Erste Group Procurement (EGP)
Discovering the Power of a World Class Procurement



Robert SEMETHY

2013-02-13
History: Austria’s first savings bank: Founded in 1819
    Erste Group went public in 1997
    with a strategy to expand its retail                                                            New holding
                                                                                                    structure
    business model into CEE                                                             2008        improving
                                                                                                    Group
                                                                                                    Governance

    Acquisition of more than 10                                                  2007
    banks between 1997 and 2008
                                                                          2006
    Erste Group now runs market
    leading retail banking operations
                                                                   2005
    in the new EU member states,
    which remain underpenetrated
                                                            2004
    compared to their Western
    European markets
                                                    2003


                                            2001


                                     2000                                  Erste Group’s customer base
                                                                           grew from 600 000 in 1997 to
                                                                           17,3 million in 2011
                           1997


EGP – Member of Erste Group © 2013
All rights reserved                                Page 2
Erste Group in Central and Eastern Europe




EGP – Member of Erste Group © 2013
All rights reserved                  Page 3
Erste Group Procurement: Procurement of the Erste Group
                                                                                                               Erste Group Bank AG - Holding Board

                                                                          CEO             CFO                  COO                 CRO                 Group Markets              GCIB                 Group Retail
Erste Group Procurement Facts & Figures:
                                                                                                              Erste Group Procurement                                                EGP AT
     Central procurement function within Erste Group                                                                                                                (incl. Centre Functions, as Finance,
                                                                                                              (Procurement Services GmbH)
                                                                                                                                                                                HRM, Org/IT)
     Managed 3rd party spend more than EUR 1 billion
                                                                                                                           Group Org/IT
                                                                                                                                                                                    EGP RO
     Headcount over 165 employees in 9 countries
                                                                                                                Group Banking Operations
                                                                                                                                                                                     EGP CZ
     Process owner for group-wide S2P process
                                                                                                                          Group Services
                                                                                                                                                                                     EGP SK
     AT: Warehouse with more than 3 000 sqm
                                                                                                                                                                                    EGP HU
                       Erste Group Procurement – (Procurement Services GmbH)                                                                                                        EGP HR
                                                         Management Board                                                                                                         SPV DRUCK




                                                                                                                                                                                                                      Leadership by EGP
                                                                                                                                                                                 Procurement RS




                                                                                                                                                                                                                          Functional
                      HRM                  Finance           Sourcing           Org/IT                                                                                           Procurement ME
                                                                                                                                                                                 Procurement UA

                 Erste Group Procurement AT                 Sourcing AT

                                EBSPK                       Sourcing SK          Erste Group Procurement SK
                                                                                                                                                                                            Established 2006

                 Erste Group Procurement CZ                 Sourcing CZ

                                                                                                                                                                                   Procurement Dept.
                                                            Sourcing HU          Erste Group Procurement HU                                                                            Ukraine
                                                                                                                                      Czech Rep
                                                                                                                                                       Slovakia
                 Erste Group Procurement HR                 Sourcing HR
                                                                                                                                    Int. & Austria
                                  ME1)                      Sourcing RO         Erste Group Procurement RO                                             Hungary
                                                                                                                                                                       Romania
                                                            Sourcing RS                                                                      Croatia
                               RS2)
                                                                                                                                             Procurement
                                                           Sourcing UA                      UA3)                                             Dept. Serbia
                         SPV – DRUCK
                                                                                                                                                   Procurement
                                                                                                                                                 Dept. Montenegro
 1) Department of Erste Bank AD Podgorica - Montenegro
 2) Department of Erste Bank Novi Sad                                                         Division
                                                                                 Board                   Team in Matrix
 3) Department of Erste Bank Ukraine




EGP – Member of Erste Group © 2013
All rights reserved                                                                  Page 4
Erste Group Procurement (EGP) Company Costs since 2008
 How much do we cost?

     Annual Procurement company operations costs decreased for more than
                      EUR 30 million compared to 2008
                                     Procurement Company (EGP) cost development 2008-2012


                                                               69% cost reduction within 6 years
                                                               18% average decrease p.a.




                                        2008



                                                 2009
                                                               2010
                                                                             2011         2012




EGP – Member of Erste Group © 2013
All rights reserved                                   Page 5
Erste Group Procurement (EGP) CoA since 2008
 How much do we cost?

                    Cost of Acquisition (CoA*) – KPI continously decreasing

                                      EGP Cost as a Percentage of EG Spend


                                      2,7%


                                                 1,8%
                                                               1,48%
                                                                          1,35%
                                     2008                                             1,2%
                                               2009
                                                               2010     2011         2012



                     *) CoA = group procurement costs (incl. VAT) vs. annual company spend
                     Peer Group Benchmark: 0.83%, World Class Benchmark: 0.63%


EGP – Member of Erste Group © 2013
All rights reserved                                   Page 6
Savings resulting from purchasing activities
How much do we save?
                             EGP Cost Reduction (CR)/Cost Avoidance (CA) 2012 YTD

Cost Reduction / Cost Avoidance




                                       3,86%credible, transparent and auditable hard savings achieved.
                                       → Real and permanent reduction in the unit cost of goods manufactured or services rendered
                                       without impairing their suitability for the use intended or diminution in the quality of the product.
                                                     Peer Group Benchmark*: 1.80%, World Class Benchmark*: 3.00%
  EG managed


    3rd party

     spend          1,26%
                      CA
                                                                  1,26% soft savings achieved.

                    3,86%
                      CR                → A purchasing action by means of which certain material/supplier increases are not incurred
                                                                        by the purchasing firm.
                                                     Peer Group Benchmark*: 0.20%, World Class Benchmark*: 1.39%
   3rd Party
     Spend         CR/CA

                                       *based on Hackett Report




 EGP – Member of Erste Group © 2013                Page 7
 All rights reserved
Erste Group Procurement (EGP) KPIs since 2008
 How satisfied is our customer?


       Drove continuous increase of customer satisfaction while at the same time
                     decreasing budget and Cost of Acquisition.

                                                              98%          98%                     98%
                                            93%
                                     87%
                                                                                          Customer Satisfaction




                                                                                                           Cost Development
              3%                       2%                           1,3%                         1,1%
                                              1,5%                                 1,2%
                                                                                                           CoA
             2008                    2009   2010               2011              2012               2013




EGP – Member of Erste Group © 2013
All rights reserved                                  Page 8
How did we achieve these results?

 •      Defined clearly formalised and structured process to avoid misunderstandings.

 •      Defined clearly roles & responsibilities to achieve the best joint decision.

 •      Transparent and documented process flows and results.

 •      Increased efficiency and effectivity.

 •      Ensured compliance to Erste Group standards.

 •      Ensured the purchase of goods/services at the optimum possible total cost in the

        correct amount and the best quality.




EGP – Member of Erste Group © 2013
All rights reserved                    Page 9
Clearly defined EGP in Erste Group

             Aligned priniciples within Erste Group:

             …The central and single competence for procurement activities within Erste Group lies in Erste Group Procurement (EGP)…

             …EGP has to be involved in any external spend of any Erste Group majority owned entity. Any exception has to be agreed between EGP
               and the respective Erste Group entity…

             …All external spend should follow the principle of Total Cost of Ownership (TCO) and Quality, Cost and Delivery. In balance with socio-
               economic, ecological and customer relationship factors the assignment of a contract has to follow the highest added value for Erste
               Group principle…

             …EGP owns, defines and aligns with the local entities the purchasing processes within Erste Group...




                       EGP Cooperation with clients based on:
                                     Contract (SLAs)
                                     Responsibility (NDAs)
                                     Code of conduct
                                     Purchasing Policy & Handbook




EGP – Member of Erste Group © 2013
All rights reserved                                              Page 10
Clearly defined EGP Services in Scope

                                                     Erste Group Procurement
                                                                                      Customised        Outsourcing        Business
                 Sourcing                    Tactical              Order                                                   Process
                                                                                      Procurement       Competence
            International/Local             Purchasing           Management             Services          Center          Outsourcing

                 Category Mgmt             Category Mgmt           Category Mgmt
                  Vendor Mgmt               Vendor Mgmt             Vendor Mgmt
                 Contract Mgmt             Contract Mgmt           Contract Mgmt                                           Operations of
                                                                                        Additional     Compliance with
                                                                                      requirements       Outsourcing          support
                Purchasing Project        Purchasing Project     Purchasing Project     requested      Policy Provision      processes
                                                                                       by customer      of Outsourcing      for the local
                                                                                      and are not in        Project          entities, i.e.
                Contract Creation         Contract Creation      Contract Creation     the scope of     Documentation
                                                                                        purchasing
                                                                                                                          • Travel Depart.
                   Requisition               Requisition            Requisition                                             • Print Shop
                       &                         &                      &                                                   • Warehouse
                    Ordering                  Ordering               Ordering
                 Documentation             Documentation          Documentation
                       &                         &                      &
                CR/CA Calculation         CR/CA Calculation      CR/CA Calculation

                   Receipting                Receipting              Receipting        Customer         Compliance to        Provide
                       &                         &                       &             Satisfaction       regulatory       cost-efficient
                   Evaluating                Evaluating              Evaluating                               and            services
                                                                                                            internal
                     Invoice                   Invoice                Invoice                            requirements
                   Processing                Processing             Processing



           Strategic, monitored          Ensure fast, easy and efficient execution    On Customer’s             Improved Services
           purchasing in a team                                                          Demand             for the customer’s benefit
                 approach                    By EGP            By EGP or Customer

                             Invoicing as a % of 3rd party spend                              Invoicing in a separate fee (SLA)


EGP – Member of Erste Group © 2013
All rights reserved                                            Page 11
What is sourcing at a glance?

