Presentation Outlines
• Conceptualizing M&E & RBM&E
• Background of IMED
• Major Functions of IMED
• Monitoring by IMED
• Different IMED tools (Formats)
Implementation Monitoring
• an administrative tool which facilitates to improve the decision-making
process of management on regular basis.
• Monitoring is a continuing function that aims primarily to provide the management
and main stakeholders of an ongoing intervention with early indication of progress,
or lack thereof in the achievement of results.
• It accepts the original plan and tracks actual progress against planned projects to
ensure it is within planned time and cost constraints.
What is Monitoring……?
-process of keeping track of progress on a continuous and/or periodic basis to
examine whether the inputs and resources meant for the implementation of plans,
policies, programmes and projects are being properly delivered.
-verify whether the project activities are being implemented and whether or not the
intended outputs are being achieved in accordance with the plan.
-The following facts are analysed in the process of monitoring:
1. If the resources are available and used within the limits of an agreed budget and
stipulated timeframe.
2. If the Intended activities are taken and outputs are achieved in a timely and cost-
effective manner.
3. What is the level of implementation capacity of the implementing agencies?
4. What kinds of risks are faced and what remedial measures are taken?
During monitoring, data and information on the above mentioned aspects are
collected, processed and reported in a continuous, systematic, and time-bound
manner. This helps identify problems and initiate corrective measures before it is too
late.
4
What is Evaluation
• Evaluation is a systematic and purposeful undertaking carried out by
internal or external evaluators to appraise the relevance, efficiency,
effectiveness of, as well as the impacts and sustainability generated by
the plans, policies, programmes and projects under implementation.
• The main objective of evaluation is to draw lessons from the strengths
and weaknesses experienced so as to improve the design and
implementation in the future as well as to hold the officials and agencies
involved in the process accountable for its implementation and results.
• It focuses on the changes impacted by devilment interventions and
assessed in a few criteria to gather lessons. Therefore, evaluation may
be taken as a tool for learning lesson.
5
The primary difference between monitoring and evaluation is that while monitoring
is a continuous activity, performed at the functional level of project/programme
management, evaluation is a periodic activity, performed at the outcome and impact
level of project activities.
Complementarity
between
M&E
Project Life Cycle
 Project Planning  Project Initiation
 Appraisal Phase
 Formulation Phase
 Approval Phase
 Project Implementation  Implementation Phase
 Monitoring Phase
 Project Termination  Closing Phase
 Evaluation Phase
7
Project Life Cycle
8
9
Pre-project Phase
• Provide comments on project proposals in :
– PEC, SPEC meeting in the Planning Commission.
– DPEC/DSPEC meetings in the development
ministries
– Internal meeting in the Administrative
Ministries/ Divisions where project proposals are
initially reviewed and examined.
Result-based monitoring
RBM Framework
11
The result-based M&E system based on the result
chain of log frame and cost effectiveness
12
Process
An example of Child morbidity
• Inputs: funding, equipments, staffing etc.
• Activities: Media campaign to educate mothers, health personnel trained in
oral rehydration
• Outputs: Increased maternal awareness and access to oral rehydration
therapy services
• Results:
• Outcomes: Improved use of oral rehydration (behavioral change)
• Impacts: Child morbidity reduced
•
RBM
RB M&E in Result Based Project Management Cycle
16
Power of measuring results
10 steps in RBM
CREAM
Process
Outputs
Outcomes
completion/milestones
units provided/created
physical availibility
working and sustainability
capacity development
organisational changes
use/satisfaction
distribution of benefits
changes in behaviour
Indicators
of
Results
Activities
