Stage 1 Stage 2, ... n Final Stage
Authorize
Initiate a
Project
Authorize
the
Project
Authorize a
Stage or
Exception Plan
Authorize
Project Closure
Directing a Project
Advise Project
Closed
Advising
Stage/Exception
Requesting
Ad Hoc Advice
Notifying
Project Authorized
Notifying
Initiation Authorized
Advise Premature
Project Closure
Give Ad Hoc
Advice
Authorize
Premature
Project Closure
Request Authorize
Next Stage Plan
Advise Project
Closed
Advising
Stage/Exception
Requesting
Ad Hoc Advice
Notifying
Project Authorized
Notifying
Initiation Authorized
Advise Premature
Project Closure
Authority to
Deliver a Project
Give Ad Hoc
Advice
Exception Raised
Exception Plan
Request
Exception Plan
Approved
Premature
Closure
Authority to
Initiate a Project
Authorize
Premature
Project ClosureGive Ad Hoc
Advice
Exception Plan
Request
Exception Plan
Approved
Premature
Closure
Authority to
Initiate a Project
Authority to
Deliver a Project
Authority to
Deliver Next Stage
Update
the
Project Plan
Produce
End Project
Report
Update
the
Business Case
Update All Other
Project
Documents
Follow-On
Actions
Draft Project Closure
Notification
End Project
Report
Project
Plan
Detailed
Business
Case
Closing a Project
Request Authorize
Project Closure
End of Project
Approaching
Produce
Product Status
Account
Sustainability
Meeting
with CSR
Request Authorize
Project Closure
Project
Plan
Update/Create Other Project Documentation
Lessons
Log
Daily
Log
End Stage
Report
SMP
Update
the
Project Plan
Produce
End Stage
Report
Update
the
Business Case
Update other
Relevant
Project Documents
Produce
an
Exception Plan
Plan
the
Next Stage
Next
Stage
Plan
Detailed
Business
Case
Project
Team Role
Descriptions
Stage Boundary
Request Authorize
Next Stage Plan
Exception
Plan
Registers CIRs
Strategy
Docs
Strategy
Docs
Accept
a
Work Package
Execute
a
Work Package
Deliver
a
Work Package
Managing Product Delivery
Completed Work
Package
Check
point
Reports
Issue
Register
Risk
Register
HightLight
Reports
Exception
Report
Review
the
Stage Status
Report Highlights
Capture and
Examine
Issues and Risks
Authorize
Work Packages
Receive
completed
Work Packages
Review
Work Package
Status
Take
Corrective
Action
Issue
Report
Escaslate
Issues and Risks
Controlling a Stage
Stage Boundary
Approaching
New Issue
Exception Raised
Authority to deliver
a Work Package
Stage Boundary
Approaching
Risk Quality
CommsConfig
Project
Controls
Project
Plan
Update/Create Other Project Documentation
Lessons
Log
Daily
Log
Registers CIRs
PID, BRP
NSP
ESR, PID,
NSP
EPR, PID,
PCNNext
Stage
Plan
Prepare
the
Project Strategy
Documents
Create
the
Project Plan
Setup
the
Project Controls
Refine
the
Business Case
Assemble
the
Project Initiation
Documentation
Plan the
Next
Stage
Project
Team Role
Descriptions
Detailed
Business
Case
Benefits
Review
Plan
Initiating a Project
Stage Boundary
Request to
Deliver a Project
Stage Boundary
Approaching
Refine
Sustainability
Management Plan
Define
Sustainability
Quality Components
SMP
Request to
Deliver a Project
Lessons
Log
Daily
Log
PB, ISP, LL, SMP
Project
Brief
Organizational
Sustainability
Goals
Starting Up a Project
Project
Mandate
Request to
Initiate a Project
Appoint the
Project Executive
and
Project Manager
Capture
Previous
Lessons
Prepare
the Outline
Business Case
Design & Appoint
the Project
Management
Team
Select Project
Approach
Assemble
Project Brief
Plan the
Initiation Stage
Initiation
Stage Plan
Project
Team Role
Descriptions
Outline
Business
Case
Review
Organizational
Sustainability
Goals
Level Business Case
Against Organizational
Systems
Perform
P5
Analysis
Sustainability
Management
Plan (SMP)
Define
Sustainability
Objectives
Request to
Initiate a Project
Sustainable PRINCE2® Process Flow Diagram
Sustainability
Documents
	 Partial
	 Full
Activity
Partial
	 Full
© della porta consulting | Consulting - Training - Coaching
della porta consulting ltd
e: info@d-p-c.net
w: www.d-p-c.net
p:+44 203 3286 1831
m: + 44 7533 240 675

Weitere ähnliche Inhalte

Was ist angesagt?

