SlideShare ist ein Scribd-Unternehmen logo
1 von 61
Downloaden Sie, um offline zu lesen
www.sapficoconsultant.com Page 2 of 61
© 2009 sapficoconsultant.com. All rights reserved. No part of this material should
be reproduced or transmitted in any form, or by any means, electronic or
mechanical including photocopying, recording or by any information storage
retrieval system without permission in writing from www.sapficoconsultant.com
“SAP” is a trademark of SAP AG, Neurottstrasse 16, 69190 Walldorf, Germany.
SAP AG is not the publisher of this material and is not responsible for it under
any aspect.
Warning and Disclaimer
This product is sold as is, without warranty of any kind, either express or implied.
While every precaution has been taken in the preparation of this material,
www.sapficoconsultant.com assumes no responsibility for errors or omissions.
Neither is any liability assumed for damages resulting from the use of the
information or instructions contained herein. It is further stated that the publisher
is not responsible for any damage or loss to your data or your equipment that
results directly or indirectly from your use of this product.
www.sapficoconsultant.com Page 3 of 61
Table of contents
Introduction........................................................................................................................4
General Ledger.................................................................................................................5
Accounts Payable/ Accounts Receivable/ Logistics Invoice Verification..............11
Bank Accounting.............................................................................................................18
Asset Accounting............................................................................................................24
Cost Center Accounting ................................................................................................30
Product Costing ..............................................................................................................39
Profit Center Accounting ...............................................................................................43
Profitability Analysis.......................................................................................................46
SD – FI – COPA .............................................................................................................54
General trouble shooting ...............................................................................................55
www.sapficoconsultant.com Page 4 of 61
Introduction
This document is prepared to help you support the users whenever they face
problems. This document is prepared by a team of fico support consultants who
have themselves faced these problems and solved them.
You too can make such a list of troubleshooting problems whenever you face a
different kind of problem. You then can refer them later on when you face a
similar problem again.
Read on and you will find this document very useful.
www.sapficoconsultant.com Page 5 of 61
General Ledger
1) You get an error message while reversing a document through transaction
code FB08 “Document includes already cleared items - reversal not
possible"? The customer line item shows no clearing document.
Solution:
When in the transaction code FB08, select document display and double click
on each of the line item of the document, to find out if they have been cleared
by some other clearing document. Generally bank line items are cleared by
another clearing document. You will find a clearing document number in the
line item. Use this clearing document and update it in transaction code FBRA
to reverse and reset the clearing document. If there is more than one clearing
document in the original document, then you need to reset and reverse all of
them.
2) You get an error message “No input tax code allowed” while doing a
document entry.
Solution:
Edit the GL code using transaction code FS00 and update * (all taxes
allowed) or update the input tax indicator.
3) Users want to do a posting in special period. In FB50 the period screen is not
visible. What needs to be done?
Solution:
Click on Editing options in transaction code FB50 or use
transaction code FB00. In the tab document entry select and
select and click on save button. Click back
and again restart FB50. The user can now see the period field
4) User has posted an FI document. He notes down the Accounting document
number generated. He then tries to access the document using transaction
code FB03. He finds that the document number does not exists? What is the
problem?
Solution:
This sometimes happens in SAP when the document number gets generated in
SAP but the data is not saved. To check for all such missing document number,
www.sapficoconsultant.com Page 6 of 61
execute the transaction code S_ALR_87012342 (Gaps in document number
assignment). This probably happens when the user is working for a long time
with a single document. The user needs to again post the document.
5) There exist a foreign currency debit open item with 100 USD as the currency
and the local currency being 4900 INR. The user now tries to clear this debit item
with an incoming payment received in 4900 INR. The system generates an
exchange rate difference for this entry since the exchange rate maintained for
USD INR is 48.5 on the date of posting incoming payment. No exchange rate
needs to be posted for this, what needs to be done?
Solution:
This happens because the configuration setting is not maintained in view
V_001_B (Company code global data) or path IMG àFinancial Accounting à
Financial Accounting Global Settings à Company Code à Enter Global
Parameters and need to select . After
maintaining this configuration no exchange rate difference will be generated
when you use local currency for clearing.
6) User wants to directly maintain the Financial statement version on the
production system using transaction code FSE2, currently it is not possible to
maintain it. How to do it?
Solution: Configure table/view “V_T100C” for application area “FE” message
“146”. You can either change the message type (to I or S) or you can switch it off
completely (-)
www.sapficoconsultant.com Page 7 of 61
7) It is observed in Automatic clearing of GR/IR accounts using transaction code
F.13 most of the items are not getting cleared. The apparent reason being that
blanket purchase orders are being used, which results in balance being
uncleared at purchase order line item level as can be seen below.
www.sapficoconsultant.com Page 8 of 61
The clearing rule is purchasing document and line item.
How can these documents be cleared?
Solution: In transaction code F.13 Automatic clearing the user needs to select
. This selection will clear those documents with
an additional clearing criteria which is material document. The material document
is update in reference 3 field. This selection is more important when blanket
purchase orders are raised. The clearing will now happen as shown below:-
www.sapficoconsultant.com Page 9 of 61
8) With the above solution the user is now trying to clear the Freight clearing and
custom clearing accounts for blanket purchase orders. Even though he selects
still no clearing happens for such items which can be
cleared within the purchase order line item as can be seen below
www.sapficoconsultant.com Page 10 of 61
Is it possible to clear the above documents?
Solution: In the planned delivery costs such as freight, custom clearing it is not
possible to use since no material document is
updated in reference 3 field in the invoice documents. Hence it is not possible to
clear such documents unless the group becomes zero. Another option is to
change the configuration in transaction code OB74 and include another criterion
PSWBT (GL amount) besides EBELN and EBELP. This will probably result in
more clearing.
9) The trial balance report S_ALR_87012277 - G/L Account Balances does not
show correct figures. It does not show opening balance. What is the problem?
Solution: This is because the GL balance carry forward program has not been
executed. Execute transaction code F.16 – Balance carryforward and carry
forward the GL account balance to the current year.
10) The GL balance carry forward transaction code F.16 has been executed.
After doing the carry forward there were again some entries posted in the prior
years. Should the carry forward transaction be executed again?
Solution: No, there is no need to execute the carry forward transaction code
again. The balance will automatically get carry forward each time the entries are
posted to the previous year. The program needs to be executed only once per
year.
www.sapficoconsultant.com Page 11 of 61
Accounts Payable/ Accounts Receivable/ Logistics
Invoice Verification
1) User is executing a payment program using transaction code F110 for a
vendor. The open items for the vendor are not getting selected in the payment
proposal. While displaying payment proposal he gets the following error
message “Company codes XXXX do not appear in proposal 19.02.2009 AM2;
correct” What is the problem and how to solve it?
Solution:
Most of the times the problem in the payment proposal is displayed by checking
the proposal log. Check the proposal log by clicking on the icon . In
this case you find that the vendor is contained in another proposal for e.g. AM1
17.02.2009. User needs to delete the earlier payment proposal AM1 dated
17.02.2009 by using transaction code F110. Take a drop down or press F4
button in the run date and select proposal AM 17.02.2009. Thereafter click Edit
à Proposal à Delete. The user can now run the payment proposal AM2.
2) In transaction code F110 user has updated all the parameters and saved it.
The Status shows Parameters have been entered. Proposal has been released
20.02.2009 01:14:16. There are no icons appearing for scheduling the proposal
nor is the payment proposal being created. What is the problem?
Solution: The problem is because the payment proposal is still lying as released
in the background job. Go to the background job monitor using transaction code
SM37 and update job status . You will find that the job
name F110-20090219-AM1 – X as Released only. Select the job
and click Job à Releasedà Scheduled. The job
status becomes Scheduled. Click on and then select immediate. Click
on refresh the status now changes from ready to finished. Now go back to
the payment program and click . Now you will find that your payment
proposal has been created. The problem sometimes occurs because the
www.sapficoconsultant.com Page 12 of 61
background job of payment proposal creation is given a Job class C ( Low
priority) and that is the reason the proposal is not automatically created.
3) Payment documents while posting through automatic payment program
(transaction code F110) got terminated due to server shut down. How to
start the abnormally terminated payment run?
Solution:
In transaction code F110 use path from the menu bar Edit --> Payments --> After
Termination --> Draw up again. You can now post the terminated payment from
the point where it had abruptly ended.
4) Payment documents posting through automatic payment program got
terminated due to server shut down. Few of the payments document have been
posted. User now reverses this payment documents which have been posted. He
tries to create another payment run with the same selection parameters. The new
payment run cannot be created due to the fact the balance payment documents
are still to be posted from the terminated run? What is the recourse now?
Solution:
In transaction F110 use path from the menu bar Edit --> Payments --> After
Termination --> Draw up again. You can now post the terminated payment from
the point where it had abruptly ended. The payment list generated through this
using DME will only contain the balance payment. Create another payment run to
post the reversed document.
5) User is trying to make a payment to a vendor and is unable to make payment
to vendor as he gets the following error message “Message F5 787 (item(s) not
activated due to inconsistent withholding tax information).” What is the
problem and how to solve it?
Solution:
This problem happens when after document entry, you have changed
withholding tax information in the vendor master record or you have changed
withholding tax information for the company code. You need to run a program
called as RFWT0010 using transaction code SE38.
Update the following information such as vendor master, company code,
document number and fiscal year, remove the test run and execute.
www.sapficoconsultant.com Page 13 of 61
6) All items linked to an invoice through down payment clearing, partial clearing
or credit memos linked to the invoices are not activated when any of the items
are selected. What could be the problem?
Solution: In the editing options (FB00) under tab Open items select or click
and save. All the linked open items will now be
selected.
7) Wrong payment terms were updated in the sales view of the customer master.
The billing was done and it was realized subsequently that the due dates
calculated were wrong, due to wrong baseline date.? How to rectify this problem
now ?
Solution: For billing documents already released into FI module you can
manually change the payment terms in the FI document using transaction code
FB02. You need to change the baseline date, if baseline date is wrong and also
www.sapficoconsultant.com Page 14 of 61
change the payment term. You can save the changes. For future documents
change the customer master data with the correct payment terms and also
change all open sales orders with the correct payment terms.
8) In the purchase order wrong custom duty was defined, based on which
GR/DCGR was posted and DCIN (Delivery cost invoice) for the prime vendor
was posted. The DCGR now needs to be reversed and set right with the correct
custom duty
Solution: Follow the given steps
1.Reverse the DCIN (Delivery cost Invoice) using tcode MR8M.
2.Reverse the GRN (DCGR) using tcode MIGO
3. Change the PO conditions and proceed with grn and do IV again
9) In MIRO transaction the user wants to book a single Vendor invoice for
multiple purchase orders for freight costs. Further he wants to book the invoice
in the local currency (the purchase order is raised in foreign currency). Is this
possible?
Solution:
Yes it is possible. In the transaction code MIRO update all the fields such as
invoice date, posting date, reference, amount and the local currency e.g. INR
then select . Thereafter update the first
purchase order number in the po field and press enter. This will fetch the first
purchase order details. Thereafter click to update the other multiple pos as
shown below:-
www.sapficoconsultant.com Page 15 of 61
Click
You can now select multiple Purchase orders and book a single vendor invoice
10) User is trying to book a Vendor invoice through transaction code MIRO when
he gets the following error message “Moving average price for material
9100001 9101 is negative “and therefore is not able to post the invoice. What
is the problem and how can it be solved?
Solution: This problem occurs when a Vendor invoice is being booked for an
amount which is higher than the GR/IR provision and there is a shortfall of stock
coverage to post the difference. This results in a negative moving average price
being calculated. The shortfall of stock is due to the stock being issued for
consumption. Therefore to do away with this error the consumption posting
should be reversed, so that full stock coverage is available. Further if required
the earlier Goods receipt posting should be required so that the moving average
price effect is removed. The reversal can be done using transaction code MBST
or MIGO.
11) While doing Invoice verification using transaction code MIRO, system gives
an error as “Check if Invoice already entered under accounting doc no
XXXXXXX" in the year 2009. On checking it was found that the document
number relates to year 2007 with different invoice number. What is the problem
and how can it be solved?
Solution: This is because in the Vendor master under the accounting view
(payment transactions), the Check double invoice is
switched on. But in Logistic Invoice verification the configuration for check co.
code, check reference is not set in transaction code OMRDC.
12) In the PO there is no delivery costs planned, vendor has billed for an actual
freight amount in invoice. The goods receipts have been done and some of the
stocks have been consumed. How to book the additional freight which was not
planned in the PO? What will be the accounting treatment of the additional freight
amount?
Solution: Since the freight is not planned in the PO, the user can book this
unplanned delivery costs in tab details
www.sapficoconsultant.com Page 16 of 61
The accounting treatment will differ based on the customizing settings:-
a) In case a separate GL code is defined in customizing for such unplanned
delivery costs, then the amount will automatically get posted to the GL
code expense account set up in customizing
b) If no gl code is set up then the amount of unplanned delivery costs, the
system splits up the delivery costs entered among the individual items,
based on the amounts invoiced so far plus those in the invoice being
entered.
Example
Purchase order raised for:-
100 pieces material X
200 pieces material Y
1st invoice received for the purchase order:
50 pieces material X at $ 10.00/piece = $ 500
50 pieces material Y at $ 12.00/piece = $ 600
2nd invoice received for the purchase order:
20 pieces material X at $ 10.00/piece = $ 200
80 pieces material Y at $ 10.00/piece = $ 800
Delivery costs = $ 90
The system divides up the delivery costs in the following ratio:
(500 + 200) : (600 + 800) = 700 : 1400 = 1 : 2.
Material X is debited for $ 30, material Y for $ 60.
6) User wants to book a custom duty invoice in local currency INR. In transaction
code MIRO he updates the invoice date, invoice reference, amount and the
purchase order. When he presses enter, the Purchase Order currency USD is
automatically updated in the currency field. The field is now not changeable to
INR. What needs to be done in order to book the customs invoice in INR(local
currency)?
www.sapficoconsultant.com Page 17 of 61
Solution: While updating details the currency must be first updated with local
currency (INR) before updating the PO details. Once this is done then the
currency of INR will not be overwritten by USD.
13) In the GR/IR account there are certain old balances lying since last few years
as old as 2006, 2007 as can be seen below:-
The user wants to clear the differences on the GR/IR account. What needs to be
done?
Solution: The difference is on account of a debit balances is probably because of
the purchase order being raised for a higher amount and the Goods receipt
provision accounted with higher provision amounts. The invoice would have been
correctly booked. Another reason for the provision still lying could be because of
excess material being received and the vendor has not charged for the excess
material and probably will now never charge for it.
Since this are provisions will never be utilized this needs to be written off. This
adjustment is possible by using transaction code MR11. This transaction code
will clear such delivery surplus, invoice surplus etc.
www.sapficoconsultant.com Page 18 of 61
Bank Accounting
1) The check length in a house bank is currently 6 digits, these needs to be
increased to 7 digits in transaction code FCHI. How to do it?
Solution: Execute program RFCHKR00 using transaction code SE38. Here you
can specify the company code, bank and account id and the old digit length
and the new digit length. The check information will be changed from 6 digits
to 7 digits
2) An electronic bank statement was being uploaded through transaction code
FF_5 (Import), the upload data was erroneous. The bank statement needs to
be deleted. Is it possible?
Solution: Yes it is possible to delete the bank statement using program
RFEBKA96 in transaction code SE38
Under application take a drop down
www.sapficoconsultant.com Page 19 of 61
Click execute
Click
www.sapficoconsultant.com Page 20 of 61
And then select the one to be deleted and then click on
3) While printing a check through system, the check has got torn on the printer.