    Sourcing is the strategic process of identifying potential suppliers, conducting
 negotiations, and agreeing on supply contracts in order to achieve a sustainable cost
                   reduction and meet the customer’s expectations.

            Demand analysis             Identificaton of potential suppliers
                 based on                       to conclude a GMA
                                                                                                      GMA
         Category Management                         support through
         Supplier Management
         Contract Management
                                           eAuction / RFx / negotiation


                                              Supporting tools
              Reporting Package              Supplier / Country /                              eAuction, RFx
                (SAP FI / QLIKVIEW)    Project Management tool (“CAP”)                             (Electool)

   • Analysing the spend of           • Allows the linking of information      • Live eAuctions
     entity/supplier/category           to a 360°view of projects,
                                                                               • Collecting of informationen (RfI*)
                                        contracts, product categories
   • Strategic basis for the                                                     and offers (RfQ*) in a defined
                                        and suppliers.
     procurement project                                                         specification form
                                      • “In-house” development                 *RfI = Request for Information
                                                                               *RfQ = Request for Quotation



EGP – Member of Erste Group © 2013
All rights reserved                        Page 12
Sourcing International/Local
Category Management/Matrixorganisation
                              Matrixorganisation                                                                 Category Classification

Sourcing Specialist, the first contact for the customer and
                                                                                            Find opportunities, create & implement a strategy in a
groupwide Category Manager and Supplier Relationship
                                                                                            team approach with the Business Line.
Manager.




                                                                     Category Management
                           145 categories divided according to local and international opportunities.
                                                                          Sourcing Categories
                FM Facility Management (FM)                IT Informationstechnology (IT)         S&O&M Service & Operations & Marketing (S&O&M)
                FM   FM Maintenancerelated Services/Work   IT   Personal and Office Computing     S&O&M   Car Fleet
                FM   FM Investmentrelated Services/Work    IT   Telephony and Communication       S&O&M   Cards
                FM   Goods                                 IT   Networks                          S&O&M   Consulting
                FM   Energy                                IT   Branch Equipment                  S&O&M   Logistic
                FM   Security Equipment                    IT   Servers/Storage/Host Components   S&O&M   Marketing
                FM   Property Management                   IT   Infrastructure Software           S&O&M   Office Equipment & Office Operation
                                                           IT   Direct Application Software       S&O&M   Personnel Management
                                                           IT   IT Services                       S&O&M   Travel
                                                           IT   Indirect Application Software     S&O&M   Security Service



EGP – Member of Erste Group © 2013
All rights reserved                                                  Page 13
Sourcing International/Local
Contract Management/Spend Data Analysis/Data Reporting
                   Budget and Category Analysis Tool                                  Data Reporting

Structure spend by suppliers, categories, countries and entities. Define Spend categories, analyse it (spend & suppliers)
Real-time. Business Intelligence Tool for management              In a team approach with the Business Line.




                                                   Contract Management
 Integrate all supplier contracts in Contract management solution and establish proactive & timely contract activity plan




 EGP – Member of Erste Group © 2013
 All rights reserved                               Page 14
Sourcing International/Local
 Supplier Relationship Management Tools

                              Identify and focus on key suppliers.
            Implement supplier relationship model in cooperation with Business Line.

                                           Supplier                  Supplier
 Business Reviews                                                                             Escalation
                                            Audits                  Strategies
• HYR/QBR                            • Standardised            • Similar to Category    • Escalation management
                                       Questionnaire for         Management
• Standardised                                                                          • Single Point of Contact
                                       Assessment and Self
  presentations                                                • Long Lists and Short     and coordination of all
                                       Assessment
                                                                 Lists                    participants (Business
• Participants: Business
                                     • Document Management                                Line, Legal, Countries,
  Line, Supplier and EGP
                                       System, Reminders                                  Suppliers)
• Measuring the                        periodically and
                                                                                        • Identification of
  cooperation                          automatically
                                                                                          disqualified suppliers
• Search out further                 • Scoring through
  cooperation/collaboration            Business Line
                                     • Risk Management
                                     • Ethics




EGP – Member of Erste Group © 2013
All rights reserved                                  Page 15
Tactical Purchasing (TP) and Order Management (OM)
 Purchasing Project

 The fast, easy and efficient execution of routine administrative tasks. These are day-
 to-day buying activities, which are low volume with no strategic importance or based
                       on agreements that have been set in place.


                                          Purchase requisition
                                     through GMA or catalogue(OM)
          Demand
   (online or catalogue)                          or                                   Offer                    Agreement
                                          Tender Project (TP)



                                                       Supporting tools
                                                    Catalogue / OM Software                               eAuction
                    SAP SRM
                                                        (ITAM – Office Asset)                             (Electool)
   • In 3 countries available                   • Standardised articles                   • In all EGP countries available
   • Integration with MM / Accounting           • Order Processing for low purchases      • Efficient eAuction through webbased
                                                                                            form
   • Covering about 55% of the spend            • Integration in Warehouse Management
                                                  System                                  • Supplier’s self registration for saving
                                                                                            resources



EGP – Member of Erste Group © 2013
All rights reserved                                  Page 16
KPIs and the Reporting




EGP – Member of Erste Group © 2013
All rights reserved                  Page 17
How did we achieve these results?
 The Key Messages for a successful Procurement Organisation
                        Centralised procurement in one seperate company with clear groupwide organisation structure and an agreed and
                        approved Power of Attorney (PoA)

   Organisation         Unique systems and tools applied in all subsidiaries in all countries
        &
    Structure           Unified processes with locally optimised deployment

                        Service Agreement structure and hierarchy applied in all countries

                        Full costs transparency through analytic tools and reporting

  Transparency          Quarterly Business Reviews with clients and suppliers
       &
 Communication
                        Defined communication and escalation process


                        By using spend analysis tool the bypassing/‘maverick spend‘ procurement activities are identified and tracked

  Sustainability        High compliance through common cooperation with budget owners on the product groups strategies and/or supplier
                        strategies


                        Through active management of product groups and suppliers EGP creates a bond between suppliers and budget owners

   Procurement          EGP is involved in the whole procurement process with clear tasks and responsibilities
     Process
                        Educated procurement specialists (Sourcing Matrix)


                        Transparency in the level of achieved goals of the cost reduction through one clear methodology and tool-based
      Goals             measurement



EGP – Member of Erste Group © 2013
All rights reserved                                           Page 18
Thank you!
                                          Erste Group Procurement
                                         Procurement Services GmbH

                                              Robert SEMETHY
                                                Managing Director
                                               Chief Procurement Officer

                                     Email: robert.semethy@erstegroup.com




EGP – Member of Erste Group © 2013
All rights reserved                            Page 19
EGP’s development started at 2006
                                                                              s Proserv renamed to
                        100% subsidiary in                                         Erste Group
                            HR. Start                                           Procurement - The                    EGP =
                          operations in a                                       Purchasing of the           World Class Procurement
                           Procurement                                             Erste Group.
                          Department RS

                                                             Finalisation and approval
          Procurement                                           of the new s Proserv
         Transformation                                          Business Strategy        Start implementation of
         (Centralization/                 Start of NGPS project                            Lean Enterprise Order                    Increase the value of a
         Consolidation)                 (New Group Procurement                               Management (LEO)                      centralised procurement
                                                 Solution)
                                                                                                                                           company



       2006                 2007          2008            2009              2010            2011         2012       2013                 2014        2015



                                                                                                       Service optimisation
Foundation of                               100%                                    Start operations     SRM Management
  s Proserv                              subsidiary in                             in a Procurement    Category Management
                                             RO.                                      Department           New RFx tool
     100%                                                                                  UA.                                •   Transparency
 subsidiaries      In the new Erste                 Finalisation of the new                                                   •   Service Quality in Sourcing and
established in   Holding structure s                 s Proserv Business                                                           Procurement
AT, CZ, HU, SK     Proserv reports                         Strategy                                                           •   Cost Reduction and Cost
                      to the CFO                                                                                                  Avoidance
                  (previously to the                                                           Start operations
                                                                                                                              •   Ethical Standards
                         COO).                                                                in a Procurement
                                                              Aligned procurement                                             •   Fraud Prevention
                                                                                                 Department
                                                               principles within EG
                                                                                                      ME.
                                                             (Purchasing Handbook)




