Prepared for the ENA EMF Committee, March 2006
1. Purpose:
To provide guidelines for use by electricity authorities in producing magnetic field profile
information for existing or proposed transmission lines.
2. Outcome:
A standardised approach to be used by electricity authorities in calculating and quoting magnetic
fields from existing or proposed transmission lines using a set of practical and consistent criteria. A
flow chart and work sheet are provided to assist staff to produce this information.
3. Background:
Electricity authorities are often requested to provide details of the magnetic field profile produced
from an existing or proposed transmission line. Such requests may come from the public, or be
required for an environmental impact assessment or other formal report.
In responding to requests for information regarding magnetic field profiles, utilities need to provide
information which is sufficiently accurate for practical purposes and is presented in a simple form
which will be readily understood by a non-specialist. Thus it is not always a straightforward matter
as the magnetic field strength varies with a number of factors including the line loading, the line
design (structures and layout), the weather conditions and the ground profile.
These guidelines provide a standardised approach which authorities may use to produce magnetic
field profile information for an existing or proposed transmission line. The process is shown in the
attached flowchart and is described in the following sections.
4. Variables Affecting Transmission Line Magnetic Fields:
4.1. Line Loading:
The electrical load and therefore the magnetic field on any power line, whether it is high or low
voltage, varies continually with time. Records, if available, may provide useful data regarding a
line’s historical loading, but long term load projections are required to estimate likely future
loading. The situation can be further complicated by changes in load growth patterns or system
requirements which may significantly alter future load flows on any line in the transmission
network. This means that any reference to a magnetic field level needs to make some
assumptions regarding the conditions under which this value occurs.
3
4.2. Line Design:
There are certain line design details which are required as inputs for magnetic field calculations.
These are:
• structure, conductor and earthwire geometry
• conductor type and parameters
• earthwire type and parameters
• conductor and earthwire stringing data
• minimum design ground clearance
• actual and equivalent span
• soil resistivity
4.3. Wire Height Above Ground:
The vertical position of conductors varies with temperature which in turn, is dependent on a
number of factors such as electrical load, ambient temperature and wind velocity as well as line
layout /design. These considerations, together with the variable nature of the ground in both
longitudinal and transverse directions means that additional assumptions are necessary to allow
calculation of magnetic field profiles.
In the case of an existing line, these details are known for any particular point along the line, but
for proposed lines, certain assumptions must be made. Likely sources of information for the
purpose of such assumptions are detailed in Table 1:
Design Detail Source - Proposed Line Source - Existing Line
Structure / Conductor /
OHEW Geometry
typical details for existing
structure designs
structure design records
Conductor Type and
Parameters
planning reports or typical
designs / standards /
manufacturer’s data
design records / standards /
manufacturer’s data
Earthwire Type and
Parameters
planning reports or typical
designs / standards /
manufacturer’s data
design records / standards /
manufacturer’s data
Conductor and
Earthwire Stringing
Data
typical designs or practices line layout records
Minimum Design
Ground Clearance
statutory requirements or
authority practices
design records
Equivalent and Actual
Span
estimated using assessment
of typical designs and terrain
line layout records
Table 1 - Line Design Details
4
5. Full Characterisation Of Fields Associated With A Line
Fields associated with a transmission line may be characterised as shown in Figure 1.MagneticField(mG)
Transmission Line Field Profile
Figure 1
A - Short Time Emergency
B - Infrequent High Load
C - Typical Daily Maximum
D - Typical Daily Minimum
Centreline
5.1.
Loading Conditions:
A Short Time Emergency:
- could be short time thermal limit - may in practice never be reached on a line
B Infrequent High Load:
- for example yearly peak with the system substantially normal
C Typical Daily Maximum:
- the peak value reached for the line on a typical day
D Typical Daily Minimum:
- the value reached for the minimum daily load on a line