The user wants to void this check and reprint this check information on
another document. How can this be done?
Solution: Use transaction code FCH7 – Reprint check. In this transaction code
the user needs to update the check to be voided and select the check lot
number on which the new check needs to be printed.
The screen shot of the transaction code is shown
www.sapficoconsultant.com Page 21 of 61
4) The user has printed a check on an incorrect check lot. Therefore the system
check number and physical check number is not matching. The user now wants
to renumber the check number in the system to the physical check number. How
can this be done?
Solution: The check number can be reprinted using transaction code FCH4.
5) In the transaction code FF67 – Manual entry bank statement the entry screen
has suddenly changed, earlier it was showing company code, house bank,
account id but now it shows bank key, bank account number, currency.
www.sapficoconsultant.com Page 22 of 61
How can the user get back the old screen?
Solution: In the transaction code FF67 on menu bar select Settings à
Specifications : Int. bank determination
www.sapficoconsultant.com Page 23 of 61
Click .
The screen will now change to
www.sapficoconsultant.com Page 24 of 61
Asset Accounting
1) The GL account for accumulated depreciation for local reporting does not
match with the group depreciation area in transaction code AR01?
Solution: Possibly additional retirement posting was done after ASKB was
executed. Execute ASKB transaction code and the difference should go.
www.sapficoconsultant.com Page 25 of 61
2) Depreciation is already posted for the month. There is an additional addition to
asset for the month after the depreciation run. Is it possible to rerun depreciation
for this additional addition of asset?
Solution: You need to rerun the depreciation run using transaction code AFAB
and selecting the option Repeat depreciation run.
3) While executing year end transaction code AJAB (to close asset accounting
module) an error is encountered “Depreciation not executed?
Solution:
This happens in case depreciation was already posted and additional acquisition
of assets posted for the depreciated period. The repeat depreciation run was not
executed. It is therefore advisable to immediately execute transaction code AJAB
after all the asset transactions for the year end including depreciation (AFAB),
parallel valuations (ASKB) have been completed.
4) How is depreciation calculated in SAP, when I have changed certain useful life
in the asset master?
Solution:
It is calculated based on Total remaining net book value divide by remaining
useful life multiplied by 12
5) The user is getting an error when he tries to execute all asset accounting
reports e.g. transaction code AR01 or S_ALR_87011990 (Asset History Sheet)
“Fiscal year change not yet made for company code 9101”. What is the problem
and how can it be solved?
Solution: This problem arises when a new fiscal year begins and the user tries to
execute the asset report for the previous year or the current year. This happens
because the fiscal year change has not been done in the asset accounting
module. The transaction code AJRW – Fiscal year change has to be immediately
executed at the beginning of the New Year for this company code. Execute the
transaction code in background and the problem will go.
www.sapficoconsultant.com Page 26 of 61
6) There is a depreciation which remain unposted on certain assets at the year
end closing process and this was realized when the AJAB – Year end close was
executed. But the depreciation figures were already reported. Was it essential
that this step should have been executed before the balance sheet and profit and
loss were finalized?
Solution: Yes, in the year end process the transaction code AJAB must be
executed before the profit and loss account is finalized. The reason being AJAB
checks for all inconsistencies such as unposted depreciation (AFAB), unposted
parallel posting (ASKB) and check any other incomplete asset. Therefore you will
be required to post all of the aforesaid posting before you can finally execute
AJAB. Further by closing asset accounting through AJAB you can stop any
wanted entries to assets for previous year.
7) After doing AJAB, is it possible to reopen the previous year for doing asset
posting?
Solution: Yes, it is possible to reopen the previous year for posting, through
transaction code OAAQ.
8) The user has incorrectly retired asset 1001 instead of asset 2001. Can he
reverse the retirement?
Solution: Yes, the user can reverse the retirement using transaction code AB08.
www.sapficoconsultant.com Page 27 of 61
9) Certain value was wrongly capitalized (settled through AUC) to asset 100011
instead of asset 200011. The mistake was realized after a few months, when
auditors were conducting audit. Is it now possible to transfer the values from
asset 100011 to asset 200011?
Solution: Yes, it is possible to transfer the values from one asset to another using
the transaction code ABUMN (Transfer within company code).
www.sapficoconsultant.com Page 28 of 61
10) There was a change in the depreciation rates as per statutory requirements
from 10% to 12 %. Based on this you (as a consultant) have changed the
configuration settings of existing depreciation key from 10% to 12%. But you find
that inspite of the change in the configuration settings from 10 to 12% the
depreciation is not being recalculated. What could be the reason and what needs
to be done for recalculating the depreciation?
Solution: Whenever any changes are done in the configuration of the existing
depreciation keys, system does not automatically recalculate depreciation. To
recalculate depreciation you need to execute transaction code AFAR
(Recalculate Values). This will recalculate depreciation based on the new rates.
www.sapficoconsultant.com Page 29 of 61
11) Depreciation rates have changed from 10 to 12 % as per statutory
requirement. Therefore configuration changes needs to be done. If the rates are
changed will the system calculate depreciation from retrospective effect for all the
assets (from the date of acquisition)?
Solution: The system will not calculate retrospective depreciation. It will calculate
revised depreciation from the year in which it is changed.
12) When user tries to settle an internal order (investment measure) in February
2009 using transaction code KO88 he receives the following error: “First settle
items from the previous year in the previous year Message no. AW 624”. The
user checks the internal order using transaction code KOB1 and finds that there
is no posting on the internal order in January and February 2009. Further he also
checks and finds that in the previous year Jan 2008 to Dec 2008 the internal
order is already settled and there is nothing to settle (meaning debit and credits
are becoming zero). The reason the user is executing KO88, he wants to
capitalize the asset from Asset under construction to the final asset and he is not
able to settle because of this error. What is the problem?
Solution: The problem is because there was a posting made in the month of
December 2008 after the settlement was done. This posting was then reversed
subsequently after the settlement. Although the balance has become zero by
virtue of the reversal, the system expects the order to be settled in December
www.sapficoconsultant.com Page 30 of 61
2008. This problem was found out by analyzing the internal order using
transaction code KOB1.
Now to solve this problem do the following steps:-
a) Open FI period for Dec 2008 using transaction code OB52.
b) Open CO period for Dec 2008 using transaction code OKP1.
c) Open Asset accounting (AA) for 2008 using transaction code OAAQ.
d) Execute settlement for Dec 2008 using transaction code KO88 and
selecting processing type automatic. There will be zero balance which will
be settled.
e) Execute transaction code ASKB.
f) Execute transaction code AJAB to close AA for 2008
g) Close FI and CO period for Dec 2008
h) Now execute transaction code KO88 selecting processing type partial
capitalization for the month of feb 2009. This will now settle the asset from
AUC to final asset.
Cost Center Accounting
1) The user is trying to add newly created cost center to a cost center group,
He gets an error message - “No valid master record”? What could be the
reason?
Solution:
The cost center master data is valid from the year 2008 while the user is
trying to update the cost center group which shows validity from 2007. In the
cost center group maintenance (transaction code KSH2) click on Extras à
Default Settings à Structure and update the master data check on from
01.01.2008
2) You start several cycles of assessment, distribution, periodic reposting or
indirect activity allocation in a collective execution. During execution you
get a short dump ASSIGN_LENGTH_NEGATIVE or ASSIGN_LENGTH_0
What needs to be done ?
Solution:
You get this error if you execute too many cycles together. To avoid the
above error execute less cycles at the same time. About 5 cycles should be
okay. This problem is taken care of in the new SAP versions.
www.sapficoconsultant.com Page 31 of 61
3) A user is trying to copy cost center plan data from current year 2009 to
next year 2010 using transaction code KP97 (Copy plan to plan). But he is
facing a problem the data is not getting copied in to year 2010. What could
be the problem?
Solution:
The user is probably not selecting - Reset and overwrite option
and that is the reason the data is not getting copied into
year 2010. Ask the user to select this option and remove the test run, the plan
data will now get copied from 2009 to 2010
4) A user wants to copy data from one cost center 910101 to another cost
center 910102 for the year 2010. How can it be done?
Solution:
Use transaction code KP97 and choose and click
and update the reference cost center i.e.
910101 and update the target cost center i.e.
910102
5) The user has copied plan data using transaction code KP97. He finds that
the secondary cost allocation done using cost center cycle is not getting
copied? What could be the reason?
Solution:
Secondary cost allocation done using cost center cycle does not get copied while
using cost center planning function, reason being system actually expects you to
execute this cycle in the respective years. Therefore ask users to execute plan
cycles during that year so as to update the secondary cost.
6) User has executed all the cost center & COPA cycles, but still find that there
exists some balance on few particular cost centers. What could be the reason
and what needs to be done?
Solution:
www.sapficoconsultant.com Page 32 of 61
There could be various reasons for balance not being settled from these cost
centers:-
1) These cost centers must have been newly created and not included in the
existing cost center cycles
2) There could be some additional posting on the cost center after the cycles
have been executed.
3) The cost centers would have been locked for actual secondary costs,
which can be unlocked using transaction code KS02 in the tab control
If you find that none of the above is applicable then you need to find out that the
cost center is included in which cycle. To find out, use transaction code KS03
update the relevant cost center (which is not settled) and press enter. Thereafter
you need to select on the menu bar Environment à Where-used list à Cycles
and update period and fiscal year for which you are executing the cycles
.
You will then get the exact cycle and segment where the cost center is actually
being used. You then need to go to the relevant cycle using transaction code
KSU3 for cost center assessment or KSV3 for cost center distribution or KEU3
for COPA assessment cycle. In the cycle you need to check the segment header
whether actual values are selected , check the receiver tracing factor.
If receiver tracing factor has been set to fixed, then check that under tab
the percentage has been updated for the affected cost center.
If the receiver tracing factor has been set to variable portions then check that
variable portion type has or
actual activity or actual costs selected. Further also check that the actual
statistical key figures have been updated for the relevant statistical key figures
using transaction code S_ALR_87013645 or actual activity types have been
updated using transaction code S_ALR_87013646 for the period. Check the
Sender/receiver tab in the cycle and check the cost element groups and the cost
elements used for postings on the cost center match.
You should now be able to get a break through by now and will be able to solve
the problem.
www.sapficoconsultant.com Page 33 of 61
7) The user is doing his yearly planning and finds that when he runs COPA
cycles, he finds all cost centers are becoming negative. What could be the
problem?
Solution: The problem is because; the user has directly deleted the cost center
plan data using transaction code KP91 without reversing the COPA cycles and
the cost center cycles.
The correct sequences to be followed by the user should have been:-
1) Reverse COPA cycle
2) Reverse cost center cycle
3) Delete cost center plan data using transaction code KP91.
The solution to the current problem is reverse the COPA cycle. Again delete the
cost center plan data. Upload the cost center plan data and then execute the cost
center cycle and the COPA cycles.
8) No posting should happen from FI on to cost centers during execution of cost
center cycles. Is it possible to lock FI posting in the CO module?
Solution: Use transaction code OKP1 update fiscal year, version and select
and check for the relevant period and click
on save. This will lock posting from the FI module to the CO module.
9) The user is trying to update planning data for version 0 - fiscal year 2011, he
gets a message “Version 0 is not defined for fiscal year 2011”. How to maintain
the version for the fiscal year 2011?
Solution:
The version 0 for fiscal year 2011 can be maintained using transaction code
S_ALR_87005830 - Maintain versions. Update the setting for the fiscal year
2011. Select version 0 and double click settings for fiscal year. Update the
settings for the fiscal year. This transaction should be directly maintainable in the
production server.
10) When the user executes actual price calculation using transaction code KSII,
the activity prices are not split between the activity prices. What is the problem?
Solution: You need to first execute transaction code KSS2 splitting before
executing actual price calculation. Again here you have to first assign the cost
centers to the splitting structure.
11) A user wants to download a cost center report S_ALR_87013611 - Cost
Centers: Actual/Plan/Variance executed for all cost centers in excel format. How
can that be done?
Solution: Proceed as follows:-
www.sapficoconsultant.com Page 34 of 61
Click
Select
Notice the screen has changed now:-
www.sapficoconsultant.com Page 35 of 61
Click
www.sapficoconsultant.com Page 36 of 61
Select
www.sapficoconsultant.com Page 37 of 61
Click
www.sapficoconsultant.com Page 38 of 61
You can check the report in excel
In the standard sap reports the cost center code and name does not
appear. For the cost center to appear you need to do the following:-
www.sapficoconsultant.com Page 39 of 61
You find above that no cost center code appears here. Therefore you need
to create a new report which will have the text for export with cost center
code.
Product Costing
1) Overheads are not getting calculated for Raw and packaging material?
Solution:
www.sapficoconsultant.com Page 40 of 61
Check whether the overhead group is updated in the finished goods in costing 1
view.
2) User gets an error message while executing product cost estimate:
“No valid source of supply could be found”? What could be the error?
Solution:
This error message generally comes from finished goods which are
subcontracted. The MRP2 view with special procurement key is updated. The
subcontracting info record is not maintained for this finished good.
Subcontracting info record needs to be maintained by the procurement
department.
3) User is trying to release a standard cost estimate for a product. He gets the
following Error message:
“CK 763 Company code: Period closing has not yet taken place
In company code XXXX, period 04 fiscal year 2008 is still active. This period is
not the same as current period 003. Carry out period closing with the current
period 003:“
Solution:
This is the problem because an early close has been done in the MM module for
the month of March 208 in spite of month April 2008 not yet reached. No solution
to this problem. User should not do an early close in MM but should control in FI
module through transaction code OB52. You can only release the cost estimate
on April 2008.
4) A material code (component) is not getting picked up while executing a
standard cost estimate of the product?
Solution:
The component is defined as a bulk product in the material master in MRP 2
view. Remove the bulk indicator tick in the MR2 view of the material master and
the problem will be solved.
5) Variance analysis program KKS1 takes a lot of time i.e. around 6 to 7 hours of
execution. How do you reduce the execution time and what exactly is the
problem?
Solution:
Variance analysis calculation program select production orders based on the
status of the order. Thus it will select only those production orders whose
status is not the following:-
www.sapficoconsultant.com Page 41 of 61
LKD(Locked)
CLSD(Closed)
DLFL (Deletion flag)
DLT(Deleted)
Which means all the production orders right from beginning gets selected.
Therefore all the old production orders which are no longer required need to
be set a status CLSD(Closed) or LKD(Locked).
Use transaction COID and set status CLSD (Closed) by mass processing.
6) How do I maintain overhead rates in the production system directly?
Solution:
Use transaction code S_ALR_87008272 to define Quantity-Based Overhead
Rate.
Use transaction code S_ALR_87008275 to define Percentage Overhead Rate
7) User is executing a standard cost estimate for a finished product. He gets a
warning message that a raw material is not assigned to cost component
structure. What is the problem?
Solution:
The raw material master is not assigned to correct valuation class in the
accounting view. Select the correct valuation class in the accounting view of
the material master.
8) You have executed a product cost estimate for finished goods. You find
that the raw material costs and packing material costs are zero. What is
the problem?
Solution:
You need to first check the costing variant and see the valuation variant. In
the valuation variant see the Material valuation strategy.
See the order of valuation:-
If the order of valuation is
1 Planned price 2
2 Valuation price according to price control in material master
Then verify in the raw material and packing material master that price has
been maintained in the planned price 2 in the costing view of the material
www.sapficoconsultant.com Page 42 of 61
master. If nothing is maintained then check the price control of the material
(which will be V). Check whether a moving average price is maintained or not.
It means that both of them must not have been maintained and that is the
cause of error.
9) During variance calculation process/production orders shows the following
error messages: “Order does not have status DLV or TECO "? What needs to be
done?
Solution:
Variance will not be calculated on order which has the status other than DLV or
TECO, therefore they will be shown as errors. The costs on these orders (which
has status released REL, partially delivered PDLV) will be treated as WIP. Ignore
these messages.
10) While executing CK40N new std. costs are not getting calculated for a few
products, the system is picking up existing standard cost for these products?
What could be the reason?
Solution:
You need to select “Always recalculate material” in the selection parameters in
the CK40N selection parameters
11) While settling process/production orders the user gets the following message
“Status DLV/TECO was reversed after settlement of period 001 2009”
How to settle this order?
Solution: This problem has occurred because the variance on the order was
settled in the month of January 2009. Thereafter the DLV and TECO status was