Agile - metodyki zwinne (ver. 2014-04-29)
Agile - metodyki zwinne (ver. 2014-04-29)Agile - metodyki zwinne (ver. 2014-04-29)
Agile - metodyki zwinne (ver. 2014-04-29)Łukasz Rzepecki
 
Creasey ADKAR Track Gartner BPM Sept 2015
Creasey ADKAR Track Gartner BPM Sept 2015Creasey ADKAR Track Gartner BPM Sept 2015
Creasey ADKAR Track Gartner BPM Sept 2015Tim Creasey
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication ManagementAhmad Maharma, PMP,RMP
 
The Triple Constraint of Project Management - Lou Bergner
The Triple Constraint of Project Management - Lou BergnerThe Triple Constraint of Project Management - Lou Bergner
The Triple Constraint of Project Management - Lou BergnerMAX Technical Training
 
Prince2, Características, Benefícios e Diferenciais de Sucesso
Prince2, Características, Benefícios e Diferenciais de SucessoPrince2, Características, Benefícios e Diferenciais de Sucesso
Prince2, Características, Benefícios e Diferenciais de SucessoMaria Angelica Castellani
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsBarry O'Reilly
 
Agile Transformation | Mike Cottmeyer
Agile Transformation | Mike CottmeyerAgile Transformation | Mike Cottmeyer
Agile Transformation | Mike CottmeyerLeadingAgile
 
Prince2 2009-process-model
Prince2 2009-process-modelPrince2 2009-process-model
Prince2 2009-process-modelRemella Suman
 
Responsibility Assignment Matrix - RACI Chart Explained
Responsibility Assignment Matrix - RACI Chart Explained  Responsibility Assignment Matrix - RACI Chart Explained
Responsibility Assignment Matrix - RACI Chart Explained Igor Kokcharov
 
Prince2 explained in 30mins
Prince2 explained in 30minsPrince2 explained in 30mins
Prince2 explained in 30minsILX Group
 
Agile Transformation Case Studies
Agile Transformation Case StudiesAgile Transformation Case Studies
Agile Transformation Case StudiesChandan Patary
 
An Introduction to Agile
An Introduction to AgileAn Introduction to Agile
An Introduction to AgileDavidMcLachlan1
 
Prosci "Presenting the Value of Change Management in Context" Webinar
Prosci "Presenting the Value of Change Management in Context" WebinarProsci "Presenting the Value of Change Management in Context" Webinar
Prosci "Presenting the Value of Change Management in Context" WebinarTim Creasey
 
10 Essential SAFe(tm) patterns you should focus on when scaling Agile
10 Essential SAFe(tm) patterns you should focus on when scaling Agile10 Essential SAFe(tm) patterns you should focus on when scaling Agile
10 Essential SAFe(tm) patterns you should focus on when scaling AgileYuval Yeret
 
Fundamentals of program, project portfolio management
Fundamentals of program, project portfolio managementFundamentals of program, project portfolio management
Fundamentals of program, project portfolio managementRobert Twiddy
 
The funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internetThe funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internetKnowledge Train
 

Was ist angesagt? (20)

Agile - metodyki zwinne (ver. 2014-04-29)
Agile - metodyki zwinne (ver. 2014-04-29)Agile - metodyki zwinne (ver. 2014-04-29)
Agile - metodyki zwinne (ver. 2014-04-29)
 
Creasey ADKAR Track Gartner BPM Sept 2015
Creasey ADKAR Track Gartner BPM Sept 2015Creasey ADKAR Track Gartner BPM Sept 2015
Creasey ADKAR Track Gartner BPM Sept 2015
 
Pmbok 4th edition chapter 10 - Project Communication Management
Pmbok 4th edition   chapter 10 - Project Communication ManagementPmbok 4th edition   chapter 10 - Project Communication Management
Pmbok 4th edition chapter 10 - Project Communication Management
 
The Triple Constraint of Project Management - Lou Bergner
The Triple Constraint of Project Management - Lou BergnerThe Triple Constraint of Project Management - Lou Bergner
The Triple Constraint of Project Management - Lou Bergner
 
Prince2, Características, Benefícios e Diferenciais de Sucesso
Prince2, Características, Benefícios e Diferenciais de SucessoPrince2, Características, Benefícios e Diferenciais de Sucesso
Prince2, Características, Benefícios e Diferenciais de Sucesso
 
Project management
Project managementProject management
Project management
 
Stakeholder management _1
Stakeholder management _1Stakeholder management _1
Stakeholder management _1
 
Agile pmo nueva generación
Agile pmo nueva generaciónAgile pmo nueva generación
Agile pmo nueva generación
 
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & OrganisationsTraditional vs Lean Portfolio Management, Agile PMO & Organisations
Traditional vs Lean Portfolio Management, Agile PMO & Organisations
 
