Projects done in BOSCH LTD., Nashik
Debolina Mukherjee
( BE Mechanical)
Department : Process Development : TEF1
1 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
Guidance : Mr. Mendse.M.S.
Mr. Nikam.P.D.
Development:-
Cycle time reduction in WIDMA Machine no. 11411 & 11516 from 48 sec to 32 sec. used for Guide
Bore Gun Drilling operation in DSLA Nozzle Body.
New machine Commissioning :-
• Retco TC 5 and TC6 machine in DSLA Soft Stage used for Drilling guide bore & seat sinking
operation in DSLA Nozzle Body.
• ACE U-Turn I & ACE U-Turn II used for 1st Side and 2nd side turning operation of CRI Injector
Body.
 Tool Trial:-
Projects done in BOSCH LTD., Nashik
2 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
 Tool Trial:-
• Trial of Grinding Wheel on DN Bahmuller Machine no. 20157 used for external grinding of Shaft,
Shoulder,Collar diameter and finish bottom of DN Nozzle Body.
• Trial of CBN Grinding Wheel on pre-finish station on DN Supfina Machine No.20356 used for
Grinding Top face & maintaining seat depth w.r.t top for DN X Hard Body.
• Trial of face Grinding Wheel on Bahmuller B23 Machine 20536 of CRI CKD area used for face
Grinding of CRI Valve piece.
Trouble shooting:-
• Defect Cause Analysis for Seat defect of CRI CKD Valve Piece manufactured in Bahmuller B23
machine.
Component : CRI Injector Body
Operation : First & Second Side Turning
Make : ACE Designers, Bangalore
Machine Description :
• 2 Axis CNC Turing Centre
• Model µ Turn 500 : 4 Nos.
Commissioning of ACEI & ACE II machine:
Projects done in BOSCH LTD., Nashik
3 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
•Model µ Turn : 5 Nos.
First Side Turning
Second Side Turning
Sequence of Operation in ACEI (1st side Turning machine):-
CENTRING
ROUGH OD
TURNING
OPERATIONAL
SEQUENCE
TOOL USED
CENTRE DRILL 2.5
X 10 TYPE B
C3-DDJNL-22045-11, DNMG
110408 PF 4015, C3-
LC2085-4038M
LOCATING LOCATING CONE
Projects done in BOSCH LTD., Nashik
4 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
FINISH OD TURNING
THREAD
ROLLING
DRILLING
REAMING
C3-DDJNL-22045-11,
DNMG 110408 PF 4015,
C3-LC2085-4038M
FETTE THREAD
ROLL T27(M15X
0.5 MM)
CARBIDE DRILL
DIA.5.5 MM
CARBIDE
REAMER 6 MM
OD ROUGHTURNING
OD FINISH TURNING
M27X 1 THREAD ROLLING
STEP DRILLING
OPERATION TOOL USED
Ø 6 PILOT DRILL
DNMG 11 0408-PM-4225
DNMG 110408 PF4015
THREAD ROLLERS M27X1
STEP DRILL Ø PILOT DRILL
Ø 6 PILOT DRILL
Projects done in BOSCH LTD., Nashik
Sequence of Operation in ACEI (2nd side
Turning machine):-
5 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
ROUGH BORE DRILLING
ROUGH SINKERING
INTERNAL THREADING M17X1
FRESBEE OPERATION
FINISH SINKERING
Ø 6 PILOT DRILL
CPMT 060204 PM4025
Ø 6 PILOT DRILL
ROUGH SINKER
KVCGT 030204-PM2WXK10
R166.0 L- MM01-100
FINISH SINKER
List of Dimension to be
checked in 1st side Turning :-
Projects done in BOSCH LTD., Nashik
Confirmation of Quality
parameters :-
6 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
Projects done in BOSCH LTD., Nashik
List of Dimension to be checked
in 2nd side Turning :-
Confirmation of Quality
parameters :-
7 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
Projects done in BOSCH LTD., Nashik
Activities undertaken during commissioning
ACE I & II machines:-
Cmk No of characteristics where CmK
1.67 to 2.0 to 5.0 to Above
Status ACE machines
Quality : Capability study for all 9 machines Over
Installation
Commissioning
Functional Checking
Machining
8 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
1.67 to
2.0
2.0 to
5.0
5.0 to
10.0
Above
10.0
ACE1 2 (11%) 5(29%) 6(35%) 4(23%)
ACE2 1 (4%) 7(30%) 5(21%) 10
(43%)
Availability : 8 Hr Run for all machines is over
• Technical Availability more than 95 %
Final Acceptance…Capability test
Availability Test…8hours run
Associates training
Optimization : Process parameters