   EGP – Member of Erste Group © 2013
   All rights reserved                                            Page 20
An overview of the main steps in a RFI/RFP process
What is Request for Information (RFI) 1                What are the roles & responsibilities                 2          What information is required for a 3
and Request for Proposal (RFP)?                        in RFI/RFP processes?                                            successful RFI/RFP process?
Filtering system:                                      1. A joint effort of Business, Operations,                       1. Introduction
                                                          Organization and Procurement.                                 2. Background
1. Initial total solution space
                                                       2. Overall project and process is managed by a                   3. Subject of RFI/RFP
2. Preparation marketing screening
                                                          project manager nominated by Organization
3. RFI - Long list of solutions (up to 15)                                                                              4. Requirements
                                                       3. The procurement relevant part is driven by a
4. RFP - Short list of solutions (3-5)                    single point of contact nominated by EGP                      5. Legal Disclaimer
5. Finalist solutions (1-3)                            4. Definition in a RACI matrix




                                                                                        5           What are the main steps in a RFI/RFP process?         4
                                  When we are announcing the winner?
                                  1. EGP decides on commercial                                      1. Preparation

                                  2. Business decides on technical/content                          2. RFI (optional)

                                  3. Joint decision on supplier selection                           3. RFP
                                                                                                    4. POC – Proof of Concept (optional)
                                                                                                    5. Contract Negotiation




EGP – Member of Erste Group © 2012
All rights reserved                                               Page 21
What are the critical success factors?
 DOs
 •     Early involvement of EGP
 •     Fully defined scope/specification by business before commercial negotiation starts.
 •     EGP in charge of all communication with suppliers unless otherwise agreed between EGP
       and business line.
 •     Negotiation strategy and method selected by EGP.
 •     All supplier communication through Electool (EGP’s tendering and auctioning tool).
 •     Agreement on TCO and evaluation matrix before RFP starts.


 DON’Ts
 •     EGP cannot decide on content/technical requirements.
 •     No commercial negotiation without EGP.
 •     Business triggers a RFx process without involving EGP.



EGP – Member of Erste Group © 2012
All rights reserved                      Page 22
RFI/RFP process for quickly focusing on feasible solution
What is Request for Information (RFI) and Request for Proposal (RFP)?
    RFI/RFP process as filtering system                                                                                  Explanation
                 Initial total solution space                                        Identify key stakeholders

         Solu-                                       Solu- Solu- Solu-               Understand business and business objectives, strategic framework and TOM
                  Solu- Solu-     Solu-
          tion                              Solu-     tion tion tion
                   tion tion       tion                                              Define generic solution concepts and identify potential solutions and solution providers out of
                                     Solu- tion                                      total solution space (Long List)
             Preparation/Market screening
                     Solu-            tion
                                   Solu-                Solu-
                  Solu-
                      tion Solu- tion Solu-  Solu-       tion Solu-                Request for Information (RFI)
                   tion          Solu- tion
             Solu- Solu- tion E               tion Solu-       tion
                             Solu- Solu-
            Long list tiontion Solu-Solu- tion Solu-15)
              tion       tion
                              of solutionsSolu- to
                                       tion tion
                                    tion
                                                    (up                              Survey used for requesting information to
                                                    tion tion                        −   Secure basic understanding of market
                                                             …                           Gain first information on solution providers
                                       RFI                                           −

                 Main characteristics:                                               −   Identify Short List of solutions (3-5)
                 •   RFI is an information only
                                                                                     No legally binding proposal; not suitable to engage with supplier
                 •   RFI is the best to cooperate
                 •   RFI can be initiated by BL                                      Up to 100 requirements
                 •   RFI can be part of Market Research and                          Little interaction with solution providers
                     done independently by EGP
                                                                                     Limited internal efforts; project organisation not necessarily required
                                        Solu-     Solu-                              Mandatory alignment with Erste Group Procurement
                       Solu-
                          Solu- tion
                 Short list of solutions (3-5)
                                         tion
                     tion            Solu-
                                tion
                                                tion                               Request for Proposal (RFP)
                                                                                     Formal invitation for solution providers to bid on supplying solution within specified time period
                                       RFP                                           and process
                           Main characteristics:
                         RFP is always a BL request                                  Formal proposal; mandatory task before engaging with supplier
                         RFP will result in a purchase                               Legally binding for solution provider (appendix for final contract)
                         RFP is always in cooperation
                                      Solu-                                          More than 100 requirements
                                         tion
                                                                                     Intense interaction with solution providers
                                       Solu-
                                        tion                                         Requires involvement of several internal units with substantial internal efforts and a clear project
                                                                                     organisation and structures
                    Finalist solutions (1-3)                                         Mandatory involvement of Erste Group Procurement

                      A RFI process can be a joint effort OR can be done independently by EGP (as part of Market Research).
                                       A RFP process is a joint effort of Business, Operations, Organization and Procurement.

EGP – Member of Erste Group © 2012
All rights reserved                                                      Page 23
General responsibilities in RFI/RFP process
What are the roles & responsibilities in RFI/RFP processes?

   A solution selection project and RFI/RFP process is a joint effort of Business, Operations, Organization and Procurement. Whilst the overall
   project and process is managed by a project manager nominated by Organization, the procurement relevant part is driven by a single point of
   contact nominated by Erste Group Procurement.


                       Project Sponsor (PS)                                                                  Project Manager (PM)                                              Erste Group Procurement (EGP)
                (see Erste Group Project Management Standard)                                          (see Erste Group Project Management Standard)

   •   Defines the goals and priorities                                             •        Planning, coordination and tracking of all project activities        •       Communication with external suppliers
   •   Approves business case, project charter                                      •        Consolidating of inputs from the various streams                     •       Consolidation of RFI/RFP documents
   •   Ensures the funding of the project                                           •        Reporting to project sponsor and steering committee                  •       Commercial and legal negotiations with solution providers
                                                                                                                                                                          in all phases
   •   Provides strategic guidance and leadership to the project
   •   Approves project deliverables
                                                                                                                                                                  •       Contract management


              Org – Business Analyst (Org-BA)                                               Business/ Operations Representative (Bus/Ops)                                                             IT Expert
                                                                                                                                                                              (incl. IT Solution Management, IT Operation, IT Architecture)


   •   Defining and evaluating requirements along the six defined                       •     Definition of requirements for business functionality               •       Defining and evaluating technical requirements and
       categories                                                                                                                                                         requirements for implementation and ongoing support
                                                                                        •     Evaluating of business functionally
   •   Ensure that strategic and operational business                                                                                                             •       Providing IT expertise and input where needed
       requirements are considered throughout the project
                                                                                        •     Defining expected benefits business and operations
                                                                                                                                                                  •       Management of testing environments
   •   Operational support for Business/Operations




   Sample of a RACI Matrix for an IT Project
       Key Activity                                                                                              PS            PM            EGP       Bus/Ops   Org-BA           IT              IS            CON              LA
   0.1 Understand business and IT objectives, strategic framework and TOM
       0.1.1 Perform focus interviews with stakeholders                                                           A              C                        C           R            C
       0.1.2 Draft strategic requirements for needed solution                                                     A              C                        C           R            C
       0.1.3 Research external case studies with comparable business objectives                                   I              A                        C           R            C
       0.1.4 Enrich understanding of challenges & framework with case study findings                              I              A                        C           R            C
       0.1.5 Outline benefits of needed solution                                                                  A              C                        C           R            C
       0.1.6 Define strategic requirements                                                                        A              C                        C           R            C              C                                           RACI Matrix
       0.1.7 Agree on measurable KPIs for project success                                                         A              C                        C           R            C              C
   0.2 Market screening & “big picture”
       0.2.1 Perform market research of potential solutions (internal & external)                                                A             C                      R            C
       0.2.2 Review case studies (internal & external)                                                                           A                        C           R            C
       0.2.3 Collate and present research findings                                                                I              A                        C           R            C
       0.2.4 Define generic solution concept                                                                      A              C                        C           R            C              C
       0.2.5 Consider make or buy decision                                                                        A              C              I         C           R            C              C




EGP – Member of Erste Group © 2012
All rights reserved                                                                                    Page 24
Draft RFI/RFP according to standard contents
What information is required for a successful RFI/RFP process?



