SlideShare ist ein Scribd-Unternehmen logo
1 von 36
Development policy and change:
 Public Financial Management

                        Tamara Levine
                        November 8, 2012
Seminar objectives
• Gain a basic understanding of public financial management
  in developing countries
• Understand the challenges and opportunities presented by
  PFM reform

  Today’s program:
• Part I: Overview of national public financial management
  practices in developing countries
• Part II: Specific country cases of PFM reform particularly in
  East Africa
Structure
1.   Key definitions
2.   What is PFM reform?
3.   Why is PFM important?
4.   Case studies
5.   Lessons learned
6.   Key questions
1. Key definitions
1.1. Key definitions – PFM (I)
• Until recently, there was no universally agreed definition of PFM,
  and the narrowest definition confined PFM to ”the downstream
  activities of budget execution, control, accounting, reporting,
  monitoring and evaluation” (Allen et al, 2004)
• PFM is now broadly considered as “the system by which financial
  resources are planned, directed and controlled to enable and
  influence the efficient and effective delivery of public service
  goals” (CIPFA 2010:5)
• PFM moves away from the concept that ‘managing the money’
  rests solely with the Ministry of Finance: Every public service
  manager is equally responsible for ensuring that public money is
  managed well (CIPFA 2010)
1.2. Key definitions - PEFA
• The Public Expenditure and Financial Accountability (PEFA)
  Performance Measurement Framework was developed in
  2003 by a group of donors prominent in this field.
• It lists 73 key PFM dimensions (organized into 31 indicator
  areas) described as “critical” to the “performance of an
  open and orderly PFM system” and “the key PFM elements
  … recognized as being critical for all countries to achieve
  sound public financial management” (PEFA 2006, 2).
• The PEFA framework standardizes an approach that focuses
  on “the immediate objectives of reform” (Wescott,
  2008)based on OECD best practice and international
  accounting norms
1.3. Key definitions – Others
•   Fiscal strategy
•   Budget
•   Medium-Term Expenditure Framework (MTEF)
•   Line Item Budgeting
•   Budget Support
2. What is PFM reform?
2.1. What is PFM reform?
• Reform is ”the action or process of changing an institution or
  practice”
• Change is a central theme of development, and the change
  agenda in developing countries increasingly focuses on public
  organizations; a study of 31 African countries (Andrews 2008a)
  found that:
   – All 31 adopting Government Financial Statistics (GFS) or Classifications of
     the Functions of Government (COFOG);
   – All were adopting International Public Sector Accounting Standards (IPSAS)
     or some other version
   – 28 were pursuing Medium Term Expenditure Frameworks (MTEF);
   – 26 were using ceilings to prepare budgets; all were creating Treasury
     Single Accounts (TSAs) or some consolidated public accounts structure;
   – 25 were introducing program, performance or activity-based budgeting;
   – 20 were tackling a systems project (like FMIS)
2.2. When do PFM reforms work?
• PFM reforms deliver results when three conditions
  coincide:
   – When there is a strong political commitment to their
     implementation,
   – When reform designs and implementation models are
     well tailored to the institutional and capacity context;
     and
   – When strong coordination arrangements – led by
     government officials – are in place to monitor and guide
     reforms.
2.3. PFM process
                                       Strategic
Policy processes                      budgeting



              External audit   Levels:                         Budget
                   and         -National PFM system          preparaTion
              accountability   -Sub-national PFM system

                               Stakeholders:
                               -Core entities: MoF,
                               Treasury, SAIs, Parliament,
                               etc.
                               -Spending entities: Line
                               ministries, Agencies, etc.
                               -Civil society, donors,
             Accounting and    academia, media, private       Ressource
                reporting      sector                        management



                                      Internal
                                   controls, audit
                                   and monitoring
2.4. Capacity development process
                                             Step 1:
                Step 5:
                                             Engage
               Evaluate
                                          stakeholders
               capacity
                                           on capacity
             development
                                          development




          Step 4:                                    Step 2:
      Implement a                                    Assess
         capacity                                   capacity
      development                                  assets and
        response                                     needs

                               Step 3:
                            Formulate a
                              capacity
                           development
                             response
3. Why is it important?
3.1. Why is it important?
• Strong PFM institutions build institutional and country
  capacity to
   – underpin fiscal and macro stability
   – guide the allocation of public resources to national priorities
   – support the efficient delivery of services for poverty reduction
     and economic development
   – make possible the transparency and scrutiny of public funds
• PFM contributes to achieving strategic and operational
  goals as a key aspect of good governance
• To make aid more efficient
• To deliver tangible results
3.2. Why is it important?
• PFM dominates the World Bank reform agenda with PFM
  being “a major component of 81 percent” of projects:
   – Projects containing PFM components number over 30 a year since
     2000, valued at $912 million per year (World Bank 2008, 28)
   – PFM also routinely provides conditions for other loans (World Bank
     2006)
4. Some case studies
4.1. Case characteristics
1. Burkina Faso: donor support appeared to be positively correlated with PFM
   improvements;
2. Malawi: donor support appeared to be negatively correlated with PFM
   improvement;
3. Ghana: significant PFM improvements appear to have occurred despite relatively
   low levels of donor support

