Ken Weinberg, Director of Water Resources
Supply/Demand Analysis and Scenario Planning
Evaluation Thresholds and Decision Metrics
Baseline System Performance
Storage Utilization Analysis
New Supply and Conveyance Options (Long-Term)
Recommended Near-Term System Improvements
In-Line Hydroelectric Opportunities
Project Costs & Supply/Conveyance Comparisons (MWD Rates)
CEQA Process
Selection of Preferred Project List
2
 Demand Uncertainty and Sensitivity
◦ Conducted sensitivity using SANDAG
Series 13 population forecast
◦<5% in 2035 lower than UWMP
 Role of Storage
◦ Connected surface water storage
is optimized for regional and local
management of supplies
◦ Increasing connected regional
Storage limited by infrastructure
constraints and supply availability
3
0
100000
200000
300000
400000
500000
600000
700000
800000
RegionalStorageCapacity
Dead Pool
Emergency
Pool
Carryover
Pool
Local
Operations
Pool
Not Connected
to Aqueducts
Miramar
Otay
Perdue
Levy
Alvarado
Twin Oaks Valley
100 MGD
Escondido/Vista ID
Poway
Badger
Olivenhain
Weese
Untreated Water Delivery System Conveyance Constraints
4
Future System Capacity
Constraint - Pipelines 3 and 5
(beyond 2020)
Existing / Future System
Capacity Constraint – Serving
South County WTPs
Crossover Pipeline to serve
WTP (beyond 2025)
SV Pump Station
(to optimize storage use)
5
5%
25%
10%
Lines represent % of traces (frequency)
Urban Water Management Plan Scenario (Expected)
45 days
60 days
90 days
120 days
50% 75%
6
5%
25%
10%
Lines represent % of traces (frequency)
Maximum Local Scenario (IPR and Other Local Projects)
45 days
60 days
90 days
120 days
50%
75%
7
5%
25%
10%
Lines represent % of traces (frequency)
Urban Water Management Plan Scenario (Expected)
45 days
60 days
90 days
120 days
50%
 Measuring System Performance
◦ Untreated Water Constraint
 Additional untreated water conveyance capacity at MWD
delivery point
 2020 to 2025 time frame
◦ Internal system bottlenecks need to be addressed
 South County untreated water service
 Immediate need to expand capacity – temporary repair
insufficient
 Review timing/scope of other long-term improvements
◦ Need for new supply development is 2025-30 or later
 Dependent on local supply development & conservation
8
Project Purpose Prelim Estimated Cost
New 30-inch South
County Intertie*
Alleviate conveyance
bottleneck south of Alvarado
$6,000,000
Pipeline 3/4
Conversion
Address untreated water
conveyance constraint at
MWD delivery point
~$220,000,000
(includes MWD portion)
North County ESP
Pump Station
Meet ESP treated water
delivery needs
$21,563,000
Construct as Defined
Project Purpose Estimated Cost
Mission Trails Suite of
projects
Increase untreated water conveyance
to serve South County WTPs.
(*May replace 30-in. intertie)
$63,917,000
Regulatory Storage
Provide operational storage for
increased deliveries
$55,650,000
Third Pump San
Vicente PS
Meet ESP, Carryover Storage needs $8,044,000
Revise Scope, Size and Timing (May Decrease Cost)
Project Purpose Estimated Cost
Pipeline 6
(Water Authority
Facility)
Address untreated water
delivery constraint at MWD
delivery point
$480,000,000
Second Crossover
Pipeline
Address untreated water
delivery constraint s/o Twin
Oaks
$371,041,000
Other Facilities
Flow Controls and Pipeline
Rehab (LMSE)
$20,000,000
Current CIP Budget Delay Beyond 2030
10
 June 25th Meeting with Member Agency TAC
◦ Reviewed cost and technical data
◦ Comments and input on selecting a preferred list of projects for CEQA analysis
 Comprehensive evaluation of proposed projects and
modifications to current CIP
◦ Integrating long-term supply options into analysis
◦ Project cost estimates and comparison to future imported water costs
◦ Opportunities for in-line hydroelectric generation
◦ Analysis of reliability improvements
 Decision matrix on project timing
◦ Dependency on Member Agency actions
◦ No regrets actions
◦ Timing of future Water Authority Board decision
11
12
July 11, 2013 Special Meeting of the Water Planning Committee – Review
draft Master Plan document, project costs, and rate impacts
and draft Staff Recommended alternative for PEIR analysis
July 25, 2013 Water Planning Committee – Board input for final
preparation of the draft Master Plan, Committee
consideration of Staff Recommended Preferred List of
Projects for analysis in PEIR
August 2013 Water Planning Committee – Board input and direction for
Final preparation of Climate Action Plan and PEIR
September 2013 Release Draft Master Plan, CAP, and PEIR for member agency
and public review and comment
October 2013-
January 2014
Water Planning Committee- Updates and Informational
reports on progress of Draft Master Plan and Program EIR
February 2014 Regular Board Meeting - Certification of Final PEIR and
approval of Final Master Plan and CAP.
Wp   [final]master plan may 16 workshop summary

