SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Harris Academy South Norwood                              MEDIA Risk Assessment Record

                       Tamanna and Zachery                                                                    Studio, Bus, on the road
Production /                                                                        Location of Shoot:
Person(s) involved:
                       Music video and photo shoot                                  Location Contact No:      020 8405 5070
Activity or process:
                                                                                    Date of Assessment:       January
Shoot Date(s):         January - March                                              Director’s / Student(s)   Tamanna Miah
                                                                                    Signature:


                 A: HAZARDS                           B: DEGREE OF RISK               C: PREVENTIVE MEASURES                     D: IF ACCIDENT OCCURS?
                 In the studio                        (Refer to Risk Matrix)


        Nature of hazard           Person(s) at   Severity Likelihood     Risk     Measures in place aimed at reducing      Further necessary measures, involving
                                       risk                              Rating          risk to minimum level?                      whom and by when?
                                   (See below)
    •   Tripping over equipment   1. Cast         Major      Possible    C        Tape down the wires on the floor or       Have a teacher supervise the inside the
        and wires                                                                 around the edges of the room              room or outside
    •   Getting hit by the door   2. Crew         Major      Possible    C        Have equipment at the back of the room    Have the number for the ambulance or
    •   Over crowded                              Minor      Possible    D        away from the performance                 local hospital
                                                                                  Tidy the room so there’s more space       Have a first aid kit with the equipments
                                                                                  and less things to trip over              Have access to teachers around the
                                                                                  Have a sign on the door that says there   perimeter
                                                                                  if filming going on so they can knock
                                                                                  before entering
                                                                                  We can mark out spots for where the
                                                                                  singer and dance crew have to stand so
                                                                                  that they are not in danger of tripping
                                                                                  over or getting too close to the camera
                                                                                  when its moving around the room to get
                                                                                  different shots
A: HAZARDS                             B: DEGREE OF RISK               C: PREVENTIVE MEASURES                       D: IF ACCIDENT OCCURS?
                   On the bus                            (Refer to Risk Matrix)


        Nature of hazard              Person(s) at   Severity Likelihood     Risk     Measures in place aimed at reducing     Further necessary measures, involving
                                          risk                              Rating          risk to minimum level?                     whom and by when?
                                      (See below)
    •   Tripping over equipment      3. Cast         Major      Possible    C        Have everyone know where to go/stand     Have a teacher supervise
    •   Crashing in to each other                    Major      Possible    C        so no one bumps in to each other         Have the number for the ambulance or
    •   Falling down the stairs of   4. Crew         Major      Possible    C        Keep equipment to one place on the bus   local hospital
        the bus                                                                                                               Have a first aid kit with the equipments
                                                                                                                              Have access to teachers around the
                                                                                                                              perimeter




                 A: HAZARDS                              B: DEGREE OF RISK               C: PREVENTIVE MEASURES                       D: IF ACCIDENT OCCURS?
               On the road, street                       (Refer to Risk Matrix)


        Nature of hazard              Person(s) at   Severity Likelihood     Risk     Measures in place aimed at reducing     Further necessary measures, involving
                                          risk                              Rating          risk to minimum level?                     whom and by when?
                                      (See below)
    •   Getting hit by a car         5. Cast         Major      Possible    B        Find a place where few cars and people   Have a teacher supervise
    •   People walking by                            Major      Possible    C        are known to pass by                     Have the number for the ambulance or
        getting hit by the           6. Crew                                                                                  local hospital
        equipment or us                                                                                                       Have a first aid kit with the equipments
                                                                                                                              Have access to teachers around the
                                                                                                                              perimeter

Persons at risk include: Cas – Cast                      Cre - Crew                    Fam - Family                    Pub - Public
                         Stu - Students                  Tut - Tutor(s)                Vis - Visitors
The “Risk Matrix” or Table of Overall Risk

The Risk Matrix is a useful tool in the assessment of the severity of overall risk. It is intended to allow the relationship between the likelihood of
incident/injury occurring and the possible severity of outcome. By comparing these two factors against each other, a Risk Rating can be arrived at,
employing a scale between ‘A’ (highest risk) and ‘E’ (lowest risk).