                    Countries where budget           Countries where budget institutions
                    institutions improved            did not improve
High donor effort   Burkina Faso, Tanzania, Zambia   Benin, Malawi, Uganda, Mozambique,
                                                     Rwanda, São Tomé and Principe
Low donor effort    Ethiopia, Ghana, Mali            Guinea, Madagascar
4.2. Political indicators
• The political environment is more competitive in Malawi and Ghana where
  political leaders have to resort to more extensive use of patronage to
  succeed
• This has made a major difference to the ability of each of these countries
  to provide leadership to PFM reforms and a consistent commitment to
  their implementation
• The importance of patronage in Malawi and Ghana, relative to Burkina
  Faso is illustrated by the discrepancy in the numbers of Ministers, Deputy
  Ministers and Members of Parliament per head of population
                                         (2009)   Burkina Faso         Ghana             Malawi
Total number of ministers and deputy ministers                   30                75                 45
- Ministers                                                      25                37                 22
- Deputy ministers                                                5                38                 21
Total number of MPs                                              111              230                194
Number of citizens per minister                            526,667             317,333            355,814
Number of citizens per MP                                  142,342             103,478             78,866
4.3. Reform inputs, 2001-2010
(Million USD)         Burkina Faso           Ghana                  Malawi
External Funding of   30-35                  39                     38-45
PFM Reform Inputs
Domestic Funding of   30-35                  20                     30
PFM Reform Inputs
Approximate Total     60-70                  60                     68-75
Main Areas of         All clusters, but      All clusters, but      All clusters, but
Concentration         especially Financial   especially Financial   especially Financial
                      Mgt & reporting,       Mgt & reporting,       Mgt & reporting,
                      Budget preparation,    Budget preparation,    Budget preparation,
                      Revenue                Revenue                Procurement, Internal
                      Administration, and    Administration,        Audit, and External
                      Procurement            Procurement and        Audit.
                                             Internal & External
                                             Audit
Timing of Spending    Broadly consistent     Some spend             Some spend
                      throughout period      throughout but focus   throughout but focus
                                             on 2001–2007 and       on 2005–2009
                                             2010
4.3. Reform inputs (cont.)
• All of the case study countries have overseen major programs of
  PFM reforms over the past ten years, with total spending
  amounting to some US $ 60 –70 million.
• Domestic allocations to PFM reform have also been high, both for
  recurrent funding and for funding of specific projects. This is
  especially true in Burkina Faso and Malawi.
• The significant inflows of General Budget Support in each country,
  (see table), would have facilitated increased domestic budget
  allocations but their use to support PFM reform was in each case an
  exclusively internal decision, unrelated to any conditionality.
• Both Ghana and Malawi experienced fluctuations in the total level
  of annual spending on PFM reforms, whereas Burkina Faso saw a
  more steady, continuous pattern of spending.
4.4. Reform outcomes
PEFA Scores by Cluster                Burkina Faso    Ghana          Malawi
(64 Indicators; max. = 4; min. = 1)
                                      2007    2010    2006    2010   2006     2011
Strategic Budgeting                   2.75     3.25   2.00    2.50   1.75     2.25
Budget Preparation                    3.26    3.40    2.50    2.64   2.34     2.57
Resource Management                   2.33    2.78    2.32    2.38   1.96     2.74
(Inflows, Outflows, Procurement
& Payroll)
Internal Control, Audit and           2.22    3.22    2.00    1.88   2.00     2.38
Monitoring
Accounting and Reporting              3.00    3.13    2.33    2.33   2.13     2.33
External Accountability               2.33    2.00    2.50    2.33   1.67     2.00
4.5.1. Burkina Faso: Context
• EQ8: Political commitment has been consistent and long-
  standing, deep, and technically informed. Financing has
  been sufficient. Some limitations on policy space, especially
  regarding program Budgets.
• EQ 3: Limited & inconsistent use of country Systems.
  Budget Support 31 % of ODA, 12 % of public spending, but
  unpredictable within-year disbursements. BS dialogue
  helped to institutionalize reform monitoring process but
  conditionality not influential.
• EQ 4: Civil Society & Legislature uninfluential but WAEMU
  Commission a significant influence through peer pressure
  and directives on PFM.
4.5.2. Burkina Faso: Mechanisms
• EQ 2: strong coordination arrangements, based upon an integrated
  reform programme (PRGB/ SRFP), endorsed at Cabinet level, led by
  Secretariat (SP-PPF) of high calibre staff, reporting to Minister of
  Finance, with harmonised framework for support to reforms.
• EQ 5: Reform inputs relevant in targeting identified areas of
  weakness, addressing reform issues of interest to the political
  leadership, and in adapting to institutional constraints. Active
  learning and adaptation process.
• EQ 7: Most outputs in GoBF’s PFM reform programme (PRGB/
  SRFP) delivered, without excessive delays. TA not linked to outputs
  in PRGB/ SRFP considerably less efficient. Reform sequencing
  generally good, with gradual development of integrated FM system
  exemplary. Sequencing of program budgets/ MTEF reforms was
  wrong but corrected late in period (2008–2011).
4.5.3. Burkina Faso: Outcomes
• Burkina Faso’s PFM reform program has been successful in
  generating improvements in every key aspect of public
  finance management.
• By 2010, PFM systems in 5 out of 6 clusters were scored at
  levels on or above the third quartile of the sample of 100
  countries, and the remaining one, External accountability,
  was at the median level.
4.6.1. Ghana: Context
• EQ 8: Despite initial enthusiasm for PUFMARP, political commitment to
  PFM reform was never deep (PFM reforms seen as “technical”) and
  fluctuated over the electoral cycle. As a pioneer of MTEF & IFMS, Ghana
  suffered from limited policy ideas, which underestimated reform
  complexity/ change management implications. Financing sufficient.
• EQ 3: Limited & inconsistent use of country Systems. Budget Support
  29% of ODA, 9% of public spending, with improving predictability of
  disbursements 2004–2009. BS dialogue helped to improve reform
  monitoring and level of debate but failed to solve big problems with
  BPEMS & MTEF. PFM “trigger” conditions not influential.
• EQ 4: Limited domestic pressure for PFM reform but opening to public of
  PAC hearings has led to pressure on PAC to increase its technical
  capacities. Regional peer-to-peer experience-sharing cited as important
  in enabling GoG officials to access Int. experience, e.g. CABRI.
4.6.2. Ghana: Mechanisms
• EQ 2: Two reform programmes: PUFMARP 1997–2003 and
  ST/MTAP 2006–2009 with a 3 year gap. Neither plan was systematically
  updated on an annual basis. Revenue and Audit reforms managed outside
  of these frameworks. PUFMARP reported to Deputy Minister of Finance
  and had a project implementation team, later converted into Budget
  Development Unit within Budget Division.
• EQ 5: Reform inputs were relevant in targeting identified areas of
  weakness but BPEMS and MTEF were not well adapted to technical and
  system constraints and did not address change management. Overall,
  learning and adaptation very slow.
• EQ 7: Outputs on BPEMS never delivered in functional form, and IPPD2
  delivered with 4-year delay, with incomplete coverage. Procurement
  reforms never completed. MTEF outputs delivered but inappropriate to
  end objective. Internal and External Audit reform outputs delivered but
  improvement in functionality still modest. Revenue reforms successfully
  and efficiently delivered.
4.6.3. Ghana: Outcomes
• Ghana showed only limited improvements in PFM intermediate
  outcomes over the period.
• Even though PFM reform spending was concentrated in 2000 –2006, in 5
  out of 6 clusters, PEFA scores in 2006 were worse than the median of 100
  countries.
• Over 2006 to 2010, improvements in strategic budgeting also brought it
  above the median but scores in 2 other clusters deteriorated, and there
  was no improvement in the poor quality of accounting and reporting.
• Relative to the significant funds expended on PFM reform over the period,
  progress has been poor. Most substantial success has been in
  strengthening the legislative base but the Government has experienced
  significant challenges in implementing the new laws.
• Otherwise, most effective reforms have been in revenue management,
  which have led to the successful introduction of VAT, and the introduction
  of the TIN, and a significant increase in revenues as a share of GDP.
4.7.1. Malawi: Context
•   EQ 8: Extent and nature of political constraints has varied by reform area and by reform period
    In some PFM functions (e.g. Internal Audit), lack of political support has resulted in an under-
    supply of necessary outputs. In others such as IFMIS, political support has ensured the
    minimum level of outputs necessary for PFM functionality.
•   There has been a high focus on putting in place laws, rules, systems and procedures that follow
    international best practice, and a lack of consideration for the skill and the organizational
    change requirements for their implementation. This over-emphasis on international best
    practice is interpreted as a policy space constraint. Over 2004–2007, production of reform
    outputs was slowed down by financial constraints. Arguably, donors did not step up their
    support sufficiently in the 2004 to 2009 reform window.
•   EQ 3: Limited and inconsistent use of country systems. Increasing use of SWAp arrangements.
    Budget Support increasingly important over period reaching 40 % of ODA in 2008, before being
    suspended by DFID and other agencies over 2010 –2011. BS dialogue helped to formalize the
    PFM reform action plan and had a heavy influence on its content, but PFM “trigger” conditions
    not influential.
•   EQ 4: Domestic pressure for reform played a role in putting procurement reform and effective
    external audit on the reform agenda. Pressure of the Legislature also considered important in
    President Mutharika’s first term in sustaining pressure for reform. Political impetus for PFM
    reforms is said to have weakened in 2nd term with a majority in Parliament and no third term
    to contest. Learning from regional experiences and international standards has broadened the
    policy space for reforms.
4.7.2. Malawi: Mechanisms
•   EQ 2: Establishment of formal structures to coordinate PFM reforms (PFEM steering
    committee, technical committee and unit, and various working groups) was important in
    creating capacity to support ownership and leadership of reform plans. The GFEM group –
    and CABS – provided a structure to harmonize donor PFM inputs. However, until 2010, the
    PFEM Action Plan was an amalgam of individual reform interests, not a coordinated and
    sequenced response to PFM weaknesses.
•   EQ 5: Reform inputs were directed at PFM weaknesses, but PFM reform models not
    sufficiently adapted to the institutional context. Reforms in procurement, internal audit and
    budgeting followed international best practice, but were not suited to a context in which
    technical and managerial skills were scarce, and difficult to recruit or to retain when trained.
    Less sophisticated reforms might have generated greater improvements in functionality.
•   EQ 7: Up to 2004, reforms were inefficient on account of low reform output compared to
    targets and inputs. Over 2004–2009, consistent progress was made against targets but
    reform resources and capacity were thinly spread and there were regular gaps between
    actual and planned processes, due to lack of realism in reform planning. Typically outputs of
    people, skills and organizational change were not produced or not produced in sufficient
    quantities. The quality of coordination of reforms was poor for almost the full period, even if
    it improved after the creation and capacitation of coordination structures.
4.7.3. Malawi: Outcomes
• During a concentrated period from 2005 to 2008, malawi achieved
  significant improvements in PFm outcomes, but was not able to achieve
  consistent progress over the decade.
• By 2011, the quality of Malawi’s PFM functions in 4 out of 6 clusters was
  above the median of 100 countries, and average scores within each of the 6
  clusters improved from 2006 to 2011. However, apart from legislative
  changes, 2001 to 2004 saw a decline in PFM systems. Over 2009–2011, signs
  of deterioration have again emerged.
• Nevertheless, major reform outputs were delivered over the period,
  signalling significant change in the capacity for budget preparation, budget
  execution and audit. Most outputs put in place had external support but the
  effect of the political change in 2004 and the degree to which it drove
  reforms from within is significant. In retrospect, among the reform
  achievements of the GoM, the procurement and roll-out of an IFMIS that
  functions stands out as perhaps the most significant change, supporting a
  series of further secondary reforms. Yet, this functionality was achieved with
  relatively little direct external support.
5. Lessons learned
5.1. Lessons for governments
• Ensure clear and coherent support for PFM reform within
  the Executive and, over time to broaden support across the
  political spectrum
• Pay attention to the design and staffing of the structures
  coordinate an manage PFM reforms
• Those responsible for coordinating PFM reforms should
  control external support to PFM and over dialogue with
  Budget Support donors
• The monitoring structures should also evaluate
  performance to promote learning from experience and the
  corresponding adaption of implementation plans
• The regular training of PFM staff needs to be a consistent
  priority
5.2. Lessons for donors
• Be more discriminating in the provision of financial support to PFM
  reforms
• Align support closely to the Government program and avoid pursuing
  independent technical assistance initiatives
• Ensure that aid policy and practice works in favor of the PFM system and
  not against it
• Ensure that advice is up to date and informed by the experience within
  country, within the region and by wider international experience
• Ensure that internal procedures for the supervision and peer review of
  initiatives to support PFM reform are effective in providing a continuous
  check on progress
• Provide support, where necessary, to regional institutions and professional
  associations working on PFM reform issues
• Continue to provide support to CSOs and Legislative bodies on PFM reform
  issues but accept that their influence may only be effective in the longer
  term
6. Key questions
6. Key questions
• What tools and techniques do donors use to promote
  public financial management reform?
• What are the key challenges with PFM reform?
Paris Declaration Survey: What
       progress has been made in 2010?
                                                 (32 baseline countries)
                                            2005 Baseline                                      2010 Target