Agile Transformation | Mike Cottmeyer
Agile Transformation | Mike CottmeyerAgile Transformation | Mike Cottmeyer
Agile Transformation | Mike Cottmeyer
 
Prince2 2009-process-model
Prince2 2009-process-modelPrince2 2009-process-model
Prince2 2009-process-model
 
Responsibility Assignment Matrix - RACI Chart Explained
Responsibility Assignment Matrix - RACI Chart Explained  Responsibility Assignment Matrix - RACI Chart Explained
Responsibility Assignment Matrix - RACI Chart Explained
 
Prince2 explained in 30mins
Prince2 explained in 30minsPrince2 explained in 30mins
Prince2 explained in 30mins
 
Agile Transformation Case Studies
Agile Transformation Case StudiesAgile Transformation Case Studies
Agile Transformation Case Studies
 
An Introduction to Agile
An Introduction to AgileAn Introduction to Agile
An Introduction to Agile
 
Prosci "Presenting the Value of Change Management in Context" Webinar
Prosci "Presenting the Value of Change Management in Context" WebinarProsci "Presenting the Value of Change Management in Context" Webinar
Prosci "Presenting the Value of Change Management in Context" Webinar
 
10 Essential SAFe(tm) patterns you should focus on when scaling Agile
10 Essential SAFe(tm) patterns you should focus on when scaling Agile10 Essential SAFe(tm) patterns you should focus on when scaling Agile
10 Essential SAFe(tm) patterns you should focus on when scaling Agile
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
Fundamentals of program, project portfolio management
Fundamentals of program, project portfolio managementFundamentals of program, project portfolio management
Fundamentals of program, project portfolio management
 
The funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internetThe funkiest PRINCE2 Processes revision guide on the internet
The funkiest PRINCE2 Processes revision guide on the internet
 

Ähnlich wie Sustainbility in PRINCE2 Process Flow

Prince 2 Flashcard for exam preperations
Prince 2 Flashcard for exam preperationsPrince 2 Flashcard for exam preperations
Prince 2 Flashcard for exam preperationsscharique01
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdfDereje Jima
 
2009 Project Leaders Course Presentation
2009 Project Leaders Course Presentation2009 Project Leaders Course Presentation
2009 Project Leaders Course Presentationsdknight22
 
Project management unit 5(1)
Project management unit 5(1)Project management unit 5(1)
Project management unit 5(1)Rintu Das
 
Project management milestones-webinar
Project management milestones-webinarProject management milestones-webinar
Project management milestones-webinarmodijs
 
Multimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvtMultimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvtWsolvt
 
Multimedia Project Life Cycle Wsolvt
Multimedia Project Life Cycle  WsolvtMultimedia Project Life Cycle  Wsolvt
Multimedia Project Life Cycle WsolvtHatemkarim
 
Topic 1a overview program and project structures
Topic 1a overview  program and project structuresTopic 1a overview  program and project structures
Topic 1a overview program and project structuresAllan Cunningham
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Project Management For The Curious
Project Management For The CuriousProject Management For The Curious
Project Management For The Curiousdwhelbourn
 
Rescuing and revitalizing the problem project
Rescuing and revitalizing the problem projectRescuing and revitalizing the problem project
Rescuing and revitalizing the problem projectKinshook Chaturvedi
 

Ähnlich wie Sustainbility in PRINCE2 Process Flow (20)

Prince2 process model flow diagram
Prince2 process model flow diagramPrince2 process model flow diagram
Prince2 process model flow diagram
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
Prince 2 Flashcard for exam preperations
Prince 2 Flashcard for exam preperationsPrince 2 Flashcard for exam preperations
Prince 2 Flashcard for exam preperations
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Arrange building applications and approvals.pdf
Arrange building applications and approvals.pdfArrange building applications and approvals.pdf
Arrange building applications and approvals.pdf
 
Innovation Team Plan
Innovation Team PlanInnovation Team Plan
Innovation Team Plan
 
PM_Project LifeCycle
PM_Project LifeCyclePM_Project LifeCycle
PM_Project LifeCycle
 
2009 Project Leaders Course Presentation
2009 Project Leaders Course Presentation2009 Project Leaders Course Presentation
2009 Project Leaders Course Presentation
 
Project closing and methods
Project closing and methodsProject closing and methods
Project closing and methods
 
Project management unit 5(1)
Project management unit 5(1)Project management unit 5(1)
Project management unit 5(1)
 
PM framework by Ijaz Haider Malik
PM framework by Ijaz Haider MalikPM framework by Ijaz Haider Malik
PM framework by Ijaz Haider Malik
 
Project management milestones-webinar
Project management milestones-webinarProject management milestones-webinar
Project management milestones-webinar
 
Multimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvtMultimedia project life cycle - wsolvt
Multimedia project life cycle - wsolvt
 
Multimedia Project Life Cycle Wsolvt
Multimedia Project Life Cycle  WsolvtMultimedia Project Life Cycle  Wsolvt
Multimedia Project Life Cycle Wsolvt
 
What Next After Accreditation?
What Next After Accreditation?What Next After Accreditation?
What Next After Accreditation?
 
