Subway Performance and
Train Control Upgrade
Muni Metro Train Control 2
The problem
Vehicle
Breakdowns
Track Failures
Passenger Issues
Subway
Congestion
Muni Metro service regularly experiences delays and crowding, resulting in
an overall poor quality of service
Acute Delays
Chronic Congestion
Communication
Failures (ATCS)
Failed Entries
ATCS Computer
Failures
Overhead Line
Failures
ATCS Equipment
Failures
Operator Issues
Bunching/Gaps Slow-moving
subway trains
Street
congestion
Muni Metro Train Control 3
Sources of Acute Delays
Train Control
49%
Vehicle
Breakdown
31%
Operations
Related
4%
Passenger
Related
4% Other
Problems*
12%
Delays by Quantity
Train Control
19%
Vehicle
Breakdown
52%
Operations
Related
4%
Passenger
Related
4%
Other
Problems*
21%
Delays by Impact (minutes)
*Other problems include wayside infrastructure failures in addition to delays that were uncategorized in the control log.
These figures do not include delay due to congestion, only the acute delay associated with each incident.
(Jan-Dec 2018)
Source: Muni Central Control Log
Muni Metro Train Control 4
• Vehicles on the surface are fully
controlled by the operator
unsupervised by Central.
• Signals and switches are controlled by
independent wayside computers.
• Routes are requested as trains are
detected by the “VETAG” system, and
assigned first come, first serve.
• No spacing management
• A train entering one of three
portals and pings the central
computer
• The system does a “handshake”
with the vehicle, and routes it
automatically
• System keeps vehicles safely spaced
• System controls use and activation
of switches to route vehicles (first
come, first serve)
• Operators open/close doors, but all
other movements are automated
Muni’s train control today
Subway
Automatic Train Control
In service 1998
Surface
Independent Operation
.
Muni Metro Train Control 5
Types of train control
Fixed block
Moving block
Muni Metro Train Control 6
ATCS System Overview
Local Control Computer
Loop Cable
ACE
EAK
Axle Counter
Switch Machine
Signal
Operations Control CenterCentral Computers
VOBC
Propulsion
Brakes
Doors
Accelerometer
Tachometer
SMC TMC
VCC
INTERSIG
(1 of 7)
Muni Metro Train Control 7
SMC – System Management Center
Muni Metro Train Control 8
What are the key reasons for poor
train control system performance?
Multiplies the
opportunity for
system failures,
makes systemic
management of
entire rail system
complex
Three entry
portals
Components fail
regularly,
technology has
significant
capacity issues,
fewer and fewer
people have
expertise to
understand
system
Twenty-year-old
system
Extremely
unforgiving
system design,
system is slow to
come back up
and results in
delays that are
disproportionate
to significance of
initial failure
Rigid
infrastructure
We are operating
at (or even
above) capacity
of the train
control system,
leaves zero room
for error
Congestion
The present system designed in the 1980s and was rolled out in the 1990s—it
experienced significant issues then, and continues to cause headaches today
Muni Metro Train Control 9
Travel Time Variability
0
5
10
15
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Frequency(%)
Minutes
Aug - Nov 2019 Travel Time Distribution
KLM, Weekdays
KLM Inbound KLM Outbound
Muni Metro Train Control 10
15
20
25
30
35
40
45
4:00AM
5:00AM
6:00AM
7:00AM
8:00AM
9:00AM
10:00AM
11:00AM
12:00PM
1:00PM
2:00PM
3:00PM
4:00PM
5:00PM
6:00PM
7:00PM
8:00PM
9:00PM
10:00PM
11:00PM
Subway Hourly Throughput, at Embarcadero Station inbound
Weekday Scheduled Arrivals Weekday Actual Arrivals
Gap between Sch.
vs Act explained by
delay (train queue)
PM Peak
post
recovery
period
“Typical” day, averaged from non-incident weekdays in 2018