For communication purposes, experience has shown that the amount of detail above is
confusing to people without a detailed knowledge of transmission systems. Accordingly it is
recommended to adopt a simplified but nevertheless honest approach, as follows:
• For general discussion purposes - cite Curve C as this gives a (conservative) value for
long term exposure
• In an Environmental Impact Statement, mention A* and B in passing, but base discussion
on Curve C as this represents the likely maximum field which would, in practice, be
achieved over a sustained period.
In such cases, Curve C should be based on the likely loading regime to be reached during
the lifetime of a line, and not necessarily that which occurs upon commissioning.
* if Curve A is so unlikely as to be inconsequential, it could be permissible to ignore it on the
basis that, in everyday life, it is not unusual for people to encounter fields of considerable
magnitude for brief periods of time.
5
For some lines, the daily load profile will vary significantly between seasons. In such cases,
the curves relating to the season with the highest loading should be used.
The overall aims are: -
•to acknowledge the highest field which may occur in practice, and
• to focus attention and discussion on reasonably conservative estimates of the actual field
levels which would be associated with the line over an extended duration
For proposed lines or line upratings, the currents corresponding to the various load cases
should be obtained from system planners. In the case of existing lines, load records should
be consulted.
The load corresponding to the typical maximum daily load case (Curve C) is less
straightforward. Where load - duration data are available, the current loading for Curve C
should normally be taken as the 85% load. i.e. the load which is exceeded for no more than
15% of the time.
In cases where the load duration data are not available, it is necessary to exercise
judgement based on the best available information to derive a load which is unlikely to be
exceeded for more than 15% of the time.
For each curve, having established the load current, the next step is to translate this to a
magnetic field profile.
The magnetic field at a point adjacent to a line is primarily dependent on current, but also on
ground clearance which is also influenced by load current.
5.2. Ground Clearance:
In a practical situation, ground clearance varies from span to span and from point to point
within a span. Accordingly, a suitable practical (and reasonably conservative) value of
ground clearance needs to be selected to enable field calculations to be carried out.
The equivalent and actual spans, conductor conditions and terrain considerations are all
required to calculate average height above ground at the point of interest.
Average height above ground = (minimum ground clearance at max design temp) +
(additional height due to assumed operating temperature below max design temp) +
(1/3 sag at that assumed operating temperature)
The conductor temperature under a given set of conditions may be calculated using the
appropriate table in ENA publication D(b)5 -1976 “Current Ratings of Bare Overhead Line
Conductors”:
6
Inputs required are :
• Current = derived as described previously in section 5
• Conductor type = known (or nominated), surface condition assumed to be black i.e. Solar
Absorption Coefficient = 1.0 and Emissivity =1.0
• Solar Radiation intensity = assumed 1000 W/sq m
• Lateral Wind Velocity = assumed 1m/s
Conductor sag and therefore ground clearance can then be calculated from the appropriate
design information for the particular section of line under consideration (i.e span and
equivalent span). It is normal practice to assume flat ground in calculations of this type, but
if local conditions are known, an appropriate adjustment should be made to the average
ground clearance used in the calculation.
6. Magnetic Field Calculation:
The magnetic field profile is produced using standard computer software, such as Power
Technologies TLFIELD program, using inputs derived in accordance with Section 5 of these
guidelines.
Reference height for calculations should be taken as 1 metre, in accordance with normal
practice and the ENA Residential Protocol For The Measurement of Electric and Magnetic
Fields.
7
APPENDIX A
No Yes
Data Available:
• structure geometry
• conductor parameters
• earthwire parameters
• stringing data
• design minimum ground
clearance
Data Required /
Assumed:
• structure geometry
• conductor
parameters
• earthwire
parameters
• stringing data
• design minimum
ground clearance
Existing Transmission Line
Calculate Conductor
Temperature
Select Equivalent
Span and Actual
Span
Calculate Sag
Any Reason To Depart
From Flat Ground
Case?
No Yes
Adjust
Calculate Field Profile
Determine Design