removed from the order and a posting was done on the order and a confirmation
cancellation was done in March 2009. This resulted in a balance on the order for
the month of March 2009 and resulted in an error.
To solve proceed as follows:-
a) Use transaction code KO88 and reverse the settlement of January 2009 in
March 2009 by doing the following
www.sapficoconsultant.com Page 43 of 61
b) Now you can settle the balance on the order posted in the month of March
2009.
Profit Center Accounting
1) There are no profit center documents generated for a particular balance sheet
general ledger account. What is the problem and how should this be set right?
Solution: The problem is because this particular balance sheet account is not
maintained in the transaction code 3KEH (Default for balance sheet account) by
the FICO consultant. This is a configuration error. This GL code should be
maintained with a default profit center. To correct the problem the user needs to
pass a single entry only in the Profit center accounting (PCA) module using
transaction code 9KE0.
2) Profit center distribution cycles have been executed but there still exists
balance on the corporate profit center. The corporate profit center balance is
allocated to the product profit center, but in this month it is not allocated for a
particular gl code. What could be the reason?
Solution: Check using transaction code KE5Z the exact gl code which is not
allocated. Check the cycle whether it is variable or fixed. If it is variable then see
www.sapficoconsultant.com Page 44 of 61
that the tracing factors are correctly maintained. If everything looks fine, check
the GL code master data. The GL is blocked for posting and that is the cause of
problem.
3) Profit center needs to be changed in the material master, because of change
in the business set up. What are the steps to be undertaken to change the profit
center?
Solution:
Ideally if there are mass changes in the profit center in material master, then
there must be program developed to change the profit centers in all the open
process orders, open sales orders, open purchase orders.
In case only a single material is to be changed then do the following steps:-
a) Change the profit center in the material master (transaction code MM02)
or transaction code MM17 – Mass maintenance
b) Find all open sales orders and change the profit center (transaction code
VA02)
c) Find all open process orders and change the profit center (transaction
code COR2)
d) Find all the open purchase orders and change the profit center using SAP
Note number 141009 (Program ZECPCAEK)
e) Post a profit center entry for transfer of profit center balance from the old
profit center to new profit center using the inventory balance sheet gl
codes (transaction code 9KE0)
4) The balance for Receivables/Payables is incorrect in the transaction code
S_ALR_87013343 - Profit Center: Receivables and S_ALR_87013344 - Profit
Center: Payables. What is the problem?
Solution: This problem is because the balance sheet adjustment program
(transaction code F.5D) is not executed. The user needs to execute F.5D
transaction code for the respective company code. The balance will then be
correct for this report.
5) The report S_ALR_87013336 - Profit Center Group: Balance Sheet Accounts
Plan/Actual does not show correct figures for Receivables and Payables, even
though F.5D transaction code is executed. What is the problem?
Solution: The problem is because receivable and payables have not been
transferred to the profit center accounting module. Use transaction code 1KEK –
Transferring Payables/Receivables to transfer the balance to PCA module.
Thereafter you can see the correct balance in this report.
6) There are certain Documents posted from SD module in the FI module, but no
posting has happened for a certain balance sheet provision account in the profit
center accounting module. What is the problem and how can it be solved?
Solution: The problem is because this balance sheet gl code is not maintained in
configuration transaction code 3KEH in the profit center accounting module by
www.sapficoconsultant.com Page 45 of 61
the support consultant. The support consultant needs to maintain 3KEH setting
for this balance sheet gl code. Thereafter to update the profit center accounting
module for this gl code for SD billing documents execute transaction code 1KE9.
You need to update the company code, sales organization and the SD Billing
document number and billing date
Remove the test run and it will update the line item in profit center accounting
module. Sometimes the PCA line item is not generated so you will have to
uncheck and execute. This will now generate double
posting for all the other line item in the PCA module. To reverse this double
posting select , and again execute this transaction code for this
billing document. The double postings will now be reversed.
7) There are double postings happening in the accounts receivable and accounts
payable in the profit center accounting module. What is the problem and how to
stop it?
Solution: This is because the accounts receivables and accounts receivable GL
account (reconciliation account) is maintained in the configuration transaction
www.sapficoconsultant.com Page 46 of 61
code 3KEH. Thus the posting to customer and vendor is posted online to profit
center accounting module. Further at the month end when transaction code
1KEK is again executed duplicate posting happens to the profit center accounting
module. Support consultant must remove the reconciliation accounts from the
3KEH configuration. This will stop the double postings into the profit center
accounting module online.
Profitability Analysis
1) You are in KE30 transaction code. You do not get a list or drop down (F4) for
the available reports in KE30? What could be the reason?
Solution:
This happens when both accounting and costing based COPA is active.
In this case in the users‘s user parameter the accounting based COPA must be
active.
Use transaction code KEBC and select costing based COPA
2) KE30 report execution is giving a run time error? What is the issue?
Solution:
Steps to do away with the run time error:-
a) Run program S_ALR_87099920 - Create Automatic Proposal for
Summarization Levels for the past 3 months data. System will suggest a
summarization levels, create those levels.
b) Manually review the summarization levels through transaction code
S_ALR_87005563 - Define Summarization Levels and select characteristics
which require summarization and which do not require summarization. Generally
product hierarchies, material group, trading partner require summarization
therefore make it blank. The characteristics which do not require summarization
should be marked with *. Review each of the summarization level. Once you do
changes the levels will be with status “To be created”. Save these levels. After
saving it will have status "Active without data"
c) Execute transaction code KEDU with the new levels and selection Build new
levels in background. The updating and building of new levels will take couple of
hours. Once the levels are updated the status will be "Active", thereafter again
schedule this transaction code KEDU with update selection for every half an hour
update of the delta data.
The problem should be resolved, if the problem still continues pl. again review
the summarization level and follow steps 2 to 4 again
www.sapficoconsultant.com Page 47 of 61
3) It is observed that there is always a rounding off difference between the Cost
of goods sold posting done in FI module and the COPA module for a finished
goods. This often results in a difference between the FI and the COPA module at
the month end? What is the cause of such difference and how can it be
permanently rectified?
Solution: Posting in FI module is triggered based on the price and the price
control (S or V) in the material master. Thus a COGS posting in the FI module for
100 kgs of finished goods will be 100kgs * 101.25 (std. price existing in the
material master = 10125 INR, while the posting in the COPA module is picked up
from the released standard cost estimate of the product. The standard cost in the
COPA module is broken down further into Raw Material cost, Manufacturing cost
fixed and Manufacturing costing variable. This break down is possible by picking
up cost from the relevant cost component structure of the standard cost estimate
of the product. This break down some times results in rounding off difference
between posting in FI module and the COPA module.
To do away with this problem the following solution is recommended:-
a) Assign condition type VPRS (cost condition type available in SD module) to a
value field e.g. VV055 in the COPA module using transaction code KE4I.
b) Activate user exit COPA0002 in the COPA module with EXIT_NR value ‘U02’.
In this user exit calculate the difference between the value field VV055 and the
value fields updating the COPA module for COGS (e.g. RM costs VV015, Fixed
Mfg. cost VV017 and Variable cost VV016). The difference if any will be updated
in the value field VV055.
The code will be as follows:-
LINEITEM-VV055 = LINEITEM-VV055 - (LINEITEM-VV015 + LINEITEM-VV016
+ LINEITEM-VV017)
c) In the transaction code KE4U assign the user exit ‘U02’ as sequence 2 for
actual valuation.
www.sapficoconsultant.com Page 48 of 61
After doing the above, there will be no difference between the COGS posted in
the FI and the COPA module.
4) Certain wrong characteristics have been posted in the COPA module, these
characteristics needs to be corrected. How can this be done?
Solution: Use transaction code KE26 to correct the wrong COPA characteristics.
5) A difference between the FI and the COPA module has arisen. On a deeper
analysis it was found that a COPA document was not generated. The document
was not generated due to a bug in system. How do you update the posting only
in the COPA module now?
Solution: You can post a COPA document using transaction code KE21N. This
will update the COPA module only. This will not post any entry in the Profit center
accounting module.
6) A user while doing a sales planning in COPA wants to simulate and check the
standard costs that will be picked up during COPA planning. How can he do that
do that?
Solution. The user needs to use transaction code KE21S, where in the user
needs to update the point of valuation 03 (manual planning), record type e.g. F
version e.g. 0 , posting date in the initial selection.
In the characteristic update company code, product and plant. In value fields
update the sales gross sales qty, sales unit, Gross sales value and click on
. Based on the sales quantity system will fetch the standard cost
estimate valid as on the posting date and will update in the relevant value fields.
Thus you can simulate the valuation of Cost of goods sold.
7) A proforma invoice document or credit note is posted in the SD module for
finished goods. This updates the quantity and Cost of goods sold (COGS) in the
COPA module. No posting for COGS happens in the FI module. This causes a
difference between the FI and the COPA module. What is the reason for just
wrong updation of quantity and COGS in the COPA module?
Solution: The setting for reset of quantity and the COGS value fields are not
maintained in the COPA module. Update the setting using transaction code
KE4W with Billing type, value fields (for quantity, COGS). This will then stop the
quantity and COGS posting in COPA for those billing types.
www.sapficoconsultant.com Page 49 of 61
8) A user while posting a document from FI to a profitability segment (COPA)
wants certain characteristic mandatory for a certain set of general ledger
accounts. How can this be made mandatory?
Solution: Standard SAP configuration through transaction code KE4G and
KEVG2 only permits an assignment to Business transaction and record types. It
does not permit any assignment of characteristic group to value fields.
It is only possible to map this requirement using a user exit in COPA. User exit
COPA0003 (Enhancement for assignment to profitability segment (CO-PA)),
function module EXIT_SAPLKEAK_001 (User Exit for Determining the
Characteristic Group) INCLUDE ZXKKEU05. This exit will then be called during
entry. A table needs to be created which update all the relevant parameters like
Operating concern
Business transaction
Value field Name
Company code
Business group
Characteristic group.
This table needs to be maintained with all the values. A relevant characteristic
group will be configured using transaction code KEPA and assigned to this value
field.
9) It is found that when SD billing documents are posted to FI and COPA. The
documents posted in COPA document are posted with incorrect signs. The
debits postings such as sales deductions are posted with a positive sign in COPA
module. Further the credit postings (such as sales revenues) are also posted
with a positive sign in COPA module. To clarify an example the Gross sales
condition type has 2 figures +100 and -20. The posting in FI module is 80 INR,
while in COPA module it is posted as 120 INR. This causes a mismatch between
the FI and the COPA module for Gross sales. What is the cause of the problem
and how can it be rectified?
Solution: This problem is because the condition type in SD is defined as handling
both positive and negative figures, but in COPA module the transfer +/- sign
indicator has not been switched on.
The condition type in SD is defined as handling both positive and negative in
transaction code v/06
www.sapficoconsultant.com Page 50 of 61
Here this condition type is handling both positive and negative
figures .
Therefore when you assign this condition type in COPA module using transaction
code KE4I then the transfer +/- should be switched on as shown below:-
This will result in correct signs getting posted to the COPA module.
10) Invariably there are some difference in the FI and the COPA module. Often it
becomes difficult to reconcile the FI and COPA module. What is the fastest and
easiest way to reconcile FI and the COPA module?
Solution: To reconcile FI and COPA module a report needs to be designed which
will fetch data from the FI module from the FI total tables GLT0 and match it with
the costing co-pa based tables CE3XXXX and CE4XXXX. The various position of
the GL codes and value field can be arranged in a database table. The GL codes
must be arranged as cost element groups forming a part of value flow into the
various value fields. This cost elements groups which are assigned to the value
for FI/MM postings in transaction code KEI2 should be referred in this database
table. Such a report will be able to reconcile and find out the exact difference.
www.sapficoconsultant.com Page 51 of 61
11) User wants to check certain characteristics which have been updated for
Gross sales value field. How can he do so?
Solution: Use transaction code KE24 - Actual Line item display to display various
characteristic updated in the Gross sales value field.
12) There is a complex derivation of characteristics to be done, how to handle
this?
Solution: Complex derivation in COPA is not possible through standard SAP. The
support consultant needs to activate COPA user exit and would need ABAP help
to write a code in this exit.
The user exit is maintained through transaction code SMOD
Click
www.sapficoconsultant.com Page 52 of 61
Double click
Double click . A code needs to be written in this function
module
www.sapficoconsultant.com Page 53 of 61
Under include ZXKKEU1. Under this include a step id needs to be called.
This step id should be assigned in the KEDR derivation step rule as shown below
www.sapficoconsultant.com Page 54 of 61
SD – FI – COPA
1) SD Billing documents while release to accounting gets an error due to
standard cost estimate not being released? What are the steps to correct the
error?
Solution:
1) Reverse the billing document – VF11
2) Reverse the delivery document – VF09
3) Create and release the standard cost estimate – CK11N, CK24
4) Again create delivery – VL01N
5) Again create billing document – VF01
The above steps will ensure that correct & released standard cost flows into the
Accounting & COPA module, and will not cause difference.
2) You get an error while releasing the SD billing document “Accounting
document exceeds 999 line items in the SD-FI accounting interface”?
The billing document contains around 34 items which has its own condition
types such as gross price, discounts, taxes etc.? What needs to be done?
Solution:
The problem is because of the sales orders has huge number of material around
34 and they in turn has its condition types such as gross price, discounts, taxes.
This actually will generate an Accounting document with more than 999 line
items. An accounting document in SAP can have a maximum 999 line items
only. To do away with this problem, the single billing document has to be
split into multiple billing documents.
1) Cancel the billing document
2) Go to VL02N change delivery document and block the majority of the delivery
item under the tab financial processing and set billing block - Calculation
missing. Do not set billing block for around 10 items
3) Do billing using VF01 with this delivery document, the system will now
propose billing for the 10 items only. Save this billing document and release to
accounting.
4) Again go to the delivery document and remove the billing blocks for next 10
items and proceed with the billing. Thus multiple billing documents will be
created for a single delivery.
www.sapficoconsultant.com Page 55 of 61
General trouble shooting
1) User was executing a batch input session online, by mistake the user instead
of typing /bend used /nex and got logged out. The user then again logged in and
finds that the batch input session status shows as "In processing". How does the
user process this session now?
Solution:
In SM35, select the session and click on the menu bar Session --> Release. The
session status will now change from "inprocess" to "New". The user can now
process the session and post the balance entries.
2) Recently the quality system was refreshed with data from production system.
After the refresh when a user tries to check an accounting document for a
material document using transaction code MB03, a message is displayed
“Material document does not include an accounting document”. But there
actually exists an accounting document, but it is not being displayed. What is
the problem and how can it be solved?
Solution: The problem is because of client copy (Production to Quality copy).
Following a client copy, entities still have the old logical system of the source
client. Consequently, you can no longer branch to the relevant accounting
document when you display the material document in transaction MB03.
To do away with this problem the support consultant needs to do the following:-
a) Open the Quality system client with transaction code SCC4 and change it to
the following
And save the changes
www.sapficoconsultant.com Page 56 of 61
b) Use transaction code OKKP1 – ALE Distribution for Cost Accounting and
change the logical system from the production system to the quality system
for each of the active controlling areas.
c) Close the quality client with SCC 4 and set it back to
d) Execute transaction BDLS
www.sapficoconsultant.com Page 57 of 61
Update the old logical system name and the new logical system name
Update the following
Double click on
Double click on
Uncheck the test run and execute the program in background. The program will
change the logical systems in all the transaction tables such as MKPF, BKPF etc.
3) An FI document while posting is getting terminated and the following message
is received
www.sapficoconsultant.com Page 58 of 61
The FI document is not saved. What could be the problem and how to post this
document?
Solution: In this case check transaction code SM13 to check the terminated log
www.sapficoconsultant.com Page 59 of 61
Select
www.sapficoconsultant.com Page 60 of 61
Double click
Again double click
www.sapficoconsultant.com Page 61 of 61
Here this error is because of table BSET. BSET is a tax internal cluster table.
The error is because the user is updating tax code V0 (0%) in a gl line item. The
GL code currently has a setting input tax allowed but no posting without tax
allowed. The GL code needs to be removed with the indicator input tax allowed
or needs to be set posting without tax allowed.