CapacityTrainsperhour
Muni Metro Train Control 11
Non Communicating Trains (NCT)
NCT
Gap in service
Embarcadero
West Portal
Forest Hill
Castro
Church
Van Ness
Civic Ctr
Powell
Montgomery
Trains stopped
to increase
buffer
Backed up trains
at Van Ness due
to delay
NCT recovers
comms at Van
Ness
Muni Metro Train Control 12
Recent Subway Initiatives
• Service management shifted to modern Transportation
Management Center – new tools enable increased focus on service
management
• Reduced infrastructure issues in subway as a result of extended
maintenance program and switch replacement at Church/Duboce
• Combination of parking control officers, traffic modifications and
localized signal management reducing delays approaching
outbound West Portal
• New radio and staff trainings have enabled better customer
communications during disruptions
• Increased mobile maintenance staff in the subway for quicker
response times to breakdowns
Muni Metro Train Control 13
Upcoming initiatives
As part of the next 90-day plan, SFMTA is
developing a two-year plan to improve
rail service delivery, focusing on the
subway.
Highlights will include:
• Activate West Portal Crossover with three-car shuttle
• Modify service plan to reduce subway congestion
• Continue extended maintenance program
• Increased supervision throughout rail system
• Continued investment in TMC line management training
Muni Metro Train Control 14
The Train Control Upgrade Project
Reduced
Delays
Improved
Maintainability
Subway delays reduced by 20-25% through reduced
train control failures and reduced congestion
Consistent trip
times
System monitors redundant components for faults so
preventative action can be taken before service is affected
10-year upgrade and expansion of communications-based
train control (CBTC) to improve Muni light rail service.
Expanding system to surface and integrating with traffic
signals means trip times are less variable
Greater
capacity
System enables better supervision and management of
trains, addressing bottlenecks and increasing capacity
Project Benefits
Muni Metro Train Control 15
Project description
Upgrades loop-cable based system in subway to redundant, reliable
wireless communications
Replaces central computers, local computers, and onboard
computers with latest technology
Installs same wireless communications equipment along the surface
right of way
Ties isolated surface signals and switches into the same single,
centrally controlled network as the subway
Interfaces with traffic signals to provide train priority (trains don’t
get stopped at red lights)
Provides central control with tools to adjust train dwell and speeds
anywhere on the system to manage bunches and gaps
Muni Metro Train Control 16
Project phasing
Benefits by phase
Phase 1
• Improved control center
management on surface
• Traffic signal integration
• Reduced delays on N and T
Phase 2
• Improved subway reliability
• Fewer subway delays
• Increased subway capacity
Phase 3
• Shorter running time for N
Phase 4
• Shorter running time for T
Phase 5-7
• Improved control center
management at all key
junctions
• Reduced systemwide delays
Muni Metro Train Control 17
Next steps
Train control upgrade strategy; provides a plan for future
upgrades and investments in train control
Now
2021-22 Adjustments to subway service as a result of the
improvement plan
Spring 2020
2023 First CBTC project benefits on initial segment
2026 New CBTC system fully operational in subways
2029 Entire Muni Metro system fully integrated into new CBTC
RFP for new CBTC project on surface and subway
Present two-year subway service improvement plan
Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