         1. Operational Development Strategies       19%                           52%                 75%

2a. Reliable Public Financial Management (PFM)                                           38%           50%
                     systems

   3. Aid flows are aligned on national priorities   44%     46%                                      85%

4. Strengthen capacity by co-ordinated support       49%                                               50%    51%

               5a. Use of country PFM systems        40%                           48%                 54%

6. Strengthen capacity by avoiding Parallel PIUs     1 696                  1158
                                                                                                      565

                       7. Aid is more predictable    42% 43%                                          71%

                                  8. Aid is untied   87%                                               >87%   89%

9. Use of common arrangements or procedures          43%            48%                               66%

                             10a. Joint missions     20%     22%                                      40%

                10b. Joint country analytic work     41%      44%                                     66%

               11. Results-oriented frameworks       7%                    22%                         38%

                       12. Mutual accountability     44%     50%                                      100%

Weitere ähnliche Inhalte

Was ist angesagt?

Budget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in AfghanistanBudget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in AfghanistanJean-Marc Lepain
 
Yemen public financial management reforms: Background and way forward
Yemen public financial management reforms: Background and way forwardYemen public financial management reforms: Background and way forward
Yemen public financial management reforms: Background and way forwardJean-Marc Lepain
 
Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...
Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...
Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...Jean-Marc Lepain
 
Budget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paperBudget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paperJean-Marc Lepain
 
Medim Term Budget Framework Seminar: background and objectives
Medim Term Budget Framework Seminar:  background  and objectives Medim Term Budget Framework Seminar:  background  and objectives
Medim Term Budget Framework Seminar: background and objectives Jean-Marc Lepain
 
Concept note for updating yemen pfm action plan
Concept note for updating yemen pfm action planConcept note for updating yemen pfm action plan
Concept note for updating yemen pfm action planJean-Marc Lepain
 
Budget entities regulatory framework
Budget entities regulatory frameworkBudget entities regulatory framework
Budget entities regulatory frameworkJean-Marc Lepain
 
From the medium term fiscal frameworkto ministries' ceilings
From the medium term fiscal frameworkto ministries' ceilingsFrom the medium term fiscal frameworkto ministries' ceilings
From the medium term fiscal frameworkto ministries' ceilingsJean-Marc Lepain
 
Budget integration, program budgeting and reengineering of business processes
Budget integration, program budgeting and reengineering of business processesBudget integration, program budgeting and reengineering of business processes
Budget integration, program budgeting and reengineering of business processesJean-Marc Lepain
 
Budgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countriesBudgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countriesJean-Marc Lepain
 
Pitfalls of Financial Administration in india
Pitfalls of Financial Administration in indiaPitfalls of Financial Administration in india
Pitfalls of Financial Administration in indiaShantanu Basu
 
Public investment plan_management
Public investment plan_managementPublic investment plan_management
Public investment plan_managementJean-Marc Lepain
 
Yemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action planYemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action planJean-Marc Lepain
 
Introducing a revenue sharing system in lao pdr
Introducing a revenue sharing system in lao pdrIntroducing a revenue sharing system in lao pdr
Introducing a revenue sharing system in lao pdrJean-Marc Lepain
 
Cambodia: Education Sector; A Short Fiscal Assessment
Cambodia: Education Sector; A Short Fiscal AssessmentCambodia: Education Sector; A Short Fiscal Assessment
Cambodia: Education Sector; A Short Fiscal AssessmentJean-Marc Lepain
 
Public Finance Administration
Public Finance AdministrationPublic Finance Administration
Public Finance Administrationhome!
 