Weitere ähnliche Inhalte

Was ist angesagt?

Pre proposal meeting - supervisory consultancy
Pre proposal meeting  - supervisory consultancyPre proposal meeting  - supervisory consultancy
Pre proposal meeting - supervisory consultancy
Riaz Zalil
 

Was ist angesagt? (20)

March 14, 2013
March 14, 2013March 14, 2013
March 14, 2013
 
January 10, 2013
January 10, 2013January 10, 2013
January 10, 2013
 
February 9, 2012
February 9, 2012February 9, 2012
February 9, 2012
 
Bay Delta Overview - March 28, 2013
Bay Delta Overview - March 28, 2013Bay Delta Overview - March 28, 2013
Bay Delta Overview - March 28, 2013
 
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
 
Pre proposal meeting - supervisory consultancy
Pre proposal meeting  - supervisory consultancyPre proposal meeting  - supervisory consultancy
Pre proposal meeting - supervisory consultancy
 
Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014
 
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
 
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
 
Delta Policy Principles - Feb. 23, 2012
Delta Policy Principles - Feb. 23, 2012Delta Policy Principles - Feb. 23, 2012
Delta Policy Principles - Feb. 23, 2012
 
2013 02 28
2013 02 282013 02 28
2013 02 28
 
Progress at Southwestern Travis County GCD
Progress at Southwestern Travis County GCD Progress at Southwestern Travis County GCD
Progress at Southwestern Travis County GCD
 
February 2022 Texas Department of Licensing & Regulation Updates
February 2022 Texas Department of Licensing & Regulation UpdatesFebruary 2022 Texas Department of Licensing & Regulation Updates
February 2022 Texas Department of Licensing & Regulation Updates
 
Gec97
Gec97Gec97
Gec97
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...
 
Bay-Delta Activities Update
Bay-Delta Activities UpdateBay-Delta Activities Update
Bay-Delta Activities Update
 
RS-16-154 Nolan Creek Flood Protection Plan
RS-16-154 Nolan Creek Flood Protection PlanRS-16-154 Nolan Creek Flood Protection Plan
RS-16-154 Nolan Creek Flood Protection Plan
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...
 

Andere mochten auch

Positioning And Draping And Bed Mobility Power Point
Positioning And Draping And Bed Mobility Power PointPositioning And Draping And Bed Mobility Power Point
Positioning And Draping And Bed Mobility Power Point
Whatcom Community College
 
A lírica medieval galego-portuguesa
A lírica medieval galego-portuguesaA lírica medieval galego-portuguesa
A lírica medieval galego-portuguesa
noagaliza
 
Ccc chinese future_life_2014
Ccc chinese future_life_2014Ccc chinese future_life_2014
Ccc chinese future_life_2014
LYCCC
 
Presentacion sociedad del conocimiento 2
Presentacion sociedad del conocimiento 2Presentacion sociedad del conocimiento 2
Presentacion sociedad del conocimiento 2
Mireya Saalon
 