Inputs
quantity, type and
availibility of
resources
Process
indicators
Input
indicators
IMPACT Development
progress
Impact
Indicators
Baseline issues
1. What are the sources of data?
2. What are the data collection methods?
3. Who will collect the data?
4. How often will the data be collected?
5. What is the cost and difficulty to collect the data?
6. Who will analyze the data?
7. Who will report the data?
8. Who will use the data?
example
reporting
M&E Context in Bangladesh
24
Annual Development Programme’s Investment
Management Monitoring
25
26
Background of IMED
• IMED stands for ‘Implementation Monitoring and Evaluation
Division’
• The Project Implementation Bureau (PIB) was established in 1975
• PIB was under the President’s Secretariat.
• PIB was established to increase the efficiency of project aid
utilization through appropriate monitoring activities.
27
Background of IMED (con.)
• PIB was given the status of a separate
Division in 1977.
• Renamed as ‘Implementation Monitoring and
Evaluation Division (IMED)’ in 1982.
• Finally, IMED was placed under the Ministry
of Planning in 1984.
28
Major Functions of IMED
• Implementation monitoring of all on-going
development projects included in the ADP.
• Prepare periodical progress report and suggestions
for corrections where necessary
• Intensive monitoring for selected projects
• Submission of progress reports to the
Ministries/Divisions, ECNEC meeting etc
29
Major Functions of IMED (con.)
• Evaluation of all completed development projects
• Impact Evaluation for selected completed projects
• Submission of evaluation reports to the
Ministries/Divisions, ECNEC/NEC meeting
30
Different Duties of IMED
 Matter relating to the Public Procurement Act & Rules
and Overseeing its implementation
 Cost rationalization of projects
 Participating PEC meeting
 Participating ADP review meeting in ministries
 Provide opinion on time extension of projects
 Other functions as assigned to the IMED from the
Govt.
31
How IMED Contribute to Development
Work
1. Pre-Implementation Phase: Project
Approval Process
2. Implementation Phase: Implementation
Monitoring
3. Post-Implementation Phase : Evaluation
32
M&E Framework for 8FYP-Role of
IMED
• “..IMED has made some progress in doing systematic review of the entire project
portfolio to distil the key lessons of project selection and management and
strengthen the development impact of the public investment program…”
• The importance of doing a through portfolio analysis of the ADP and find ways
how to maximize the development impact of public investment has gained
momentum in an environment of resource constraint, that has been further
aggravated by the COVID-19.
• IMED will undertake an increased number of impact assessments of projects
with the help of both experimental and non-experimental data so that M&E at the
micro-level moves beyond simply tracking the financial and physical
completion of the projects.
• The IMED will develop its capacity and learning through a process of research
and collaboration with the national think tanks and the universities.”
Exact Quote from Part 1: Chapter 6 - Section 6.3.2 (Page 142)
33
M&E Framework for 8FYP
• In order to monitor the progress of 8FYP, a total of 104 indicators
have been chosen in the Development Result Framework (DRF) of
the 8FYP.
• The 6th Five Year Plan: First introduced the concept of Results-Based
Monitoring and Evaluation (RBM&E) instead of assessing completion of
financial or physical targets as indicators of progress
• DRF of the 8FYP has been elaborated in the Chapter 6 of part 1 and
highlighted
• its strategic role in planning
• the institutional arrangements
• data mobilization arrangements
• mid-term and end evaluation of the plan
• DRF: A total of 15 top priority areas with linked to the SDG and PP2041
• 4 macroeconomic
• 11 Sectoral.
34
Monitoring by IMED
• Monitoring every on-going projects included in
ADP (in house)
• Intensive monitoring for selected projects
(outsourcing)
36
IMED Data Collection Formats
• IMED 01/2003 (Revised):To collect general
information of a project when it is approved/revised
approved.
• IMED 02/2003 (Revised):To collect physical &