Construction of expenditure ceilings
Construction of expenditure ceilingsConstruction of expenditure ceilings
Construction of expenditure ceilingsJean-Marc Lepain
 

Was ist angesagt? (20)

Budget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in AfghanistanBudget reforms, program budgeting and sub national budgeting in Afghanistan
Budget reforms, program budgeting and sub national budgeting in Afghanistan
 
Yemen public financial management reforms: Background and way forward
Yemen public financial management reforms: Background and way forwardYemen public financial management reforms: Background and way forward
Yemen public financial management reforms: Background and way forward
 
Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...
Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...
Laos: Evaluation of the Impact of Budget Norms on Budget Equalization Needs (...
 
Budget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paperBudget documentation and the pre-budget statetement paper
Budget documentation and the pre-budget statetement paper
 
Medim Term Budget Framework Seminar: background and objectives
Medim Term Budget Framework Seminar:  background  and objectives Medim Term Budget Framework Seminar:  background  and objectives
Medim Term Budget Framework Seminar: background and objectives
 
Concept note for updating yemen pfm action plan
Concept note for updating yemen pfm action planConcept note for updating yemen pfm action plan
Concept note for updating yemen pfm action plan
 
Budget entities regulatory framework
Budget entities regulatory frameworkBudget entities regulatory framework
Budget entities regulatory framework
 
From the medium term fiscal frameworkto ministries' ceilings
From the medium term fiscal frameworkto ministries' ceilingsFrom the medium term fiscal frameworkto ministries' ceilings
From the medium term fiscal frameworkto ministries' ceilings
 
Improving Institutional Capability and Financial Viability to Sustain Transport
Improving Institutional Capability and Financial Viability to Sustain TransportImproving Institutional Capability and Financial Viability to Sustain Transport
Improving Institutional Capability and Financial Viability to Sustain Transport
 
Budget integration, program budgeting and reengineering of business processes
Budget integration, program budgeting and reengineering of business processesBudget integration, program budgeting and reengineering of business processes
Budget integration, program budgeting and reengineering of business processes
 
Budgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countriesBudgeting and investment management in post conflict countries
Budgeting and investment management in post conflict countries
 
Pitfalls of Financial Administration in india
Pitfalls of Financial Administration in indiaPitfalls of Financial Administration in india
Pitfalls of Financial Administration in india
 
Public investment plan_management
Public investment plan_managementPublic investment plan_management
Public investment plan_management
 
Yemen: budget integration
Yemen: budget integrationYemen: budget integration
Yemen: budget integration
 
Yemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action planYemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action plan
 
Introducing a revenue sharing system in lao pdr
Introducing a revenue sharing system in lao pdrIntroducing a revenue sharing system in lao pdr
Introducing a revenue sharing system in lao pdr
 
Cambodia: Education Sector; A Short Fiscal Assessment
Cambodia: Education Sector; A Short Fiscal AssessmentCambodia: Education Sector; A Short Fiscal Assessment
Cambodia: Education Sector; A Short Fiscal Assessment
 
Public Finance Administration
Public Finance AdministrationPublic Finance Administration
Public Finance Administration
 
Facts on Public Finance Management
Facts on Public Finance ManagementFacts on Public Finance Management
Facts on Public Finance Management
 
Construction of expenditure ceilings
Construction of expenditure ceilingsConstruction of expenditure ceilings
Construction of expenditure ceilings
 

Andere mochten auch

MGMT 374 Week 12 Lecture Presentation
MGMT 374 Week 12 Lecture PresentationMGMT 374 Week 12 Lecture Presentation
MGMT 374 Week 12 Lecture PresentationMichael Hill
 
PEFA and fiscal transparency - Lewis Hawke,PEFA Secretariat
PEFA and fiscal transparency - Lewis Hawke,PEFA SecretariatPEFA and fiscal transparency - Lewis Hawke,PEFA Secretariat
PEFA and fiscal transparency - Lewis Hawke,PEFA SecretariatOECD Governance
 
New public management (npm) and public sector administration in nigeria
New public management (npm) and public sector administration in nigeriaNew public management (npm) and public sector administration in nigeria
New public management (npm) and public sector administration in nigeriaAlexander Decker
 
SOCIAL AUDITING TRAINING
SOCIAL AUDITING TRAININGSOCIAL AUDITING TRAINING
SOCIAL AUDITING TRAININGAbraham Yelley
 
“New Public Management” Principles in Fighting Corruption and Improving Gove...
 “New Public Management” Principles in Fighting Corruption and Improving Gove... “New Public Management” Principles in Fighting Corruption and Improving Gove...
“New Public Management” Principles in Fighting Corruption and Improving Gove...E-Government Center Moldova
 
Ais Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based IsAis Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based IsSharing Slides Training
 
Arens14e ch01 ppt
Arens14e ch01 pptArens14e ch01 ppt
Arens14e ch01 pptsrkndnz
 
New public management and public service effectiveness in nigeria a pragmatic...
New public management and public service effectiveness in nigeria a pragmatic...New public management and public service effectiveness in nigeria a pragmatic...
New public management and public service effectiveness in nigeria a pragmatic...Alexander Decker
 
Chapter 1 auditing and internal control
Chapter 1 auditing and internal controlChapter 1 auditing and internal control
Chapter 1 auditing and internal controljayussuryawan
 
Forensic Accounting
Forensic AccountingForensic Accounting
Forensic AccountingMikeRosten
 

Andere mochten auch (20)

PME Work in the Bank
PME Work in the BankPME Work in the Bank
PME Work in the Bank
 
ISPMS Background, Purpose and Approach
ISPMS Background, Purpose and ApproachISPMS Background, Purpose and Approach
ISPMS Background, Purpose and Approach
 
MGMT 374 Week 12 Lecture Presentation
MGMT 374 Week 12 Lecture PresentationMGMT 374 Week 12 Lecture Presentation
MGMT 374 Week 12 Lecture Presentation
 
PEFA and fiscal transparency - Lewis Hawke,PEFA Secretariat
PEFA and fiscal transparency - Lewis Hawke,PEFA SecretariatPEFA and fiscal transparency - Lewis Hawke,PEFA Secretariat
PEFA and fiscal transparency - Lewis Hawke,PEFA Secretariat
 
New public management (npm) and public sector administration in nigeria
New public management (npm) and public sector administration in nigeriaNew public management (npm) and public sector administration in nigeria
New public management (npm) and public sector administration in nigeria
 
SOCIAL AUDITING TRAINING
SOCIAL AUDITING TRAININGSOCIAL AUDITING TRAINING
SOCIAL AUDITING TRAINING
 
The PSM Approach
The PSM ApproachThe PSM Approach
The PSM Approach
 
“New Public Management” Principles in Fighting Corruption and Improving Gove...
 “New Public Management” Principles in Fighting Corruption and Improving Gove... “New Public Management” Principles in Fighting Corruption and Improving Gove...
“New Public Management” Principles in Fighting Corruption and Improving Gove...
 
