introduction - Marek Piatkowski
 Professional Background
 Toyota Motor Manufacturing Canada (TMMC) - Cambridge, Ontario from
1987-1994
 TPS/Lean Transformation Consulting - since 1994
 Professional Affiliations
 TWI Network – John Shook, Founder
 Lean Enterprise Institute (LEI) – Jim Womack
 Lean Enterprise Academy (LEA) – Daniel Jones
 CCM/CAINTRA – Monterrey, Mexico
 SME, AME, ASQ, CME
 Lean Manufacturing Solutions - Toronto, Canada
www.twi-network.com
3Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
4Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Visual Management
 Definition: A process in which standards and actual conditions become quickly
visible in the workplace and are acted upon in a timely manner
 Purpose: Visual Management enables Managers and employees to monitor
progress of production and immediately see any interruption to production flow.
 To allow them to quickly assess the situation (normal/abnormal) and to take
immediate corrective action to return to normal (standard) conditions
 To delegate decision making process to the lowest level of operation
 To eliminate dependency on few “decision makers”
 Visual Management is how the Workplace, Team, Department talks to you and how
quickly you can determine what is going on without asking too many questions
5Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Visual Management
 Is this situation normal or abnormal? Is this good or bad?
 Do I need to take action?
 Any abnormality is identified immediately
 process/operation – are all procedures being followed?
 equipment/machinery – are they producing good parts?
 expected levels of performance
 availability of materials, inventory
 Purpose - to delegate the decision making process
to the lowest level of the organization
 implement audio-visual controls
 eliminate dependency on a few “decision makers”
6Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Visual Management
 Visual Controls
 equipment and/or material status identification
 “automotive dashboard”
 any abnormality identified immediately
 ability to see a problem at a glance
 problems are made a lot more visible in a clean and well organized workplace.
 being able to see a problem is a first step towards solving a problem
 Ability to determine at any time a status of
 process / operation
 equipment / machinery
 expected levels of performance / inventory
7Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Shop Floor Visual Management
 Information Boards & Centers
 Hourly Tracking Boards
 Attendance Boards / Manpower Planning Boards
 Detailed Project Plans with clear mile stones – Project Boards
 Action plans in a Business Plan document
 Pareto Charts
 Top 5 or 10 analysis
 Business Planning Walls
 Problem Solving Displays
 Project Status Reports
 Employee communication board
 Process abnormality display
8Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Visual Management
 Are they following Visual Management tools?
 Monthly Quality Performance trends
 PPI Performance monthly for the year
 Top 10 analysis
 Pareto charts
 Hourly production tracking boards
 Escalation signals & procedures
 What is the difference between them?
 Which ones will help you solve the problem now while you can still positively
impact the data above?
 The trend data should be a gauge of how well your daily management is performing
14Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Electronic Status Boards
15Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Visual Tools:
 are the visual indicators that communicate and support the workplace management
process.
 make the current condition and target or goal clearly identifiable.
 are easy to understand – “Status at a Glance”.
 are created & maintained to allow “out of standard” conditions to be immediately &
easily recognized
 Visual Management:
 is the use of various visual tools and controls to help run the business, while the
results are not in their final tally, and you can still impact the outcome.
Shop Floor Visual Management
16Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Electronic Production Status Boards:
 To track production basis in real time
 To provide instant updates
 To indicate targets and goals
 To show results per shift or per day
 Use red/yellow/green visual controls
17Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Andon Boards:
 Audio - visual boards that communicate the status of equipment or a production line
 To make the current condition clearly visible and identifiable
 Are easy to understand – Status at a Glance
19Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Equipment Status Lights:
 To communicate the status of equipment or a production line
 To make the current condition clearly visible and identifiable
 Call for Help:
 Visual indicators that communicate a need for help
 or equipment stop or breakdown
Equipment Status
Equipment Status
24Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Down Time Clocks:
 A Down Time Clock is used to measure total duration of machine stops –
regardless of the reasons or causes
 In it’s simplest form it is an analog clock connected to the “logic” of a
machine or an automated process
 At the start of the shift the clock is reset to 12:00
 When machine is operating – the clock is not running. When the machine
stops – the clock starts to run.
25Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Production Status Boards
26Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Production Status Boards
 Production Status Boards are located on the manufacturing floor to provide instant
information regarding status of the Operation
 Production Status Boards should be used by Managers and Supervisors to
frequently review:
 daily production results
 operational availability
 daily issues and concerns
 problem solving activities
 Minimize response time to identify and to solve problems
 Involve and focus support teams on priority actions
 Share information with all the people involved, at the same time, within a
minimum lead time
27Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Hourly/Daily Production Status Tracking Boards:
 To track production results in real time
 To provide instant updates
 To indicate targets and goals
 To show results per shift or per day
 Use red/yellow/green visual controls
Hourly Tracking Boards
29Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Production Scheduling Boards:
 To display and update production schedule
 To monitor progress of production throughout the day
 To indicate any problems or issues
31Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Shipping Boards:
 To display and update shipping schedule and status of shipments
 Long term planning and visibility
 To indicate if shipments will be completed on time
32Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Materials Management Boards:
 To indicate potential inventory problems
 To maintain min/max levels of inventory
 To indicate inventory levels
33Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
 Updating Production Status Boards:
 Establish a process for updating the information
 Who is responsible for updating the Boards
 How frequently is the information updated
 What type of information needs to be displayed
34Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Changing the World. One Kaizen at a time
This presentation is an intellectual property of W3 Group Canada Inc.
No parts of this document can be copied or reproduced
without written permission from:
Marek Piatkowski
W3 Group Canada Inc.
iPhone: 416-235-2631
Cell: 248-207-0416
Marek.Piatkowski@rogers.com
http://www.twi-network.com
Thinkingwin, Win, WIN
35Marek.Piatkowski@Rogers.com
Visual
Management
Introduction
Thinkingwin, Win, WIN
Presentations in this
Workshop
1. Log in to:
www.slideshare.net
2. Type in my name in
search area:
Marek Piatkowski
3. Select a presentation you
want to see
4. Learn and Enjoy