Risk Likely Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest)

      Likely                                                  Risk Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest)
    severity of
     outcome
                      Frequent                    Probable                     Possible                     Remote                   Unlikely

Fatal                 A                           B+                           C+                           D+                       E+
Major                 B+                          B                            C                            D                        E
Minor                 C+                          C                            D                            D                        E
Non- Reportable       D+                          D                            D                            E                        E


Explanation of severity of outcome (For definitions and full list of inclusions, refer to the Reporting of Injuries, Diseases and Dangerous Occurrence
Regulations (RIDDOR) 1995):

Fatal - any fatal injuries to employees, or any other person, sustained in an accident connected with your business

Major - any injury that includes:
· Fracture of the skull, spine, pelvis, any bone in the arms or legs (but not in the hand or foot).
· Amputations of the hand or foot, or of a finger, thumb or toe where the bone or joint is severed.
· Loss of sight in an eye, or a penetrating injury, chemical / hot burn to the eye.
· Electric shock resulting in loss of consciousness and / or medical treatment.
· Acute illness or loss of consciousness resulting from absorption, inhalation or ingestion of a substance.
· Any other injury requiring hospitalization for more than 24 hours.

Minor - any other injury to an individual that results in absence from work, or an inability to carry out their normal works, for more than 3 days.
Non-Reportable - any injury or discomfort that does not cause more than 3 days’ disablement, or permanent damage.
Note: “Ill Health”, i.e. loss of hearing, respiratory illness, dermatitis etc. should be rated on their likely severity.
For each section of the Risk Assessment Record form above,
it is recommended that the assessor(s) refer to the notes below for an outline of the main requirements of the questions:

• Activity or Process - Basically you are required to state the physical nature of the activity.
This can either be a generic activity such as “booking out kit”, or a more specific activity such as “filming in a moving car” or other more specialized activities; so if
necessary try to describe it as best as possible.
For example: “erection and use of lights in living room for fight scene”.

• Nature of Hazard? - Concentrate upon things that could cause harm, not trivial things like flaky paintwork!
Consult the people who use the area as they may have a different perspective to you.
Do not rely solely upon others however, as they have become “blinkered” to certain hazards through daily exposure to them.

• Who may be at risk? - Identify types / groups and numbers of people, and perhaps individuals.
It could be “crew” in general, or more specific groups such as cast or guest interviewees who are not familiar with the location.

• Degree of risk - Compare the likely outcome (worst case scenario if you like) against the likelihood of it occurring (unlikely through to frequent). Award a rating from A
(high) down to E (very low).

Refer to the Risk Matrix above for risk rating.

• Preventive (Existing Control Measures) - Identify the measures already in place and ask yourself if they are sufficient to eliminate or reduce the risk to the lowest
possible degree?
It is not always possible to entirely eliminate a hazard, as they are often intrinsic to a piece of equipment (such as a tungsten light) or an activity (such as driving).

• Preventive (Further Measures Required) - Is there a possibility of circumstances arising that could lead to additional unforeseen risk?
If so, how could these be pre-empted and addressed before they cause harm? If change is planned, what associated hazards could arise? Could adverse weather
conditions or a sudden influx of people result in additional hazards?

• If Accident Occurs – it is essential that plans are in place if any accident occurs, whether it be fatal, major, minor, or even some non-reportable outcomes.
This would normally take the form of having a record of emergency numbers of cast and crew, contacting the college and the media department, and calling the
emergency services as required.

This Risk Assessment Document has been approved by                                     Date
L. BRYANT                                                                              Dec 2011

Weitere ähnliche Inhalte

Was ist angesagt?

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template mediaJade0livia
 
4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan4.6 working at heights and fall protection plan
4.6 working at heights and fall protection planDwarika Bhushan Sharma
 
Risk assessment arley moldova
Risk assessment arley moldovaRisk assessment arley moldova
Risk assessment arley moldovaAshleighG
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templatesDwarika Bhushan Sharma
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templatesDwarika Bhushan Sharma
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templatesDwarika Bhushan Sharma
 
Security supervisor ppt
Security supervisor pptSecurity supervisor ppt
Security supervisor pptAccord Group
 
17 traffic operations working on live roads risk assessment templates
17 traffic operations   working on live roads risk assessment templates17 traffic operations   working on live roads risk assessment templates
17 traffic operations working on live roads risk assessment templatesDwarika Bhushan Sharma
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Abu Dhabi Occupational Health & Safety Practitioner Course
Abu Dhabi Occupational Health & Safety Practitioner CourseAbu Dhabi Occupational Health & Safety Practitioner Course
Abu Dhabi Occupational Health & Safety Practitioner CourseSUBRAMANI NELLAIAPPAN
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templatesDwarika Bhushan Sharma
 