Pay Reform in Public Administration
Pay Reform in Public AdministrationPay Reform in Public Administration
Pay Reform in Public Administration
 
Ais Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based IsAis Romney 2006 Slides 09 Auditing Computer Based Is
Ais Romney 2006 Slides 09 Auditing Computer Based Is
 
Payroll audit
Payroll auditPayroll audit
Payroll audit
 
Audit Materiality & business risks p7
Audit Materiality & business risks p7Audit Materiality & business risks p7
Audit Materiality & business risks p7
 
Auditing and inspection
Auditing and inspectionAuditing and inspection
Auditing and inspection
 
Arens14e ch01 ppt
Arens14e ch01 pptArens14e ch01 ppt
Arens14e ch01 ppt
 
New public management and public service effectiveness in nigeria a pragmatic...
New public management and public service effectiveness in nigeria a pragmatic...New public management and public service effectiveness in nigeria a pragmatic...
New public management and public service effectiveness in nigeria a pragmatic...
 
Audit of Cash Balances
Audit of Cash BalancesAudit of Cash Balances
Audit of Cash Balances
 
Chapter 1 auditing and internal control
Chapter 1 auditing and internal controlChapter 1 auditing and internal control
Chapter 1 auditing and internal control
 
Forensic Accounting
Forensic AccountingForensic Accounting
Forensic Accounting
 
Modul audit jadi-libre
Modul audit jadi-libreModul audit jadi-libre
Modul audit jadi-libre
 
Cloud Auditing
Cloud AuditingCloud Auditing
Cloud Auditing
 

Ähnlich wie Uof t nov8_levine_pfm_power point

Pefa presentation by dr malik khalid mehmood ph_d
Pefa presentation   by dr malik khalid mehmood ph_dPefa presentation   by dr malik khalid mehmood ph_d
Pefa presentation by dr malik khalid mehmood ph_dMalik Khalid Mehmood
 
Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...
Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...
Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...Oswar Mungkasa
 
Session 5C Measuring Public Financial Management Performance - Charles Seibert
Session 5C Measuring Public Financial Management Performance - Charles SeibertSession 5C Measuring Public Financial Management Performance - Charles Seibert
Session 5C Measuring Public Financial Management Performance - Charles SeibertInternational Federation of Accountants
 
Understanding the State Budget Making Process
Understanding the State Budget  Making ProcessUnderstanding the State Budget  Making Process
Understanding the State Budget Making ProcessParamita Majumdar (Ph.D)
 
Institutional Analysis of the Ministry of Public Health at Central and Provin...
Institutional Analysis of the Ministry of Public Health at Central and Provin...Institutional Analysis of the Ministry of Public Health at Central and Provin...
Institutional Analysis of the Ministry of Public Health at Central and Provin...IDS
 
GF TRP Recommendations presented by Dr. Ocampo last Plenary.ppt
GF TRP  Recommendations presented by Dr. Ocampo  last Plenary.pptGF TRP  Recommendations presented by Dr. Ocampo  last Plenary.ppt
GF TRP Recommendations presented by Dr. Ocampo last Plenary.pptRichardLaroya4
 
world_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptxworld_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptxDilanFernando33
 
mks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptx
mks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptxmks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptx
mks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptxHamseAKhaire
 
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxLECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxmansoor584949
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalGerald Ogoko
 
Getting started on the PBB reform agenda in Indonesia – a practical outline o...
Getting started on the PBB reform agenda in Indonesia – a practical outline o...Getting started on the PBB reform agenda in Indonesia – a practical outline o...
Getting started on the PBB reform agenda in Indonesia – a practical outline o...Oswar Mungkasa
 
Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...
Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...
Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...Paramita Majumdar (Ph.D)
 
130918 mk rob whiteman cg conf
130918 mk rob whiteman   cg conf130918 mk rob whiteman   cg conf
130918 mk rob whiteman cg confMattPattv1
 

Ähnlich wie Uof t nov8_levine_pfm_power point (20)

Pefa presentation by dr malik khalid mehmood ph_d
Pefa presentation   by dr malik khalid mehmood ph_dPefa presentation   by dr malik khalid mehmood ph_d
Pefa presentation by dr malik khalid mehmood ph_d
 
Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...
Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...
Australian Performance Based Budgeting (PBB) – an outline of the steps taken ...
 
Agriculture Public Expenditure Workshop Module 5
Agriculture Public Expenditure Workshop Module 5Agriculture Public Expenditure Workshop Module 5
Agriculture Public Expenditure Workshop Module 5
 
2015 ReSAKSS Conference – Day 1 - Stephen Mink
2015 ReSAKSS Conference – Day 1 - Stephen Mink2015 ReSAKSS Conference – Day 1 - Stephen Mink
2015 ReSAKSS Conference – Day 1 - Stephen Mink
 
Session 5C Measuring Public Financial Management Performance - Charles Seibert
Session 5C Measuring Public Financial Management Performance - Charles SeibertSession 5C Measuring Public Financial Management Performance - Charles Seibert
Session 5C Measuring Public Financial Management Performance - Charles Seibert
 
Understanding the State Budget Making Process
Understanding the State Budget  Making ProcessUnderstanding the State Budget  Making Process
Understanding the State Budget Making Process
 
Institutional Analysis of the Ministry of Public Health at Central and Provin...
Institutional Analysis of the Ministry of Public Health at Central and Provin...Institutional Analysis of the Ministry of Public Health at Central and Provin...
Institutional Analysis of the Ministry of Public Health at Central and Provin...
 
What Are the IFAC SMOs and Why Are They Important?
What Are the IFAC SMOs and Why Are They Important?What Are the IFAC SMOs and Why Are They Important?
What Are the IFAC SMOs and Why Are They Important?
 
GF TRP Recommendations presented by Dr. Ocampo last Plenary.ppt
GF TRP  Recommendations presented by Dr. Ocampo  last Plenary.pptGF TRP  Recommendations presented by Dr. Ocampo  last Plenary.ppt
GF TRP Recommendations presented by Dr. Ocampo last Plenary.ppt
 
world_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptxworld_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptx
 
mks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptx
mks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptxmks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptx
mks_pfm_i_module_1_1_introduction_to_pfm_2018-03-18 (1).pptx
 
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxLECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314final
 
PA USAID.pdf
PA USAID.pdfPA USAID.pdf
PA USAID.pdf
 
Getting started on the PBB reform agenda in Indonesia – a practical outline o...
Getting started on the PBB reform agenda in Indonesia – a practical outline o...Getting started on the PBB reform agenda in Indonesia – a practical outline o...
Getting started on the PBB reform agenda in Indonesia – a practical outline o...
 