Weitere ähnliche Inhalte

Mehr von DEBOLINAMUKHERJEE7

Mehr von DEBOLINAMUKHERJEE7 (20)

I C ENGINE
I C ENGINEI C ENGINE
I C ENGINE
 
Material handling
Material handlingMaterial handling
Material handling
 
Engineering Graphics and Design
Engineering Graphics and DesignEngineering Graphics and Design
Engineering Graphics and Design
 
3D printing
3D printing3D printing
3D printing
 
INDUSTRIAL SCOPE OF 3D PRINTING TECHNOLOGY
INDUSTRIAL SCOPE OF 3D PRINTING TECHNOLOGYINDUSTRIAL SCOPE OF 3D PRINTING TECHNOLOGY
INDUSTRIAL SCOPE OF 3D PRINTING TECHNOLOGY
 
Lathe operations
Lathe operationsLathe operations
Lathe operations
 
Plastic moulding methods
Plastic moulding methodsPlastic moulding methods
Plastic moulding methods
 
Cutting tool material
Cutting tool materialCutting tool material
Cutting tool material
 
Plastic moulding methods
Plastic moulding methodsPlastic moulding methods
Plastic moulding methods
 
Non convencional machining
Non convencional machiningNon convencional machining
Non convencional machining
 
Gear finishing methods
Gear finishing methodsGear finishing methods
Gear finishing methods
 
Methods of gear manufacturing
Methods of gear manufacturingMethods of gear manufacturing
Methods of gear manufacturing
 
Methods of gear manufacturing
Methods of gear manufacturingMethods of gear manufacturing
Methods of gear manufacturing
 
introduction to engineering materials
introduction to engineering materialsintroduction to engineering materials
introduction to engineering materials
 
Ees104 thermodynamics
Ees104 thermodynamicsEes104 thermodynamics
Ees104 thermodynamics
 
Ft 103 food thermodynamics psychrometry
Ft 103 food thermodynamics  psychrometryFt 103 food thermodynamics  psychrometry
Ft 103 food thermodynamics psychrometry
 
Engg mech and thermodynamics
Engg mech and thermodynamicsEngg mech and thermodynamics
Engg mech and thermodynamics
 
Engg mech and thermodynamics
Engg mech and thermodynamicsEngg mech and thermodynamics
Engg mech and thermodynamics
 
Lecture on machine design and material: Mechanical Engineering
Lecture on machine design and material: Mechanical EngineeringLecture on machine design and material: Mechanical Engineering
Lecture on machine design and material: Mechanical Engineering
 
Lecture on thermodynamics
Lecture on thermodynamicsLecture on thermodynamics
Lecture on thermodynamics
 