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Poka yoke
Poka yokePoka yoke
Poka yoke
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Advanced problems solving using A3 Report - January 2017
Advanced problems solving using A3 Report - January 2017Advanced problems solving using A3 Report - January 2017
Advanced problems solving using A3 Report - January 2017
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Stdw for managers and supervisors october 2016
Stdw for managers and supervisors   october 2016Stdw for managers and supervisors   october 2016
Stdw for managers and supervisors october 2016
 
Visual management
Visual managementVisual management
Visual management
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Mistake proofing smpl_1
Mistake proofing smpl_1Mistake proofing smpl_1
Mistake proofing smpl_1
 
Kaizen | Continuous Improvement for Organization
Kaizen | Continuous Improvement for OrganizationKaizen | Continuous Improvement for Organization
Kaizen | Continuous Improvement for Organization
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
Lean Thinking - An Introduction to Lean
Lean Thinking - An Introduction to LeanLean Thinking - An Introduction to Lean
Lean Thinking - An Introduction to Lean
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016
 
Daily Management Walk About
Daily Management Walk About  Daily Management Walk About
Daily Management Walk About
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 

Andere mochten auch

Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I I
Soe Lu Kyaw
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
Vikranth Ikkalaki
 
Pfep introduction
Pfep introductionPfep introduction
Pfep introduction
ld12987
 

Andere mochten auch (15)

Shop-Floor-Management
Shop-Floor-ManagementShop-Floor-Management
Shop-Floor-Management
 
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
 
Production scheduling boards - November 2016
Production scheduling boards - November 2016Production scheduling boards - November 2016
Production scheduling boards - November 2016
 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017
 
Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I I
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
Plan-for-Every-Part (PFEP) - Introduction November 2016
Plan-for-Every-Part (PFEP) - Introduction November 2016Plan-for-Every-Part (PFEP) - Introduction November 2016
Plan-for-Every-Part (PFEP) - Introduction November 2016
 
Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016
 
Pfep introduction
Pfep introductionPfep introduction
Pfep introduction
 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
Shop Floor Planning & Control
 
What is TPS - Toyota Production System
What is TPS - Toyota Production SystemWhat is TPS - Toyota Production System
What is TPS - Toyota Production System
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranization
 

Ähnlich wie Shop Floor Visual Management - November 2016

Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
mccall1966
 
Tired of cumbersome xls april 2013
Tired of cumbersome xls april 2013Tired of cumbersome xls april 2013
Tired of cumbersome xls april 2013
John Cachat
 
Management Team Training 4-2-07
Management Team Training 4-2-07Management Team Training 4-2-07
Management Team Training 4-2-07
wendyw
 
iNTRODUCTION TO LEAN
iNTRODUCTION TO LEANiNTRODUCTION TO LEAN
iNTRODUCTION TO LEAN
Kiril Nikolov
 

Ähnlich wie Shop Floor Visual Management - November 2016 (20)

Information centers and meeting areas
Information centers and meeting areas   Information centers and meeting areas
Information centers and meeting areas
 
Workshops and presentations by Marek Piatkowski
Workshops and presentations by Marek Piatkowski Workshops and presentations by Marek Piatkowski
Workshops and presentations by Marek Piatkowski
 