financial target on the basis of ADP &
RADP allocation.
• IMED 03/2003 (Revised):To collect information on
quarterly physical & financial progress of project
37
IMED Data Collection Formats
• IMED 04/2003 (Revised):To collect
information of a completed project.
• IMED 05/2003 (Revised):To collect monthly
progress report of a project through review
meetings.
38
39
How monitoring conducted by IMED
• Collection of information/data through IMED
Formats
• Field inspection/spot verifications of
– priority projects,
– projects targeted for completion,
– aided project and
– sick projects.
40
Monitoring conducted by IMED (con.)
• Participation in monthly ADP Review Meetings and
other Meetings (e.g Steering Committee, PIC,
TEC, Wrap-up etc,)
• Managing Data-base (PMIS) to process and
preserve collected information.
41
Evaluation by IMED
Midterm evaluation – on-going Projects
(selective cases)
Post facto evaluation (for completed project)
– Terminal Evaluation (for all projects)
– Impact Evaluation (for selected projects)
42
Evaluation conducted by IMED (…)
• Prepare Project Completion Report/Terminal
Evaluation Reports on each completed project
highlighting sustainability problems
• Providing recommendations on future course
of actions
• Conduct out-sourced impact evaluation on
selected projects.
43
Outsourcing of Consultants by IMED
• Consulting firms are outsourced very often to conduct
both In-depth monitoring and Impact evaluation of some
technically complex projects.
• Finding are sent to Planning Commission and concerned
project initiating agencies/authorities/ECNEC/NEC
• IMED is conducting 50 In-depth monitoring and 20
Impact evaluation this year through outsourced
consultants.
44
ক্র: নং স঳ক্টয/কামযক্রভ প্রকল্প ঳ংখ্যা সভাট %
ক. স঳ক্টয ভবভিক ফযাদ্দ
১. ঳াধাযণ ঳যকাভয স঳ফা ৫৫ ৩০৩৬.৪৬ ১.২৮
২. প্রভিযক্ষা ৭ ৯৮৮.১১ ০.৪২
৩. জন শৃঙ্খরা ও সুযক্ষা ৪৯ ৩২০৪.৯৮ ১.৩৫
৪. ভ঱ল্প ও অর্যননভিক স঳ফা ৮৬ ৭৪৯৯.১৫ ৩.১৭
৫. কৃভল ১৫৭ ৭৬৬৫.৩৭ ৩.২৪
৬. ভফদ্যুৎ ও জ্বারাভন ১০৫ ৪৯৪০৮.৮৯ ২০.৮৭
৭. ঩ভযফ঴ন ও সমাগাযমাগ ৩০৭ ৬৪৯২৬.৮১ ২৭.৪২
৮. স্থানীয় ঳যকায ও ঩ল্লী উন্নয়ন ১০৫ ১৪২৯৯.৮৯ ৬.০৪
৯. ঩ভযযফ঱, জরফায়ু ঩ভযফিযন এফং ঩াভন ঳ম্পদ ৯৩ ৮৫২৬.২৩ ৩.৬০
১০. গৃ঴ায়ন ও কভভউভনটি সুভফধাফভর ২৩৮ ২৫৩৫১.৫৩ ১০.৭১
১১. স্বাস্থু ৬৫ ১৭৩১১.৮২ ৭.৩১
১২. ধভয, ঳ংস্কৃভি ও ভফযনাদন ৪৯ ২২১৮.৯৩ ০.৯৪
১৩. ভ঱ক্ষা ১১৭ ২৩১৭৭.৯৬ ৯.৭৯
১৪. ভফজ্ঞান ও িথ্য প্রযুভি ৪৮ ৩৬৭৬.৮৭ ১.৫৫
১৫. ঳াভাভজক সুযক্ষা ৫৩ ১৬৪৬.৩০ ০.৭০
উ঩-সভাট: ১৫টি স঳ক্টয ১৫৩৪ ২৩২৯৩৯.৩০ ৯৮.৩৭
এক নজযয ২০২১-২০২২ অর্যফছযযয ফাভলযক উন্নয়ন কভযসূভিযি স঳ক্টয ভবভিক ফযাদ্দ ভফবাজন
(সকাটি টাকা)
- এট ঩ভযষ্কায সম, ফাভলযক উন্নয়ন কভযসূভি ঴যে ঳যকাযযয ঩ঞ্চফাভলযক ঩ভযকল্পনা ফাস্তফায়যনয মূর
দভরর;
-আয এই ফাভলযক উন্নয়ন কভযসূভিযি অন্তর্ভযি ঳কর প্রকযল্পয ফাস্তফায়ন কামযক্রভ ঩ভযফীক্ষণ, ঳ভাপ্ত
প্রকযল্পয মূল্যায়ন এফং ঳যকাভয ক্রয় প্রভক্রয়ায় স্বেিা, দক্ষিা জফাফভদভ঴িায ভাধ্যযভ সদয঱য আর্য-
঳াভাভজক উন্নয়যন ঳঴ায়িা প্রদান কযাই আইএভভভিয মূর কাজ;
45
46
প্রকল্প ঩ভযফীক্ষযণয সক্ষযে ঳যকাযযয অগ্রাভধকাযপ্রাপ্ত প্রকল্প, বৃ঴ৎ ফযাদ্দপ্রাপ্ত প্রকল্প,
঳া঴ায্যপুষ্ট প্রকল্প, ঳ভস্যাভিষ্ট প্রকল্প, শ্লর্ গভি঳ম্পন্ন প্রকল্প এফং ঳ভাভপ্তয জন্য ভনধ যাভযি
প্রকল্পযক অগ্রাভধকায সদয়া ঴যয় র্াযক। এয পযর প্রকল্প এরাকা, কাযজয ভান এফং
অগ্রগভি ঳ম্পযকয একটি ফাস্তফ ধাযণা ঩াওয়া মায়।
• ২০২০-২১ অর্যফছযয এ ভফবাগ কর্তযক ঳যকাযযয ০৮টি পাস্টট্রাকর্ভি প্রকল্প঳঴ ৬৩৮টি
প্রভিযফদন ঳ংভশ্লষ্ট ভন্ত্রণারয়/ভফবাযগ সপ্রযণ কযা ঴যয়যছ।
• এয ঩া঱া঩াভ঱ উি ঳ভযয় ৮১টি অনরাইন প্রকল্প ভভনটভযং ঳ম্পাদন কযা ঴যয়যছ।
• ০৮টি ভফবাগীয় ঱঴যয ভফবাগীয় ঩মযাযয় অনুভিি উন্নয়ন ঳ভন্বয় কভভটিয ঳বায়
আইএভইভি’য ঩ক্ষ ঴যি অং঱ গ্র঴ণ কযয ভিাভি প্রদান কযা ঴যে।
প্রকল্প ঩ভযফীক্ষণ
47
প্রকল্প মূল্যায়ন
• গযে প্রভি ফছয প্রায় ২৫০-৩০০টি প্রকল্প ঳ভাপ্ত ঴য়।
• ২০২০-২১ অর্যফছযয ৩৪৫টি প্রকল্প ঳ভাভপ্তয জন্য ভনধ যাভযি ভছর
এফং ভ঩ভ঳আয প্রাভপ্ত ঳ায঩যক্ষ ঳ভাপ্ত প্রকল্প঳মূ঴ ঩ভযফীক্ষণ কযয
মূল্যায়ন প্রভিযফদন প্রণয়যনয কাজ িরভান যযয়যছ।
48
প্রকযল্পয ভনভফে ঩ভযফীক্ষণ ও প্রবাফ মূল্যায়ন
• ২০২১-২০২২ অর্যফছযয ৫০টি প্রকযল্পয ভনভফে ঩ভযফীক্ষণ ও ২০টি প্রকযল্পয
প্রবাফ মূল্যায়ন কযয চূোন্ত প্রভিযফদনগুযরা ঳ংভশ্লষ্ট কর্তয঩যক্ষয ভনকট সপ্রযণ
কযযফ;
• উি ঳ভীক্ষা প্রভিযফদনগুযরাযি প্রকযল্পয ঳পর এফং দ্যফ যর ভদকগুযরা ভিভিি
কযা ঴যয়যছ। ঩া঱া঩াভ঱ বভফষ্যযি প্রকযল্পয ঳পর ফাস্তফায়ন, ফাস্তফাভয়ি প্রকল্প
সর্যক অভজযি পরাপর সটক঳ইকযণ এফং এিভিলযয় উদ্ভূি ঳ভস্যা ভনয঳যন
সু঩াভয঱ প্রদান কযা ঴য়।
49