Examen del primer trimestre
Examen del primer trimestreExamen del primer trimestre
Examen del primer trimestre
NumanHurtadoJ
 
A Inclusao De Computadores
A Inclusao De ComputadoresA Inclusao De Computadores
A Inclusao De Computadores
Andrei Silva
 

Andere mochten auch (20)

BDCP: Water Authority Board Review Process July 25, 2013
BDCP: Water Authority Board Review Process July 25, 2013BDCP: Water Authority Board Review Process July 25, 2013
BDCP: Water Authority Board Review Process July 25, 2013
 
Bay-Delta Conservation Plan (BDCP) Environmental Review Process - October 24,...
Bay-Delta Conservation Plan (BDCP) Environmental Review Process - October 24,...Bay-Delta Conservation Plan (BDCP) Environmental Review Process - October 24,...
Bay-Delta Conservation Plan (BDCP) Environmental Review Process - October 24,...
 
Positioning And Draping And Bed Mobility Power Point
Positioning And Draping And Bed Mobility Power PointPositioning And Draping And Bed Mobility Power Point
Positioning And Draping And Bed Mobility Power Point
 
Time Series Analysis Ravi
Time Series Analysis RaviTime Series Analysis Ravi
Time Series Analysis Ravi
 
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
 
Marketing mobile
Marketing mobileMarketing mobile
Marketing mobile
 
A lírica medieval galego-portuguesa
A lírica medieval galego-portuguesaA lírica medieval galego-portuguesa
A lírica medieval galego-portuguesa
 
Ccc chinese future_life_2014
Ccc chinese future_life_2014Ccc chinese future_life_2014
Ccc chinese future_life_2014
 
Anniversaire
AnniversaireAnniversaire
Anniversaire
 
Keane
KeaneKeane
Keane
 
Presentacion sociedad del conocimiento 2
Presentacion sociedad del conocimiento 2Presentacion sociedad del conocimiento 2
Presentacion sociedad del conocimiento 2
 
Apresentação1
Apresentação1Apresentação1
Apresentação1
 
Ky thu-co-vay-t06
Ky thu-co-vay-t06Ky thu-co-vay-t06
Ky thu-co-vay-t06
 
El ecosistema!
El ecosistema!El ecosistema!
El ecosistema!
 
Curso de Marketing Digital (Agosto 2009)
Curso de Marketing Digital (Agosto 2009)Curso de Marketing Digital (Agosto 2009)
Curso de Marketing Digital (Agosto 2009)
 
Ferrari
FerrariFerrari
Ferrari
 
Examen del primer trimestre
Examen del primer trimestreExamen del primer trimestre
Examen del primer trimestre
 
A Inclusao De Computadores
A Inclusao De ComputadoresA Inclusao De Computadores
A Inclusao De Computadores
 
Ky thu-co-vay-t20
Ky thu-co-vay-t20Ky thu-co-vay-t20
Ky thu-co-vay-t20
 
Corction atmosferic
Corction atmosfericCorction atmosferic
Corction atmosferic
 

Ähnlich wie Wp [final]master plan may 16 workshop summary

Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christi
jeshaml10
 
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
San Diego County Water Authority
 
Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...
Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...
Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...
TWCA
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
Tim Bail
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
ascemiami-dade
 
Sustainable in Seattle: From Street Edge Alternatives to City Standards
Sustainable in Seattle: From Street Edge Alternatives to City StandardsSustainable in Seattle: From Street Edge Alternatives to City Standards
Sustainable in Seattle: From Street Edge Alternatives to City Standards
Center for Neighborhood Technology
 

Ähnlich wie Wp [final]master plan may 16 workshop summary (20)

Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
Wastewater Master Plan Update
Wastewater Master Plan UpdateWastewater Master Plan Update
Wastewater Master Plan Update
 
Risk Analysis and the Identification of Infrastructure Renewal Needs for the ...
Risk Analysis and the Identification of Infrastructure Renewal Needs for the ...Risk Analysis and the Identification of Infrastructure Renewal Needs for the ...
Risk Analysis and the Identification of Infrastructure Renewal Needs for the ...
 