Debolina Mukherjee project Bosch limited

  • 1. Projects done in BOSCH LTD., Nashik Debolina Mukherjee ( BE Mechanical) Department : Process Development : TEF1 1 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen. Guidance : Mr. Mendse.M.S. Mr. Nikam.P.D.
  • 2. Development:- Cycle time reduction in WIDMA Machine no. 11411 & 11516 from 48 sec to 32 sec. used for Guide Bore Gun Drilling operation in DSLA Nozzle Body. New machine Commissioning :- • Retco TC 5 and TC6 machine in DSLA Soft Stage used for Drilling guide bore & seat sinking operation in DSLA Nozzle Body. • ACE U-Turn I & ACE U-Turn II used for 1st Side and 2nd side turning operation of CRI Injector Body.  Tool Trial:- Projects done in BOSCH LTD., Nashik 2 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.  Tool Trial:- • Trial of Grinding Wheel on DN Bahmuller Machine no. 20157 used for external grinding of Shaft, Shoulder,Collar diameter and finish bottom of DN Nozzle Body. • Trial of CBN Grinding Wheel on pre-finish station on DN Supfina Machine No.20356 used for Grinding Top face & maintaining seat depth w.r.t top for DN X Hard Body. • Trial of face Grinding Wheel on Bahmuller B23 Machine 20536 of CRI CKD area used for face Grinding of CRI Valve piece. Trouble shooting:- • Defect Cause Analysis for Seat defect of CRI CKD Valve Piece manufactured in Bahmuller B23 machine.
  • 3. Component : CRI Injector Body Operation : First & Second Side Turning Make : ACE Designers, Bangalore Machine Description : • 2 Axis CNC Turing Centre • Model µ Turn 500 : 4 Nos. Commissioning of ACEI & ACE II machine: Projects done in BOSCH LTD., Nashik 3 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen. •Model µ Turn : 5 Nos. First Side Turning Second Side Turning
  • 4. Sequence of Operation in ACEI (1st side Turning machine):- CENTRING ROUGH OD TURNING OPERATIONAL SEQUENCE TOOL USED CENTRE DRILL 2.5 X 10 TYPE B C3-DDJNL-22045-11, DNMG 110408 PF 4015, C3- LC2085-4038M LOCATING LOCATING CONE Projects done in BOSCH LTD., Nashik 4 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen. FINISH OD TURNING THREAD ROLLING DRILLING REAMING C3-DDJNL-22045-11, DNMG 110408 PF 4015, C3-LC2085-4038M FETTE THREAD ROLL T27(M15X 0.5 MM) CARBIDE DRILL DIA.5.5 MM CARBIDE REAMER 6 MM
  • 5. OD ROUGHTURNING OD FINISH TURNING M27X 1 THREAD ROLLING STEP DRILLING OPERATION TOOL USED Ø 6 PILOT DRILL DNMG 11 0408-PM-4225 DNMG 110408 PF4015 THREAD ROLLERS M27X1 STEP DRILL Ø PILOT DRILL Ø 6 PILOT DRILL Projects done in BOSCH LTD., Nashik Sequence of Operation in ACEI (2nd side Turning machine):- 5 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen. ROUGH BORE DRILLING ROUGH SINKERING INTERNAL THREADING M17X1 FRESBEE OPERATION FINISH SINKERING Ø 6 PILOT DRILL CPMT 060204 PM4025 Ø 6 PILOT DRILL ROUGH SINKER KVCGT 030204-PM2WXK10 R166.0 L- MM01-100 FINISH SINKER
  • 6. List of Dimension to be checked in 1st side Turning :- Projects done in BOSCH LTD., Nashik Confirmation of Quality parameters :- 6 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
  • 7. Projects done in BOSCH LTD., Nashik List of Dimension to be checked in 2nd side Turning :- Confirmation of Quality parameters :- 7 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen.
  • 8. Projects done in BOSCH LTD., Nashik Activities undertaken during commissioning ACE I & II machines:- Cmk No of characteristics where CmK 1.67 to 2.0 to 5.0 to Above Status ACE machines Quality : Capability study for all 9 machines Over Installation Commissioning Functional Checking Machining 8 Abteilung | 19.06.2009 | © Bosch Limited 2009. Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung, Weitergabe sowie für den Fall von Schutzrechtsanmeldungen. 1.67 to 2.0 2.0 to 5.0 5.0 to 10.0 Above 10.0 ACE1 2 (11%) 5(29%) 6(35%) 4(23%) ACE2 1 (4%) 7(30%) 5(21%) 10 (43%) Availability : 8 Hr Run for all machines is over • Technical Availability more than 95 % Final Acceptance…Capability test Availability Test…8hours run Associates training Optimization : Process parameters