BASICs to Roadside Inspection Selection System (ISS) for CSA 2010 Update
BASICs to Roadside Inspection Selection System (ISS) for CSA 2010 UpdateBASICs to Roadside Inspection Selection System (ISS) for CSA 2010 Update
BASICs to Roadside Inspection Selection System (ISS) for CSA 2010 Update
UGPTI
 
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet EffectVTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
John Tsoucalas
 
SIE 250 Final Report
SIE 250 Final ReportSIE 250 Final Report
SIE 250 Final Report
Qisong Xiao
 
PSD(Screen Door)
PSD(Screen Door)PSD(Screen Door)
PSD(Screen Door)
simrc
 
Traffic information system
Traffic information systemTraffic information system
Traffic information system
Presi
 
Proposed smart traffic signal control in brunei darussalam
Proposed smart traffic signal control in brunei darussalamProposed smart traffic signal control in brunei darussalam
Proposed smart traffic signal control in brunei darussalam
Andino Maseleno
 

Was ist angesagt? (20)

Adaptive Traffic Control Systems Overview
Adaptive Traffic Control Systems OverviewAdaptive Traffic Control Systems Overview
Adaptive Traffic Control Systems Overview
 
I John Siraut Economic Impact Of Traffic Signals Final
I   John Siraut   Economic Impact Of Traffic Signals FinalI   John Siraut   Economic Impact Of Traffic Signals Final
I John Siraut Economic Impact Of Traffic Signals Final
 
Ic engine
Ic engineIc engine
Ic engine
 
BASICs to Roadside Inspection Selection System (ISS) for CSA 2010 Update
BASICs to Roadside Inspection Selection System (ISS) for CSA 2010 UpdateBASICs to Roadside Inspection Selection System (ISS) for CSA 2010 Update
BASICs to Roadside Inspection Selection System (ISS) for CSA 2010 Update
 
Wfcs2019
Wfcs2019Wfcs2019
Wfcs2019
 
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet EffectVTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
VTA Priority Report Summer 2016 - Paperless CoR Speed Compliance- Fleet Effect
 
Proposed alternative to assist current overload operations in South Africa
Proposed alternative to assist current overload operations in South Africa Proposed alternative to assist current overload operations in South Africa
Proposed alternative to assist current overload operations in South Africa
 
SIE 250 Final Report
SIE 250 Final ReportSIE 250 Final Report
SIE 250 Final Report
 
Traffic Signal Management System
Traffic Signal Management SystemTraffic Signal Management System
Traffic Signal Management System
 
A Brief review to the intelligent controllerswhich used to control trafficflow
A Brief review to the intelligent controllerswhich used to control trafficflowA Brief review to the intelligent controllerswhich used to control trafficflow
A Brief review to the intelligent controllerswhich used to control trafficflow
 
PSD(Screen Door)
PSD(Screen Door)PSD(Screen Door)
PSD(Screen Door)
 
Need for platform-to-track intrusion detection systems in automated metro lines
Need for platform-to-track intrusion detection systems in automated metro linesNeed for platform-to-track intrusion detection systems in automated metro lines
Need for platform-to-track intrusion detection systems in automated metro lines
 
Traffic control system and its management
Traffic control system and its managementTraffic control system and its management
Traffic control system and its management
 
CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work Zones
 
Management of I/O request & Communication among devices
Management of I/O request & Communication among devicesManagement of I/O request & Communication among devices
Management of I/O request & Communication among devices
 
Traffic information system
Traffic information systemTraffic information system
Traffic information system
 
Proposed smart traffic signal control in brunei darussalam
Proposed smart traffic signal control in brunei darussalamProposed smart traffic signal control in brunei darussalam
Proposed smart traffic signal control in brunei darussalam
 
IRJET-Intellectual 4way Traffic Control System using PLC and SCADA
IRJET-Intellectual 4way Traffic Control System using PLC and SCADAIRJET-Intellectual 4way Traffic Control System using PLC and SCADA
IRJET-Intellectual 4way Traffic Control System using PLC and SCADA
 
Culver Test Track
Culver Test TrackCulver Test Track
Culver Test Track
 
INTELLIGENT URBAN TRAFFIC CONTROL SYSTEM :ITS ARCHITECTURE
INTELLIGENT URBAN TRAFFIC CONTROL SYSTEM :ITS ARCHITECTUREINTELLIGENT URBAN TRAFFIC CONTROL SYSTEM :ITS ARCHITECTURE
INTELLIGENT URBAN TRAFFIC CONTROL SYSTEM :ITS ARCHITECTURE
 

Ähnlich wie SFMTA Subway Performance Report

1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
Ello Weits
 
Future of Traffic Management and ITS
Future of Traffic Management and ITSFuture of Traffic Management and ITS
Future of Traffic Management and ITS
Serge Hoogendoorn
 
21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx
Naresh Prasad Keshari
 
Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
ASWATHY VG
 

Ähnlich wie SFMTA Subway Performance Report (20)

1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
1.08 European Traffic Management Approaches-Ello Weits-Emmanuel Houriez NR
 
Vmuralidharan
VmuralidharanVmuralidharan
Vmuralidharan
 
Transantiago
TransantiagoTransantiago
Transantiago
 
Intelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsIntelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail Systems
 
CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014
 
Presentation gapeka (eng ver) 31 may 2011
Presentation gapeka (eng ver) 31 may 2011Presentation gapeka (eng ver) 31 may 2011
Presentation gapeka (eng ver) 31 may 2011
 
its project
its projectits project
its project
 
Future of Traffic Management and ITS
Future of Traffic Management and ITSFuture of Traffic Management and ITS
Future of Traffic Management and ITS
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx
 
ATC_CMS
ATC_CMSATC_CMS
ATC_CMS
 
Train control system using can protocol
Train control system using can protocolTrain control system using can protocol
Train control system using can protocol
 
Design of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded systemDesign of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded system
 
Presentation1 (5).pptx
Presentation1 (5).pptxPresentation1 (5).pptx
Presentation1 (5).pptx
 
Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014
 
Design of Smart Traffic Light Controller Using Embedded System
Design of Smart Traffic Light Controller Using Embedded SystemDesign of Smart Traffic Light Controller Using Embedded System
Design of Smart Traffic Light Controller Using Embedded System
 
Mta impact analysis1
Mta impact analysis1Mta impact analysis1
Mta impact analysis1
 
Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 
Mta impact analysis
Mta impact analysisMta impact analysis
Mta impact analysis
 

Kürzlich hochgeladen

Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
HyderabadDolls
 

Kürzlich hochgeladen (20)

2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery ServicePrivate Call Girls Bidar  9332606886Call Girls Advance Cash On Delivery Service
Private Call Girls Bidar 9332606886Call Girls Advance Cash On Delivery Service
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
 