       Topic                         Subtopic                                     Description                                  Important appendices
1. Introduction       • Objectives of the document      • Explains purpose of RFI/RFP
2. Background         • Entity’s Background             • Description includes
                      • Current situation                     −     Overall strategy the RFI/RFP process supports
                      • Objectives of RFI/RFP                 −     Selection goals
                          process                             −     Affected business processes or operations
                                                              −     Specific capabilities that on business requires
                                                                       to realise improvements

3. Subject of         • Scope of the solution           • Outlines required applications and services                      • Information on
   RFI/RFP            • Planned implementation time     • Explains expected time frame                                         organization, volumes,
                          frame (if applicable)                                                                                FTE s etc.
                      •   Response documents and        • Outlines required response format and content (e.g.              •   Roll-out roadmap
                          deliverables                      solution overview, cost breakdown)
                      •   Schedule and time frame of    •   Outlines selection process, e.g. rules of the “game”, terms
                          RFI/RFP process               •   Informs about deadlines and time table
4. Requirements       •   Business functionality
                      •   Non-business functionality
                                                                                                                           • Excel file with detailed
                      •   Technology (if applicable)    • List of organized questions to confirm availability of               requirements
                      •   Implementation and on going       desired requirements and to measure solution provider’s
                                                                                                                           • Interfaces
                          support                           competencies, reliability and ability to fulfil requirements
                      •   Solution provider
                                                                                                                           • Cost evaluation sheet
                      •   Cost indication/TCO
5. Legal              • -                               • Includes e.g. liability and non-disclosure agreement
   disclaimer




EGP – Member of Erste Group © 2012
All rights reserved                                         Page 25
Overview solution selection approach in five steps
What are the main steps in a RFI/RFP process?
    Phases

                                                                                                                                                                                                             Contract
                           0 Preparation                                 1            RFI                         2            RFP                         3           POC                            4     Negotiation


                       •   Understand business                                                         •       Develop and issue RFP                                                         •       Agree on scope, project plan,
                                                               •       Develop and issue RFI           •       Evaluate RFP responses              •       Define and prepare POC                    milestones and success
                           objectives, strategic
    Activities




                                                                                                                                                           approach                                  criteria
                           framework                           •       Evaluate long list of solutions •       Reference checks
                       •   Market screening                                                            •       Solution provider presentation      •       Perform workshops, tests and      •       Conduct and finalize
                                                                                                                                                           demonstrations                            commercial and legal contract
                                                                                                       •       Plan roadmap
                       •   Design „big picture“                                                                                                                                                      negotiations
                                                                                                       •       Estimate costs                      •       Evaluate POC results
                                                                                                       •       Evaluate solutions

                                                                                                       •       Detailed requirements               •       Proof of concept approach &       •       Finalised contractual
                       •   Joint understanding of        •             Requirements                    •       Weighting and evaluation                    process                                   documents and appendices
                                                                                                               approach
                                                                                                                                                   •                                         •
    Key Deliverables




                           business challenge /strategic •             RFI, NDA (Optional)                                                                 Test cases and test data                  Handover material (if
                           framework
                                                                                                       •       RFP, NDA (mandatory)
                                                                                                                                                                                                     applicable)
                                                         •             RFI responses                   •       RFP proposals                       •       POC3) report
                       •   First thoughts on business,
                                                                                                       •
                           operations and benefits       •             Qualitative evaluation                  Evaluation results                  •       Updated evaluation
                                                                                                       •       TCO4 & benefits analysis            •       Updated TCO4) & benefits
                       •   Strategic requirements        •             Feasibility cross check
                                                                                                       •       Roll-out roadmap
                       •   Generic solution concept      •             Short list of solutions                                                     •       Feasibility and
                                                                                                       •       Implementation and
                                                                                                                                                           cost/benefit check
                                                                       (3-5)                                   resource plan
                       •   Long list of solutions
                           (up to 15)                          •       Agreed further selection        •       Finalist solutions (1-3)            •       Updated ranking of finalist
                                                                       process                         •       Feasibility and                             solutions (1-3)
                       •   Defined selection process                                                           cost/benefit check
                                                                                                       •       Agreed further selection process


                                                           1                                       2                                        3                                            4                                   5
 Key decision




                       •   Long list of solutions (up to           •    Short list of solutions            •     Finalist solutions (1-3)              •    Updated ranking of                   •    Contract ready for
    points




                           15)                                          (3-5)                              •     Go/No go decision                          finalist solutions (1-3)                  signature
                       •   Go/No go decision                       •    Go/No go decision                  •     TCO4 & benefits                       •    Updated TCO4) &
                                                                                                                                                            benefits
                       •   Defined selection process
                                                                                                                                                       •    Go/No go decision
                           1 RFI   = request for information               2 RFP   = request for proposal             3 POC   = proof of concept           4 TCO   = Total cost of ownership



EGP – Member of Erste Group © 2012
All rights reserved                                                                                 Page 26
„Negotiations“ and „Winner Announcement“
  When we are announcing the winner?



  EGP Sourcing Specialist starts a negotiation                            EGP                    Business              Joint
                                                                                                   Line              decision
       project and owns the process                                                                                     on
                                                                                                 Content/
                                                                       Commercial                                    supplier
                                                                                                 Technical
                                                                        Decision                                     selection
                                                                                                 Decision
                Joint decision on Short List
                                                                   A negotiation …
         EGP ensures the right quality in the
         right time to the right price of goods                    .. process is owned by the sourcing specialist
           and services in the most efficient
                                                                   .. can be focused with one selectee
           way by selecting the appropriate
                        supplier.                                  .. lasts until the contract is signed

                                                                   In case no signature is reached with the first selectee a
          Commonly selected supplier signs
                                                                   negotiation ...
                   the contract
                                     NOTE: Only after signing a    …can be restarted with other selected suppliers
                                     contract a winner is to be
                                     announced!                    …can run parallel with multiple bidders
            The supplier - who signs the
         contract - is the ‚Winner‘ and will be                    The EGP Sourcing Specialist must document the
                announced as such.                                 achievements and offers/wording in discussion/analysis
                                                                   during all negotiation stages


EGP – Member of Erste Group © 2012
All rights reserved                                      Page 27

Weitere ähnliche Inhalte

Was ist angesagt?

northrop grumman Information & Services
northrop grumman 	Information & Servicesnorthrop grumman 	Information & Services
northrop grumman Information & Servicesfinance8
 
autosuccessMay04
autosuccessMay04autosuccessMay04
autosuccessMay04autosuccess
 
Compensation plan 2013 final-a
Compensation plan 2013 final-aCompensation plan 2013 final-a
Compensation plan 2013 final-aSanjeev Sharma
 
Heizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planningHeizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planningRozaimi Mohd Saad
 
northrop grumman Aerospace
northrop grumman Aerospacenorthrop grumman Aerospace
northrop grumman Aerospacefinance8
 
Heizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programmingHeizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programmingRozaimi Mohd Saad
 
BGR Energy IC, 26 March
BGR Energy  IC, 26 MarchBGR Energy  IC, 26 March
BGR Energy IC, 26 MarchAngel Broking
 
Delivering Revenue Against Expectation
Delivering Revenue Against ExpectationDelivering Revenue Against Expectation
Delivering Revenue Against ExpectationSalesFRX Corporation
 
Flat plan template
Flat plan templateFlat plan template
Flat plan templateRoseGoddard
 
northrop grumman Electronics
northrop grumman Electronicsnorthrop grumman Electronics
northrop grumman Electronicsfinance8
 
Demographic Outlook for Health Insurance in Australia in the 2010s
Demographic Outlook for Health Insurance in Australia in the 2010sDemographic Outlook for Health Insurance in Australia in the 2010s
Demographic Outlook for Health Insurance in Australia in the 2010sPrivate Healthcare Australia
 
Fleet Logistics Intro Presentation Eng Linkedin
Fleet Logistics Intro Presentation Eng LinkedinFleet Logistics Intro Presentation Eng Linkedin
Fleet Logistics Intro Presentation Eng Linkedinmanos99
 
Tunnelling Job Bores Through
Tunnelling Job Bores ThroughTunnelling Job Bores Through
Tunnelling Job Bores ThroughBoyboy cute
 
Managing economic volatility
Managing economic volatilityManaging economic volatility
Managing economic volatilitykeshav lagwal
 
Non Deal Roadshow Localiza Goldman Sachs(InglêS)
Non Deal Roadshow Localiza Goldman Sachs(InglêS)Non Deal Roadshow Localiza Goldman Sachs(InglêS)
Non Deal Roadshow Localiza Goldman Sachs(InglêS)Localiza
 
CVP analysis
CVP analysisCVP analysis
CVP analysisoshal1
 

Was ist angesagt? (18)

northrop grumman Information & Services
northrop grumman 	Information & Servicesnorthrop grumman 	Information & Services
northrop grumman Information & Services
 
autosuccessMay04
autosuccessMay04autosuccessMay04
autosuccessMay04
 
Compensation plan 2013 final-a
Compensation plan 2013 final-aCompensation plan 2013 final-a
Compensation plan 2013 final-a
 
Heizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planningHeizer om10 ch13-aggregate planning
Heizer om10 ch13-aggregate planning
 
northrop grumman Aerospace
northrop grumman Aerospacenorthrop grumman Aerospace
northrop grumman Aerospace
 
Heizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programmingHeizer om10 mod_b-linear programming
Heizer om10 mod_b-linear programming
 
BGR Energy IC, 26 March
BGR Energy  IC, 26 MarchBGR Energy  IC, 26 March
BGR Energy IC, 26 March
 
Delivering Revenue Against Expectation
Delivering Revenue Against ExpectationDelivering Revenue Against Expectation
Delivering Revenue Against Expectation
 
Flat plan template
Flat plan templateFlat plan template
Flat plan template
 
northrop grumman Electronics
northrop grumman Electronicsnorthrop grumman Electronics
northrop grumman Electronics
 
Demographic Outlook for Health Insurance in Australia in the 2010s
Demographic Outlook for Health Insurance in Australia in the 2010sDemographic Outlook for Health Insurance in Australia in the 2010s
Demographic Outlook for Health Insurance in Australia in the 2010s
 
Fleet Logistics Intro Presentation Eng Linkedin
Fleet Logistics Intro Presentation Eng LinkedinFleet Logistics Intro Presentation Eng Linkedin
Fleet Logistics Intro Presentation Eng Linkedin
 