Weitere ähnliche Inhalte

Was ist angesagt?

Sap FICO complete end user manual
Sap FICO complete end user manual Sap FICO complete end user manual
Sap FICO complete end user manual learnstraightsap
 
Sap fico tutorial
Sap fico tutorialSap fico tutorial
Sap fico tutorialus268612
 
SAP FI AP: Configuration & End User Guide
SAP FI AP: Configuration & End User GuideSAP FI AP: Configuration & End User Guide
SAP FI AP: Configuration & End User Guidesapdocs. info
 
Accenture fico interview-questions
Accenture fico interview-questionsAccenture fico interview-questions
Accenture fico interview-questionsprabhakar vanam
 
SAP Account determination MM-FI by Odaiah Pelley - 1
SAP Account determination MM-FI by Odaiah Pelley - 1SAP Account determination MM-FI by Odaiah Pelley - 1
SAP Account determination MM-FI by Odaiah Pelley - 1Intelligroup, Inc.
 
SAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infoSAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infosapdocs. info
 
SAP FICO overview
SAP FICO overviewSAP FICO overview
SAP FICO overviewPeter Ezzat
 
Quick sap co configuration Internal Order
Quick sap co configuration Internal OrderQuick sap co configuration Internal Order
Quick sap co configuration Internal OrderCapgemini
 
SAP Bank Accounting - EBS Compilation by Techlorean.pdf
SAP Bank Accounting - EBS Compilation by Techlorean.pdfSAP Bank Accounting - EBS Compilation by Techlorean.pdf
SAP Bank Accounting - EBS Compilation by Techlorean.pdferikotsuji
 
New GL parallel ledgers in asset accounting
New GL parallel ledgers in asset accounting New GL parallel ledgers in asset accounting
New GL parallel ledgers in asset accounting Hari Krishna
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitEdwin Weijers
 
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...John Jordan
 
Sap auc internal orders as investment measures
Sap auc internal orders as investment measuresSap auc internal orders as investment measures
Sap auc internal orders as investment measuresSURESH BABU MUCHINTHALA
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Documentsapdocs. info
 

Was ist angesagt? (20)

Sap FICO complete end user manual
Sap FICO complete end user manual Sap FICO complete end user manual
Sap FICO complete end user manual
 
Sap fico tutorial
Sap fico tutorialSap fico tutorial
Sap fico tutorial
 
SAP FI Module
SAP FI ModuleSAP FI Module
SAP FI Module
 
Sap funds management training
Sap funds management trainingSap funds management training
Sap funds management training
 
Sap fi overview
Sap fi overviewSap fi overview
Sap fi overview
 
SAP FI AP: Configuration & End User Guide
SAP FI AP: Configuration & End User GuideSAP FI AP: Configuration & End User Guide
SAP FI AP: Configuration & End User Guide
 
Accenture fico interview-questions
Accenture fico interview-questionsAccenture fico interview-questions
Accenture fico interview-questions
 
SAP Account determination MM-FI by Odaiah Pelley - 1
SAP Account determination MM-FI by Odaiah Pelley - 1SAP Account determination MM-FI by Odaiah Pelley - 1
SAP Account determination MM-FI by Odaiah Pelley - 1
 
SAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infoSAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.info
 
SAP FICO overview
SAP FICO overviewSAP FICO overview
SAP FICO overview
 
Asset sales
Asset salesAsset sales
Asset sales
 
1668146695188.pdf
1668146695188.pdf1668146695188.pdf
1668146695188.pdf
 
Quick sap co configuration Internal Order
Quick sap co configuration Internal OrderQuick sap co configuration Internal Order
Quick sap co configuration Internal Order
 
SAP Bank Accounting - EBS Compilation by Techlorean.pdf
SAP Bank Accounting - EBS Compilation by Techlorean.pdfSAP Bank Accounting - EBS Compilation by Techlorean.pdf
SAP Bank Accounting - EBS Compilation by Techlorean.pdf
 
New GL parallel ledgers in asset accounting
New GL parallel ledgers in asset accounting New GL parallel ledgers in asset accounting
New GL parallel ledgers in asset accounting
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration Cockpit
 
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
SAP Accounting powered by SAP HANA – Moving controlling and finance closer to...
 
Sap auc internal orders as investment measures
Sap auc internal orders as investment measuresSap auc internal orders as investment measures
Sap auc internal orders as investment measures
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Document
 
SAP S4 HANA.pptx
SAP S4 HANA.pptxSAP S4 HANA.pptx
SAP S4 HANA.pptx
 

Andere mochten auch

inter-company-reconciliation in SAP
inter-company-reconciliation in SAPinter-company-reconciliation in SAP
inter-company-reconciliation in SAPRajeev Kumar
 
Co pa power point
Co pa power pointCo pa power point
Co pa power pointkrnprjp
 
Improving Intercompany Reconciliation for a Faster Close
Improving Intercompany Reconciliation for a Faster CloseImproving Intercompany Reconciliation for a Faster Close
Improving Intercompany Reconciliation for a Faster CloseFindWhitePapers
 
Warranty processing recall config_guide
Warranty processing  recall config_guideWarranty processing  recall config_guide
Warranty processing recall config_guidevinayk_35919
 
Warranty processing authorization config_guide
Warranty processing  authorization config_guideWarranty processing  authorization config_guide
Warranty processing authorization config_guidevinayk_35919
 
CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3cristito maghanoy
 
New a 481 month-end closing process in sap w-exh_final
New a 481 month-end closing process in sap w-exh_finalNew a 481 month-end closing process in sap w-exh_final
New a 481 month-end closing process in sap w-exh_finalitzi2001
 
Warranty processing recall config_guide
Warranty processing  recall config_guideWarranty processing  recall config_guide
Warranty processing recall config_guidevinayk_35919
 
Account receivable manager
Account receivable managerAccount receivable manager
Account receivable managerhughjackman261
 
Receivables
ReceivablesReceivables
Receivablesmscuttle
 
Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...
Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...
Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...Proformative, Inc.
 