Weitere ähnliche Inhalte

Was ist angesagt?

Bangladesh Planning Commission
Bangladesh Planning Commission Bangladesh Planning Commission
Bangladesh Planning Commission Reazul Kabir
 
Development Planning and Project Approval Process TA
Development Planning and Project Approval Process TADevelopment Planning and Project Approval Process TA
Development Planning and Project Approval Process TADr. Md. Taibur Rahman
 
Public Private partnership
Public Private partnershipPublic Private partnership
Public Private partnershipRayhan Mia
 
Public Policy Formulation and Analysis-2:Features of Good Public Policy
Public Policy Formulation and Analysis-2:Features of Good Public PolicyPublic Policy Formulation and Analysis-2:Features of Good Public Policy
Public Policy Formulation and Analysis-2:Features of Good Public PolicyShahid Hussain Raja
 
PPP Bangladesh
PPP BangladeshPPP Bangladesh
PPP BangladeshBPSA
 
Recruitment and selection process in bangladesh civil service
Recruitment and selection process in bangladesh civil serviceRecruitment and selection process in bangladesh civil service
Recruitment and selection process in bangladesh civil serviceAlexander Decker
 
Disaster Management in Bangladesh: Risk Reduction and Challenges
Disaster Management in Bangladesh: Risk Reduction and ChallengesDisaster Management in Bangladesh: Risk Reduction and Challenges
Disaster Management in Bangladesh: Risk Reduction and ChallengesSajid Karim
 
The role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IR
The role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IRThe role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IR
The role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IRShahin Ali
 
Annual Performance Agreement.pptx
Annual Performance Agreement.pptxAnnual Performance Agreement.pptx
Annual Performance Agreement.pptxSifatiMim
 
PERSPECTIVE Plan & Bangladesh.pdf
PERSPECTIVE Plan & Bangladesh.pdfPERSPECTIVE Plan & Bangladesh.pdf
PERSPECTIVE Plan & Bangladesh.pdfMahiMozumder
 
Administrative structure of bangladesh
Administrative structure of bangladeshAdministrative structure of bangladesh
Administrative structure of bangladeshFahim Rokon
 
Evolution of Panchayat Raj Institutions and Its Role in Community Development.
Evolution of Panchayat Raj Institutions and Its Role in Community Development.Evolution of Panchayat Raj Institutions and Its Role in Community Development.
Evolution of Panchayat Raj Institutions and Its Role in Community Development.Hridoy Deb
 
Public Administration of Bangladesh
Public Administration of BangladeshPublic Administration of Bangladesh
Public Administration of BangladeshAnupom Sarker
 
Presentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffPresentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffFida Karim 🇵🇰
 
Public private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspectivePublic private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspectivePrazwal Pradhan
 
The institutions for disaster management in bangladesh
The institutions for disaster management in bangladeshThe institutions for disaster management in bangladesh
The institutions for disaster management in bangladeshMd. Ayatullah Khan
 
Rural Development in bangladesh
Rural Development in bangladeshRural Development in bangladesh
Rural Development in bangladeshAsaduzzaman Kanok
 

Was ist angesagt? (20)

Bangladesh Planning Commission
Bangladesh Planning Commission Bangladesh Planning Commission
Bangladesh Planning Commission
 
Development Planning and Project Approval Process TA
Development Planning and Project Approval Process TADevelopment Planning and Project Approval Process TA
Development Planning and Project Approval Process TA
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Public Private partnership
Public Private partnershipPublic Private partnership
Public Private partnership
 
Public Policy Formulation and Analysis-2:Features of Good Public Policy
Public Policy Formulation and Analysis-2:Features of Good Public PolicyPublic Policy Formulation and Analysis-2:Features of Good Public Policy
Public Policy Formulation and Analysis-2:Features of Good Public Policy
 
PPP Bangladesh
PPP BangladeshPPP Bangladesh
PPP Bangladesh
 
Recruitment and selection process in bangladesh civil service
Recruitment and selection process in bangladesh civil serviceRecruitment and selection process in bangladesh civil service
Recruitment and selection process in bangladesh civil service
 
Disaster Management in Bangladesh: Risk Reduction and Challenges
Disaster Management in Bangladesh: Risk Reduction and ChallengesDisaster Management in Bangladesh: Risk Reduction and Challenges
Disaster Management in Bangladesh: Risk Reduction and Challenges
 
The role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IR
The role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IRThe role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IR
The role of NGOs in Bangladesh: A critical perspective... Muhammed Shahin .IR
 
Annual Performance Agreement.pptx
Annual Performance Agreement.pptxAnnual Performance Agreement.pptx
Annual Performance Agreement.pptx
 
PERSPECTIVE Plan & Bangladesh.pdf
PERSPECTIVE Plan & Bangladesh.pdfPERSPECTIVE Plan & Bangladesh.pdf
PERSPECTIVE Plan & Bangladesh.pdf
 
Administrative structure of bangladesh
Administrative structure of bangladeshAdministrative structure of bangladesh
Administrative structure of bangladesh
 
Evolution of Panchayat Raj Institutions and Its Role in Community Development.
Evolution of Panchayat Raj Institutions and Its Role in Community Development.Evolution of Panchayat Raj Institutions and Its Role in Community Development.
Evolution of Panchayat Raj Institutions and Its Role in Community Development.
 