Computacenter Anual Report 2010
Computacenter Anual Report 2010Computacenter Anual Report 2010
Computacenter Anual Report 2010
 
Tunnelling Job Bores Through
Tunnelling Job Bores ThroughTunnelling Job Bores Through
Tunnelling Job Bores Through
 
Managing economic volatility
Managing economic volatilityManaging economic volatility
Managing economic volatility
 
Non Deal Roadshow Localiza Goldman Sachs(InglêS)
Non Deal Roadshow Localiza Goldman Sachs(InglêS)Non Deal Roadshow Localiza Goldman Sachs(InglêS)
Non Deal Roadshow Localiza Goldman Sachs(InglêS)
 
Chap11
Chap11Chap11
Chap11
 
CVP analysis
CVP analysisCVP analysis
CVP analysis
 

Ähnlich wie 20130213 Discovering the Power of a World Class Pr…

Supply Relationship Management Srm 7.0
Supply Relationship Management Srm 7.0Supply Relationship Management Srm 7.0
Supply Relationship Management Srm 7.0SAPbyExpert
 
HCM M&A Transactions Recap October 2012
HCM M&A Transactions Recap October 2012HCM M&A Transactions Recap October 2012
HCM M&A Transactions Recap October 2012Charles Bedard
 
SEB Goldman Sachs Berlin June 2008
SEB Goldman Sachs Berlin June 2008SEB Goldman Sachs Berlin June 2008
SEB Goldman Sachs Berlin June 2008SEBgroup
 
20131003 Erste Group Procurement Supplier Relationship Management
20131003 Erste Group Procurement Supplier Relationship Management20131003 Erste Group Procurement Supplier Relationship Management
20131003 Erste Group Procurement Supplier Relationship ManagementRobert SEMETHY
 
prezentare rezultate financiare pe 2008 Deutsche Telekom
prezentare rezultate financiare pe 2008 Deutsche Telekomprezentare rezultate financiare pe 2008 Deutsche Telekom
prezentare rezultate financiare pe 2008 Deutsche Telekomaseceleanu
 
Microsoft Power Point EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...
Microsoft Power Point   EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...Microsoft Power Point   EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...
Microsoft Power Point EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...Estácio Participações
 
Introduction To One Sherpa
Introduction To One SherpaIntroduction To One Sherpa
Introduction To One SherpaAndee Sellman
 

Ähnlich wie 20130213 Discovering the Power of a World Class Pr… (12)

Welcome to ibm
Welcome to ibmWelcome to ibm
Welcome to ibm
 
Supply Relationship Management Srm 7.0
Supply Relationship Management Srm 7.0Supply Relationship Management Srm 7.0
Supply Relationship Management Srm 7.0
 
Gruppo Aster
Gruppo AsterGruppo Aster
Gruppo Aster
 
HCM M&A Transactions Recap October 2012
HCM M&A Transactions Recap October 2012HCM M&A Transactions Recap October 2012
HCM M&A Transactions Recap October 2012
 
SEB Goldman Sachs Berlin June 2008
SEB Goldman Sachs Berlin June 2008SEB Goldman Sachs Berlin June 2008
SEB Goldman Sachs Berlin June 2008
 
Wlmg template
Wlmg templateWlmg template
Wlmg template
 
20131003 Erste Group Procurement Supplier Relationship Management
20131003 Erste Group Procurement Supplier Relationship Management20131003 Erste Group Procurement Supplier Relationship Management
20131003 Erste Group Procurement Supplier Relationship Management
 
prezentare rezultate financiare pe 2008 Deutsche Telekom
prezentare rezultate financiare pe 2008 Deutsche Telekomprezentare rezultate financiare pe 2008 Deutsche Telekom
prezentare rezultate financiare pe 2008 Deutsche Telekom
 
Microsoft Power Point EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...
Microsoft Power Point   EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...Microsoft Power Point   EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...
Microsoft Power Point EstáCio Apr Corporativa 4 Q08 (2) [Modo De Compatibil...
 
Introduction To One Sherpa
Introduction To One SherpaIntroduction To One Sherpa
Introduction To One Sherpa
 
2.Taneo
2.Taneo2.Taneo
2.Taneo
 
EstáCio Apr Corporativa 1 Q09 Eng V2
EstáCio Apr Corporativa 1 Q09 Eng V2EstáCio Apr Corporativa 1 Q09 Eng V2
EstáCio Apr Corporativa 1 Q09 Eng V2
 

Mehr von Robert SEMETHY

CIPS_CorpEthics_V2_FINAL
CIPS_CorpEthics_V2_FINALCIPS_CorpEthics_V2_FINAL
CIPS_CorpEthics_V2_FINALRobert SEMETHY
 
20070608 Lessons in Leadership
20070608 Lessons in Leadership20070608 Lessons in Leadership
20070608 Lessons in LeadershipRobert SEMETHY
 
1985 Who's Who Among American High School Students
1985 Who's Who Among American High School Students1985 Who's Who Among American High School Students
1985 Who's Who Among American High School StudentsRobert SEMETHY
 
1984 Who's Who Among American High School Students
1984 Who's Who Among American High School Students1984 Who's Who Among American High School Students
1984 Who's Who Among American High School StudentsRobert SEMETHY
 
19890429 SEMETHY Robert Pitt BSE
19890429 SEMETHY Robert Pitt BSE19890429 SEMETHY Robert Pitt BSE
19890429 SEMETHY Robert Pitt BSERobert SEMETHY
 
19850323 Phi Eta Sigma
19850323 Phi Eta Sigma19850323 Phi Eta Sigma
19850323 Phi Eta SigmaRobert SEMETHY
 
1985 Churchill High School Varsity Letter for Swimming
1985 Churchill High School Varsity Letter for Swimming1985 Churchill High School Varsity Letter for Swimming
1985 Churchill High School Varsity Letter for SwimmingRobert SEMETHY
 
1984 Churchill High School Varsity Letter for Swimming
1984 Churchill High School Varsity Letter for Swimming1984 Churchill High School Varsity Letter for Swimming
1984 Churchill High School Varsity Letter for SwimmingRobert SEMETHY
 
High Honor Roll Certificate
High Honor Roll CertificateHigh Honor Roll Certificate
High Honor Roll CertificateRobert SEMETHY
 
19850604 Churchill High School Diploma
19850604 Churchill High School Diploma19850604 Churchill High School Diploma
19850604 Churchill High School DiplomaRobert SEMETHY
 
19910427 SEMETHY Robert Pitt MBA
19910427 SEMETHY Robert Pitt MBA19910427 SEMETHY Robert Pitt MBA
19910427 SEMETHY Robert Pitt MBARobert SEMETHY
 
20160329 CMGR FCMI P04483999
20160329 CMGR FCMI P0448399920160329 CMGR FCMI P04483999
20160329 CMGR FCMI P04483999Robert SEMETHY
 
Exemplary Supply Chain Social Responsibility Certification
Exemplary Supply Chain Social Responsibility CertificationExemplary Supply Chain Social Responsibility Certification
Exemplary Supply Chain Social Responsibility CertificationRobert SEMETHY
 
20150219 Slides that win
20150219 Slides that win20150219 Slides that win
20150219 Slides that winRobert SEMETHY
 
20140111 W. Robert SEMETHY, Jr. Resume
20140111 W. Robert SEMETHY, Jr. Resume20140111 W. Robert SEMETHY, Jr. Resume
20140111 W. Robert SEMETHY, Jr. ResumeRobert SEMETHY
 
Bessere Argumente für die Einkäuferstellten
Bessere Argumente für die EinkäuferstelltenBessere Argumente für die Einkäuferstellten
Bessere Argumente für die EinkäuferstelltenRobert SEMETHY
 
International Negotiations and Business Etiquette
International Negotiations and Business EtiquetteInternational Negotiations and Business Etiquette
International Negotiations and Business EtiquetteRobert SEMETHY
 
Next Level Purchasing SPSM Certification at Erste Group Procurement Case Study
Next Level Purchasing SPSM Certification at Erste Group Procurement Case StudyNext Level Purchasing SPSM Certification at Erste Group Procurement Case Study
Next Level Purchasing SPSM Certification at Erste Group Procurement Case StudyRobert SEMETHY
 
1998 ABB Supervisory Roles and Responsibilities
1998 ABB Supervisory Roles and Responsibilities1998 ABB Supervisory Roles and Responsibilities
1998 ABB Supervisory Roles and ResponsibilitiesRobert SEMETHY
 

Mehr von Robert SEMETHY (20)

CIPS_CorpEthics_V2_FINAL
CIPS_CorpEthics_V2_FINALCIPS_CorpEthics_V2_FINAL
CIPS_CorpEthics_V2_FINAL
 
20070608 Lessons in Leadership
20070608 Lessons in Leadership20070608 Lessons in Leadership
20070608 Lessons in Leadership
 
1985 Who's Who Among American High School Students
1985 Who's Who Among American High School Students1985 Who's Who Among American High School Students
1985 Who's Who Among American High School Students
 
1984 Who's Who Among American High School Students
1984 Who's Who Among American High School Students1984 Who's Who Among American High School Students
1984 Who's Who Among American High School Students
 