Sap fico bbp sample document pdf new!
Sap fico bbp sample document pdf new!Sap fico bbp sample document pdf new!
Sap fico bbp sample document pdf new!Sanju Sivan, MBA
 
Cross charge and Inter Company billing
Cross charge and Inter Company billingCross charge and Inter Company billing
Cross charge and Inter Company billingAtul Sadanand
 
end to end process flow
end to end process flowend to end process flow
end to end process flowRicha Dwivedi
 
Steel India Limited Business Blue print
Steel India Limited Business Blue printSteel India Limited Business Blue print
Steel India Limited Business Blue printLav Memories
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsMangesh Ambardekar
 
Fico bbp final
Fico bbp final Fico bbp final
Fico bbp final poonam_sri
 

Andere mochten auch (20)

inter-company-reconciliation in SAP
inter-company-reconciliation in SAPinter-company-reconciliation in SAP
inter-company-reconciliation in SAP
 
Co pa power point
Co pa power pointCo pa power point
Co pa power point
 
Improving Intercompany Reconciliation for a Faster Close
Improving Intercompany Reconciliation for a Faster CloseImproving Intercompany Reconciliation for a Faster Close
Improving Intercompany Reconciliation for a Faster Close
 
Megaupload sap
Megaupload sapMegaupload sap
Megaupload sap
 
Warranty processing recall config_guide
Warranty processing  recall config_guideWarranty processing  recall config_guide
Warranty processing recall config_guide
 
Warranty processing authorization config_guide
Warranty processing  authorization config_guideWarranty processing  authorization config_guide
Warranty processing authorization config_guide
 
CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3
 
New a 481 month-end closing process in sap w-exh_final
New a 481 month-end closing process in sap w-exh_finalNew a 481 month-end closing process in sap w-exh_final
New a 481 month-end closing process in sap w-exh_final
 
Warranty processing recall config_guide
Warranty processing  recall config_guideWarranty processing  recall config_guide
Warranty processing recall config_guide
 
Account receivable manager
Account receivable managerAccount receivable manager
Account receivable manager
 
Receivables
ReceivablesReceivables
Receivables
 
Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...
Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...
Reinventing the Record-to-Report Process for Worry-Free Governance, Risk & Co...
 
Sap fico bbp sample document pdf new!
Sap fico bbp sample document pdf new!Sap fico bbp sample document pdf new!
Sap fico bbp sample document pdf new!
 
Cross charge and Inter Company billing
Cross charge and Inter Company billingCross charge and Inter Company billing
Cross charge and Inter Company billing
 
end to end process flow
end to end process flowend to end process flow
end to end process flow
 
Steel India Limited Business Blue print
Steel India Limited Business Blue printSteel India Limited Business Blue print
Steel India Limited Business Blue print
 
Intercompany config
Intercompany configIntercompany config
Intercompany config
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -Basics
 
Fico bbp final
Fico bbp final Fico bbp final
Fico bbp final
 
Sudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print SampleSudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print Sample
 

Ähnlich wie Fico troubleshooting

SAP FICO Interview Questions
SAP FICO Interview QuestionsSAP FICO Interview Questions
SAP FICO Interview QuestionsAjeesh Sudevan
 
SAP - Vendor Entries
SAP - Vendor EntriesSAP - Vendor Entries
SAP - Vendor EntriesKumar M.
 
SAP FICO Interview questions
SAP FICO Interview questionsSAP FICO Interview questions
SAP FICO Interview questionsIT LearnMore
 
SAP Accounts Payable Payment | http://sapdocs.info
SAP Accounts Payable Payment | http://sapdocs.infoSAP Accounts Payable Payment | http://sapdocs.info
SAP Accounts Payable Payment | http://sapdocs.infosapdocs. info
 
Sap fi interview question
Sap fi interview questionSap fi interview question
Sap fi interview questionsjoshi1
 
Systems Admin - Deposit Refund Process
Systems Admin - Deposit Refund ProcessSystems Admin - Deposit Refund Process
Systems Admin - Deposit Refund ProcessSteve Best
 
Qs2 um en_03_financial_account_to_reconciliation
Qs2 um en_03_financial_account_to_reconciliationQs2 um en_03_financial_account_to_reconciliation
Qs2 um en_03_financial_account_to_reconciliationkhayer
 
procurement process-documentation-draft-20150515
procurement process-documentation-draft-20150515procurement process-documentation-draft-20150515
procurement process-documentation-draft-20150515Rawntech Mak
 
Vendor Master Training Provides by Metaphor Consulting
Vendor Master Training Provides by Metaphor ConsultingVendor Master Training Provides by Metaphor Consulting
Vendor Master Training Provides by Metaphor ConsultingMetaphor Consulting
 

Ähnlich wie Fico troubleshooting (20)

Question
QuestionQuestion
Question
 
SAP FICO Interview Questions
SAP FICO Interview QuestionsSAP FICO Interview Questions
SAP FICO Interview Questions
 
SAP - Vendor Entries
SAP - Vendor EntriesSAP - Vendor Entries
SAP - Vendor Entries
 
Microsoft Convergence Presentation
Microsoft Convergence PresentationMicrosoft Convergence Presentation
Microsoft Convergence Presentation
 
SAP FICO Interview questions
SAP FICO Interview questionsSAP FICO Interview questions
SAP FICO Interview questions
 
Fico notes
Fico notesFico notes
Fico notes
 
SAP Accounts Payable Payment | http://sapdocs.info
SAP Accounts Payable Payment | http://sapdocs.infoSAP Accounts Payable Payment | http://sapdocs.info
SAP Accounts Payable Payment | http://sapdocs.info
 
Sap fi interview question
Sap fi interview questionSap fi interview question
Sap fi interview question
 
Fico
FicoFico
Fico
 
Iinsight 5.1.0 release notes
Iinsight 5.1.0 release notesIinsight 5.1.0 release notes
Iinsight 5.1.0 release notes
 
Systems Admin - Deposit Refund Process
Systems Admin - Deposit Refund ProcessSystems Admin - Deposit Refund Process
Systems Admin - Deposit Refund Process
 
SAP QA.pptx
SAP QA.pptxSAP QA.pptx
SAP QA.pptx
 
Ban k config
Ban k configBan k config
Ban k config
 
Qs2 um en_03_financial_account_to_reconciliation
Qs2 um en_03_financial_account_to_reconciliationQs2 um en_03_financial_account_to_reconciliation
Qs2 um en_03_financial_account_to_reconciliation
 
procurement process-documentation-draft-20150515
procurement process-documentation-draft-20150515procurement process-documentation-draft-20150515
procurement process-documentation-draft-20150515
 
Dora ppt2(fico)
Dora ppt2(fico)Dora ppt2(fico)
Dora ppt2(fico)
 
Computerised sage 100
Computerised sage 100Computerised sage 100
Computerised sage 100
 
Fico
FicoFico
Fico
 
Dunning document
Dunning documentDunning document
Dunning document
 
Vendor Master Training Provides by Metaphor Consulting
Vendor Master Training Provides by Metaphor ConsultingVendor Master Training Provides by Metaphor Consulting
Vendor Master Training Provides by Metaphor Consulting
 

Kürzlich hochgeladen

What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Kürzlich hochgeladen (20)