James Solution to Pollution
James Solution to Pollution James Solution to Pollution
James Solution to Pollution
 
Lightning Round on Current TWDB Studies
Lightning Round on Current TWDB StudiesLightning Round on Current TWDB Studies
Lightning Round on Current TWDB Studies
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christi
 
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
Bay Delta Conservation Plan - Paul Helliker, Department of Water Resources - ...
 
Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van KelleyGMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
GMA 8 Northern Trinity Woodbine GAM Update: Bill Mullican and Van Kelley
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
 
Transforming Our Cities: High Performance Green Infrastructure and Distribute...
Transforming Our Cities: High Performance Green Infrastructure and Distribute...Transforming Our Cities: High Performance Green Infrastructure and Distribute...
Transforming Our Cities: High Performance Green Infrastructure and Distribute...
 
Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...
Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...
Innovations in Water Resources Planning – The City of Sugar Land’s New Integr...
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
Kansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional ApproachKansas Water Vision Implementation - A Regional Approach
Kansas Water Vision Implementation - A Regional Approach
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
Sustainable in Seattle: From Street Edge Alternatives to City Standards
Sustainable in Seattle: From Street Edge Alternatives to City StandardsSustainable in Seattle: From Street Edge Alternatives to City Standards
Sustainable in Seattle: From Street Edge Alternatives to City Standards
 
Resource Recovery Panel
Resource Recovery PanelResource Recovery Panel
Resource Recovery Panel
 
Vermont Power Import Alternatives
Vermont Power Import AlternativesVermont Power Import Alternatives
Vermont Power Import Alternatives
 

Mehr von San Diego County Water Authority

Mehr von San Diego County Water Authority (20)

Session 2 presentation
Session 2 presentationSession 2 presentation
Session 2 presentation
 
Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015
 
Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015 Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015
 
Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015
 
Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015
 
Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016
 
Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015
 
Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015 Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...
 
2015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 20152015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 2015
 
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
 
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
 
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
 
Update on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response ActivitiesUpdate on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response Activities
 
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
 
Update on Supply Conditions and Drought Response Actions
Update on Supply Conditions and Drought Response ActionsUpdate on Supply Conditions and Drought Response Actions
Update on Supply Conditions and Drought Response Actions
 
Water Supply and Drought Management Update - Feb. 26, 2015
Water Supply and Drought Management Update - Feb. 26, 2015Water Supply and Drought Management Update - Feb. 26, 2015
Water Supply and Drought Management Update - Feb. 26, 2015
 
Update on Water Supply Conditions and Drought Response Activities - March 26,...
Update on Water Supply Conditions and Drought Response Activities - March 26,...Update on Water Supply Conditions and Drought Response Activities - March 26,...
Update on Water Supply Conditions and Drought Response Activities - March 26,...
 
Water Supply and Drought Management Update - Nov. 20, 2014
Water Supply and Drought Management Update - Nov. 20, 2014Water Supply and Drought Management Update - Nov. 20, 2014
Water Supply and Drought Management Update - Nov. 20, 2014
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 

Kürzlich hochgeladen (20)

BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 

Wp [final]master plan may 16 workshop summary

  • 1. Ken Weinberg, Director of Water Resources
  • 2. Supply/Demand Analysis and Scenario Planning Evaluation Thresholds and Decision Metrics Baseline System Performance Storage Utilization Analysis New Supply and Conveyance Options (Long-Term) Recommended Near-Term System Improvements In-Line Hydroelectric Opportunities Project Costs & Supply/Conveyance Comparisons (MWD Rates) CEQA Process Selection of Preferred Project List 2
  • 3.  Demand Uncertainty and Sensitivity ◦ Conducted sensitivity using SANDAG Series 13 population forecast ◦<5% in 2035 lower than UWMP  Role of Storage ◦ Connected surface water storage is optimized for regional and local management of supplies ◦ Increasing connected regional Storage limited by infrastructure constraints and supply availability 3 0 100000 200000 300000 400000 500000 600000 700000 800000 RegionalStorageCapacity Dead Pool Emergency Pool Carryover Pool Local Operations Pool Not Connected to Aqueducts
  • 4. Miramar Otay Perdue Levy Alvarado Twin Oaks Valley 100 MGD Escondido/Vista ID Poway Badger Olivenhain Weese Untreated Water Delivery System Conveyance Constraints 4 Future System Capacity Constraint - Pipelines 3 and 5 (beyond 2020) Existing / Future System Capacity Constraint – Serving South County WTPs Crossover Pipeline to serve WTP (beyond 2025) SV Pump Station (to optimize storage use)
  • 5. 5 5% 25% 10% Lines represent % of traces (frequency) Urban Water Management Plan Scenario (Expected) 45 days 60 days 90 days 120 days 50% 75%
  • 6. 6 5% 25% 10% Lines represent % of traces (frequency) Maximum Local Scenario (IPR and Other Local Projects) 45 days 60 days 90 days 120 days 50% 75%
  • 7. 7 5% 25% 10% Lines represent % of traces (frequency) Urban Water Management Plan Scenario (Expected) 45 days 60 days 90 days 120 days 50%
  • 8.  Measuring System Performance ◦ Untreated Water Constraint  Additional untreated water conveyance capacity at MWD delivery point  2020 to 2025 time frame ◦ Internal system bottlenecks need to be addressed  South County untreated water service  Immediate need to expand capacity – temporary repair insufficient  Review timing/scope of other long-term improvements ◦ Need for new supply development is 2025-30 or later  Dependent on local supply development & conservation 8
  • 9. Project Purpose Prelim Estimated Cost New 30-inch South County Intertie* Alleviate conveyance bottleneck south of Alvarado $6,000,000 Pipeline 3/4 Conversion Address untreated water conveyance constraint at MWD delivery point ~$220,000,000 (includes MWD portion) North County ESP Pump Station Meet ESP treated water delivery needs $21,563,000 Construct as Defined Project Purpose Estimated Cost Mission Trails Suite of projects Increase untreated water conveyance to serve South County WTPs. (*May replace 30-in. intertie) $63,917,000 Regulatory Storage Provide operational storage for increased deliveries $55,650,000 Third Pump San Vicente PS Meet ESP, Carryover Storage needs $8,044,000 Revise Scope, Size and Timing (May Decrease Cost)
  • 10. Project Purpose Estimated Cost Pipeline 6 (Water Authority Facility) Address untreated water delivery constraint at MWD delivery point $480,000,000 Second Crossover Pipeline Address untreated water delivery constraint s/o Twin Oaks $371,041,000 Other Facilities Flow Controls and Pipeline Rehab (LMSE) $20,000,000 Current CIP Budget Delay Beyond 2030 10
  • 11.  June 25th Meeting with Member Agency TAC ◦ Reviewed cost and technical data ◦ Comments and input on selecting a preferred list of projects for CEQA analysis  Comprehensive evaluation of proposed projects and modifications to current CIP ◦ Integrating long-term supply options into analysis ◦ Project cost estimates and comparison to future imported water costs ◦ Opportunities for in-line hydroelectric generation ◦ Analysis of reliability improvements  Decision matrix on project timing ◦ Dependency on Member Agency actions ◦ No regrets actions ◦ Timing of future Water Authority Board decision 11
  • 12. 12 July 11, 2013 Special Meeting of the Water Planning Committee – Review draft Master Plan document, project costs, and rate impacts and draft Staff Recommended alternative for PEIR analysis July 25, 2013 Water Planning Committee – Board input for final preparation of the draft Master Plan, Committee consideration of Staff Recommended Preferred List of Projects for analysis in PEIR August 2013 Water Planning Committee – Board input and direction for Final preparation of Climate Action Plan and PEIR September 2013 Release Draft Master Plan, CAP, and PEIR for member agency and public review and comment October 2013- January 2014 Water Planning Committee- Updates and Informational reports on progress of Draft Master Plan and Program EIR February 2014 Regular Board Meeting - Certification of Final PEIR and approval of Final Master Plan and CAP.