19890429 SEMETHY Robert Pitt BSE
19890429 SEMETHY Robert Pitt BSE19890429 SEMETHY Robert Pitt BSE
19890429 SEMETHY Robert Pitt BSE
 
19850323 Phi Eta Sigma
19850323 Phi Eta Sigma19850323 Phi Eta Sigma
19850323 Phi Eta Sigma
 
1985 Churchill High School Varsity Letter for Swimming
1985 Churchill High School Varsity Letter for Swimming1985 Churchill High School Varsity Letter for Swimming
1985 Churchill High School Varsity Letter for Swimming
 
1984 Churchill High School Varsity Letter for Swimming
1984 Churchill High School Varsity Letter for Swimming1984 Churchill High School Varsity Letter for Swimming
1984 Churchill High School Varsity Letter for Swimming
 
High Honor Roll Certificate
High Honor Roll CertificateHigh Honor Roll Certificate
High Honor Roll Certificate
 
19850604 Churchill High School Diploma
19850604 Churchill High School Diploma19850604 Churchill High School Diploma
19850604 Churchill High School Diploma
 
19910427 SEMETHY Robert Pitt MBA
19910427 SEMETHY Robert Pitt MBA19910427 SEMETHY Robert Pitt MBA
19910427 SEMETHY Robert Pitt MBA
 
20160329 CMGR FCMI P04483999
20160329 CMGR FCMI P0448399920160329 CMGR FCMI P04483999
20160329 CMGR FCMI P04483999
 
SSDBP_certificate
SSDBP_certificateSSDBP_certificate
SSDBP_certificate
 
Exemplary Supply Chain Social Responsibility Certification
Exemplary Supply Chain Social Responsibility CertificationExemplary Supply Chain Social Responsibility Certification
Exemplary Supply Chain Social Responsibility Certification
 
20150219 Slides that win
20150219 Slides that win20150219 Slides that win
20150219 Slides that win
 
20140111 W. Robert SEMETHY, Jr. Resume
20140111 W. Robert SEMETHY, Jr. Resume20140111 W. Robert SEMETHY, Jr. Resume
20140111 W. Robert SEMETHY, Jr. Resume
 
Bessere Argumente für die Einkäuferstellten
Bessere Argumente für die EinkäuferstelltenBessere Argumente für die Einkäuferstellten
Bessere Argumente für die Einkäuferstellten
 
International Negotiations and Business Etiquette
International Negotiations and Business EtiquetteInternational Negotiations and Business Etiquette
International Negotiations and Business Etiquette
 
Next Level Purchasing SPSM Certification at Erste Group Procurement Case Study
Next Level Purchasing SPSM Certification at Erste Group Procurement Case StudyNext Level Purchasing SPSM Certification at Erste Group Procurement Case Study
Next Level Purchasing SPSM Certification at Erste Group Procurement Case Study
 
1998 ABB Supervisory Roles and Responsibilities
1998 ABB Supervisory Roles and Responsibilities1998 ABB Supervisory Roles and Responsibilities
1998 ABB Supervisory Roles and Responsibilities
 