What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

Fico troubleshooting

  • 1.
  • 2. www.sapficoconsultant.com Page 2 of 61 © 2009 sapficoconsultant.com. All rights reserved. No part of this material should be reproduced or transmitted in any form, or by any means, electronic or mechanical including photocopying, recording or by any information storage retrieval system without permission in writing from www.sapficoconsultant.com “SAP” is a trademark of SAP AG, Neurottstrasse 16, 69190 Walldorf, Germany. SAP AG is not the publisher of this material and is not responsible for it under any aspect. Warning and Disclaimer This product is sold as is, without warranty of any kind, either express or implied. While every precaution has been taken in the preparation of this material, www.sapficoconsultant.com assumes no responsibility for errors or omissions. Neither is any liability assumed for damages resulting from the use of the information or instructions contained herein. It is further stated that the publisher is not responsible for any damage or loss to your data or your equipment that results directly or indirectly from your use of this product.
  • 3. www.sapficoconsultant.com Page 3 of 61 Table of contents Introduction........................................................................................................................4 General Ledger.................................................................................................................5 Accounts Payable/ Accounts Receivable/ Logistics Invoice Verification..............11 Bank Accounting.............................................................................................................18 Asset Accounting............................................................................................................24 Cost Center Accounting ................................................................................................30 Product Costing ..............................................................................................................39 Profit Center Accounting ...............................................................................................43 Profitability Analysis.......................................................................................................46 SD – FI – COPA .............................................................................................................54 General trouble shooting ...............................................................................................55
  • 4. www.sapficoconsultant.com Page 4 of 61 Introduction This document is prepared to help you support the users whenever they face problems. This document is prepared by a team of fico support consultants who have themselves faced these problems and solved them. You too can make such a list of troubleshooting problems whenever you face a different kind of problem. You then can refer them later on when you face a similar problem again. Read on and you will find this document very useful.
  • 5. www.sapficoconsultant.com Page 5 of 61 General Ledger 1) You get an error message while reversing a document through transaction code FB08 “Document includes already cleared items - reversal not possible"? The customer line item shows no clearing document. Solution: When in the transaction code FB08, select document display and double click on each of the line item of the document, to find out if they have been cleared by some other clearing document. Generally bank line items are cleared by another clearing document. You will find a clearing document number in the line item. Use this clearing document and update it in transaction code FBRA to reverse and reset the clearing document. If there is more than one clearing document in the original document, then you need to reset and reverse all of them. 2) You get an error message “No input tax code allowed” while doing a document entry. Solution: Edit the GL code using transaction code FS00 and update * (all taxes allowed) or update the input tax indicator. 3) Users want to do a posting in special period. In FB50 the period screen is not visible. What needs to be done? Solution: Click on Editing options in transaction code FB50 or use transaction code FB00. In the tab document entry select and select and click on save button. Click back and again restart FB50. The user can now see the period field 4) User has posted an FI document. He notes down the Accounting document number generated. He then tries to access the document using transaction code FB03. He finds that the document number does not exists? What is the problem? Solution: This sometimes happens in SAP when the document number gets generated in SAP but the data is not saved. To check for all such missing document number,
  • 6. www.sapficoconsultant.com Page 6 of 61 execute the transaction code S_ALR_87012342 (Gaps in document number assignment). This probably happens when the user is working for a long time with a single document. The user needs to again post the document. 5) There exist a foreign currency debit open item with 100 USD as the currency and the local currency being 4900 INR. The user now tries to clear this debit item with an incoming payment received in 4900 INR. The system generates an exchange rate difference for this entry since the exchange rate maintained for USD INR is 48.5 on the date of posting incoming payment. No exchange rate needs to be posted for this, what needs to be done? Solution: This happens because the configuration setting is not maintained in view V_001_B (Company code global data) or path IMG àFinancial Accounting à Financial Accounting Global Settings à Company Code à Enter Global Parameters and need to select . After maintaining this configuration no exchange rate difference will be generated when you use local currency for clearing. 6) User wants to directly maintain the Financial statement version on the production system using transaction code FSE2, currently it is not possible to maintain it. How to do it? Solution: Configure table/view “V_T100C” for application area “FE” message “146”. You can either change the message type (to I or S) or you can switch it off completely (-)
  • 7. www.sapficoconsultant.com Page 7 of 61 7) It is observed in Automatic clearing of GR/IR accounts using transaction code F.13 most of the items are not getting cleared. The apparent reason being that blanket purchase orders are being used, which results in balance being uncleared at purchase order line item level as can be seen below.
  • 8. www.sapficoconsultant.com Page 8 of 61 The clearing rule is purchasing document and line item. How can these documents be cleared? Solution: In transaction code F.13 Automatic clearing the user needs to select . This selection will clear those documents with an additional clearing criteria which is material document. The material document is update in reference 3 field. This selection is more important when blanket purchase orders are raised. The clearing will now happen as shown below:-
  • 9. www.sapficoconsultant.com Page 9 of 61 8) With the above solution the user is now trying to clear the Freight clearing and custom clearing accounts for blanket purchase orders. Even though he selects still no clearing happens for such items which can be cleared within the purchase order line item as can be seen below
  • 10. www.sapficoconsultant.com Page 10 of 61 Is it possible to clear the above documents? Solution: In the planned delivery costs such as freight, custom clearing it is not possible to use since no material document is updated in reference 3 field in the invoice documents. Hence it is not possible to clear such documents unless the group becomes zero. Another option is to change the configuration in transaction code OB74 and include another criterion PSWBT (GL amount) besides EBELN and EBELP. This will probably result in more clearing. 9) The trial balance report S_ALR_87012277 - G/L Account Balances does not show correct figures. It does not show opening balance. What is the problem? Solution: This is because the GL balance carry forward program has not been executed. Execute transaction code F.16 – Balance carryforward and carry forward the GL account balance to the current year. 10) The GL balance carry forward transaction code F.16 has been executed. After doing the carry forward there were again some entries posted in the prior years. Should the carry forward transaction be executed again? Solution: No, there is no need to execute the carry forward transaction code again. The balance will automatically get carry forward each time the entries are posted to the previous year. The program needs to be executed only once per year.
  • 11. www.sapficoconsultant.com Page 11 of 61 Accounts Payable/ Accounts Receivable/ Logistics Invoice Verification 1) User is executing a payment program using transaction code F110 for a vendor. The open items for the vendor are not getting selected in the payment proposal. While displaying payment proposal he gets the following error message “Company codes XXXX do not appear in proposal 19.02.2009 AM2; correct” What is the problem and how to solve it? Solution: Most of the times the problem in the payment proposal is displayed by checking the proposal log. Check the proposal log by clicking on the icon . In this case you find that the vendor is contained in another proposal for e.g. AM1 17.02.2009. User needs to delete the earlier payment proposal AM1 dated 17.02.2009 by using transaction code F110. Take a drop down or press F4 button in the run date and select proposal AM 17.02.2009. Thereafter click Edit à Proposal à Delete. The user can now run the payment proposal AM2. 2) In transaction code F110 user has updated all the parameters and saved it. The Status shows Parameters have been entered. Proposal has been released 20.02.2009 01:14:16. There are no icons appearing for scheduling the proposal nor is the payment proposal being created. What is the problem? Solution: The problem is because the payment proposal is still lying as released in the background job. Go to the background job monitor using transaction code SM37 and update job status . You will find that the job name F110-20090219-AM1 – X as Released only. Select the job and click Job à Releasedà Scheduled. The job status becomes Scheduled. Click on and then select immediate. Click on refresh the status now changes from ready to finished. Now go back to the payment program and click . Now you will find that your payment proposal has been created. The problem sometimes occurs because the
  • 12. www.sapficoconsultant.com Page 12 of 61 background job of payment proposal creation is given a Job class C ( Low priority) and that is the reason the proposal is not automatically created. 3) Payment documents while posting through automatic payment program (transaction code F110) got terminated due to server shut down. How to start the abnormally terminated payment run? Solution: In transaction code F110 use path from the menu bar Edit --> Payments --> After Termination --> Draw up again. You can now post the terminated payment from the point where it had abruptly ended. 4) Payment documents posting through automatic payment program got terminated due to server shut down. Few of the payments document have been posted. User now reverses this payment documents which have been posted. He tries to create another payment run with the same selection parameters. The new payment run cannot be created due to the fact the balance payment documents are still to be posted from the terminated run? What is the recourse now? Solution: In transaction F110 use path from the menu bar Edit --> Payments --> After Termination --> Draw up again. You can now post the terminated payment from the point where it had abruptly ended. The payment list generated through this using DME will only contain the balance payment. Create another payment run to post the reversed document. 5) User is trying to make a payment to a vendor and is unable to make payment to vendor as he gets the following error message “Message F5 787 (item(s) not activated due to inconsistent withholding tax information).” What is the problem and how to solve it? Solution: This problem happens when after document entry, you have changed withholding tax information in the vendor master record or you have changed withholding tax information for the company code. You need to run a program called as RFWT0010 using transaction code SE38. Update the following information such as vendor master, company code, document number and fiscal year, remove the test run and execute.
  • 13. www.sapficoconsultant.com Page 13 of 61 6) All items linked to an invoice through down payment clearing, partial clearing or credit memos linked to the invoices are not activated when any of the items are selected. What could be the problem? Solution: In the editing options (FB00) under tab Open items select or click and save. All the linked open items will now be selected. 7) Wrong payment terms were updated in the sales view of the customer master. The billing was done and it was realized subsequently that the due dates calculated were wrong, due to wrong baseline date.? How to rectify this problem now ? Solution: For billing documents already released into FI module you can manually change the payment terms in the FI document using transaction code FB02. You need to change the baseline date, if baseline date is wrong and also
  • 14. www.sapficoconsultant.com Page 14 of 61 change the payment term. You can save the changes. For future documents change the customer master data with the correct payment terms and also change all open sales orders with the correct payment terms. 8) In the purchase order wrong custom duty was defined, based on which GR/DCGR was posted and DCIN (Delivery cost invoice) for the prime vendor was posted. The DCGR now needs to be reversed and set right with the correct custom duty Solution: Follow the given steps 1.Reverse the DCIN (Delivery cost Invoice) using tcode MR8M. 2.Reverse the GRN (DCGR) using tcode MIGO 3. Change the PO conditions and proceed with grn and do IV again 9) In MIRO transaction the user wants to book a single Vendor invoice for multiple purchase orders for freight costs. Further he wants to book the invoice in the local currency (the purchase order is raised in foreign currency). Is this possible? Solution: Yes it is possible. In the transaction code MIRO update all the fields such as invoice date, posting date, reference, amount and the local currency e.g. INR then select . Thereafter update the first purchase order number in the po field and press enter. This will fetch the first purchase order details. Thereafter click to update the other multiple pos as shown below:-
  • 15. www.sapficoconsultant.com Page 15 of 61 Click You can now select multiple Purchase orders and book a single vendor invoice 10) User is trying to book a Vendor invoice through transaction code MIRO when he gets the following error message “Moving average price for material 9100001 9101 is negative “and therefore is not able to post the invoice. What is the problem and how can it be solved? Solution: This problem occurs when a Vendor invoice is being booked for an amount which is higher than the GR/IR provision and there is a shortfall of stock coverage to post the difference. This results in a negative moving average price being calculated. The shortfall of stock is due to the stock being issued for consumption. Therefore to do away with this error the consumption posting should be reversed, so that full stock coverage is available. Further if required the earlier Goods receipt posting should be required so that the moving average price effect is removed. The reversal can be done using transaction code MBST or MIGO. 11) While doing Invoice verification using transaction code MIRO, system gives an error as “Check if Invoice already entered under accounting doc no XXXXXXX" in the year 2009. On checking it was found that the document number relates to year 2007 with different invoice number. What is the problem and how can it be solved? Solution: This is because in the Vendor master under the accounting view (payment transactions), the Check double invoice is switched on. But in Logistic Invoice verification the configuration for check co. code, check reference is not set in transaction code OMRDC. 12) In the PO there is no delivery costs planned, vendor has billed for an actual freight amount in invoice. The goods receipts have been done and some of the stocks have been consumed. How to book the additional freight which was not planned in the PO? What will be the accounting treatment of the additional freight amount? Solution: Since the freight is not planned in the PO, the user can book this unplanned delivery costs in tab details
  • 16. www.sapficoconsultant.com Page 16 of 61 The accounting treatment will differ based on the customizing settings:- a) In case a separate GL code is defined in customizing for such unplanned delivery costs, then the amount will automatically get posted to the GL code expense account set up in customizing b) If no gl code is set up then the amount of unplanned delivery costs, the system splits up the delivery costs entered among the individual items, based on the amounts invoiced so far plus those in the invoice being entered. Example Purchase order raised for:- 100 pieces material X 200 pieces material Y 1st invoice received for the purchase order: 50 pieces material X at $ 10.00/piece = $ 500 50 pieces material Y at $ 12.00/piece = $ 600 2nd invoice received for the purchase order: 20 pieces material X at $ 10.00/piece = $ 200 80 pieces material Y at $ 10.00/piece = $ 800 Delivery costs = $ 90 The system divides up the delivery costs in the following ratio: (500 + 200) : (600 + 800) = 700 : 1400 = 1 : 2. Material X is debited for $ 30, material Y for $ 60. 6) User wants to book a custom duty invoice in local currency INR. In transaction code MIRO he updates the invoice date, invoice reference, amount and the purchase order. When he presses enter, the Purchase Order currency USD is automatically updated in the currency field. The field is now not changeable to INR. What needs to be done in order to book the customs invoice in INR(local currency)?
  • 17. www.sapficoconsultant.com Page 17 of 61 Solution: While updating details the currency must be first updated with local currency (INR) before updating the PO details. Once this is done then the currency of INR will not be overwritten by USD. 13) In the GR/IR account there are certain old balances lying since last few years as old as 2006, 2007 as can be seen below:- The user wants to clear the differences on the GR/IR account. What needs to be done? Solution: The difference is on account of a debit balances is probably because of the purchase order being raised for a higher amount and the Goods receipt provision accounted with higher provision amounts. The invoice would have been correctly booked. Another reason for the provision still lying could be because of excess material being received and the vendor has not charged for the excess material and probably will now never charge for it. Since this are provisions will never be utilized this needs to be written off. This adjustment is possible by using transaction code MR11. This transaction code will clear such delivery surplus, invoice surplus etc.
  • 18. www.sapficoconsultant.com Page 18 of 61 Bank Accounting 1) The check length in a house bank is currently 6 digits, these needs to be increased to 7 digits in transaction code FCHI. How to do it? Solution: Execute program RFCHKR00 using transaction code SE38. Here you can specify the company code, bank and account id and the old digit length and the new digit length. The check information will be changed from 6 digits to 7 digits 2) An electronic bank statement was being uploaded through transaction code FF_5 (Import), the upload data was erroneous. The bank statement needs to be deleted. Is it possible? Solution: Yes it is possible to delete the bank statement using program RFEBKA96 in transaction code SE38 Under application take a drop down
  • 19. www.sapficoconsultant.com Page 19 of 61 Click execute Click