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdfRA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdfMohPhoolay
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templatesDwarika Bhushan Sharma
 

Was ist angesagt? (20)

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan4.6 working at heights and fall protection plan
4.6 working at heights and fall protection plan
 
Risk assessment arley moldova
Risk assessment arley moldovaRisk assessment arley moldova
Risk assessment arley moldova
 
32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates32 use of aluminium mobile scaffolding risk assessment templates
32 use of aluminium mobile scaffolding risk assessment templates
 
19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates19 use of mobile elevated work platforms risk assessment templates
19 use of mobile elevated work platforms risk assessment templates
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 
Security supervisor ppt
Security supervisor pptSecurity supervisor ppt
Security supervisor ppt
 
17 traffic operations working on live roads risk assessment templates
17 traffic operations   working on live roads risk assessment templates17 traffic operations   working on live roads risk assessment templates
17 traffic operations working on live roads risk assessment templates
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates15 formwork (temporary works) risk assessment templates
15 formwork (temporary works) risk assessment templates
 
Hira
HiraHira
Hira
 
Abu Dhabi Occupational Health & Safety Practitioner Course
Abu Dhabi Occupational Health & Safety Practitioner CourseAbu Dhabi Occupational Health & Safety Practitioner Course
Abu Dhabi Occupational Health & Safety Practitioner Course
 
9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates9 lifting operations with tower crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
 
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdfRA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
RA for Hot works at MOE-Ghim Moh (Ceiling support works).pdf
 
18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates18 laying blockwork with access scaffolding risk assessment templates
18 laying blockwork with access scaffolding risk assessment templates
 

Ähnlich wie Risk assessment template

Risk Assessment
Risk Assessment Risk Assessment
Risk Assessment LarelleShay
 
Media Risk Assessment
Media Risk AssessmentMedia Risk Assessment
Media Risk AssessmentLarelleShay
 
Media risk assessment record
Media risk assessment recordMedia risk assessment record
Media risk assessment recordLarelleShay
 
Risk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalRisk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalDmeeThriller
 
Risk assessment south bank
Risk assessment south bankRisk assessment south bank
Risk assessment south bankDmeeThriller
 
Risk assessment party scene
Risk assessment party sceneRisk assessment party scene
Risk assessment party sceneYinka93
 
Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street finalDmeeThriller
 
Risk assessment troc
Risk assessment trocRisk assessment troc
Risk assessment trocDmeeThriller
 
Risk assessment 2016
Risk assessment 2016Risk assessment 2016
Risk assessment 2016AW180415
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessmentjonese3
 

Ähnlich wie Risk assessment template (11)

Risk Assessment
Risk Assessment Risk Assessment
Risk Assessment
 
Media Risk Assessment
Media Risk AssessmentMedia Risk Assessment
Media Risk Assessment
 
Media risk assessment record
Media risk assessment recordMedia risk assessment record
Media risk assessment record
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalRisk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene final
 
Risk assessment south bank
Risk assessment south bankRisk assessment south bank
Risk assessment south bank
 
Risk assessment party scene
Risk assessment party sceneRisk assessment party scene
Risk assessment party scene
 
Risk assessment regent street final
Risk assessment regent street finalRisk assessment regent street final
Risk assessment regent street final
 
Risk assessment troc
Risk assessment trocRisk assessment troc
Risk assessment troc
 
Risk assessment 2016
Risk assessment 2016Risk assessment 2016
Risk assessment 2016
 
Student risk assessment
Student risk assessmentStudent risk assessment
Student risk assessment
 

Mehr von tamz486

Question 1
Question 1Question 1
Question 1tamz486
 
Target audience
Target audienceTarget audience
Target audiencetamz486
 
Costume and prop ideas
Costume and prop ideasCostume and prop ideas
Costume and prop ideastamz486
 
Story board
Story boardStory board
Story boardtamz486
 
Story board
Story boardStory board
Story boardtamz486
 
Story board
Story boardStory board
Story boardtamz486
 
Audition poster
Audition posterAudition poster
Audition postertamz486
 
Audition poster 2
Audition poster 2Audition poster 2
Audition poster 2tamz486
 
Audition poster
Audition posterAudition poster
Audition postertamz486
 
Audition poster 2
Audition poster 2Audition poster 2
Audition poster 2tamz486
 
Our proposal for media
Our proposal for mediaOur proposal for media
Our proposal for mediatamz486
 