SFMTA Subway Performance Report

  • 1. Dan Howard Muni Technology Systems Manager SFMTA Board of Directors January 7, 2020 Subway Performance and Train Control Upgrade
  • 2. Muni Metro Train Control 2 The problem Vehicle Breakdowns Track Failures Passenger Issues Subway Congestion Muni Metro service regularly experiences delays and crowding, resulting in an overall poor quality of service Acute Delays Chronic Congestion Communication Failures (ATCS) Failed Entries ATCS Computer Failures Overhead Line Failures ATCS Equipment Failures Operator Issues Bunching/Gaps Slow-moving subway trains Street congestion
  • 3. Muni Metro Train Control 3 Sources of Acute Delays Train Control 49% Vehicle Breakdown 31% Operations Related 4% Passenger Related 4% Other Problems* 12% Delays by Quantity Train Control 19% Vehicle Breakdown 52% Operations Related 4% Passenger Related 4% Other Problems* 21% Delays by Impact (minutes) *Other problems include wayside infrastructure failures in addition to delays that were uncategorized in the control log. These figures do not include delay due to congestion, only the acute delay associated with each incident. (Jan-Dec 2018) Source: Muni Central Control Log
  • 4. Muni Metro Train Control 4 • Vehicles on the surface are fully controlled by the operator unsupervised by Central. • Signals and switches are controlled by independent wayside computers. • Routes are requested as trains are detected by the “VETAG” system, and assigned first come, first serve. • No spacing management • A train entering one of three portals and pings the central computer • The system does a “handshake” with the vehicle, and routes it automatically • System keeps vehicles safely spaced • System controls use and activation of switches to route vehicles (first come, first serve) • Operators open/close doors, but all other movements are automated Muni’s train control today Subway Automatic Train Control In service 1998 Surface Independent Operation .
  • 5. Muni Metro Train Control 5 Types of train control Fixed block Moving block
  • 6. Muni Metro Train Control 6 ATCS System Overview Local Control Computer Loop Cable ACE EAK Axle Counter Switch Machine Signal Operations Control CenterCentral Computers VOBC Propulsion Brakes Doors Accelerometer Tachometer SMC TMC VCC INTERSIG (1 of 7)
  • 7. Muni Metro Train Control 7 SMC – System Management Center
  • 8. Muni Metro Train Control 8 What are the key reasons for poor train control system performance? Multiplies the opportunity for system failures, makes systemic management of entire rail system complex Three entry portals Components fail regularly, technology has significant capacity issues, fewer and fewer people have expertise to understand system Twenty-year-old system Extremely unforgiving system design, system is slow to come back up and results in delays that are disproportionate to significance of initial failure Rigid infrastructure We are operating at (or even above) capacity of the train control system, leaves zero room for error Congestion The present system designed in the 1980s and was rolled out in the 1990s—it experienced significant issues then, and continues to cause headaches today
  • 9. Muni Metro Train Control 9 Travel Time Variability 0 5 10 15 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Frequency(%) Minutes Aug - Nov 2019 Travel Time Distribution KLM, Weekdays KLM Inbound KLM Outbound
  • 10. Muni Metro Train Control 10 15 20 25 30 35 40 45 4:00AM 5:00AM 6:00AM 7:00AM 8:00AM 9:00AM 10:00AM 11:00AM 12:00PM 1:00PM 2:00PM 3:00PM 4:00PM 5:00PM 6:00PM 7:00PM 8:00PM 9:00PM 10:00PM 11:00PM Subway Hourly Throughput, at Embarcadero Station inbound Weekday Scheduled Arrivals Weekday Actual Arrivals Gap between Sch. vs Act explained by delay (train queue) PM Peak post recovery period “Typical” day, averaged from non-incident weekdays in 2018 CapacityTrainsperhour
  • 11. Muni Metro Train Control 11 Non Communicating Trains (NCT) NCT Gap in service Embarcadero West Portal Forest Hill Castro Church Van Ness Civic Ctr Powell Montgomery Trains stopped to increase buffer Backed up trains at Van Ness due to delay NCT recovers comms at Van Ness
  • 12. Muni Metro Train Control 12 Recent Subway Initiatives • Service management shifted to modern Transportation Management Center – new tools enable increased focus on service management • Reduced infrastructure issues in subway as a result of extended maintenance program and switch replacement at Church/Duboce • Combination of parking control officers, traffic modifications and localized signal management reducing delays approaching outbound West Portal • New radio and staff trainings have enabled better customer communications during disruptions • Increased mobile maintenance staff in the subway for quicker response times to breakdowns
  • 13. Muni Metro Train Control 13 Upcoming initiatives As part of the next 90-day plan, SFMTA is developing a two-year plan to improve rail service delivery, focusing on the subway. Highlights will include: • Activate West Portal Crossover with three-car shuttle • Modify service plan to reduce subway congestion • Continue extended maintenance program • Increased supervision throughout rail system • Continued investment in TMC line management training
  • 14. Muni Metro Train Control 14 The Train Control Upgrade Project Reduced Delays Improved Maintainability Subway delays reduced by 20-25% through reduced train control failures and reduced congestion Consistent trip times System monitors redundant components for faults so preventative action can be taken before service is affected 10-year upgrade and expansion of communications-based train control (CBTC) to improve Muni light rail service. Expanding system to surface and integrating with traffic signals means trip times are less variable Greater capacity System enables better supervision and management of trains, addressing bottlenecks and increasing capacity Project Benefits
  • 15. Muni Metro Train Control 15 Project description Upgrades loop-cable based system in subway to redundant, reliable wireless communications Replaces central computers, local computers, and onboard computers with latest technology Installs same wireless communications equipment along the surface right of way Ties isolated surface signals and switches into the same single, centrally controlled network as the subway Interfaces with traffic signals to provide train priority (trains don’t get stopped at red lights) Provides central control with tools to adjust train dwell and speeds anywhere on the system to manage bunches and gaps
  • 16. Muni Metro Train Control 16 Project phasing Benefits by phase Phase 1 • Improved control center management on surface • Traffic signal integration • Reduced delays on N and T Phase 2 • Improved subway reliability • Fewer subway delays • Increased subway capacity Phase 3 • Shorter running time for N Phase 4 • Shorter running time for T Phase 5-7 • Improved control center management at all key junctions • Reduced systemwide delays
  • 17. Muni Metro Train Control 17 Next steps Train control upgrade strategy; provides a plan for future upgrades and investments in train control Now 2021-22 Adjustments to subway service as a result of the improvement plan Spring 2020 2023 First CBTC project benefits on initial segment 2026 New CBTC system fully operational in subways 2029 Entire Muni Metro system fully integrated into new CBTC RFP for new CBTC project on surface and subway Present two-year subway service improvement plan