The IMF Structure
The IMF StructureThe IMF Structure
The IMF Structure
 
Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...
Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...
Gender budgeting and Transparency : Understandingthe National and Sub-Nationa...
 
130918 mk rob whiteman cg conf
130918 mk rob whiteman   cg conf130918 mk rob whiteman   cg conf
130918 mk rob whiteman cg conf
 
Rob Whiteman presentation to CIPFA Central Governmet Conference
Rob Whiteman presentation to CIPFA Central Governmet ConferenceRob Whiteman presentation to CIPFA Central Governmet Conference
Rob Whiteman presentation to CIPFA Central Governmet Conference
 
Analytical Support for Agricultural Public Expenditure Scale-Up in Sub-Sahara...
Analytical Support for Agricultural Public Expenditure Scale-Up in Sub-Sahara...Analytical Support for Agricultural Public Expenditure Scale-Up in Sub-Sahara...
Analytical Support for Agricultural Public Expenditure Scale-Up in Sub-Sahara...
 

Kürzlich hochgeladen

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 

Kürzlich hochgeladen (20)

Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 

Uof t nov8_levine_pfm_power point

  • 1. Development policy and change: Public Financial Management Tamara Levine November 8, 2012
  • 2. Seminar objectives • Gain a basic understanding of public financial management in developing countries • Understand the challenges and opportunities presented by PFM reform Today’s program: • Part I: Overview of national public financial management practices in developing countries • Part II: Specific country cases of PFM reform particularly in East Africa
  • 3. Structure 1. Key definitions 2. What is PFM reform? 3. Why is PFM important? 4. Case studies 5. Lessons learned 6. Key questions
  • 5. 1.1. Key definitions – PFM (I) • Until recently, there was no universally agreed definition of PFM, and the narrowest definition confined PFM to ”the downstream activities of budget execution, control, accounting, reporting, monitoring and evaluation” (Allen et al, 2004) • PFM is now broadly considered as “the system by which financial resources are planned, directed and controlled to enable and influence the efficient and effective delivery of public service goals” (CIPFA 2010:5) • PFM moves away from the concept that ‘managing the money’ rests solely with the Ministry of Finance: Every public service manager is equally responsible for ensuring that public money is managed well (CIPFA 2010)
  • 6. 1.2. Key definitions - PEFA • The Public Expenditure and Financial Accountability (PEFA) Performance Measurement Framework was developed in 2003 by a group of donors prominent in this field. • It lists 73 key PFM dimensions (organized into 31 indicator areas) described as “critical” to the “performance of an open and orderly PFM system” and “the key PFM elements … recognized as being critical for all countries to achieve sound public financial management” (PEFA 2006, 2). • The PEFA framework standardizes an approach that focuses on “the immediate objectives of reform” (Wescott, 2008)based on OECD best practice and international accounting norms
  • 7. 1.3. Key definitions – Others • Fiscal strategy • Budget • Medium-Term Expenditure Framework (MTEF) • Line Item Budgeting • Budget Support
  • 8. 2. What is PFM reform?
  • 9. 2.1. What is PFM reform? • Reform is ”the action or process of changing an institution or practice” • Change is a central theme of development, and the change agenda in developing countries increasingly focuses on public organizations; a study of 31 African countries (Andrews 2008a) found that: – All 31 adopting Government Financial Statistics (GFS) or Classifications of the Functions of Government (COFOG); – All were adopting International Public Sector Accounting Standards (IPSAS) or some other version – 28 were pursuing Medium Term Expenditure Frameworks (MTEF); – 26 were using ceilings to prepare budgets; all were creating Treasury Single Accounts (TSAs) or some consolidated public accounts structure; – 25 were introducing program, performance or activity-based budgeting; – 20 were tackling a systems project (like FMIS)
  • 10. 2.2. When do PFM reforms work? • PFM reforms deliver results when three conditions coincide: – When there is a strong political commitment to their implementation, – When reform designs and implementation models are well tailored to the institutional and capacity context; and – When strong coordination arrangements – led by government officials – are in place to monitor and guide reforms.
  • 11. 2.3. PFM process Strategic Policy processes budgeting External audit Levels: Budget and -National PFM system preparaTion accountability -Sub-national PFM system Stakeholders: -Core entities: MoF, Treasury, SAIs, Parliament, etc. -Spending entities: Line ministries, Agencies, etc. -Civil society, donors, Accounting and academia, media, private Ressource reporting sector management Internal controls, audit and monitoring
  • 12. 2.4. Capacity development process Step 1: Step 5: Engage Evaluate stakeholders capacity on capacity development development Step 4: Step 2: Implement a Assess capacity capacity development assets and response needs Step 3: Formulate a capacity development response
  • 13. 3. Why is it important?
  • 14. 3.1. Why is it important? • Strong PFM institutions build institutional and country capacity to – underpin fiscal and macro stability – guide the allocation of public resources to national priorities – support the efficient delivery of services for poverty reduction and economic development – make possible the transparency and scrutiny of public funds • PFM contributes to achieving strategic and operational goals as a key aspect of good governance • To make aid more efficient • To deliver tangible results
  • 15. 3.2. Why is it important? • PFM dominates the World Bank reform agenda with PFM being “a major component of 81 percent” of projects: – Projects containing PFM components number over 30 a year since 2000, valued at $912 million per year (World Bank 2008, 28) – PFM also routinely provides conditions for other loans (World Bank 2006)
  • 16. 4. Some case studies
  • 17. 4.1. Case characteristics 1. Burkina Faso: donor support appeared to be positively correlated with PFM improvements; 2. Malawi: donor support appeared to be negatively correlated with PFM improvement; 3. Ghana: significant PFM improvements appear to have occurred despite relatively low levels of donor support Countries where budget Countries where budget institutions institutions improved did not improve High donor effort Burkina Faso, Tanzania, Zambia Benin, Malawi, Uganda, Mozambique, Rwanda, São Tomé and Principe Low donor effort Ethiopia, Ghana, Mali Guinea, Madagascar
  • 18. 4.2. Political indicators • The political environment is more competitive in Malawi and Ghana where political leaders have to resort to more extensive use of patronage to succeed • This has made a major difference to the ability of each of these countries to provide leadership to PFM reforms and a consistent commitment to their implementation • The importance of patronage in Malawi and Ghana, relative to Burkina Faso is illustrated by the discrepancy in the numbers of Ministers, Deputy Ministers and Members of Parliament per head of population (2009) Burkina Faso Ghana Malawi Total number of ministers and deputy ministers 30 75 45 - Ministers 25 37 22 - Deputy ministers 5 38 21 Total number of MPs 111 230 194 Number of citizens per minister 526,667 317,333 355,814 Number of citizens per MP 142,342 103,478 78,866
  • 19. 4.3. Reform inputs, 2001-2010 (Million USD) Burkina Faso Ghana Malawi External Funding of 30-35 39 38-45 PFM Reform Inputs Domestic Funding of 30-35 20 30 PFM Reform Inputs Approximate Total 60-70 60 68-75 Main Areas of All clusters, but All clusters, but All clusters, but Concentration especially Financial especially Financial especially Financial Mgt & reporting, Mgt & reporting, Mgt & reporting, Budget preparation, Budget preparation, Budget preparation, Revenue Revenue Procurement, Internal Administration, and Administration, Audit, and External Procurement Procurement and Audit. Internal & External Audit Timing of Spending Broadly consistent Some spend Some spend throughout period throughout but focus throughout but focus on 2001–2007 and on 2005–2009 2010
  • 20. 4.3. Reform inputs (cont.) • All of the case study countries have overseen major programs of PFM reforms over the past ten years, with total spending amounting to some US $ 60 –70 million. • Domestic allocations to PFM reform have also been high, both for recurrent funding and for funding of specific projects. This is especially true in Burkina Faso and Malawi. • The significant inflows of General Budget Support in each country, (see table), would have facilitated increased domestic budget allocations but their use to support PFM reform was in each case an exclusively internal decision, unrelated to any conditionality. • Both Ghana and Malawi experienced fluctuations in the total level of annual spending on PFM reforms, whereas Burkina Faso saw a more steady, continuous pattern of spending.
  • 21. 4.4. Reform outcomes PEFA Scores by Cluster Burkina Faso Ghana Malawi (64 Indicators; max. = 4; min. = 1) 2007 2010 2006 2010 2006 2011 Strategic Budgeting 2.75 3.25 2.00 2.50 1.75 2.25 Budget Preparation 3.26 3.40 2.50 2.64 2.34 2.57 Resource Management 2.33 2.78 2.32 2.38 1.96 2.74 (Inflows, Outflows, Procurement & Payroll) Internal Control, Audit and 2.22 3.22 2.00 1.88 2.00 2.38 Monitoring Accounting and Reporting 3.00 3.13 2.33 2.33 2.13 2.33 External Accountability 2.33 2.00 2.50 2.33 1.67 2.00
  • 22. 4.5.1. Burkina Faso: Context • EQ8: Political commitment has been consistent and long- standing, deep, and technically informed. Financing has been sufficient. Some limitations on policy space, especially regarding program Budgets. • EQ 3: Limited & inconsistent use of country Systems. Budget Support 31 % of ODA, 12 % of public spending, but unpredictable within-year disbursements. BS dialogue helped to institutionalize reform monitoring process but conditionality not influential. • EQ 4: Civil Society & Legislature uninfluential but WAEMU Commission a significant influence through peer pressure and directives on PFM.