Details
Select Load
Calculate Conductor
Temperature
Select Equivalent
Span and Actual
Span
Calculate Sag
Determine Average
Ground Clearance
Calculate Field Profile
For particular
conditions using
appropriate
software
For terrain or other
considerations
Flat ground is
assumed
Translate To Average
Ground Clearance
Based on typical line
design or structure
data
Calculate
Determine Design
Details
Select Load
Available from
control centre data
Known from
line layout
From the line
profile if at a
particular point
otherwise use an
average figure as
for new lines
8
APPENDIX B
Notes on Calculation of Ground Clearance.
The input for field calculation requires an “average conductor height” - which is determined by
ground clearance (at certain load conditions) and sag (at the same set of conditions).
It is assumed that the ground is flat unless there is sufficient information available to make an
assessment for the case being considered.
It can be shown (using parabolic equations) that the average conductor sag is 2/3 of overall sag
when measured from the points of attachment. Alternatively, the average conductor height is equal
to ground clearance at the low point of the parabola, plus 1/3 sag.
Average height above ground = (minimum ground clearance at max design temperature) +
(additional height due to assumed operating temperature below max design temperature) +
(1/3 sag at that assumed operating temperature)
Conductor electrical loading (calculated or assumed) causes a conductor temperature rise above
ambient but the temperature will normally remain below that corresponding to maximum design
load (minimum (design) ground clearance is based on this maximum load).
As the load and therefore conductor temperature is below this design value - the conductors will
be higher - and have less sag.
Layout clearances for conductors at maximum design temperature are generally based on
individual State Regulations and authority design practices. Typically, minimum layout clearances
may be:
• 110 / 132kV = 7.0m
• 220 / 275kV = 8.0m
• 330kV = 8.5m
• 500kV = 9.5m
While this document is directed primarily towards transmission lines, the basic approach may be
modified and applied to suit sub-transmission and distribution lines.
Conductor at reduced temperatureAverage conductor height
Conductor at maximum
design temperature
Design ground
clearance
Ground level
Increased
clearance due
to temperature
reduction
9
APPENDIX C
Typical Inputs - Magnetic Field Calculation Program
Input Existing Line Future Line
(a) Reference ht for field calculations: Known (1m) Known (1m)
(b) Overhead Earthwire data:
- No. of wires Known Assumed
- X and Y coordinates of each wire Known / Calculated Calc (Assumed)
- size (diameter) of wires Known Assumed
(c) Phase Conductor data:
- No. of phase conductors Known Assumed
- X ,Y coordinates-bundle/conductor Calc (Known) Calc (Assumed)
- size (diameter) of wires Known Assumed
- subconductor spacing Known Assumed
- phase to phase voltage Known Known
- phase angle Known Assumed
(d) Grounded horizontal guard wires? Known Assumed
(e) Energised E cancellation wires? Known Assumed
(f) Currents in Overhead Earthwires:
- current in each wire Known Assumed
- phase angle for each current Known Assumed
(g) Current details for Conductors:
- current and direction in each wire Calc (Known) Calc (Assumed)
- phase angle for each current Assumed Assumed
(h) Soil Resistivity Known / Assumed Assumed
(i) X- Coordinate: both sides of element Known Known / Assumed
10
APPENDIX D
Worksheet - Standard Basis for Quoting Transmission Line Magnetic Fields
1. Design Details
Line Voltage
Structure Geometry
• number of circuits
• horizontal and vertical coordinates of conductors and earthwires
• conductor phasing
Conductor Parameters
• type / diameter / unit weight
• number and spacing of subconductors
Earthwire Parameters
• type / diameter / unit weight
Stringing Data
• conductor sag / tension condition
• earthwire sag / tension condition
Design Minimum Ground Clearance
• design minimum ground clearance
2. Line Loading
• maximum daily load
3. Conductor Temperature
Use appropriate table from ENA D(b)5 - Inputs Required
• conductor type (from Step 1)
• line loading (from Step 2)
Assumed Parameters:
• daytime, black conductor, 1m/s wind
4. Equivalent and Actual Span
To be determined / calculated:
• equivalent (ruling) span
• span under consideration
5. Calculate Sag
Inputs:
• conductor unit weight, tension (from Step 1)
• equivalent span, actual span (from Step 3)
6. Average Ground Clearance
Inputs:
• minimum design ground clearance (from Step 1)
• adjustment (for temperature below max design temp- from Step 4)
• 1/3 sag at assumed operating temperature (from Step 4)
7. Adjustment for Departure from Flat Ground Case
8. Calculate Magnetic Field Profile