Topic 1a overview program and project structures
Topic 1a overview  program and project structuresTopic 1a overview  program and project structures
Topic 1a overview program and project structures
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Project Management For The Curious
Project Management For The CuriousProject Management For The Curious
Project Management For The Curious
 
Project management
Project managementProject management
Project management
 
Rescuing and revitalizing the problem project
Rescuing and revitalizing the problem projectRescuing and revitalizing the problem project
Rescuing and revitalizing the problem project
 

Kürzlich hochgeladen

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Kürzlich hochgeladen (20)

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

Sustainbility in PRINCE2 Process Flow

  • 1. Stage 1 Stage 2, ... n Final Stage Authorize Initiate a Project Authorize the Project Authorize a Stage or Exception Plan Authorize Project Closure Directing a Project Advise Project Closed Advising Stage/Exception Requesting Ad Hoc Advice Notifying Project Authorized Notifying Initiation Authorized Advise Premature Project Closure Give Ad Hoc Advice Authorize Premature Project Closure Request Authorize Next Stage Plan Advise Project Closed Advising Stage/Exception Requesting Ad Hoc Advice Notifying Project Authorized Notifying Initiation Authorized Advise Premature Project Closure Authority to Deliver a Project Give Ad Hoc Advice Exception Raised Exception Plan Request Exception Plan Approved Premature Closure Authority to Initiate a Project Authorize Premature Project ClosureGive Ad Hoc Advice Exception Plan Request Exception Plan Approved Premature Closure Authority to Initiate a Project Authority to Deliver a Project Authority to Deliver Next Stage Update the Project Plan Produce End Project Report Update the Business Case Update All Other Project Documents Follow-On Actions Draft Project Closure Notification End Project Report Project Plan Detailed Business Case Closing a Project Request Authorize Project Closure End of Project Approaching Produce Product Status Account Sustainability Meeting with CSR Request Authorize Project Closure Project Plan Update/Create Other Project Documentation Lessons Log Daily Log End Stage Report SMP Update the Project Plan Produce End Stage Report Update the Business Case Update other Relevant Project Documents Produce an Exception Plan Plan the Next Stage Next Stage Plan Detailed Business Case Project Team Role Descriptions Stage Boundary Request Authorize Next Stage Plan Exception Plan Registers CIRs Strategy Docs Strategy Docs Accept a Work Package Execute a Work Package Deliver a Work Package Managing Product Delivery Completed Work Package Check point Reports Issue Register Risk Register HightLight Reports Exception Report Review the Stage Status Report Highlights Capture and Examine Issues and Risks Authorize Work Packages Receive completed Work Packages Review Work Package Status Take Corrective Action Issue Report Escaslate Issues and Risks Controlling a Stage Stage Boundary Approaching New Issue Exception Raised Authority to deliver a Work Package Stage Boundary Approaching Risk Quality CommsConfig Project Controls Project Plan Update/Create Other Project Documentation Lessons Log Daily Log Registers CIRs PID, BRP NSP ESR, PID, NSP EPR, PID, PCNNext Stage Plan Prepare the Project Strategy Documents Create the Project Plan Setup the Project Controls Refine the Business Case Assemble the Project Initiation Documentation Plan the Next Stage Project Team Role Descriptions Detailed Business Case Benefits Review Plan Initiating a Project Stage Boundary Request to Deliver a Project Stage Boundary Approaching Refine Sustainability Management Plan Define Sustainability Quality Components SMP Request to Deliver a Project Lessons Log Daily Log PB, ISP, LL, SMP Project Brief Organizational Sustainability Goals Starting Up a Project Project Mandate Request to Initiate a Project Appoint the Project Executive and Project Manager Capture Previous Lessons Prepare the Outline Business Case Design & Appoint the Project Management Team Select Project Approach Assemble Project Brief Plan the Initiation Stage Initiation Stage Plan Project Team Role Descriptions Outline Business Case Review Organizational Sustainability Goals Level Business Case Against Organizational Systems Perform P5 Analysis Sustainability Management Plan (SMP) Define Sustainability Objectives Request to Initiate a Project Sustainable PRINCE2® Process Flow Diagram Sustainability Documents Partial Full Activity Partial Full © della porta consulting | Consulting - Training - Coaching della porta consulting ltd e: info@d-p-c.net w: www.d-p-c.net p:+44 203 3286 1831 m: + 44 7533 240 675