  • 20. www.sapficoconsultant.com Page 20 of 61 And then select the one to be deleted and then click on 3) While printing a check through system, the check has got torn on the printer. The user wants to void this check and reprint this check information on another document. How can this be done? Solution: Use transaction code FCH7 – Reprint check. In this transaction code the user needs to update the check to be voided and select the check lot number on which the new check needs to be printed. The screen shot of the transaction code is shown
  • 21. www.sapficoconsultant.com Page 21 of 61 4) The user has printed a check on an incorrect check lot. Therefore the system check number and physical check number is not matching. The user now wants to renumber the check number in the system to the physical check number. How can this be done? Solution: The check number can be reprinted using transaction code FCH4. 5) In the transaction code FF67 – Manual entry bank statement the entry screen has suddenly changed, earlier it was showing company code, house bank, account id but now it shows bank key, bank account number, currency.
  • 22. www.sapficoconsultant.com Page 22 of 61 How can the user get back the old screen? Solution: In the transaction code FF67 on menu bar select Settings à Specifications : Int. bank determination
  • 23. www.sapficoconsultant.com Page 23 of 61 Click . The screen will now change to
  • 24. www.sapficoconsultant.com Page 24 of 61 Asset Accounting 1) The GL account for accumulated depreciation for local reporting does not match with the group depreciation area in transaction code AR01? Solution: Possibly additional retirement posting was done after ASKB was executed. Execute ASKB transaction code and the difference should go.
  • 25. www.sapficoconsultant.com Page 25 of 61 2) Depreciation is already posted for the month. There is an additional addition to asset for the month after the depreciation run. Is it possible to rerun depreciation for this additional addition of asset? Solution: You need to rerun the depreciation run using transaction code AFAB and selecting the option Repeat depreciation run. 3) While executing year end transaction code AJAB (to close asset accounting module) an error is encountered “Depreciation not executed? Solution: This happens in case depreciation was already posted and additional acquisition of assets posted for the depreciated period. The repeat depreciation run was not executed. It is therefore advisable to immediately execute transaction code AJAB after all the asset transactions for the year end including depreciation (AFAB), parallel valuations (ASKB) have been completed. 4) How is depreciation calculated in SAP, when I have changed certain useful life in the asset master? Solution: It is calculated based on Total remaining net book value divide by remaining useful life multiplied by 12 5) The user is getting an error when he tries to execute all asset accounting reports e.g. transaction code AR01 or S_ALR_87011990 (Asset History Sheet) “Fiscal year change not yet made for company code 9101”. What is the problem and how can it be solved? Solution: This problem arises when a new fiscal year begins and the user tries to execute the asset report for the previous year or the current year. This happens because the fiscal year change has not been done in the asset accounting module. The transaction code AJRW – Fiscal year change has to be immediately executed at the beginning of the New Year for this company code. Execute the transaction code in background and the problem will go.
  • 26. www.sapficoconsultant.com Page 26 of 61 6) There is a depreciation which remain unposted on certain assets at the year end closing process and this was realized when the AJAB – Year end close was executed. But the depreciation figures were already reported. Was it essential that this step should have been executed before the balance sheet and profit and loss were finalized? Solution: Yes, in the year end process the transaction code AJAB must be executed before the profit and loss account is finalized. The reason being AJAB checks for all inconsistencies such as unposted depreciation (AFAB), unposted parallel posting (ASKB) and check any other incomplete asset. Therefore you will be required to post all of the aforesaid posting before you can finally execute AJAB. Further by closing asset accounting through AJAB you can stop any wanted entries to assets for previous year. 7) After doing AJAB, is it possible to reopen the previous year for doing asset posting? Solution: Yes, it is possible to reopen the previous year for posting, through transaction code OAAQ. 8) The user has incorrectly retired asset 1001 instead of asset 2001. Can he reverse the retirement? Solution: Yes, the user can reverse the retirement using transaction code AB08.
  • 27. www.sapficoconsultant.com Page 27 of 61 9) Certain value was wrongly capitalized (settled through AUC) to asset 100011 instead of asset 200011. The mistake was realized after a few months, when auditors were conducting audit. Is it now possible to transfer the values from asset 100011 to asset 200011? Solution: Yes, it is possible to transfer the values from one asset to another using the transaction code ABUMN (Transfer within company code).
  • 28. www.sapficoconsultant.com Page 28 of 61 10) There was a change in the depreciation rates as per statutory requirements from 10% to 12 %. Based on this you (as a consultant) have changed the configuration settings of existing depreciation key from 10% to 12%. But you find that inspite of the change in the configuration settings from 10 to 12% the depreciation is not being recalculated. What could be the reason and what needs to be done for recalculating the depreciation? Solution: Whenever any changes are done in the configuration of the existing depreciation keys, system does not automatically recalculate depreciation. To recalculate depreciation you need to execute transaction code AFAR (Recalculate Values). This will recalculate depreciation based on the new rates.
  • 29. www.sapficoconsultant.com Page 29 of 61 11) Depreciation rates have changed from 10 to 12 % as per statutory requirement. Therefore configuration changes needs to be done. If the rates are changed will the system calculate depreciation from retrospective effect for all the assets (from the date of acquisition)? Solution: The system will not calculate retrospective depreciation. It will calculate revised depreciation from the year in which it is changed. 12) When user tries to settle an internal order (investment measure) in February 2009 using transaction code KO88 he receives the following error: “First settle items from the previous year in the previous year Message no. AW 624”. The user checks the internal order using transaction code KOB1 and finds that there is no posting on the internal order in January and February 2009. Further he also checks and finds that in the previous year Jan 2008 to Dec 2008 the internal order is already settled and there is nothing to settle (meaning debit and credits are becoming zero). The reason the user is executing KO88, he wants to capitalize the asset from Asset under construction to the final asset and he is not able to settle because of this error. What is the problem? Solution: The problem is because there was a posting made in the month of December 2008 after the settlement was done. This posting was then reversed subsequently after the settlement. Although the balance has become zero by virtue of the reversal, the system expects the order to be settled in December
  • 30. www.sapficoconsultant.com Page 30 of 61 2008. This problem was found out by analyzing the internal order using transaction code KOB1. Now to solve this problem do the following steps:- a) Open FI period for Dec 2008 using transaction code OB52. b) Open CO period for Dec 2008 using transaction code OKP1. c) Open Asset accounting (AA) for 2008 using transaction code OAAQ. d) Execute settlement for Dec 2008 using transaction code KO88 and selecting processing type automatic. There will be zero balance which will be settled. e) Execute transaction code ASKB. f) Execute transaction code AJAB to close AA for 2008 g) Close FI and CO period for Dec 2008 h) Now execute transaction code KO88 selecting processing type partial capitalization for the month of feb 2009. This will now settle the asset from AUC to final asset. Cost Center Accounting 1) The user is trying to add newly created cost center to a cost center group, He gets an error message - “No valid master record”? What could be the reason? Solution: The cost center master data is valid from the year 2008 while the user is trying to update the cost center group which shows validity from 2007. In the cost center group maintenance (transaction code KSH2) click on Extras à Default Settings à Structure and update the master data check on from 01.01.2008 2) You start several cycles of assessment, distribution, periodic reposting or indirect activity allocation in a collective execution. During execution you get a short dump ASSIGN_LENGTH_NEGATIVE or ASSIGN_LENGTH_0 What needs to be done ? Solution: You get this error if you execute too many cycles together. To avoid the above error execute less cycles at the same time. About 5 cycles should be okay. This problem is taken care of in the new SAP versions.
  • 31. www.sapficoconsultant.com Page 31 of 61 3) A user is trying to copy cost center plan data from current year 2009 to next year 2010 using transaction code KP97 (Copy plan to plan). But he is facing a problem the data is not getting copied in to year 2010. What could be the problem? Solution: The user is probably not selecting - Reset and overwrite option and that is the reason the data is not getting copied into year 2010. Ask the user to select this option and remove the test run, the plan data will now get copied from 2009 to 2010 4) A user wants to copy data from one cost center 910101 to another cost center 910102 for the year 2010. How can it be done? Solution: Use transaction code KP97 and choose and click and update the reference cost center i.e. 910101 and update the target cost center i.e. 910102 5) The user has copied plan data using transaction code KP97. He finds that the secondary cost allocation done using cost center cycle is not getting copied? What could be the reason? Solution: Secondary cost allocation done using cost center cycle does not get copied while using cost center planning function, reason being system actually expects you to execute this cycle in the respective years. Therefore ask users to execute plan cycles during that year so as to update the secondary cost. 6) User has executed all the cost center & COPA cycles, but still find that there exists some balance on few particular cost centers. What could be the reason and what needs to be done? Solution:
  • 32. www.sapficoconsultant.com Page 32 of 61 There could be various reasons for balance not being settled from these cost centers:- 1) These cost centers must have been newly created and not included in the existing cost center cycles 2) There could be some additional posting on the cost center after the cycles have been executed. 3) The cost centers would have been locked for actual secondary costs, which can be unlocked using transaction code KS02 in the tab control If you find that none of the above is applicable then you need to find out that the cost center is included in which cycle. To find out, use transaction code KS03 update the relevant cost center (which is not settled) and press enter. Thereafter you need to select on the menu bar Environment à Where-used list à Cycles and update period and fiscal year for which you are executing the cycles . You will then get the exact cycle and segment where the cost center is actually being used. You then need to go to the relevant cycle using transaction code KSU3 for cost center assessment or KSV3 for cost center distribution or KEU3 for COPA assessment cycle. In the cycle you need to check the segment header whether actual values are selected , check the receiver tracing factor. If receiver tracing factor has been set to fixed, then check that under tab the percentage has been updated for the affected cost center. If the receiver tracing factor has been set to variable portions then check that variable portion type has or actual activity or actual costs selected. Further also check that the actual statistical key figures have been updated for the relevant statistical key figures using transaction code S_ALR_87013645 or actual activity types have been updated using transaction code S_ALR_87013646 for the period. Check the Sender/receiver tab in the cycle and check the cost element groups and the cost elements used for postings on the cost center match. You should now be able to get a break through by now and will be able to solve the problem.
  • 33. www.sapficoconsultant.com Page 33 of 61 7) The user is doing his yearly planning and finds that when he runs COPA cycles, he finds all cost centers are becoming negative. What could be the problem? Solution: The problem is because; the user has directly deleted the cost center plan data using transaction code KP91 without reversing the COPA cycles and the cost center cycles. The correct sequences to be followed by the user should have been:- 1) Reverse COPA cycle 2) Reverse cost center cycle 3) Delete cost center plan data using transaction code KP91. The solution to the current problem is reverse the COPA cycle. Again delete the cost center plan data. Upload the cost center plan data and then execute the cost center cycle and the COPA cycles. 8) No posting should happen from FI on to cost centers during execution of cost center cycles. Is it possible to lock FI posting in the CO module? Solution: Use transaction code OKP1 update fiscal year, version and select and check for the relevant period and click on save. This will lock posting from the FI module to the CO module. 9) The user is trying to update planning data for version 0 - fiscal year 2011, he gets a message “Version 0 is not defined for fiscal year 2011”. How to maintain the version for the fiscal year 2011? Solution: The version 0 for fiscal year 2011 can be maintained using transaction code S_ALR_87005830 - Maintain versions. Update the setting for the fiscal year 2011. Select version 0 and double click settings for fiscal year. Update the settings for the fiscal year. This transaction should be directly maintainable in the production server. 10) When the user executes actual price calculation using transaction code KSII, the activity prices are not split between the activity prices. What is the problem? Solution: You need to first execute transaction code KSS2 splitting before executing actual price calculation. Again here you have to first assign the cost centers to the splitting structure. 11) A user wants to download a cost center report S_ALR_87013611 - Cost Centers: Actual/Plan/Variance executed for all cost centers in excel format. How can that be done? Solution: Proceed as follows:-
  • 34. www.sapficoconsultant.com Page 34 of 61 Click Select Notice the screen has changed now:-
  • 38. www.sapficoconsultant.com Page 38 of 61 You can check the report in excel In the standard sap reports the cost center code and name does not appear. For the cost center to appear you need to do the following:-
  • 39. www.sapficoconsultant.com Page 39 of 61 You find above that no cost center code appears here. Therefore you need to create a new report which will have the text for export with cost center code. Product Costing 1) Overheads are not getting calculated for Raw and packaging material? Solution:
  • 40. www.sapficoconsultant.com Page 40 of 61 Check whether the overhead group is updated in the finished goods in costing 1 view. 2) User gets an error message while executing product cost estimate: “No valid source of supply could be found”? What could be the error? Solution: This error message generally comes from finished goods which are subcontracted. The MRP2 view with special procurement key is updated. The subcontracting info record is not maintained for this finished good. Subcontracting info record needs to be maintained by the procurement department. 3) User is trying to release a standard cost estimate for a product. He gets the following Error message: “CK 763 Company code: Period closing has not yet taken place In company code XXXX, period 04 fiscal year 2008 is still active. This period is not the same as current period 003. Carry out period closing with the current period 003:“ Solution: This is the problem because an early close has been done in the MM module for the month of March 208 in spite of month April 2008 not yet reached. No solution to this problem. User should not do an early close in MM but should control in FI module through transaction code OB52. You can only release the cost estimate on April 2008. 4) A material code (component) is not getting picked up while executing a standard cost estimate of the product? Solution: The component is defined as a bulk product in the material master in MRP 2 view. Remove the bulk indicator tick in the MR2 view of the material master and the problem will be solved. 5) Variance analysis program KKS1 takes a lot of time i.e. around 6 to 7 hours of execution. How do you reduce the execution time and what exactly is the problem? Solution: Variance analysis calculation program select production orders based on the status of the order. Thus it will select only those production orders whose status is not the following:-
  • 41. www.sapficoconsultant.com Page 41 of 61 LKD(Locked) CLSD(Closed) DLFL (Deletion flag) DLT(Deleted) Which means all the production orders right from beginning gets selected. Therefore all the old production orders which are no longer required need to be set a status CLSD(Closed) or LKD(Locked). Use transaction COID and set status CLSD (Closed) by mass processing. 6) How do I maintain overhead rates in the production system directly? Solution: Use transaction code S_ALR_87008272 to define Quantity-Based Overhead Rate. Use transaction code S_ALR_87008275 to define Percentage Overhead Rate 7) User is executing a standard cost estimate for a finished product. He gets a warning message that a raw material is not assigned to cost component structure. What is the problem? Solution: The raw material master is not assigned to correct valuation class in the accounting view. Select the correct valuation class in the accounting view of the material master. 8) You have executed a product cost estimate for finished goods. You find that the raw material costs and packing material costs are zero. What is the problem? Solution: You need to first check the costing variant and see the valuation variant. In the valuation variant see the Material valuation strategy. See the order of valuation:- If the order of valuation is 1 Planned price 2 2 Valuation price according to price control in material master Then verify in the raw material and packing material master that price has been maintained in the planned price 2 in the costing view of the material
  • 42. www.sapficoconsultant.com Page 42 of 61 master. If nothing is maintained then check the price control of the material (which will be V). Check whether a moving average price is maintained or not. It means that both of them must not have been maintained and that is the cause of error. 9) During variance calculation process/production orders shows the following error messages: “Order does not have status DLV or TECO "? What needs to be done? Solution: Variance will not be calculated on order which has the status other than DLV or TECO, therefore they will be shown as errors. The costs on these orders (which has status released REL, partially delivered PDLV) will be treated as WIP. Ignore these messages. 10) While executing CK40N new std. costs are not getting calculated for a few products, the system is picking up existing standard cost for these products? What could be the reason? Solution: You need to select “Always recalculate material” in the selection parameters in the CK40N selection parameters 11) While settling process/production orders the user gets the following message “Status DLV/TECO was reversed after settlement of period 001 2009” How to settle this order? Solution: This problem has occurred because the variance on the order was settled in the month of January 2009. Thereafter the DLV and TECO status was removed from the order and a posting was done on the order and a confirmation cancellation was done in March 2009. This resulted in a balance on the order for the month of March 2009 and resulted in an error. To solve proceed as follows:- a) Use transaction code KO88 and reverse the settlement of January 2009 in March 2009 by doing the following