Weitere ähnliche Inhalte

Was ist angesagt?

DETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODS
DETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODSDETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODS
DETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODS
Raja Larik
 
FEAS_Poster_2016_WNCS_Tina
FEAS_Poster_2016_WNCS_TinaFEAS_Poster_2016_WNCS_Tina
FEAS_Poster_2016_WNCS_Tina
Tina Mirfakhraie
 
Uses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentUses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor development
IES / IAQM
 
Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...
eSAT Publishing House
 

Was ist angesagt? (20)

DETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODS
DETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODSDETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODS
DETERMINISTIC APPROACH AVAILABLE TRANSFER CAPABILITY (ATC) CALCULATION METHODS
 
Lessons Learned of AC Arc Flash Studies for Station Auxiliary Service Systems
Lessons Learned of AC Arc Flash Studies for Station Auxiliary Service SystemsLessons Learned of AC Arc Flash Studies for Station Auxiliary Service Systems
Lessons Learned of AC Arc Flash Studies for Station Auxiliary Service Systems
 
Aircraft design lab report converted
Aircraft design lab report convertedAircraft design lab report converted
Aircraft design lab report converted
 
Excerpts From JETT Revise
Excerpts From JETT ReviseExcerpts From JETT Revise
Excerpts From JETT Revise
 
40220130405009
4022013040500940220130405009
40220130405009
 
Power Quality Improvement in Microgrids using STATCOM under Unbalanced Voltag...
Power Quality Improvement in Microgrids using STATCOM under Unbalanced Voltag...Power Quality Improvement in Microgrids using STATCOM under Unbalanced Voltag...
Power Quality Improvement in Microgrids using STATCOM under Unbalanced Voltag...
 
Optimal Placement of TCSC and SVC Using PSO
Optimal Placement of TCSC and SVC Using PSOOptimal Placement of TCSC and SVC Using PSO
Optimal Placement of TCSC and SVC Using PSO
 
Review Paper Study on Steel Transmission Tower
Review Paper Study on Steel Transmission TowerReview Paper Study on Steel Transmission Tower
Review Paper Study on Steel Transmission Tower
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
FEAS_Poster_2016_WNCS_Tina
FEAS_Poster_2016_WNCS_TinaFEAS_Poster_2016_WNCS_Tina
FEAS_Poster_2016_WNCS_Tina
 
Impact of dynamic demand response in the load frequency control
Impact of dynamic demand response in the load frequency controlImpact of dynamic demand response in the load frequency control
Impact of dynamic demand response in the load frequency control
 
Uses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentUses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor development
 
Atc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarniAtc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarni
 
Robust speed controller design for permanent magnet synchronous motor based o...
Robust speed controller design for permanent magnet synchronous motor based o...Robust speed controller design for permanent magnet synchronous motor based o...
Robust speed controller design for permanent magnet synchronous motor based o...
 
Viva
VivaViva
Viva
 
A Novel Control Method for Transformerless H-Bridge Cascaded STATCOM With Sta...
A Novel Control Method for Transformerless H-Bridge Cascaded STATCOM With Sta...A Novel Control Method for Transformerless H-Bridge Cascaded STATCOM With Sta...
A Novel Control Method for Transformerless H-Bridge Cascaded STATCOM With Sta...
 
Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...Available transfer capability computations in the indian southern e.h.v power...
Available transfer capability computations in the indian southern e.h.v power...
 
T rec-e.501-199206-s!!pdf-e
T rec-e.501-199206-s!!pdf-eT rec-e.501-199206-s!!pdf-e
T rec-e.501-199206-s!!pdf-e
 
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationImpact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
 
IRJET- Review Paper on Call Admission Control with Bandwidth Reservation Sche...
IRJET- Review Paper on Call Admission Control with Bandwidth Reservation Sche...IRJET- Review Paper on Call Admission Control with Bandwidth Reservation Sche...
IRJET- Review Paper on Call Admission Control with Bandwidth Reservation Sche...
 

Ähnlich wie 123

Meeting ieee 519 1992 using harmonic guard passive filters harmonic limits
Meeting ieee 519 1992 using harmonic guard passive filters harmonic limitsMeeting ieee 519 1992 using harmonic guard passive filters harmonic limits
Meeting ieee 519 1992 using harmonic guard passive filters harmonic limits
Raymund Cortez
 

Ähnlich wie 123 (20)

10.1109@powercon.2014.6993724
10.1109@powercon.2014.699372410.1109@powercon.2014.6993724
10.1109@powercon.2014.6993724
 
10.1109@powercon.2014.6993724
10.1109@powercon.2014.699372410.1109@powercon.2014.6993724
10.1109@powercon.2014.6993724
 
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
Arc Fault and Flash Signal Analysis and Detection in DC Distribution Systems ...
 
Gis substation
Gis substationGis substation
Gis substation
 
Configuration and working point and state estimation
Configuration and working point and state estimationConfiguration and working point and state estimation
Configuration and working point and state estimation
 
Optimal Placement of Distributed Generation on Radial Distribution System for...
Optimal Placement of Distributed Generation on Radial Distribution System for...Optimal Placement of Distributed Generation on Radial Distribution System for...
Optimal Placement of Distributed Generation on Radial Distribution System for...
 
Investigation Effect of Outage Line on the Transmission Line for Karbalaa-132...
Investigation Effect of Outage Line on the Transmission Line for Karbalaa-132...Investigation Effect of Outage Line on the Transmission Line for Karbalaa-132...
Investigation Effect of Outage Line on the Transmission Line for Karbalaa-132...
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...
 
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 Determining Crossing Conductor Clearance Using Line-Mounted LiDAR  Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 
Conductors for the uprating of existing overhead lines
Conductors for the uprating of existing overhead linesConductors for the uprating of existing overhead lines
Conductors for the uprating of existing overhead lines
 
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
 
voltage scaling
voltage scalingvoltage scaling
voltage scaling
 
Ground potential rise at overhead AC transmission line structures during powe...
Ground potential rise at overhead AC transmission line structures during powe...Ground potential rise at overhead AC transmission line structures during powe...
Ground potential rise at overhead AC transmission line structures during powe...
 
Impacts of Distributed Generation on Power Quality
Impacts of Distributed Generation on Power QualityImpacts of Distributed Generation on Power Quality
Impacts of Distributed Generation on Power Quality
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
R026201070114
R026201070114R026201070114
R026201070114
 
R026201070114
R026201070114R026201070114
R026201070114
 
Meeting ieee 519 1992 using harmonic guard passive filters harmonic limits
Meeting ieee 519 1992 using harmonic guard passive filters harmonic limitsMeeting ieee 519 1992 using harmonic guard passive filters harmonic limits
Meeting ieee 519 1992 using harmonic guard passive filters harmonic limits
 

Kürzlich hochgeladen

Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
nirzagarg
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
eqaqen
 

Kürzlich hochgeladen (20)

Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 

123

  • 1. March 2006 Standard Basis for Quoting Transmission Line Magnetic Fields
  • 2. 2 Standard Basis for Quoting Transmission Line Magnetic Fields Prepared for the ENA EMF Committee, March 2006 1. Purpose: To provide guidelines for use by electricity authorities in producing magnetic field profile information for existing or proposed transmission lines. 2. Outcome: A standardised approach to be used by electricity authorities in calculating and quoting magnetic fields from existing or proposed transmission lines using a set of practical and consistent criteria. A flow chart and work sheet are provided to assist staff to produce this information. 3. Background: Electricity authorities are often requested to provide details of the magnetic field profile produced from an existing or proposed transmission line. Such requests may come from the public, or be required for an environmental impact assessment or other formal report. In responding to requests for information regarding magnetic field profiles, utilities need to provide information which is sufficiently accurate for practical purposes and is presented in a simple form which will be readily understood by a non-specialist. Thus it is not always a straightforward matter as the magnetic field strength varies with a number of factors including the line loading, the line design (structures and layout), the weather conditions and the ground profile. These guidelines provide a standardised approach which authorities may use to produce magnetic field profile information for an existing or proposed transmission line. The process is shown in the attached flowchart and is described in the following sections. 4. Variables Affecting Transmission Line Magnetic Fields: 4.1. Line Loading: The electrical load and therefore the magnetic field on any power line, whether it is high or low voltage, varies continually with time. Records, if available, may provide useful data regarding a line’s historical loading, but long term load projections are required to estimate likely future loading. The situation can be further complicated by changes in load growth patterns or system requirements which may significantly alter future load flows on any line in the transmission network. This means that any reference to a magnetic field level needs to make some assumptions regarding the conditions under which this value occurs.
  • 3. 3 4.2. Line Design: There are certain line design details which are required as inputs for magnetic field calculations. These are: • structure, conductor and earthwire geometry • conductor type and parameters • earthwire type and parameters • conductor and earthwire stringing data • minimum design ground clearance • actual and equivalent span • soil resistivity 4.3. Wire Height Above Ground: The vertical position of conductors varies with temperature which in turn, is dependent on a number of factors such as electrical load, ambient temperature and wind velocity as well as line layout /design. These considerations, together with the variable nature of the ground in both longitudinal and transverse directions means that additional assumptions are necessary to allow calculation of magnetic field profiles. In the case of an existing line, these details are known for any particular point along the line, but for proposed lines, certain assumptions must be made. Likely sources of information for the purpose of such assumptions are detailed in Table 1: Design Detail Source - Proposed Line Source - Existing Line Structure / Conductor / OHEW Geometry typical details for existing structure designs structure design records Conductor Type and Parameters planning reports or typical designs / standards / manufacturer’s data design records / standards / manufacturer’s data Earthwire Type and Parameters planning reports or typical designs / standards / manufacturer’s data design records / standards / manufacturer’s data Conductor and Earthwire Stringing Data typical designs or practices line layout records Minimum Design Ground Clearance statutory requirements or authority practices design records Equivalent and Actual Span estimated using assessment of typical designs and terrain line layout records Table 1 - Line Design Details