20130213 Discovering the Power of a World Class Pr…

  • 1. Erste Group Procurement (EGP) Discovering the Power of a World Class Procurement Robert SEMETHY 2013-02-13
  • 2. History: Austria’s first savings bank: Founded in 1819 Erste Group went public in 1997 with a strategy to expand its retail New holding structure business model into CEE 2008 improving Group Governance Acquisition of more than 10 2007 banks between 1997 and 2008 2006 Erste Group now runs market leading retail banking operations 2005 in the new EU member states, which remain underpenetrated 2004 compared to their Western European markets 2003 2001 2000 Erste Group’s customer base grew from 600 000 in 1997 to 17,3 million in 2011 1997 EGP – Member of Erste Group © 2013 All rights reserved Page 2
  • 3. Erste Group in Central and Eastern Europe EGP – Member of Erste Group © 2013 All rights reserved Page 3
  • 4. Erste Group Procurement: Procurement of the Erste Group Erste Group Bank AG - Holding Board CEO CFO COO CRO Group Markets GCIB Group Retail Erste Group Procurement Facts & Figures: Erste Group Procurement EGP AT Central procurement function within Erste Group (incl. Centre Functions, as Finance, (Procurement Services GmbH) HRM, Org/IT) Managed 3rd party spend more than EUR 1 billion Group Org/IT EGP RO Headcount over 165 employees in 9 countries Group Banking Operations EGP CZ Process owner for group-wide S2P process Group Services EGP SK AT: Warehouse with more than 3 000 sqm EGP HU Erste Group Procurement – (Procurement Services GmbH) EGP HR Management Board SPV DRUCK Leadership by EGP Procurement RS Functional HRM Finance Sourcing Org/IT Procurement ME Procurement UA Erste Group Procurement AT Sourcing AT EBSPK Sourcing SK Erste Group Procurement SK Established 2006 Erste Group Procurement CZ Sourcing CZ Procurement Dept. Sourcing HU Erste Group Procurement HU Ukraine Czech Rep Slovakia Erste Group Procurement HR Sourcing HR Int. & Austria ME1) Sourcing RO Erste Group Procurement RO Hungary Romania Sourcing RS Croatia RS2) Procurement Sourcing UA UA3) Dept. Serbia SPV – DRUCK Procurement Dept. Montenegro 1) Department of Erste Bank AD Podgorica - Montenegro 2) Department of Erste Bank Novi Sad Division Board Team in Matrix 3) Department of Erste Bank Ukraine EGP – Member of Erste Group © 2013 All rights reserved Page 4
  • 5. Erste Group Procurement (EGP) Company Costs since 2008 How much do we cost? Annual Procurement company operations costs decreased for more than EUR 30 million compared to 2008 Procurement Company (EGP) cost development 2008-2012 69% cost reduction within 6 years 18% average decrease p.a. 2008 2009 2010 2011 2012 EGP – Member of Erste Group © 2013 All rights reserved Page 5
  • 6. Erste Group Procurement (EGP) CoA since 2008 How much do we cost? Cost of Acquisition (CoA*) – KPI continously decreasing EGP Cost as a Percentage of EG Spend 2,7% 1,8% 1,48% 1,35% 2008 1,2% 2009 2010 2011 2012 *) CoA = group procurement costs (incl. VAT) vs. annual company spend Peer Group Benchmark: 0.83%, World Class Benchmark: 0.63% EGP – Member of Erste Group © 2013 All rights reserved Page 6
  • 7. Savings resulting from purchasing activities How much do we save? EGP Cost Reduction (CR)/Cost Avoidance (CA) 2012 YTD Cost Reduction / Cost Avoidance 3,86%credible, transparent and auditable hard savings achieved. → Real and permanent reduction in the unit cost of goods manufactured or services rendered without impairing their suitability for the use intended or diminution in the quality of the product. Peer Group Benchmark*: 1.80%, World Class Benchmark*: 3.00% EG managed 3rd party spend 1,26% CA 1,26% soft savings achieved. 3,86% CR → A purchasing action by means of which certain material/supplier increases are not incurred by the purchasing firm. Peer Group Benchmark*: 0.20%, World Class Benchmark*: 1.39% 3rd Party Spend CR/CA *based on Hackett Report EGP – Member of Erste Group © 2013 Page 7 All rights reserved
  • 8. Erste Group Procurement (EGP) KPIs since 2008 How satisfied is our customer? Drove continuous increase of customer satisfaction while at the same time decreasing budget and Cost of Acquisition. 98% 98% 98% 93% 87% Customer Satisfaction Cost Development 3% 2% 1,3% 1,1% 1,5% 1,2% CoA 2008 2009 2010 2011 2012 2013 EGP – Member of Erste Group © 2013 All rights reserved Page 8
  • 9. How did we achieve these results? • Defined clearly formalised and structured process to avoid misunderstandings. • Defined clearly roles & responsibilities to achieve the best joint decision. • Transparent and documented process flows and results. • Increased efficiency and effectivity. • Ensured compliance to Erste Group standards. • Ensured the purchase of goods/services at the optimum possible total cost in the correct amount and the best quality. EGP – Member of Erste Group © 2013 All rights reserved Page 9
  • 10. Clearly defined EGP in Erste Group Aligned priniciples within Erste Group: …The central and single competence for procurement activities within Erste Group lies in Erste Group Procurement (EGP)… …EGP has to be involved in any external spend of any Erste Group majority owned entity. Any exception has to be agreed between EGP and the respective Erste Group entity… …All external spend should follow the principle of Total Cost of Ownership (TCO) and Quality, Cost and Delivery. In balance with socio- economic, ecological and customer relationship factors the assignment of a contract has to follow the highest added value for Erste Group principle… …EGP owns, defines and aligns with the local entities the purchasing processes within Erste Group... EGP Cooperation with clients based on: Contract (SLAs) Responsibility (NDAs) Code of conduct Purchasing Policy & Handbook EGP – Member of Erste Group © 2013 All rights reserved Page 10
  • 11. Clearly defined EGP Services in Scope Erste Group Procurement Customised Outsourcing Business Sourcing Tactical Order Process Procurement Competence International/Local Purchasing Management Services Center Outsourcing Category Mgmt Category Mgmt Category Mgmt Vendor Mgmt Vendor Mgmt Vendor Mgmt Contract Mgmt Contract Mgmt Contract Mgmt Operations of Additional Compliance with requirements Outsourcing support Purchasing Project Purchasing Project Purchasing Project requested Policy Provision processes by customer of Outsourcing for the local and are not in Project entities, i.e. Contract Creation Contract Creation Contract Creation the scope of Documentation purchasing • Travel Depart. Requisition Requisition Requisition • Print Shop & & & • Warehouse Ordering Ordering Ordering Documentation Documentation Documentation & & & CR/CA Calculation CR/CA Calculation CR/CA Calculation Receipting Receipting Receipting Customer Compliance to Provide & & & Satisfaction regulatory cost-efficient Evaluating Evaluating Evaluating and services internal Invoice Invoice Invoice requirements Processing Processing Processing Strategic, monitored Ensure fast, easy and efficient execution On Customer’s Improved Services purchasing in a team Demand for the customer’s benefit approach By EGP By EGP or Customer Invoicing as a % of 3rd party spend Invoicing in a separate fee (SLA) EGP – Member of Erste Group © 2013 All rights reserved Page 11
  • 12. What is sourcing at a glance? Sourcing is the strategic process of identifying potential suppliers, conducting negotiations, and agreeing on supply contracts in order to achieve a sustainable cost reduction and meet the customer’s expectations. Demand analysis Identificaton of potential suppliers based on to conclude a GMA GMA Category Management support through Supplier Management Contract Management eAuction / RFx / negotiation Supporting tools Reporting Package Supplier / Country / eAuction, RFx (SAP FI / QLIKVIEW) Project Management tool (“CAP”) (Electool) • Analysing the spend of • Allows the linking of information • Live eAuctions entity/supplier/category to a 360°view of projects, • Collecting of informationen (RfI*) contracts, product categories • Strategic basis for the and offers (RfQ*) in a defined and suppliers. procurement project specification form • “In-house” development *RfI = Request for Information *RfQ = Request for Quotation EGP – Member of Erste Group © 2013 All rights reserved Page 12
  • 13. Sourcing International/Local Category Management/Matrixorganisation Matrixorganisation Category Classification Sourcing Specialist, the first contact for the customer and Find opportunities, create & implement a strategy in a groupwide Category Manager and Supplier Relationship team approach with the Business Line. Manager. Category Management 145 categories divided according to local and international opportunities. Sourcing Categories FM Facility Management (FM) IT Informationstechnology (IT) S&O&M Service & Operations & Marketing (S&O&M) FM FM Maintenancerelated Services/Work IT Personal and Office Computing S&O&M Car Fleet FM FM Investmentrelated Services/Work IT Telephony and Communication S&O&M Cards FM Goods IT Networks S&O&M Consulting FM Energy IT Branch Equipment S&O&M Logistic FM Security Equipment IT Servers/Storage/Host Components S&O&M Marketing FM Property Management IT Infrastructure Software S&O&M Office Equipment & Office Operation IT Direct Application Software S&O&M Personnel Management IT IT Services S&O&M Travel IT Indirect Application Software S&O&M Security Service EGP – Member of Erste Group © 2013 All rights reserved Page 13
  • 14. Sourcing International/Local Contract Management/Spend Data Analysis/Data Reporting Budget and Category Analysis Tool Data Reporting Structure spend by suppliers, categories, countries and entities. Define Spend categories, analyse it (spend & suppliers) Real-time. Business Intelligence Tool for management In a team approach with the Business Line. Contract Management Integrate all supplier contracts in Contract management solution and establish proactive & timely contract activity plan EGP – Member of Erste Group © 2013 All rights reserved Page 14
  • 15. Sourcing International/Local Supplier Relationship Management Tools Identify and focus on key suppliers. Implement supplier relationship model in cooperation with Business Line. Supplier Supplier Business Reviews Escalation Audits Strategies • HYR/QBR • Standardised • Similar to Category • Escalation management Questionnaire for Management • Standardised • Single Point of Contact Assessment and Self presentations • Long Lists and Short and coordination of all Assessment Lists participants (Business • Participants: Business • Document Management Line, Legal, Countries, Line, Supplier and EGP System, Reminders Suppliers) • Measuring the periodically and • Identification of cooperation automatically disqualified suppliers • Search out further • Scoring through cooperation/collaboration Business Line • Risk Management • Ethics EGP – Member of Erste Group © 2013 All rights reserved Page 15
  • 16. Tactical Purchasing (TP) and Order Management (OM) Purchasing Project The fast, easy and efficient execution of routine administrative tasks. These are day- to-day buying activities, which are low volume with no strategic importance or based on agreements that have been set in place. Purchase requisition through GMA or catalogue(OM) Demand (online or catalogue) or Offer Agreement Tender Project (TP) Supporting tools Catalogue / OM Software eAuction SAP SRM (ITAM – Office Asset) (Electool) • In 3 countries available • Standardised articles • In all EGP countries available • Integration with MM / Accounting • Order Processing for low purchases • Efficient eAuction through webbased form • Covering about 55% of the spend • Integration in Warehouse Management System • Supplier’s self registration for saving resources EGP – Member of Erste Group © 2013 All rights reserved Page 16
  • 17. KPIs and the Reporting EGP – Member of Erste Group © 2013 All rights reserved Page 17
  • 18. How did we achieve these results? The Key Messages for a successful Procurement Organisation Centralised procurement in one seperate company with clear groupwide organisation structure and an agreed and approved Power of Attorney (PoA) Organisation Unique systems and tools applied in all subsidiaries in all countries & Structure Unified processes with locally optimised deployment Service Agreement structure and hierarchy applied in all countries Full costs transparency through analytic tools and reporting Transparency Quarterly Business Reviews with clients and suppliers & Communication Defined communication and escalation process By using spend analysis tool the bypassing/‘maverick spend‘ procurement activities are identified and tracked Sustainability High compliance through common cooperation with budget owners on the product groups strategies and/or supplier strategies Through active management of product groups and suppliers EGP creates a bond between suppliers and budget owners Procurement EGP is involved in the whole procurement process with clear tasks and responsibilities Process Educated procurement specialists (Sourcing Matrix) Transparency in the level of achieved goals of the cost reduction through one clear methodology and tool-based Goals measurement EGP – Member of Erste Group © 2013 All rights reserved Page 18
  • 19. Thank you! Erste Group Procurement Procurement Services GmbH Robert SEMETHY Managing Director Chief Procurement Officer Email: robert.semethy@erstegroup.com EGP – Member of Erste Group © 2013 All rights reserved Page 19