Our proposal for media
Our proposal for mediaOur proposal for media
Our proposal for mediatamz486
 
Textual analysis of music video
Textual analysis of music videoTextual analysis of music video
Textual analysis of music videotamz486
 
Magazine adverts
Magazine advertsMagazine adverts
Magazine advertstamz486
 
Analysis of digipaks
Analysis of digipaksAnalysis of digipaks
Analysis of digipakstamz486
 
Digipaks
DigipaksDigipaks
Digipakstamz486
 
Question 6
Question 6Question 6
Question 6tamz486
 
Q4 who would be the audience of
Q4   who would be the audience ofQ4   who would be the audience of
Q4 who would be the audience oftamz486
 

Mehr von tamz486 (20)

Question 1
Question 1Question 1
Question 1
 
Results
ResultsResults
Results
 
Target audience
Target audienceTarget audience
Target audience
 
Costume and prop ideas
Costume and prop ideasCostume and prop ideas
Costume and prop ideas
 
Story board
Story boardStory board
Story board
 
Story board
Story boardStory board
Story board
 
Story board
Story boardStory board
Story board
 
Audition poster
Audition posterAudition poster
Audition poster
 
Audition poster 2
Audition poster 2Audition poster 2
Audition poster 2
 
Audition poster
Audition posterAudition poster
Audition poster
 
Audition poster 2
Audition poster 2Audition poster 2
Audition poster 2
 
Our proposal for media
Our proposal for mediaOur proposal for media
Our proposal for media
 
Our proposal for media
Our proposal for mediaOur proposal for media
Our proposal for media
 
Textual analysis of music video
Textual analysis of music videoTextual analysis of music video
Textual analysis of music video
 
Magazine adverts
Magazine advertsMagazine adverts
Magazine adverts
 
Analysis of digipaks
Analysis of digipaksAnalysis of digipaks
Analysis of digipaks
 
Digipaks
DigipaksDigipaks
Digipaks
 
Question 6
Question 6Question 6
Question 6
 
Q7
Q7Q7
Q7
 
Q4 who would be the audience of
Q4   who would be the audience ofQ4   who would be the audience of
Q4 who would be the audience of
 