  • 43. www.sapficoconsultant.com Page 43 of 61 b) Now you can settle the balance on the order posted in the month of March 2009. Profit Center Accounting 1) There are no profit center documents generated for a particular balance sheet general ledger account. What is the problem and how should this be set right? Solution: The problem is because this particular balance sheet account is not maintained in the transaction code 3KEH (Default for balance sheet account) by the FICO consultant. This is a configuration error. This GL code should be maintained with a default profit center. To correct the problem the user needs to pass a single entry only in the Profit center accounting (PCA) module using transaction code 9KE0. 2) Profit center distribution cycles have been executed but there still exists balance on the corporate profit center. The corporate profit center balance is allocated to the product profit center, but in this month it is not allocated for a particular gl code. What could be the reason? Solution: Check using transaction code KE5Z the exact gl code which is not allocated. Check the cycle whether it is variable or fixed. If it is variable then see
  • 44. www.sapficoconsultant.com Page 44 of 61 that the tracing factors are correctly maintained. If everything looks fine, check the GL code master data. The GL is blocked for posting and that is the cause of problem. 3) Profit center needs to be changed in the material master, because of change in the business set up. What are the steps to be undertaken to change the profit center? Solution: Ideally if there are mass changes in the profit center in material master, then there must be program developed to change the profit centers in all the open process orders, open sales orders, open purchase orders. In case only a single material is to be changed then do the following steps:- a) Change the profit center in the material master (transaction code MM02) or transaction code MM17 – Mass maintenance b) Find all open sales orders and change the profit center (transaction code VA02) c) Find all open process orders and change the profit center (transaction code COR2) d) Find all the open purchase orders and change the profit center using SAP Note number 141009 (Program ZECPCAEK) e) Post a profit center entry for transfer of profit center balance from the old profit center to new profit center using the inventory balance sheet gl codes (transaction code 9KE0) 4) The balance for Receivables/Payables is incorrect in the transaction code S_ALR_87013343 - Profit Center: Receivables and S_ALR_87013344 - Profit Center: Payables. What is the problem? Solution: This problem is because the balance sheet adjustment program (transaction code F.5D) is not executed. The user needs to execute F.5D transaction code for the respective company code. The balance will then be correct for this report. 5) The report S_ALR_87013336 - Profit Center Group: Balance Sheet Accounts Plan/Actual does not show correct figures for Receivables and Payables, even though F.5D transaction code is executed. What is the problem? Solution: The problem is because receivable and payables have not been transferred to the profit center accounting module. Use transaction code 1KEK – Transferring Payables/Receivables to transfer the balance to PCA module. Thereafter you can see the correct balance in this report. 6) There are certain Documents posted from SD module in the FI module, but no posting has happened for a certain balance sheet provision account in the profit center accounting module. What is the problem and how can it be solved? Solution: The problem is because this balance sheet gl code is not maintained in configuration transaction code 3KEH in the profit center accounting module by
  • 45. www.sapficoconsultant.com Page 45 of 61 the support consultant. The support consultant needs to maintain 3KEH setting for this balance sheet gl code. Thereafter to update the profit center accounting module for this gl code for SD billing documents execute transaction code 1KE9. You need to update the company code, sales organization and the SD Billing document number and billing date Remove the test run and it will update the line item in profit center accounting module. Sometimes the PCA line item is not generated so you will have to uncheck and execute. This will now generate double posting for all the other line item in the PCA module. To reverse this double posting select , and again execute this transaction code for this billing document. The double postings will now be reversed. 7) There are double postings happening in the accounts receivable and accounts payable in the profit center accounting module. What is the problem and how to stop it? Solution: This is because the accounts receivables and accounts receivable GL account (reconciliation account) is maintained in the configuration transaction
  • 46. www.sapficoconsultant.com Page 46 of 61 code 3KEH. Thus the posting to customer and vendor is posted online to profit center accounting module. Further at the month end when transaction code 1KEK is again executed duplicate posting happens to the profit center accounting module. Support consultant must remove the reconciliation accounts from the 3KEH configuration. This will stop the double postings into the profit center accounting module online. Profitability Analysis 1) You are in KE30 transaction code. You do not get a list or drop down (F4) for the available reports in KE30? What could be the reason? Solution: This happens when both accounting and costing based COPA is active. In this case in the users‘s user parameter the accounting based COPA must be active. Use transaction code KEBC and select costing based COPA 2) KE30 report execution is giving a run time error? What is the issue? Solution: Steps to do away with the run time error:- a) Run program S_ALR_87099920 - Create Automatic Proposal for Summarization Levels for the past 3 months data. System will suggest a summarization levels, create those levels. b) Manually review the summarization levels through transaction code S_ALR_87005563 - Define Summarization Levels and select characteristics which require summarization and which do not require summarization. Generally product hierarchies, material group, trading partner require summarization therefore make it blank. The characteristics which do not require summarization should be marked with *. Review each of the summarization level. Once you do changes the levels will be with status “To be created”. Save these levels. After saving it will have status "Active without data" c) Execute transaction code KEDU with the new levels and selection Build new levels in background. The updating and building of new levels will take couple of hours. Once the levels are updated the status will be "Active", thereafter again schedule this transaction code KEDU with update selection for every half an hour update of the delta data. The problem should be resolved, if the problem still continues pl. again review the summarization level and follow steps 2 to 4 again
  • 47. www.sapficoconsultant.com Page 47 of 61 3) It is observed that there is always a rounding off difference between the Cost of goods sold posting done in FI module and the COPA module for a finished goods. This often results in a difference between the FI and the COPA module at the month end? What is the cause of such difference and how can it be permanently rectified? Solution: Posting in FI module is triggered based on the price and the price control (S or V) in the material master. Thus a COGS posting in the FI module for 100 kgs of finished goods will be 100kgs * 101.25 (std. price existing in the material master = 10125 INR, while the posting in the COPA module is picked up from the released standard cost estimate of the product. The standard cost in the COPA module is broken down further into Raw Material cost, Manufacturing cost fixed and Manufacturing costing variable. This break down is possible by picking up cost from the relevant cost component structure of the standard cost estimate of the product. This break down some times results in rounding off difference between posting in FI module and the COPA module. To do away with this problem the following solution is recommended:- a) Assign condition type VPRS (cost condition type available in SD module) to a value field e.g. VV055 in the COPA module using transaction code KE4I. b) Activate user exit COPA0002 in the COPA module with EXIT_NR value ‘U02’. In this user exit calculate the difference between the value field VV055 and the value fields updating the COPA module for COGS (e.g. RM costs VV015, Fixed Mfg. cost VV017 and Variable cost VV016). The difference if any will be updated in the value field VV055. The code will be as follows:- LINEITEM-VV055 = LINEITEM-VV055 - (LINEITEM-VV015 + LINEITEM-VV016 + LINEITEM-VV017) c) In the transaction code KE4U assign the user exit ‘U02’ as sequence 2 for actual valuation.
  • 48. www.sapficoconsultant.com Page 48 of 61 After doing the above, there will be no difference between the COGS posted in the FI and the COPA module. 4) Certain wrong characteristics have been posted in the COPA module, these characteristics needs to be corrected. How can this be done? Solution: Use transaction code KE26 to correct the wrong COPA characteristics. 5) A difference between the FI and the COPA module has arisen. On a deeper analysis it was found that a COPA document was not generated. The document was not generated due to a bug in system. How do you update the posting only in the COPA module now? Solution: You can post a COPA document using transaction code KE21N. This will update the COPA module only. This will not post any entry in the Profit center accounting module. 6) A user while doing a sales planning in COPA wants to simulate and check the standard costs that will be picked up during COPA planning. How can he do that do that? Solution. The user needs to use transaction code KE21S, where in the user needs to update the point of valuation 03 (manual planning), record type e.g. F version e.g. 0 , posting date in the initial selection. In the characteristic update company code, product and plant. In value fields update the sales gross sales qty, sales unit, Gross sales value and click on . Based on the sales quantity system will fetch the standard cost estimate valid as on the posting date and will update in the relevant value fields. Thus you can simulate the valuation of Cost of goods sold. 7) A proforma invoice document or credit note is posted in the SD module for finished goods. This updates the quantity and Cost of goods sold (COGS) in the COPA module. No posting for COGS happens in the FI module. This causes a difference between the FI and the COPA module. What is the reason for just wrong updation of quantity and COGS in the COPA module? Solution: The setting for reset of quantity and the COGS value fields are not maintained in the COPA module. Update the setting using transaction code KE4W with Billing type, value fields (for quantity, COGS). This will then stop the quantity and COGS posting in COPA for those billing types.
  • 49. www.sapficoconsultant.com Page 49 of 61 8) A user while posting a document from FI to a profitability segment (COPA) wants certain characteristic mandatory for a certain set of general ledger accounts. How can this be made mandatory? Solution: Standard SAP configuration through transaction code KE4G and KEVG2 only permits an assignment to Business transaction and record types. It does not permit any assignment of characteristic group to value fields. It is only possible to map this requirement using a user exit in COPA. User exit COPA0003 (Enhancement for assignment to profitability segment (CO-PA)), function module EXIT_SAPLKEAK_001 (User Exit for Determining the Characteristic Group) INCLUDE ZXKKEU05. This exit will then be called during entry. A table needs to be created which update all the relevant parameters like Operating concern Business transaction Value field Name Company code Business group Characteristic group. This table needs to be maintained with all the values. A relevant characteristic group will be configured using transaction code KEPA and assigned to this value field. 9) It is found that when SD billing documents are posted to FI and COPA. The documents posted in COPA document are posted with incorrect signs. The debits postings such as sales deductions are posted with a positive sign in COPA module. Further the credit postings (such as sales revenues) are also posted with a positive sign in COPA module. To clarify an example the Gross sales condition type has 2 figures +100 and -20. The posting in FI module is 80 INR, while in COPA module it is posted as 120 INR. This causes a mismatch between the FI and the COPA module for Gross sales. What is the cause of the problem and how can it be rectified? Solution: This problem is because the condition type in SD is defined as handling both positive and negative figures, but in COPA module the transfer +/- sign indicator has not been switched on. The condition type in SD is defined as handling both positive and negative in transaction code v/06
  • 50. www.sapficoconsultant.com Page 50 of 61 Here this condition type is handling both positive and negative figures . Therefore when you assign this condition type in COPA module using transaction code KE4I then the transfer +/- should be switched on as shown below:- This will result in correct signs getting posted to the COPA module. 10) Invariably there are some difference in the FI and the COPA module. Often it becomes difficult to reconcile the FI and COPA module. What is the fastest and easiest way to reconcile FI and the COPA module? Solution: To reconcile FI and COPA module a report needs to be designed which will fetch data from the FI module from the FI total tables GLT0 and match it with the costing co-pa based tables CE3XXXX and CE4XXXX. The various position of the GL codes and value field can be arranged in a database table. The GL codes must be arranged as cost element groups forming a part of value flow into the various value fields. This cost elements groups which are assigned to the value for FI/MM postings in transaction code KEI2 should be referred in this database table. Such a report will be able to reconcile and find out the exact difference.
  • 51. www.sapficoconsultant.com Page 51 of 61 11) User wants to check certain characteristics which have been updated for Gross sales value field. How can he do so? Solution: Use transaction code KE24 - Actual Line item display to display various characteristic updated in the Gross sales value field. 12) There is a complex derivation of characteristics to be done, how to handle this? Solution: Complex derivation in COPA is not possible through standard SAP. The support consultant needs to activate COPA user exit and would need ABAP help to write a code in this exit. The user exit is maintained through transaction code SMOD Click
  • 52. www.sapficoconsultant.com Page 52 of 61 Double click Double click . A code needs to be written in this function module
  • 53. www.sapficoconsultant.com Page 53 of 61 Under include ZXKKEU1. Under this include a step id needs to be called. This step id should be assigned in the KEDR derivation step rule as shown below
  • 54. www.sapficoconsultant.com Page 54 of 61 SD – FI – COPA 1) SD Billing documents while release to accounting gets an error due to standard cost estimate not being released? What are the steps to correct the error? Solution: 1) Reverse the billing document – VF11 2) Reverse the delivery document – VF09 3) Create and release the standard cost estimate – CK11N, CK24 4) Again create delivery – VL01N 5) Again create billing document – VF01 The above steps will ensure that correct & released standard cost flows into the Accounting & COPA module, and will not cause difference. 2) You get an error while releasing the SD billing document “Accounting document exceeds 999 line items in the SD-FI accounting interface”? The billing document contains around 34 items which has its own condition types such as gross price, discounts, taxes etc.? What needs to be done? Solution: The problem is because of the sales orders has huge number of material around 34 and they in turn has its condition types such as gross price, discounts, taxes. This actually will generate an Accounting document with more than 999 line items. An accounting document in SAP can have a maximum 999 line items only. To do away with this problem, the single billing document has to be split into multiple billing documents. 1) Cancel the billing document 2) Go to VL02N change delivery document and block the majority of the delivery item under the tab financial processing and set billing block - Calculation missing. Do not set billing block for around 10 items 3) Do billing using VF01 with this delivery document, the system will now propose billing for the 10 items only. Save this billing document and release to accounting. 4) Again go to the delivery document and remove the billing blocks for next 10 items and proceed with the billing. Thus multiple billing documents will be created for a single delivery.
  • 55. www.sapficoconsultant.com Page 55 of 61 General trouble shooting 1) User was executing a batch input session online, by mistake the user instead of typing /bend used /nex and got logged out. The user then again logged in and finds that the batch input session status shows as "In processing". How does the user process this session now? Solution: In SM35, select the session and click on the menu bar Session --> Release. The session status will now change from "inprocess" to "New". The user can now process the session and post the balance entries. 2) Recently the quality system was refreshed with data from production system. After the refresh when a user tries to check an accounting document for a material document using transaction code MB03, a message is displayed “Material document does not include an accounting document”. But there actually exists an accounting document, but it is not being displayed. What is the problem and how can it be solved? Solution: The problem is because of client copy (Production to Quality copy). Following a client copy, entities still have the old logical system of the source client. Consequently, you can no longer branch to the relevant accounting document when you display the material document in transaction MB03. To do away with this problem the support consultant needs to do the following:- a) Open the Quality system client with transaction code SCC4 and change it to the following And save the changes
  • 56. www.sapficoconsultant.com Page 56 of 61 b) Use transaction code OKKP1 – ALE Distribution for Cost Accounting and change the logical system from the production system to the quality system for each of the active controlling areas. c) Close the quality client with SCC 4 and set it back to d) Execute transaction BDLS
  • 57. www.sapficoconsultant.com Page 57 of 61 Update the old logical system name and the new logical system name Update the following Double click on Double click on Uncheck the test run and execute the program in background. The program will change the logical systems in all the transaction tables such as MKPF, BKPF etc. 3) An FI document while posting is getting terminated and the following message is received
  • 58. www.sapficoconsultant.com Page 58 of 61 The FI document is not saved. What could be the problem and how to post this document? Solution: In this case check transaction code SM13 to check the terminated log
  • 60. www.sapficoconsultant.com Page 60 of 61 Double click Again double click
  • 61. www.sapficoconsultant.com Page 61 of 61 Here this error is because of table BSET. BSET is a tax internal cluster table. The error is because the user is updating tax code V0 (0%) in a gl line item. The GL code currently has a setting input tax allowed but no posting without tax allowed. The GL code needs to be removed with the indicator input tax allowed or needs to be set posting without tax allowed.