Public Administration of Bangladesh
Public Administration of BangladeshPublic Administration of Bangladesh
Public Administration of Bangladesh
 
Policy cycle
Policy cyclePolicy cycle
Policy cycle
 
Comilla model
Comilla modelComilla model
Comilla model
 
Presentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffPresentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E Staff
 
Public private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspectivePublic private partnerships-nepal and bangladesh perspective
Public private partnerships-nepal and bangladesh perspective
 
The institutions for disaster management in bangladesh
The institutions for disaster management in bangladeshThe institutions for disaster management in bangladesh
The institutions for disaster management in bangladesh
 
Rural Development in bangladesh
Rural Development in bangladeshRural Development in bangladesh
Rural Development in bangladesh
 

Ähnlich wie M&E of development projects and role of imed dr taibur

Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.pptMdFarhanShahriar3
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle managementhamza khwaja
 
Lecture PLAN MONITORING and EVALUATING.
Lecture PLAN  MONITORING and EVALUATING.Lecture PLAN  MONITORING and EVALUATING.
Lecture PLAN MONITORING and EVALUATING.Jo Balucanag - Bitonio
 
Monitoring and evaluation1
Monitoring and evaluation1Monitoring and evaluation1
Monitoring and evaluation1PCPD Palestine
 
Livestock and Fish monitoring, evaluation and learning framework
Livestock and Fish monitoring, evaluation and learning frameworkLivestock and Fish monitoring, evaluation and learning framework
Livestock and Fish monitoring, evaluation and learning frameworkILRI
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.pptUjalaBatool7
 
Results based planning and management
Results based planning and managementResults based planning and management
Results based planning and managementBilal Naqeeb
 
Introduction DM 211 Project Development and Management
Introduction DM 211 Project Development and ManagementIntroduction DM 211 Project Development and Management
Introduction DM 211 Project Development and ManagementJo Balucanag - Bitonio
 
Project: Monitoring
Project: Monitoring Project: Monitoring
Project: Monitoring Mfb Firoz
 
Monitoring and Evaluation for e-Governance Projects
Monitoring and Evaluation for e-Governance ProjectsMonitoring and Evaluation for e-Governance Projects
Monitoring and Evaluation for e-Governance ProjectsLalengzuala Zualtea
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxAbdulrahmanAfabafal
 

Ähnlich wie M&E of development projects and role of imed dr taibur (20)

IFPRI - Results and Impact Management System (RIMS)
IFPRI - Results and Impact Management System (RIMS)IFPRI - Results and Impact Management System (RIMS)
IFPRI - Results and Impact Management System (RIMS)
 
sample456.pptx
sample456.pptxsample456.pptx
sample456.pptx
 
project m&e
 project m&e project m&e
project m&e
 
UNIT - I - ppe.pptx
UNIT - I - ppe.pptxUNIT - I - ppe.pptx
UNIT - I - ppe.pptx
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.ppt
 
Project Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) NotesProject Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) Notes
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
Lecture PLAN MONITORING and EVALUATING.
Lecture PLAN  MONITORING and EVALUATING.Lecture PLAN  MONITORING and EVALUATING.
Lecture PLAN MONITORING and EVALUATING.
 
Monitoring and evaluation1
Monitoring and evaluation1Monitoring and evaluation1
Monitoring and evaluation1
 
Livestock and Fish monitoring, evaluation and learning framework
Livestock and Fish monitoring, evaluation and learning frameworkLivestock and Fish monitoring, evaluation and learning framework
Livestock and Fish monitoring, evaluation and learning framework
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.ppt
 
Results based planning and management
Results based planning and managementResults based planning and management
Results based planning and management
 
Introduction DM 211 Project Development and Management
Introduction DM 211 Project Development and ManagementIntroduction DM 211 Project Development and Management
Introduction DM 211 Project Development and Management
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
PA 210.pptx
PA 210.pptxPA 210.pptx
PA 210.pptx
 
Project: Monitoring
Project: Monitoring Project: Monitoring
Project: Monitoring
 
Monitoring and Evaluation for e-Governance Projects
Monitoring and Evaluation for e-Governance ProjectsMonitoring and Evaluation for e-Governance Projects
Monitoring and Evaluation for e-Governance Projects
 
Project management
Project managementProject management
Project management
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 

Mehr von Dr. Md. Taibur Rahman

Flow of External Resources in Bangladesh
Flow of External Resources in BangladeshFlow of External Resources in Bangladesh
Flow of External Resources in BangladeshDr. Md. Taibur Rahman
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFDr. Md. Taibur Rahman
 
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur RahmanLdc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur RahmanDr. Md. Taibur Rahman
 
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur RahmanScenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur RahmanDr. Md. Taibur Rahman
 
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100Dr. Md. Taibur Rahman
 

Mehr von Dr. Md. Taibur Rahman (6)

Flow of External Resources in Bangladesh
Flow of External Resources in BangladeshFlow of External Resources in Bangladesh
Flow of External Resources in Bangladesh
 
Bangladesh Delta Plan 2100
Bangladesh Delta Plan 2100Bangladesh Delta Plan 2100
Bangladesh Delta Plan 2100
 
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEFRenewable Energy status and road-map of Bangladesh and support of UNDP-GEF
Renewable Energy status and road-map of Bangladesh and support of UNDP-GEF
 
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur RahmanLdc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
Ldc graduation of Bangladesh: Issues and Challenges by Dr. Md. Taibur Rahman
 
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur RahmanScenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
Scenarios of Bangladesh Delta Plan 2100 by Dr. Taibur Rahman
 
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
Adaptive Delta Management Approach and Bangladesh Delta Plan 2100
 

Kürzlich hochgeladen

unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionGLADYSNUEVO1
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.Christina Parmionova
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Delhi Call girls
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfSERUDS INDIA
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.Christina Parmionova
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgergMadhuKothuru
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfSocial Samosa
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...Namrata Singh
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxScottMeyers35
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiPriya Reddy
 

