4. Energy system Installed capacity, MW
RE Total
CES 50 (Wind) 1014
EES - 36
SES - 27
WES 12 (Hydro) 12
AUES 11 (Hydro) 30
Total ~73 ~1100
1. MONGOLIA: ENERGY
6. Wind: 1.1TW at 30m height
2. RE RESOURCES
Geothermal: 40 springs/spas
Hydro: 6.5GW Solar: 4.3-4.7kWh/sq.m. 300 sunny
days in Gobi
7. NATIONAL RENEWABLE
ENERGY PROGRAM
(2005-2020) IN 2005
IN 2007 THE RENEWABLE
ENERGY LAW
IN 2014, GREEN
DEVELOPMENT POLICY
OF MONGOLIA
100000 SOLAR GER
PROJECT
(2001-2012)
3. RE POLICIES
8. ⢠Established in 2008
⢠Member to GWEC; WWEA
⢠Members: General Electric, Qleantech, Clean
Energy, National Renewable Energy Center,
Aydiner, Sainshand Wind Park, etc.
4. MONGOLIAN WIND ENERGY
ASSOCIATION
9. MISSION
⢠Mission: âDevelop wind energy industry and
train professional industry personnelâ
⢠Objectives:
1. Tax exemptions from land lease and customs
duty for wind energy projects
2. Increase public awareness and distribute
information
10. ACTIVITIES
⢠WEBSITE: www.monwea.org
⢠Annual wind energy report for Mongolia: 2008-2009; 2010-2011,
2012-2013
⢠Training wind energy professionals in both local and international
training sessions
⢠Monthly columns for Business Time magazine
⢠Promotional television program on wind energy with Mongolian
National Broadcasting Channel
⢠Wind Energy Day since 2010
⢠Wind assessment report for GWEC; WWEA
⢠Participation in various international and local wind conferences
(China Wind Power, US Wind Power, World Wind Energy
Conference, National Forum for Renewable Energy in Mongolia)
⢠Mongolian Partner for Quantum Leap in Wind promoted and
implemented by Asian Development Bank (ADB).
⢠Wind Energy Asia 2014 conference
⢠National Renewable Energy Forum 2015
13. 1. SALKHIT WIND FARM- CLEAN
ENERGY LLC
⢠Operational since June 2013;
⢠Transmitted 53M kWh to Central Grid as of
the end of 2013
⢠Capacity: 49.6MW
⢠Investment: USD120M
⢠Tariff: 0.095USD/kWh
14. 2. OYUTOLGOI WINDFARM-
QLEANTECH
⢠Capacity: 250 MW (102MW in 2015; 148MW in
2017-2018)
First stage: 102MW
⢠Investment: USD180M
⢠Projected electricity inflow to the grid: 370M
kWh
⢠Tariff: 0.095USD/kWh
⢠Investor: Swedish and Chinese investors
⢠Construction initiation: 2015
⢠Operational: January, 2016