Definition of kp is november 2016
Definition of kp is   november 2016Definition of kp is   november 2016
Definition of kp is november 2016
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
Tired of cumbersome xls april 2013
Tired of cumbersome xls april 2013Tired of cumbersome xls april 2013
Tired of cumbersome xls april 2013
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing concepts
 
P2P Path To Productivity Linkedin
P2P  Path To Productivity LinkedinP2P  Path To Productivity Linkedin
P2P Path To Productivity Linkedin
 
P2 P Path To Productivity Linkedin
P2 P  Path To Productivity LinkedinP2 P  Path To Productivity Linkedin
P2 P Path To Productivity Linkedin
 
Introduction to Standardized Work
Introduction to Standardized WorkIntroduction to Standardized Work
Introduction to Standardized Work
 
Management Team Training 4-2-07
Management Team Training 4-2-07Management Team Training 4-2-07
Management Team Training 4-2-07
 
Seeing the Whole - Creating Lean Supply Chains
Seeing the Whole - Creating Lean Supply ChainsSeeing the Whole - Creating Lean Supply Chains
Seeing the Whole - Creating Lean Supply Chains
 
Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...
 
Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...
 
Lean Managment
Lean ManagmentLean Managment
Lean Managment
 
DFSS short
DFSS shortDFSS short
DFSS short
 
iNTRODUCTION TO LEAN
iNTRODUCTION TO LEANiNTRODUCTION TO LEAN
iNTRODUCTION TO LEAN
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
APO ITBuzz Overview
APO ITBuzz OverviewAPO ITBuzz Overview
APO ITBuzz Overview
 
Creating Intelligent SOPs with VKS - Using the DMAIC Approach
Creating Intelligent SOPs with VKS - Using the DMAIC ApproachCreating Intelligent SOPs with VKS - Using the DMAIC Approach
Creating Intelligent SOPs with VKS - Using the DMAIC Approach
 

Mehr von W3 Group Canada Inc.

Mehr von W3 Group Canada Inc. (16)

Lean Manager Certification Program - January 2018
Lean Manager Certification Program - January 2018Lean Manager Certification Program - January 2018
Lean Manager Certification Program - January 2018
 
My Journey and Passion for Lean - July 2017
My Journey and Passion for Lean - July 2017My Journey and Passion for Lean - July 2017
My Journey and Passion for Lean - July 2017
 
5 s workplace organization
5 s workplace organization 5 s workplace organization
5 s workplace organization
 
Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)
 
The DNA of Toyota - January 2017
The DNA of Toyota - January 2017The DNA of Toyota - January 2017
The DNA of Toyota - January 2017
 
What is lean transformation - January 2017
What is lean transformation - January 2017What is lean transformation - January 2017
What is lean transformation - January 2017
 
History of Toyota Production System (TPS)
History of Toyota Production System (TPS)History of Toyota Production System (TPS)
History of Toyota Production System (TPS)
 
Business Unit KPIs - Definitions November 2016
Business Unit KPIs - Definitions November 2016Business Unit KPIs - Definitions November 2016
Business Unit KPIs - Definitions November 2016
 
Principles of Kanban - November 2016
Principles of Kanban - November 2016Principles of Kanban - November 2016
Principles of Kanban - November 2016
 
Design of Lean Mini Markets - November 2016
Design of Lean Mini Markets - November 2016Design of Lean Mini Markets - November 2016
Design of Lean Mini Markets - November 2016
 
Introduction to Pull system - November 2016
Introduction to Pull system - November 2016Introduction to Pull system - November 2016
Introduction to Pull system - November 2016
 
Lean Supermarekt principles - November 2016
Lean Supermarekt principles - November 2016Lean Supermarekt principles - November 2016
Lean Supermarekt principles - November 2016
 
New (Lean) Supply Chain Organization - November 2016
New (Lean) Supply Chain Organization - November 2016New (Lean) Supply Chain Organization - November 2016
New (Lean) Supply Chain Organization - November 2016
 
Supply chain management strategy - November 2016
Supply chain management strategy - November 2016Supply chain management strategy - November 2016
Supply chain management strategy - November 2016
 
Materials Management - Areas of Responsibilities - TPS Model
Materials Management - Areas of Responsibilities - TPS ModelMaterials Management - Areas of Responsibilities - TPS Model
Materials Management - Areas of Responsibilities - TPS Model
 
Evolution of lean tps - November 2016
Evolution of lean   tps - November 2016Evolution of lean   tps - November 2016
Evolution of lean tps - November 2016
 

Kürzlich hochgeladen

Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 

Kürzlich hochgeladen (14)

Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 

Shop Floor Visual Management - November 2016