Kürzlich hochgeladen (20)

unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
sponsor for poor old age person food.pdf
sponsor for poor old age person food.pdfsponsor for poor old age person food.pdf
sponsor for poor old age person food.pdf
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...Kolkata Call Girls Halisahar  💯Call Us 🔝 8005736733 🔝 💃  Top Class Call Girl ...
Kolkata Call Girls Halisahar 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl ...
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 

M&E of development projects and role of imed dr taibur

  • 1. 1 Monitoring & Evaluation (M&E) of Development Projects: Role of IMED & Project Director Dr. Md. Taibur Rahman Director, IMED trsumon@gmail.com
  • 2. 2 Presentation Outlines • Conceptualizing M&E & RBM&E • Background of IMED • Major Functions of IMED • Monitoring by IMED • Different IMED tools (Formats)
  • 3. Implementation Monitoring • an administrative tool which facilitates to improve the decision-making process of management on regular basis. • Monitoring is a continuing function that aims primarily to provide the management and main stakeholders of an ongoing intervention with early indication of progress, or lack thereof in the achievement of results. • It accepts the original plan and tracks actual progress against planned projects to ensure it is within planned time and cost constraints.
  • 4. What is Monitoring……? -process of keeping track of progress on a continuous and/or periodic basis to examine whether the inputs and resources meant for the implementation of plans, policies, programmes and projects are being properly delivered. -verify whether the project activities are being implemented and whether or not the intended outputs are being achieved in accordance with the plan. -The following facts are analysed in the process of monitoring: 1. If the resources are available and used within the limits of an agreed budget and stipulated timeframe. 2. If the Intended activities are taken and outputs are achieved in a timely and cost- effective manner. 3. What is the level of implementation capacity of the implementing agencies? 4. What kinds of risks are faced and what remedial measures are taken? During monitoring, data and information on the above mentioned aspects are collected, processed and reported in a continuous, systematic, and time-bound manner. This helps identify problems and initiate corrective measures before it is too late. 4
  • 5. What is Evaluation • Evaluation is a systematic and purposeful undertaking carried out by internal or external evaluators to appraise the relevance, efficiency, effectiveness of, as well as the impacts and sustainability generated by the plans, policies, programmes and projects under implementation. • The main objective of evaluation is to draw lessons from the strengths and weaknesses experienced so as to improve the design and implementation in the future as well as to hold the officials and agencies involved in the process accountable for its implementation and results. • It focuses on the changes impacted by devilment interventions and assessed in a few criteria to gather lessons. Therefore, evaluation may be taken as a tool for learning lesson. 5 The primary difference between monitoring and evaluation is that while monitoring is a continuous activity, performed at the functional level of project/programme management, evaluation is a periodic activity, performed at the outcome and impact level of project activities.
  • 7. Project Life Cycle  Project Planning  Project Initiation  Appraisal Phase  Formulation Phase  Approval Phase  Project Implementation  Implementation Phase  Monitoring Phase  Project Termination  Closing Phase  Evaluation Phase 7
  • 9. 9 Pre-project Phase • Provide comments on project proposals in : – PEC, SPEC meeting in the Planning Commission. – DPEC/DSPEC meetings in the development ministries – Internal meeting in the Administrative Ministries/ Divisions where project proposals are initially reviewed and examined.
  • 12. The result-based M&E system based on the result chain of log frame and cost effectiveness 12
  • 14. An example of Child morbidity • Inputs: funding, equipments, staffing etc. • Activities: Media campaign to educate mothers, health personnel trained in oral rehydration • Outputs: Increased maternal awareness and access to oral rehydration therapy services • Results: • Outcomes: Improved use of oral rehydration (behavioral change) • Impacts: Child morbidity reduced •
