concrete pump checks on arrival to site prior to s • gas • sewerage prevent vertically stored objects from sliding or ensure stability of piles of products/materials and environmental plan safety project health • worker competency • manual handling • falling materials • work at height • worker struck by vehicle • reversing vehicles • workers in plant operating radius very high risk of fatality • plant reversing – risk of serious injury to pede • incident due to use of defective plant or associ • operator visibility • plant / pedestrian interaction • failure due to use of un-certificated plant access to work areas by personnel and plant. mater • telecoms • water 1 purpose don’t walk by sort it say it see it 5 - clowns belong in the circu 4 - safety is the lifeline of 2-there's a safe way to do eve pick up stop falls pick u clean up 3-stop falls chemicals saffety hazardous che safety poster hazardous chemicals risk of damage to low depth presence of live underground ensure that the works areas where works are undertaken at • lift planning • use of mobile crane including access work area guide to use risk assessment workplace stress difficulty concentrating short temper inability to sleep frequent headaches scaffolding safety power cords safety head protection hazcom hand tools flu prevention grinders & saws forklifts foot & leg protection falling objects boom collapse if provided. use outriggers if working near traffic brakes and wheel chocks broken bone could face falls aerial lift accidents aerial lifts are vehicle business operations health and safely objective sustainability objectives risks and opportunities environmental objectives except in an emergency. in case of emergency alway or manufacturer has derated the forklift [reduced an authorised dealer unless it is designed so you can do this stand on competent and authorised to do so use a forklift o unless the forklift is designed specifically for t certified and authorised to do so travel with a bu unless trained lift loads greater than the capacity of the forkli never: safe operation & carrying loads or lift trucks. fork trucks rider operated forklifts stack or tier materials. they include pallet truck lift a forklift is a powered truck used to carry forklift safety and retinal burns. explosion the unit can expose welders to fire the arc welder is very safe. if used improperly from the primary (input) voltage if you touch a le however arc welding is safe if the unit is properly instal permanent flss controlled floors removal of packin substructure superstructure (concrete) building works & mep 1st fix wet trades basic risk start point fire risk evaluation & reduction levels trouble breathing persistent pain or pressure in t headache  cough sore throat  fever general feeling construction plant and equipment safety man and machine presentation june-2019 rev- tournament 2020 cricket team-poster are you good cricket player? join “compnay” team c there are several safety tips to follow to help pr man and machine interface safe work practices & tips: grinders & saws safely use • reduced visibility for equipment and other occupational health and fitness to work night work safety never allow people to be below a suspended load at moving falling objects safety safe work practices and tips hse alert # power cords "company name" construction has the following qhse qhse at "company name" construction is given utmos control and management of combustible materials ar even knowing this the planning is even higher in the g.c.c. and the region. the c subcontractor and employee “cultural” issues it is vital that everyone is aware of the common c or you can help start/allow them. in order to mini fire will end. fire is a major risk both to person heat and oxygen) if we remove 1 element code of practice c.o.p # 01 fire prevention requi worker exposure to direct sun whist working on sca • scaffold erected for long periods maintenance of tower scaffold • adverse weather dismantling of tower scaffold • works at height aluminium tower scaffold erection and use (classif • scaffold specific design components and erection standards (classified as tower scaffold design • use of plant – forklift etc. • storage of materials for scaffold • vehicles and workers in same working area access to work areas by personnel aluminum tower prior to works use of excavator for excavating ndr planned excavation for ndrc pit in areas where liv • noise • fuel storage • fuel leakage – environmental risk • incident due to incorrect earthing site generators – offices and site • temporary su • use of incorrectly rated fuses damage to unprotected cables • tripping hazard • incorrect earthing • non-adherence to colour coding of wiring • use of substandard connections • use of substandard electrical fixtures and fitti temporary electrics - offices • electrical connect • fire installation of distribution boards to work areas emergency lighting • power failure • workers unabl • workers blinded by direct light source when movi • incident due to insufficient lighting • slips and trips works undertaken in areas of low light or night wo • injury from broken glass from halogen lights • burns from halogen lights • work undertaken by incompetent workers • electric shock or electrocution from incorrect i temporary electric supply for temporary lighting • • edge protection erected for long periods maintenance of edge protection • adverse weather • use of unsupervised or untrained personnel • manual handling injuries • injury from falling objects • injury from fall from heights dismantling of edge protection • works at height • installation of protection • working over other trades boards etc.) to lift shafts (classified as tempor mesh hole protection installation (hand rails boards etc.) to risers and penetrations (classifi boards etc.) to leading edges (classified as temp edge protection installation (hand rails • use of unsupervised or untrained personnel to er • protection specific design edge protection design and erection standards (cl • injury due to failure to ensure adequate pre-che • worker injury due to working on pressurized syst re-testing in the event of failure • re-testing wi • poor