  • 20. EGP’s development started at 2006 s Proserv renamed to 100% subsidiary in Erste Group HR. Start Procurement - The EGP = operations in a Purchasing of the World Class Procurement Procurement Erste Group. Department RS Finalisation and approval Procurement of the new s Proserv Transformation Business Strategy Start implementation of (Centralization/ Start of NGPS project Lean Enterprise Order Increase the value of a Consolidation) (New Group Procurement Management (LEO) centralised procurement Solution) company 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Service optimisation Foundation of 100% Start operations SRM Management s Proserv subsidiary in in a Procurement Category Management RO. Department New RFx tool 100% UA. • Transparency subsidiaries In the new Erste Finalisation of the new • Service Quality in Sourcing and established in Holding structure s s Proserv Business Procurement AT, CZ, HU, SK Proserv reports Strategy • Cost Reduction and Cost to the CFO Avoidance (previously to the Start operations • Ethical Standards COO). in a Procurement Aligned procurement • Fraud Prevention Department principles within EG ME. (Purchasing Handbook) EGP – Member of Erste Group © 2013 All rights reserved Page 20
  • 21. An overview of the main steps in a RFI/RFP process What is Request for Information (RFI) 1 What are the roles & responsibilities 2 What information is required for a 3 and Request for Proposal (RFP)? in RFI/RFP processes? successful RFI/RFP process? Filtering system: 1. A joint effort of Business, Operations, 1. Introduction Organization and Procurement. 2. Background 1. Initial total solution space 2. Overall project and process is managed by a 3. Subject of RFI/RFP 2. Preparation marketing screening project manager nominated by Organization 3. RFI - Long list of solutions (up to 15) 4. Requirements 3. The procurement relevant part is driven by a 4. RFP - Short list of solutions (3-5) single point of contact nominated by EGP 5. Legal Disclaimer 5. Finalist solutions (1-3) 4. Definition in a RACI matrix 5 What are the main steps in a RFI/RFP process? 4 When we are announcing the winner? 1. EGP decides on commercial 1. Preparation 2. Business decides on technical/content 2. RFI (optional) 3. Joint decision on supplier selection 3. RFP 4. POC – Proof of Concept (optional) 5. Contract Negotiation EGP – Member of Erste Group © 2012 All rights reserved Page 21
  • 22. What are the critical success factors? DOs • Early involvement of EGP • Fully defined scope/specification by business before commercial negotiation starts. • EGP in charge of all communication with suppliers unless otherwise agreed between EGP and business line. • Negotiation strategy and method selected by EGP. • All supplier communication through Electool (EGP’s tendering and auctioning tool). • Agreement on TCO and evaluation matrix before RFP starts. DON’Ts • EGP cannot decide on content/technical requirements. • No commercial negotiation without EGP. • Business triggers a RFx process without involving EGP. EGP – Member of Erste Group © 2012 All rights reserved Page 22
  • 23. RFI/RFP process for quickly focusing on feasible solution What is Request for Information (RFI) and Request for Proposal (RFP)? RFI/RFP process as filtering system Explanation Initial total solution space Identify key stakeholders Solu- Solu- Solu- Solu- Understand business and business objectives, strategic framework and TOM Solu- Solu- Solu- tion Solu- tion tion tion tion tion tion Define generic solution concepts and identify potential solutions and solution providers out of Solu- tion total solution space (Long List) Preparation/Market screening Solu- tion Solu- Solu- Solu- tion Solu- tion Solu- Solu- tion Solu- Request for Information (RFI) tion Solu- tion Solu- Solu- tion E tion Solu- tion Solu- Solu- Long list tiontion Solu-Solu- tion Solu-15) tion tion of solutionsSolu- to tion tion tion (up Survey used for requesting information to tion tion − Secure basic understanding of market … Gain first information on solution providers RFI − Main characteristics: − Identify Short List of solutions (3-5) • RFI is an information only No legally binding proposal; not suitable to engage with supplier • RFI is the best to cooperate • RFI can be initiated by BL Up to 100 requirements • RFI can be part of Market Research and Little interaction with solution providers done independently by EGP Limited internal efforts; project organisation not necessarily required Solu- Solu- Mandatory alignment with Erste Group Procurement Solu- Solu- tion Short list of solutions (3-5) tion tion Solu- tion tion Request for Proposal (RFP) Formal invitation for solution providers to bid on supplying solution within specified time period RFP and process Main characteristics: RFP is always a BL request Formal proposal; mandatory task before engaging with supplier RFP will result in a purchase Legally binding for solution provider (appendix for final contract) RFP is always in cooperation Solu- More than 100 requirements tion Intense interaction with solution providers Solu- tion Requires involvement of several internal units with substantial internal efforts and a clear project organisation and structures Finalist solutions (1-3) Mandatory involvement of Erste Group Procurement A RFI process can be a joint effort OR can be done independently by EGP (as part of Market Research). A RFP process is a joint effort of Business, Operations, Organization and Procurement. EGP – Member of Erste Group © 2012 All rights reserved Page 23
  • 24. General responsibilities in RFI/RFP process What are the roles & responsibilities in RFI/RFP processes? A solution selection project and RFI/RFP process is a joint effort of Business, Operations, Organization and Procurement. Whilst the overall project and process is managed by a project manager nominated by Organization, the procurement relevant part is driven by a single point of contact nominated by Erste Group Procurement. Project Sponsor (PS) Project Manager (PM) Erste Group Procurement (EGP) (see Erste Group Project Management Standard) (see Erste Group Project Management Standard) • Defines the goals and priorities • Planning, coordination and tracking of all project activities • Communication with external suppliers • Approves business case, project charter • Consolidating of inputs from the various streams • Consolidation of RFI/RFP documents • Ensures the funding of the project • Reporting to project sponsor and steering committee • Commercial and legal negotiations with solution providers in all phases • Provides strategic guidance and leadership to the project • Approves project deliverables • Contract management Org – Business Analyst (Org-BA) Business/ Operations Representative (Bus/Ops) IT Expert (incl. IT Solution Management, IT Operation, IT Architecture) • Defining and evaluating requirements along the six defined • Definition of requirements for business functionality • Defining and evaluating technical requirements and categories requirements for implementation and ongoing support • Evaluating of business functionally • Ensure that strategic and operational business • Providing IT expertise and input where needed requirements are considered throughout the project • Defining expected benefits business and operations • Management of testing environments • Operational support for Business/Operations Sample of a RACI Matrix for an IT Project Key Activity PS PM EGP Bus/Ops Org-BA IT IS CON LA 0.1 Understand business and IT objectives, strategic framework and TOM 0.1.1 Perform focus interviews with stakeholders A C C R C 0.1.2 Draft strategic requirements for needed solution A C C R C 0.1.3 Research external case studies with comparable business objectives I A C R C 0.1.4 Enrich understanding of challenges & framework with case study findings I A C R C 0.1.5 Outline benefits of needed solution A C C R C 0.1.6 Define strategic requirements A C C R C C RACI Matrix 0.1.7 Agree on measurable KPIs for project success A C C R C C 0.2 Market screening & “big picture” 0.2.1 Perform market research of potential solutions (internal & external) A C R C 0.2.2 Review case studies (internal & external) A C R C 0.2.3 Collate and present research findings I A C R C 0.2.4 Define generic solution concept A C C R C C 0.2.5 Consider make or buy decision A C I C R C C EGP – Member of Erste Group © 2012 All rights reserved Page 24
  • 25. Draft RFI/RFP according to standard contents What information is required for a successful RFI/RFP process? Topic Subtopic Description Important appendices 1. Introduction • Objectives of the document • Explains purpose of RFI/RFP 2. Background • Entity’s Background • Description includes • Current situation − Overall strategy the RFI/RFP process supports • Objectives of RFI/RFP − Selection goals process − Affected business processes or operations − Specific capabilities that on business requires to realise improvements 3. Subject of • Scope of the solution • Outlines required applications and services • Information on RFI/RFP • Planned implementation time • Explains expected time frame organization, volumes, frame (if applicable) FTE s etc. • Response documents and • Outlines required response format and content (e.g. • Roll-out roadmap deliverables solution overview, cost breakdown) • Schedule and time frame of • Outlines selection process, e.g. rules of the “game”, terms RFI/RFP process • Informs about deadlines and time table 4. Requirements • Business functionality • Non-business functionality • Excel file with detailed • Technology (if applicable) • List of organized questions to confirm availability of requirements • Implementation and on going desired requirements and to measure solution provider’s • Interfaces support competencies, reliability and ability to fulfil requirements • Solution provider • Cost evaluation sheet • Cost indication/TCO 5. Legal • - • Includes e.g. liability and non-disclosure agreement disclaimer EGP – Member of Erste Group © 2012 All rights reserved Page 25
  • 26. Overview solution selection approach in five steps What are the main steps in a RFI/RFP process? Phases Contract 0 Preparation 1 RFI 2 RFP 3 POC 4 Negotiation • Understand business • Develop and issue RFP • Agree on scope, project plan, • Develop and issue RFI • Evaluate RFP responses • Define and prepare POC milestones and success objectives, strategic Activities approach criteria framework • Evaluate long list of solutions • Reference checks • Market screening • Solution provider presentation • Perform workshops, tests and • Conduct and finalize demonstrations commercial and legal contract • Plan roadmap • Design „big picture“ negotiations • Estimate costs • Evaluate POC results • Evaluate solutions • Detailed requirements • Proof of concept approach & • Finalised contractual • Joint understanding of • Requirements • Weighting and evaluation process documents and appendices approach • • Key Deliverables business challenge /strategic • RFI, NDA (Optional) Test cases and test data Handover material (if framework • RFP, NDA (mandatory) applicable) • RFI responses • RFP proposals • POC3) report • First thoughts on business, • operations and benefits • Qualitative evaluation Evaluation results • Updated evaluation • TCO4 & benefits analysis • Updated TCO4) & benefits • Strategic requirements • Feasibility cross check • Roll-out roadmap • Generic solution concept • Short list of solutions • Feasibility and • Implementation and cost/benefit check (3-5) resource plan • Long list of solutions (up to 15) • Agreed further selection • Finalist solutions (1-3) • Updated ranking of finalist process • Feasibility and solutions (1-3) • Defined selection process cost/benefit check • Agreed further selection process 1 2 3 4 5 Key decision • Long list of solutions (up to • Short list of solutions • Finalist solutions (1-3) • Updated ranking of • Contract ready for points 15) (3-5) • Go/No go decision finalist solutions (1-3) signature • Go/No go decision • Go/No go decision • TCO4 & benefits • Updated TCO4) & benefits • Defined selection process • Go/No go decision 1 RFI = request for information 2 RFP = request for proposal 3 POC = proof of concept 4 TCO = Total cost of ownership EGP – Member of Erste Group © 2012 All rights reserved Page 26
  • 27. „Negotiations“ and „Winner Announcement“ When we are announcing the winner? EGP Sourcing Specialist starts a negotiation EGP Business Joint Line decision project and owns the process on Content/ Commercial supplier Technical Decision selection Decision Joint decision on Short List A negotiation … EGP ensures the right quality in the right time to the right price of goods .. process is owned by the sourcing specialist and services in the most efficient .. can be focused with one selectee way by selecting the appropriate supplier. .. lasts until the contract is signed In case no signature is reached with the first selectee a Commonly selected supplier signs negotiation ... the contract NOTE: Only after signing a …can be restarted with other selected suppliers contract a winner is to be announced! …can run parallel with multiple bidders The supplier - who signs the contract - is the ‚Winner‘ and will be The EGP Sourcing Specialist must document the announced as such. achievements and offers/wording in discussion/analysis during all negotiation stages EGP – Member of Erste Group © 2012 All rights reserved Page 27