  • 4. 4 5. Full Characterisation Of Fields Associated With A Line Fields associated with a transmission line may be characterised as shown in Figure 1.MagneticField(mG) Transmission Line Field Profile Figure 1 A - Short Time Emergency B - Infrequent High Load C - Typical Daily Maximum D - Typical Daily Minimum Centreline 5.1. Loading Conditions: A Short Time Emergency: - could be short time thermal limit - may in practice never be reached on a line B Infrequent High Load: - for example yearly peak with the system substantially normal C Typical Daily Maximum: - the peak value reached for the line on a typical day D Typical Daily Minimum: - the value reached for the minimum daily load on a line For communication purposes, experience has shown that the amount of detail above is confusing to people without a detailed knowledge of transmission systems. Accordingly it is recommended to adopt a simplified but nevertheless honest approach, as follows: • For general discussion purposes - cite Curve C as this gives a (conservative) value for long term exposure • In an Environmental Impact Statement, mention A* and B in passing, but base discussion on Curve C as this represents the likely maximum field which would, in practice, be achieved over a sustained period. In such cases, Curve C should be based on the likely loading regime to be reached during the lifetime of a line, and not necessarily that which occurs upon commissioning. * if Curve A is so unlikely as to be inconsequential, it could be permissible to ignore it on the basis that, in everyday life, it is not unusual for people to encounter fields of considerable magnitude for brief periods of time.
  • 5. 5 For some lines, the daily load profile will vary significantly between seasons. In such cases, the curves relating to the season with the highest loading should be used. The overall aims are: - •to acknowledge the highest field which may occur in practice, and • to focus attention and discussion on reasonably conservative estimates of the actual field levels which would be associated with the line over an extended duration For proposed lines or line upratings, the currents corresponding to the various load cases should be obtained from system planners. In the case of existing lines, load records should be consulted. The load corresponding to the typical maximum daily load case (Curve C) is less straightforward. Where load - duration data are available, the current loading for Curve C should normally be taken as the 85% load. i.e. the load which is exceeded for no more than 15% of the time. In cases where the load duration data are not available, it is necessary to exercise judgement based on the best available information to derive a load which is unlikely to be exceeded for more than 15% of the time. For each curve, having established the load current, the next step is to translate this to a magnetic field profile. The magnetic field at a point adjacent to a line is primarily dependent on current, but also on ground clearance which is also influenced by load current. 5.2. Ground Clearance: In a practical situation, ground clearance varies from span to span and from point to point within a span. Accordingly, a suitable practical (and reasonably conservative) value of ground clearance needs to be selected to enable field calculations to be carried out. The equivalent and actual spans, conductor conditions and terrain considerations are all required to calculate average height above ground at the point of interest. Average height above ground = (minimum ground clearance at max design temp) + (additional height due to assumed operating temperature below max design temp) + (1/3 sag at that assumed operating temperature) The conductor temperature under a given set of conditions may be calculated using the appropriate table in ENA publication D(b)5 -1976 “Current Ratings of Bare Overhead Line Conductors”:
  • 6. 6 Inputs required are : • Current = derived as described previously in section 5 • Conductor type = known (or nominated), surface condition assumed to be black i.e. Solar Absorption Coefficient = 1.0 and Emissivity =1.0 • Solar Radiation intensity = assumed 1000 W/sq m • Lateral Wind Velocity = assumed 1m/s Conductor sag and therefore ground clearance can then be calculated from the appropriate design information for the particular section of line under consideration (i.e span and equivalent span). It is normal practice to assume flat ground in calculations of this type, but if local conditions are known, an appropriate adjustment should be made to the average ground clearance used in the calculation. 6. Magnetic Field Calculation: The magnetic field profile is produced using standard computer software, such as Power Technologies TLFIELD program, using inputs derived in accordance with Section 5 of these guidelines. Reference height for calculations should be taken as 1 metre, in accordance with normal practice and the ENA Residential Protocol For The Measurement of Electric and Magnetic Fields.