Kürzlich hochgeladen

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 

Kürzlich hochgeladen (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

Risk assessment template

  • 1. Harris Academy South Norwood MEDIA Risk Assessment Record Tamanna and Zachery Studio, Bus, on the road Production / Location of Shoot: Person(s) involved: Music video and photo shoot Location Contact No: 020 8405 5070 Activity or process: Date of Assessment: January Shoot Date(s): January - March Director’s / Student(s) Tamanna Miah Signature: A: HAZARDS B: DEGREE OF RISK C: PREVENTIVE MEASURES D: IF ACCIDENT OCCURS? In the studio (Refer to Risk Matrix) Nature of hazard Person(s) at Severity Likelihood Risk Measures in place aimed at reducing Further necessary measures, involving risk Rating risk to minimum level? whom and by when? (See below) • Tripping over equipment 1. Cast Major Possible C Tape down the wires on the floor or Have a teacher supervise the inside the and wires around the edges of the room room or outside • Getting hit by the door 2. Crew Major Possible C Have equipment at the back of the room Have the number for the ambulance or • Over crowded Minor Possible D away from the performance local hospital Tidy the room so there’s more space Have a first aid kit with the equipments and less things to trip over Have access to teachers around the Have a sign on the door that says there perimeter if filming going on so they can knock before entering We can mark out spots for where the singer and dance crew have to stand so that they are not in danger of tripping over or getting too close to the camera when its moving around the room to get different shots
  • 2. A: HAZARDS B: DEGREE OF RISK C: PREVENTIVE MEASURES D: IF ACCIDENT OCCURS? On the bus (Refer to Risk Matrix) Nature of hazard Person(s) at Severity Likelihood Risk Measures in place aimed at reducing Further necessary measures, involving risk Rating risk to minimum level? whom and by when? (See below) • Tripping over equipment 3. Cast Major Possible C Have everyone know where to go/stand Have a teacher supervise • Crashing in to each other Major Possible C so no one bumps in to each other Have the number for the ambulance or • Falling down the stairs of 4. Crew Major Possible C Keep equipment to one place on the bus local hospital the bus Have a first aid kit with the equipments Have access to teachers around the perimeter A: HAZARDS B: DEGREE OF RISK C: PREVENTIVE MEASURES D: IF ACCIDENT OCCURS? On the road, street (Refer to Risk Matrix) Nature of hazard Person(s) at Severity Likelihood Risk Measures in place aimed at reducing Further necessary measures, involving risk Rating risk to minimum level? whom and by when? (See below) • Getting hit by a car 5. Cast Major Possible B Find a place where few cars and people Have a teacher supervise • People walking by Major Possible C are known to pass by Have the number for the ambulance or getting hit by the 6. Crew local hospital equipment or us Have a first aid kit with the equipments Have access to teachers around the perimeter Persons at risk include: Cas – Cast Cre - Crew Fam - Family Pub - Public Stu - Students Tut - Tutor(s) Vis - Visitors
  • 3. The “Risk Matrix” or Table of Overall Risk The Risk Matrix is a useful tool in the assessment of the severity of overall risk. It is intended to allow the relationship between the likelihood of incident/injury occurring and the possible severity of outcome. By comparing these two factors against each other, a Risk Rating can be arrived at, employing a scale between ‘A’ (highest risk) and ‘E’ (lowest risk). Risk Likely Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest) Likely Risk Rating, on a scale of ‘A’ to ‘E’ (‘A’ being the highest) severity of outcome Frequent Probable Possible Remote Unlikely Fatal A B+ C+ D+ E+ Major B+ B C D E Minor C+ C D D E Non- Reportable D+ D D E E Explanation of severity of outcome (For definitions and full list of inclusions, refer to the Reporting of Injuries, Diseases and Dangerous Occurrence Regulations (RIDDOR) 1995): Fatal - any fatal injuries to employees, or any other person, sustained in an accident connected with your business Major - any injury that includes: · Fracture of the skull, spine, pelvis, any bone in the arms or legs (but not in the hand or foot). · Amputations of the hand or foot, or of a finger, thumb or toe where the bone or joint is severed. · Loss of sight in an eye, or a penetrating injury, chemical / hot burn to the eye. · Electric shock resulting in loss of consciousness and / or medical treatment. · Acute illness or loss of consciousness resulting from absorption, inhalation or ingestion of a substance. · Any other injury requiring hospitalization for more than 24 hours. Minor - any other injury to an individual that results in absence from work, or an inability to carry out their normal works, for more than 3 days. Non-Reportable - any injury or discomfort that does not cause more than 3 days’ disablement, or permanent damage.
  • 4. Note: “Ill Health”, i.e. loss of hearing, respiratory illness, dermatitis etc. should be rated on their likely severity. For each section of the Risk Assessment Record form above, it is recommended that the assessor(s) refer to the notes below for an outline of the main requirements of the questions: • Activity or Process - Basically you are required to state the physical nature of the activity. This can either be a generic activity such as “booking out kit”, or a more specific activity such as “filming in a moving car” or other more specialized activities; so if necessary try to describe it as best as possible. For example: “erection and use of lights in living room for fight scene”. • Nature of Hazard? - Concentrate upon things that could cause harm, not trivial things like flaky paintwork! Consult the people who use the area as they may have a different perspective to you. Do not rely solely upon others however, as they have become “blinkered” to certain hazards through daily exposure to them. • Who may be at risk? - Identify types / groups and numbers of people, and perhaps individuals. It could be “crew” in general, or more specific groups such as cast or guest interviewees who are not familiar with the location. • Degree of risk - Compare the likely outcome (worst case scenario if you like) against the likelihood of it occurring (unlikely through to frequent). Award a rating from A (high) down to E (very low). Refer to the Risk Matrix above for risk rating. • Preventive (Existing Control Measures) - Identify the measures already in place and ask yourself if they are sufficient to eliminate or reduce the risk to the lowest possible degree? It is not always possible to entirely eliminate a hazard, as they are often intrinsic to a piece of equipment (such as a tungsten light) or an activity (such as driving). • Preventive (Further Measures Required) - Is there a possibility of circumstances arising that could lead to additional unforeseen risk? If so, how could these be pre-empted and addressed before they cause harm? If change is planned, what associated hazards could arise? Could adverse weather conditions or a sudden influx of people result in additional hazards? • If Accident Occurs – it is essential that plans are in place if any accident occurs, whether it be fatal, major, minor, or even some non-reportable outcomes. This would normally take the form of having a record of emergency numbers of cast and crew, contacting the college and the media department, and calling the emergency services as required. This Risk Assessment Document has been approved by Date L. BRYANT Dec 2011