  • 23. 4.5.2. Burkina Faso: Mechanisms • EQ 2: strong coordination arrangements, based upon an integrated reform programme (PRGB/ SRFP), endorsed at Cabinet level, led by Secretariat (SP-PPF) of high calibre staff, reporting to Minister of Finance, with harmonised framework for support to reforms. • EQ 5: Reform inputs relevant in targeting identified areas of weakness, addressing reform issues of interest to the political leadership, and in adapting to institutional constraints. Active learning and adaptation process. • EQ 7: Most outputs in GoBF’s PFM reform programme (PRGB/ SRFP) delivered, without excessive delays. TA not linked to outputs in PRGB/ SRFP considerably less efficient. Reform sequencing generally good, with gradual development of integrated FM system exemplary. Sequencing of program budgets/ MTEF reforms was wrong but corrected late in period (2008–2011).
  • 24. 4.5.3. Burkina Faso: Outcomes • Burkina Faso’s PFM reform program has been successful in generating improvements in every key aspect of public finance management. • By 2010, PFM systems in 5 out of 6 clusters were scored at levels on or above the third quartile of the sample of 100 countries, and the remaining one, External accountability, was at the median level.
  • 25. 4.6.1. Ghana: Context • EQ 8: Despite initial enthusiasm for PUFMARP, political commitment to PFM reform was never deep (PFM reforms seen as “technical”) and fluctuated over the electoral cycle. As a pioneer of MTEF & IFMS, Ghana suffered from limited policy ideas, which underestimated reform complexity/ change management implications. Financing sufficient. • EQ 3: Limited & inconsistent use of country Systems. Budget Support 29% of ODA, 9% of public spending, with improving predictability of disbursements 2004–2009. BS dialogue helped to improve reform monitoring and level of debate but failed to solve big problems with BPEMS & MTEF. PFM “trigger” conditions not influential. • EQ 4: Limited domestic pressure for PFM reform but opening to public of PAC hearings has led to pressure on PAC to increase its technical capacities. Regional peer-to-peer experience-sharing cited as important in enabling GoG officials to access Int. experience, e.g. CABRI.
  • 26. 4.6.2. Ghana: Mechanisms • EQ 2: Two reform programmes: PUFMARP 1997–2003 and ST/MTAP 2006–2009 with a 3 year gap. Neither plan was systematically updated on an annual basis. Revenue and Audit reforms managed outside of these frameworks. PUFMARP reported to Deputy Minister of Finance and had a project implementation team, later converted into Budget Development Unit within Budget Division. • EQ 5: Reform inputs were relevant in targeting identified areas of weakness but BPEMS and MTEF were not well adapted to technical and system constraints and did not address change management. Overall, learning and adaptation very slow. • EQ 7: Outputs on BPEMS never delivered in functional form, and IPPD2 delivered with 4-year delay, with incomplete coverage. Procurement reforms never completed. MTEF outputs delivered but inappropriate to end objective. Internal and External Audit reform outputs delivered but improvement in functionality still modest. Revenue reforms successfully and efficiently delivered.
  • 27. 4.6.3. Ghana: Outcomes • Ghana showed only limited improvements in PFM intermediate outcomes over the period. • Even though PFM reform spending was concentrated in 2000 –2006, in 5 out of 6 clusters, PEFA scores in 2006 were worse than the median of 100 countries. • Over 2006 to 2010, improvements in strategic budgeting also brought it above the median but scores in 2 other clusters deteriorated, and there was no improvement in the poor quality of accounting and reporting. • Relative to the significant funds expended on PFM reform over the period, progress has been poor. Most substantial success has been in strengthening the legislative base but the Government has experienced significant challenges in implementing the new laws. • Otherwise, most effective reforms have been in revenue management, which have led to the successful introduction of VAT, and the introduction of the TIN, and a significant increase in revenues as a share of GDP.
  • 28. 4.7.1. Malawi: Context • EQ 8: Extent and nature of political constraints has varied by reform area and by reform period In some PFM functions (e.g. Internal Audit), lack of political support has resulted in an under- supply of necessary outputs. In others such as IFMIS, political support has ensured the minimum level of outputs necessary for PFM functionality. • There has been a high focus on putting in place laws, rules, systems and procedures that follow international best practice, and a lack of consideration for the skill and the organizational change requirements for their implementation. This over-emphasis on international best practice is interpreted as a policy space constraint. Over 2004–2007, production of reform outputs was slowed down by financial constraints. Arguably, donors did not step up their support sufficiently in the 2004 to 2009 reform window. • EQ 3: Limited and inconsistent use of country systems. Increasing use of SWAp arrangements. Budget Support increasingly important over period reaching 40 % of ODA in 2008, before being suspended by DFID and other agencies over 2010 –2011. BS dialogue helped to formalize the PFM reform action plan and had a heavy influence on its content, but PFM “trigger” conditions not influential. • EQ 4: Domestic pressure for reform played a role in putting procurement reform and effective external audit on the reform agenda. Pressure of the Legislature also considered important in President Mutharika’s first term in sustaining pressure for reform. Political impetus for PFM reforms is said to have weakened in 2nd term with a majority in Parliament and no third term to contest. Learning from regional experiences and international standards has broadened the policy space for reforms.
  • 29. 4.7.2. Malawi: Mechanisms • EQ 2: Establishment of formal structures to coordinate PFM reforms (PFEM steering committee, technical committee and unit, and various working groups) was important in creating capacity to support ownership and leadership of reform plans. The GFEM group – and CABS – provided a structure to harmonize donor PFM inputs. However, until 2010, the PFEM Action Plan was an amalgam of individual reform interests, not a coordinated and sequenced response to PFM weaknesses. • EQ 5: Reform inputs were directed at PFM weaknesses, but PFM reform models not sufficiently adapted to the institutional context. Reforms in procurement, internal audit and budgeting followed international best practice, but were not suited to a context in which technical and managerial skills were scarce, and difficult to recruit or to retain when trained. Less sophisticated reforms might have generated greater improvements in functionality. • EQ 7: Up to 2004, reforms were inefficient on account of low reform output compared to targets and inputs. Over 2004–2009, consistent progress was made against targets but reform resources and capacity were thinly spread and there were regular gaps between actual and planned processes, due to lack of realism in reform planning. Typically outputs of people, skills and organizational change were not produced or not produced in sufficient quantities. The quality of coordination of reforms was poor for almost the full period, even if it improved after the creation and capacitation of coordination structures.
  • 30. 4.7.3. Malawi: Outcomes • During a concentrated period from 2005 to 2008, malawi achieved significant improvements in PFm outcomes, but was not able to achieve consistent progress over the decade. • By 2011, the quality of Malawi’s PFM functions in 4 out of 6 clusters was above the median of 100 countries, and average scores within each of the 6 clusters improved from 2006 to 2011. However, apart from legislative changes, 2001 to 2004 saw a decline in PFM systems. Over 2009–2011, signs of deterioration have again emerged. • Nevertheless, major reform outputs were delivered over the period, signalling significant change in the capacity for budget preparation, budget execution and audit. Most outputs put in place had external support but the effect of the political change in 2004 and the degree to which it drove reforms from within is significant. In retrospect, among the reform achievements of the GoM, the procurement and roll-out of an IFMIS that functions stands out as perhaps the most significant change, supporting a series of further secondary reforms. Yet, this functionality was achieved with relatively little direct external support.
  • 32. 5.1. Lessons for governments • Ensure clear and coherent support for PFM reform within the Executive and, over time to broaden support across the political spectrum • Pay attention to the design and staffing of the structures coordinate an manage PFM reforms • Those responsible for coordinating PFM reforms should control external support to PFM and over dialogue with Budget Support donors • The monitoring structures should also evaluate performance to promote learning from experience and the corresponding adaption of implementation plans • The regular training of PFM staff needs to be a consistent priority
  • 33. 5.2. Lessons for donors • Be more discriminating in the provision of financial support to PFM reforms • Align support closely to the Government program and avoid pursuing independent technical assistance initiatives • Ensure that aid policy and practice works in favor of the PFM system and not against it • Ensure that advice is up to date and informed by the experience within country, within the region and by wider international experience • Ensure that internal procedures for the supervision and peer review of initiatives to support PFM reform are effective in providing a continuous check on progress • Provide support, where necessary, to regional institutions and professional associations working on PFM reform issues • Continue to provide support to CSOs and Legislative bodies on PFM reform issues but accept that their influence may only be effective in the longer term
  • 35. 6. Key questions • What tools and techniques do donors use to promote public financial management reform? • What are the key challenges with PFM reform?
  • 36. Paris Declaration Survey: What progress has been made in 2010? (32 baseline countries) 2005 Baseline 2010 Target 1. Operational Development Strategies 19% 52% 75% 2a. Reliable Public Financial Management (PFM) 38% 50% systems 3. Aid flows are aligned on national priorities 44% 46% 85% 4. Strengthen capacity by co-ordinated support 49% 50% 51% 5a. Use of country PFM systems 40% 48% 54% 6. Strengthen capacity by avoiding Parallel PIUs 1 696 1158 565 7. Aid is more predictable 42% 43% 71% 8. Aid is untied 87% >87% 89% 9. Use of common arrangements or procedures 43% 48% 66% 10a. Joint missions 20% 22% 40% 10b. Joint country analytic work 41% 44% 66% 11. Results-oriented frameworks 7% 22% 38% 12. Mutual accountability 44% 50% 100%