  • 15. RBM
  • 16. RB M&E in Result Based Project Management Cycle 16
  • 18. 10 steps in RBM
  • 19. CREAM
  • 20. Process Outputs Outcomes completion/milestones units provided/created physical availibility working and sustainability capacity development organisational changes use/satisfaction distribution of benefits changes in behaviour Indicators of Results Activities Inputs quantity, type and availibility of resources Process indicators Input indicators IMPACT Development progress Impact Indicators
  • 21. Baseline issues 1. What are the sources of data? 2. What are the data collection methods? 3. Who will collect the data? 4. How often will the data be collected? 5. What is the cost and difficulty to collect the data? 6. Who will analyze the data? 7. Who will report the data? 8. Who will use the data?
  • 24. M&E Context in Bangladesh 24
  • 25. Annual Development Programme’s Investment Management Monitoring 25
  • 26. 26 Background of IMED • IMED stands for ‘Implementation Monitoring and Evaluation Division’ • The Project Implementation Bureau (PIB) was established in 1975 • PIB was under the President’s Secretariat. • PIB was established to increase the efficiency of project aid utilization through appropriate monitoring activities.
  • 27. 27 Background of IMED (con.) • PIB was given the status of a separate Division in 1977. • Renamed as ‘Implementation Monitoring and Evaluation Division (IMED)’ in 1982. • Finally, IMED was placed under the Ministry of Planning in 1984.
  • 28. 28 Major Functions of IMED • Implementation monitoring of all on-going development projects included in the ADP. • Prepare periodical progress report and suggestions for corrections where necessary • Intensive monitoring for selected projects • Submission of progress reports to the Ministries/Divisions, ECNEC meeting etc
  • 29. 29 Major Functions of IMED (con.) • Evaluation of all completed development projects • Impact Evaluation for selected completed projects • Submission of evaluation reports to the Ministries/Divisions, ECNEC/NEC meeting
  • 30. 30 Different Duties of IMED  Matter relating to the Public Procurement Act & Rules and Overseeing its implementation  Cost rationalization of projects  Participating PEC meeting  Participating ADP review meeting in ministries  Provide opinion on time extension of projects  Other functions as assigned to the IMED from the Govt.
  • 31. 31 How IMED Contribute to Development Work 1. Pre-Implementation Phase: Project Approval Process 2. Implementation Phase: Implementation Monitoring 3. Post-Implementation Phase : Evaluation
  • 32. 32 M&E Framework for 8FYP-Role of IMED • “..IMED has made some progress in doing systematic review of the entire project portfolio to distil the key lessons of project selection and management and strengthen the development impact of the public investment program…” • The importance of doing a through portfolio analysis of the ADP and find ways how to maximize the development impact of public investment has gained momentum in an environment of resource constraint, that has been further aggravated by the COVID-19. • IMED will undertake an increased number of impact assessments of projects with the help of both experimental and non-experimental data so that M&E at the micro-level moves beyond simply tracking the financial and physical completion of the projects. • The IMED will develop its capacity and learning through a process of research and collaboration with the national think tanks and the universities.” Exact Quote from Part 1: Chapter 6 - Section 6.3.2 (Page 142)
  • 33. 33 M&E Framework for 8FYP • In order to monitor the progress of 8FYP, a total of 104 indicators have been chosen in the Development Result Framework (DRF) of the 8FYP. • The 6th Five Year Plan: First introduced the concept of Results-Based Monitoring and Evaluation (RBM&E) instead of assessing completion of financial or physical targets as indicators of progress • DRF of the 8FYP has been elaborated in the Chapter 6 of part 1 and highlighted • its strategic role in planning • the institutional arrangements • data mobilization arrangements • mid-term and end evaluation of the plan • DRF: A total of 15 top priority areas with linked to the SDG and PP2041 • 4 macroeconomic • 11 Sectoral.
  • 34. 34
  • 35. Monitoring by IMED • Monitoring every on-going projects included in ADP (in house) • Intensive monitoring for selected projects (outsourcing)