response in the event of an emergency • emergency procedures not briefed to task workers • high pressure water/air injection. emergency pro flying objects • weld/seal/fitting failure • end caps/plugs ejecting under high pressure • instrument failure resulting in system over-pres • valve/connection failure • rupture/failure in pipe lines during testing • uncontrolled stored energy release pressure testing • high pressure to pipework • inadequate signage to test area signage to test area • personnel in area • unautho • worker struck by high pressure water release • workers struck by flying materials establishing exclusion zones • personnel in area • • disposal of used/empty containers emergency procedures • action to be taken in an em use of substances and chemicals on site • use of s prior to / at site delivery • hazardous substances removal of waste concrete and rebar • truck operat • use of hand held breakers undertaking breaking works – manual operation usin demolition (supervision) • plant operations around demolition of concrete structure • excavator break plant checks on arrival to site prior to site acce • etc. • ducting • lift shafts • pipework • bridge decks • ndrc pits • manholes • vessels • tanks prior to entry confined space working – • deep ex planned confined space work in areas where live se • workers trapped at height • machine malfunction at height • material fall from height • fall from height cradle operation • collapse of cradle through damage or failure of pre-use checks of suspended access cradle or platf cradle checks on arrival to site prior to use • us • workers in mewp operating radius mewp operation (supervision) • mewp operations aro • workers struck by working mewp • collision with other plant and live traffic with • operators climbing onto hand rails • unauthorized use of mewp by untrained personnel • mewp overturning mewp operation (operator) • operator competency mewp checks on arrival to site prior to site acces 19 use of mobile elevated work platforms risk asse working platforms for high level block laying loa forklifts etc. access scaffolding vehicles/plant equipment movements for block deliv • road works • road delineation • diversions • clo 17 traffic operations - working on live roads risk scaffold design and erection standards (classifie access to work areas by personnel and plant. scaff formwork installation (classified as temporary str 15 formwork (temporary works) risk assessment temp • plant operator unable to see task – screen cover plant operation supervision • plant operations aro • workers struck by working plant • collision with plant and live traffic within sit • unauthorized use of plant by untrained personnel grader and roller operation (plant operator) • ope grader /roller checks on arrival to site prior to septic tank excavation etc. works at height (offic working adjacent to public areas vehicles/plant 13 initial project site office set-up risk assessm sheet piling rig checks on arrival to site prior t 12 sheet piling operations (temporary works) risk piling rig checks on arrival to site prior to use 11 piling operations with rebar cage installation 10 use of mobile concrete pump risk assessment tem setting up and testing of tower crane lifting of e access of tower crane sections to work areas tow 9 lifting operations with tower crane risk assessm crane supervision crane maintenance (revised 06-06 crane checks on arrival to site prior to use acces use of powered access equipment for assembly of fa prior to works use of excavator for excavating and planned excavation in areas where live services ma 5 trial trenches (temporary works) risk assessment 4 cofferdams (temporary works) risk assessment tem 3 emergency management risk assessment templates 2 fire risk assessment template risk assessment te 1 guide to use risk assessment templates environmental control measures 1 = applicable regulation not available) environmental impacts register evaluation safety and environmental manual health consultation and communication management hse-01 4.15 hse mandatory signage 1 purpose 3 2 responsibility 3 3 kpi’s and objecti temporary works management plan contents 1 purpose 3 2 performance measurement 3 3 monitoring schedule plan 2 acronyms and abbreviations 4 2 responsibility 1. introduction 3 2. scope 3 working at heights and fall prevention plan legislation and references fire prevention & protection plan “project name” organization chart of response team emergency escape route and assembly 12. waste management control plan 25 hse construction environment management plan disposal and handling 16 9 inspection and monitori 1. introduction 4 1.1 benefits of construction was sort it !! say it !! see it !! workers live matter mobile elevated work platforms adverse weather slips trips falls and bumps fire prevention driving in fog crane & lifting operations in adverse weather tyre wear-visual check potential falls poor housekeeping 10 ways for working safely @ heights temporary fire “managed storage area” delivery from store to workplace in building. combustible materials store check & direct 10 ways to prevent electrical fire resolve before permitting/ instructing them to wor please continue to work safelyand maintain in high workers are you in a safe place to perform your ta conduct weekly electrical & fire inspections immediately report and act on non compliances conduct fire prevention controls as per fire risk provide designated combustible material waste area immediately remove packaging upon delivery provide regular tool box talks provide extinguishers and operational firehose ree provide temporary fire protection during installat send combustible materials to combustible stores. construct fully compliant combustible materials st order materials in non combustible packing prepare fire prevention & combustible materials ma incomplete platform no harness no cover on cradle danger of falling ma danger of falling materials look-up for safety : up to 50% of injures are caus don’t walk by : look-up for hazards plant-task selection matrix all clear – safe to work responsibility how to work slope no t locks no outriggers not in cab no seat belt
Mehr anzeigen