Hinweis der Redaktion

  1. The central feature from the Paris Declaration is the Paris Declaration monitoring survey which has tracked progress against the agreed targets in 2005, 2008 and now 2011. Monitoring took place in 2006 with 34 countries, in 2008 with 56 countries, and currently 90 countries have voluntarily taken part in the monitoring survey (representing about ¾ of total ODA)So what do the results of the 2011 Survey tell us? Progress has been mixed. This slide shows the progress made towards the 2010 targets for those indicators for which data are available, and for that baseline group of 32 countries that have both baseline and 2010 data.Note: to assess whether targets have been met, we have considered the full 78 countries participating in the countries when targets were not dependent on 2005 data or when 2005 data where available).[mouse click]At the global level, two of the targets set for 2010 were met.A slight increase in the proportion of technical cooperation that was coordinated pushed indicator four over its 2010 target. It is worth stressing here that the bars show progress from the baseline towards the target over the period 2005 to 2010, so in this case you can see that the proportion of technical co-operation that was considered co-ordinated increased slightly from 49% in 2005 to 51% in 2010, against a target of 50%.Second, you can see a slight increase in the proportion of aid that was untied – when donors do not impose restrictions on the countries from which recipients can aid-funded procure goods and services. The baseline here was 87%, and the target was to continue progress over time, so the 2010 score of 89% suggests that some progress has been made. I should add that we are only looking at the proportion of aid that is untied to LDCs and HIPCs, as these are the countries that donors have committed to untie aid to.[mouse click]As you can see from the orange bars, significant progress was made against four indicators, even though targets weren’t met. These are the indicators for which progress towards targets was at least half way from the baseline. For example, the proportion of developing countries with operational development strategies has increased significantly (indicator 1); 38% of developing countries improved the quality of their public financial management by at least one measure on the World Bank’s CPIA scale, which is used to measure indicator 2a.47% of aid to partner countries used their own PFM systems (indicator 5a). I should add here that the target of 54% has been calculated on the basis of the improvement in the quality of country systems shown by indicator 2a, as the agreed formula sees the target for donors’ use of country systems increasing in tandem with the quality of partner countries’ systems.The proportion of partner countries deemed to have high quality results-oriented frameworks has also increased since 2005.[mouse click]The seven indicators shown in red are those where progress has gone less than half way to the targets, and as you can see, very slight setbacks were observed on two of them.These tend to suggest that harmonisation in particular has been challenging, and also that implementing mechanisms to support mutual accountability at the country level has also been a challenge. On this point, you should be aware that because of the way the indicator is defined, the headline figure hides the fact that many countries have made some efforts to promote mutual accountability.