  • 36. 36 IMED Data Collection Formats • IMED 01/2003 (Revised):To collect general information of a project when it is approved/revised approved. • IMED 02/2003 (Revised):To collect physical & financial target on the basis of ADP & RADP allocation. • IMED 03/2003 (Revised):To collect information on quarterly physical & financial progress of project
  • 37. 37 IMED Data Collection Formats • IMED 04/2003 (Revised):To collect information of a completed project. • IMED 05/2003 (Revised):To collect monthly progress report of a project through review meetings.
  • 38. 38
  • 39. 39 How monitoring conducted by IMED • Collection of information/data through IMED Formats • Field inspection/spot verifications of – priority projects, – projects targeted for completion, – aided project and – sick projects.
  • 40. 40 Monitoring conducted by IMED (con.) • Participation in monthly ADP Review Meetings and other Meetings (e.g Steering Committee, PIC, TEC, Wrap-up etc,) • Managing Data-base (PMIS) to process and preserve collected information.
  • 41. 41 Evaluation by IMED Midterm evaluation – on-going Projects (selective cases) Post facto evaluation (for completed project) – Terminal Evaluation (for all projects) – Impact Evaluation (for selected projects)
  • 42. 42 Evaluation conducted by IMED (…) • Prepare Project Completion Report/Terminal Evaluation Reports on each completed project highlighting sustainability problems • Providing recommendations on future course of actions • Conduct out-sourced impact evaluation on selected projects.
  • 43. 43 Outsourcing of Consultants by IMED • Consulting firms are outsourced very often to conduct both In-depth monitoring and Impact evaluation of some technically complex projects. • Finding are sent to Planning Commission and concerned project initiating agencies/authorities/ECNEC/NEC • IMED is conducting 50 In-depth monitoring and 20 Impact evaluation this year through outsourced consultants.
  • 44. 44 ক্র: নং স঳ক্টয/কামযক্রভ প্রকল্প ঳ংখ্যা সভাট % ক. স঳ক্টয ভবভিক ফযাদ্দ ১. ঳াধাযণ ঳যকাভয স঳ফা ৫৫ ৩০৩৬.৪৬ ১.২৮ ২. প্রভিযক্ষা ৭ ৯৮৮.১১ ০.৪২ ৩. জন শৃঙ্খরা ও সুযক্ষা ৪৯ ৩২০৪.৯৮ ১.৩৫ ৪. ভ঱ল্প ও অর্যননভিক স঳ফা ৮৬ ৭৪৯৯.১৫ ৩.১৭ ৫. কৃভল ১৫৭ ৭৬৬৫.৩৭ ৩.২৪ ৬. ভফদ্যুৎ ও জ্বারাভন ১০৫ ৪৯৪০৮.৮৯ ২০.৮৭ ৭. ঩ভযফ঴ন ও সমাগাযমাগ ৩০৭ ৬৪৯২৬.৮১ ২৭.৪২ ৮. স্থানীয় ঳যকায ও ঩ল্লী উন্নয়ন ১০৫ ১৪২৯৯.৮৯ ৬.০৪ ৯. ঩ভযযফ঱, জরফায়ু ঩ভযফিযন এফং ঩াভন ঳ম্পদ ৯৩ ৮৫২৬.২৩ ৩.৬০ ১০. গৃ঴ায়ন ও কভভউভনটি সুভফধাফভর ২৩৮ ২৫৩৫১.৫৩ ১০.৭১ ১১. স্বাস্থু ৬৫ ১৭৩১১.৮২ ৭.৩১ ১২. ধভয, ঳ংস্কৃভি ও ভফযনাদন ৪৯ ২২১৮.৯৩ ০.৯৪ ১৩. ভ঱ক্ষা ১১৭ ২৩১৭৭.৯৬ ৯.৭৯ ১৪. ভফজ্ঞান ও িথ্য প্রযুভি ৪৮ ৩৬৭৬.৮৭ ১.৫৫ ১৫. ঳াভাভজক সুযক্ষা ৫৩ ১৬৪৬.৩০ ০.৭০ উ঩-সভাট: ১৫টি স঳ক্টয ১৫৩৪ ২৩২৯৩৯.৩০ ৯৮.৩৭ এক নজযয ২০২১-২০২২ অর্যফছযযয ফাভলযক উন্নয়ন কভযসূভিযি স঳ক্টয ভবভিক ফযাদ্দ ভফবাজন (সকাটি টাকা)
  • 45. - এট ঩ভযষ্কায সম, ফাভলযক উন্নয়ন কভযসূভি ঴যে ঳যকাযযয ঩ঞ্চফাভলযক ঩ভযকল্পনা ফাস্তফায়যনয মূর দভরর; -আয এই ফাভলযক উন্নয়ন কভযসূভিযি অন্তর্ভযি ঳কর প্রকযল্পয ফাস্তফায়ন কামযক্রভ ঩ভযফীক্ষণ, ঳ভাপ্ত প্রকযল্পয মূল্যায়ন এফং ঳যকাভয ক্রয় প্রভক্রয়ায় স্বেিা, দক্ষিা জফাফভদভ঴িায ভাধ্যযভ সদয঱য আর্য- ঳াভাভজক উন্নয়যন ঳঴ায়িা প্রদান কযাই আইএভভভিয মূর কাজ; 45
  • 46. 46 প্রকল্প ঩ভযফীক্ষযণয সক্ষযে ঳যকাযযয অগ্রাভধকাযপ্রাপ্ত প্রকল্প, বৃ঴ৎ ফযাদ্দপ্রাপ্ত প্রকল্প, ঳া঴ায্যপুষ্ট প্রকল্প, ঳ভস্যাভিষ্ট প্রকল্প, শ্লর্ গভি঳ম্পন্ন প্রকল্প এফং ঳ভাভপ্তয জন্য ভনধ যাভযি প্রকল্পযক অগ্রাভধকায সদয়া ঴যয় র্াযক। এয পযর প্রকল্প এরাকা, কাযজয ভান এফং অগ্রগভি ঳ম্পযকয একটি ফাস্তফ ধাযণা ঩াওয়া মায়। • ২০২০-২১ অর্যফছযয এ ভফবাগ কর্তযক ঳যকাযযয ০৮টি পাস্টট্রাকর্ভি প্রকল্প঳঴ ৬৩৮টি প্রভিযফদন ঳ংভশ্লষ্ট ভন্ত্রণারয়/ভফবাযগ সপ্রযণ কযা ঴যয়যছ। • এয ঩া঱া঩াভ঱ উি ঳ভযয় ৮১টি অনরাইন প্রকল্প ভভনটভযং ঳ম্পাদন কযা ঴যয়যছ। • ০৮টি ভফবাগীয় ঱঴যয ভফবাগীয় ঩মযাযয় অনুভিি উন্নয়ন ঳ভন্বয় কভভটিয ঳বায় আইএভইভি’য ঩ক্ষ ঴যি অং঱ গ্র঴ণ কযয ভিাভি প্রদান কযা ঴যে। প্রকল্প ঩ভযফীক্ষণ
  • 47. 47 প্রকল্প মূল্যায়ন • গযে প্রভি ফছয প্রায় ২৫০-৩০০টি প্রকল্প ঳ভাপ্ত ঴য়। • ২০২০-২১ অর্যফছযয ৩৪৫টি প্রকল্প ঳ভাভপ্তয জন্য ভনধ যাভযি ভছর এফং ভ঩ভ঳আয প্রাভপ্ত ঳ায঩যক্ষ ঳ভাপ্ত প্রকল্প঳মূ঴ ঩ভযফীক্ষণ কযয মূল্যায়ন প্রভিযফদন প্রণয়যনয কাজ িরভান যযয়যছ।
  • 48. 48 প্রকযল্পয ভনভফে ঩ভযফীক্ষণ ও প্রবাফ মূল্যায়ন • ২০২১-২০২২ অর্যফছযয ৫০টি প্রকযল্পয ভনভফে ঩ভযফীক্ষণ ও ২০টি প্রকযল্পয প্রবাফ মূল্যায়ন কযয চূোন্ত প্রভিযফদনগুযরা ঳ংভশ্লষ্ট কর্তয঩যক্ষয ভনকট সপ্রযণ কযযফ; • উি ঳ভীক্ষা প্রভিযফদনগুযরাযি প্রকযল্পয ঳পর এফং দ্যফ যর ভদকগুযরা ভিভিি কযা ঴যয়যছ। ঩া঱া঩াভ঱ বভফষ্যযি প্রকযল্পয ঳পর ফাস্তফায়ন, ফাস্তফাভয়ি প্রকল্প সর্যক অভজযি পরাপর সটক঳ইকযণ এফং এিভিলযয় উদ্ভূি ঳ভস্যা ভনয঳যন সু঩াভয঱ প্রদান কযা ঴য়।
  • 49. 49