  • 7. 7 APPENDIX A No Yes Data Available: • structure geometry • conductor parameters • earthwire parameters • stringing data • design minimum ground clearance Data Required / Assumed: • structure geometry • conductor parameters • earthwire parameters • stringing data • design minimum ground clearance Existing Transmission Line Calculate Conductor Temperature Select Equivalent Span and Actual Span Calculate Sag Any Reason To Depart From Flat Ground Case? No Yes Adjust Calculate Field Profile Determine Design Details Select Load Calculate Conductor Temperature Select Equivalent Span and Actual Span Calculate Sag Determine Average Ground Clearance Calculate Field Profile For particular conditions using appropriate software For terrain or other considerations Flat ground is assumed Translate To Average Ground Clearance Based on typical line design or structure data Calculate Determine Design Details Select Load Available from control centre data Known from line layout From the line profile if at a particular point otherwise use an average figure as for new lines
  • 8. 8 APPENDIX B Notes on Calculation of Ground Clearance. The input for field calculation requires an “average conductor height” - which is determined by ground clearance (at certain load conditions) and sag (at the same set of conditions). It is assumed that the ground is flat unless there is sufficient information available to make an assessment for the case being considered. It can be shown (using parabolic equations) that the average conductor sag is 2/3 of overall sag when measured from the points of attachment. Alternatively, the average conductor height is equal to ground clearance at the low point of the parabola, plus 1/3 sag. Average height above ground = (minimum ground clearance at max design temperature) + (additional height due to assumed operating temperature below max design temperature) + (1/3 sag at that assumed operating temperature) Conductor electrical loading (calculated or assumed) causes a conductor temperature rise above ambient but the temperature will normally remain below that corresponding to maximum design load (minimum (design) ground clearance is based on this maximum load). As the load and therefore conductor temperature is below this design value - the conductors will be higher - and have less sag. Layout clearances for conductors at maximum design temperature are generally based on individual State Regulations and authority design practices. Typically, minimum layout clearances may be: • 110 / 132kV = 7.0m • 220 / 275kV = 8.0m • 330kV = 8.5m • 500kV = 9.5m While this document is directed primarily towards transmission lines, the basic approach may be modified and applied to suit sub-transmission and distribution lines. Conductor at reduced temperatureAverage conductor height Conductor at maximum design temperature Design ground clearance Ground level Increased clearance due to temperature reduction
  • 9. 9 APPENDIX C Typical Inputs - Magnetic Field Calculation Program Input Existing Line Future Line (a) Reference ht for field calculations: Known (1m) Known (1m) (b) Overhead Earthwire data: - No. of wires Known Assumed - X and Y coordinates of each wire Known / Calculated Calc (Assumed) - size (diameter) of wires Known Assumed (c) Phase Conductor data: - No. of phase conductors Known Assumed - X ,Y coordinates-bundle/conductor Calc (Known) Calc (Assumed) - size (diameter) of wires Known Assumed - subconductor spacing Known Assumed - phase to phase voltage Known Known - phase angle Known Assumed (d) Grounded horizontal guard wires? Known Assumed (e) Energised E cancellation wires? Known Assumed (f) Currents in Overhead Earthwires: - current in each wire Known Assumed - phase angle for each current Known Assumed (g) Current details for Conductors: - current and direction in each wire Calc (Known) Calc (Assumed) - phase angle for each current Assumed Assumed (h) Soil Resistivity Known / Assumed Assumed (i) X- Coordinate: both sides of element Known Known / Assumed
  • 10. 10 APPENDIX D Worksheet - Standard Basis for Quoting Transmission Line Magnetic Fields 1. Design Details Line Voltage Structure Geometry • number of circuits • horizontal and vertical coordinates of conductors and earthwires • conductor phasing Conductor Parameters • type / diameter / unit weight • number and spacing of subconductors Earthwire Parameters • type / diameter / unit weight Stringing Data • conductor sag / tension condition • earthwire sag / tension condition Design Minimum Ground Clearance • design minimum ground clearance 2. Line Loading • maximum daily load 3. Conductor Temperature Use appropriate table from ENA D(b)5 - Inputs Required • conductor type (from Step 1) • line loading (from Step 2) Assumed Parameters: • daytime, black conductor, 1m/s wind 4. Equivalent and Actual Span To be determined / calculated: • equivalent (ruling) span • span under consideration 5. Calculate Sag Inputs: • conductor unit weight, tension (from Step 1) • equivalent span, actual span (from Step 3) 6. Average Ground Clearance Inputs: • minimum design ground clearance (from Step 1) • adjustment (for temperature below max design temp- from Step 4) • 1/3 sag at assumed operating temperature (from Step 4) 7. Adjustment for Departure from Flat Ground Case 8. Calculate Magnetic Field Profile