PERMANENT WAY + TRACK
FOUNDATION
RAILWAY TRACK
PERMANENT
WAY
PLAIN
TRACK
SPECIAL
TRACK
POINTS &
CROSSINGSTo Guide The Vehicle For Directional
Change
Switch expansion joints (SEJ) are provided at the ends of long
welded rails to allow for the cumulative thermal expansion
movements of the ends of the rails
1. RAILS TRACK STRUCTURE
2. SLEEPERS
3. BALLAST
4. FASTENINGS
PERMANENT WAY
TRACK FOUNDATION & PERMANENT WAY
DIAGRAM
The "track bed" is the layers of ballast and
sub-ballast above a prepared
subgrade/formation (see diagram). It is
designed primarily to reduce the stress on
the subgrade.
The trackbed can significantly influence the
performance of the track, especially ride
quality of passenger service
GAUGE
 The perpendicular distance between the inner
faces of heads of the two rails forming the track is
known as the ‘Gauge’.
 Broad Gauge - 1676 MM
 Meter Gauge - 1000 MM
 Narrow Gauge - 762 MM OR 610
MM
 Broad gauge is known as Indian standard gauge.
 The WORLD standard gauge is 1483MM.
RAILS
 Rails are continuous girders which carry the axle
load.
 Functions:-Provides
 Hard and smooth surface for the wheels of a train
to roll on
 Bears lateral stress and vertical loads due to
breaking and thermal stresses.
 Transmit load to the formation through sleepers
and ballast.
Types of Rails-
 Double headed rails
 Bull headed rails &
 Flat footed rail or Vignoles rails(Invented by
CHARLETS VIGNOLES)
95% of the railway track in the world laid with this form
of rails.
Classification According to Size:
1.60KG Rails
2.52KG Rails
3.90R
FLAT FOOTED RAIL & BULL-
HEADED RAIL
DOUBLE HEADED RAIL
Manufacture of Rails:-
Most commonly used alloy steels are:
 1.Medium manganese steel
 2.High Manganese steel
 3.Chromium Steel
Standard Lengths of Rails are:
 12.8 M for B.G
 11.89 M for M.G
SLEEPERS:
 Sleepers are transverse ties in a Railway Track
 Functions:
 To support the rails firmly and evenly
 To maintain gauge correctly
 To transfer the load from rails to ballast
 To maintain alignment of the track
Types of Sleepers:
1. Timber or Wooden sleepers
2. Steel Sleepers
3. Cast Iron Sleepers
4. R.C.C Sleepers
Classification according to the size:
60 Kg 2.74 m x 25 cm x 13 cm on
BG
52 Kg
BALLAST
 Broken stone or any other suitable material
placed below and around the sleepers.
Functions: Provides
1. Provides Hard and level bed for the sleepers to
rest on
2. Provides to hold sleepers in position
3. Provides Elasticity to the track
4. To drain away the rain water and prevent its
percolation into the formation
FORMATION
 Distribute the load of traffic from the sleepers to
the formation without
 Progressive settlement
 Permit drainage of the track
 Prevent lateral movement of the track
 Prevent longitudinal movement of the track, and
 Afford a convenient medium for packing the track
to cross level and
Rail fastenings:
 Fish Plates and Fish Bolts
 Spikes and hook Bolts
 Chairs and keys
 Bearing Plates
Functions:
 Distribute the load coming on rails to the sleepers
over a large area.
 To hold Rails to the sleepers firmly

Weitere ähnliche Inhalte

Was ist angesagt?

Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
GARRE RAVI KUMAR
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
Vipul Naidu
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
RAMPRASAD KUMAWAT
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)
comsats
 
Coning of wheels
Coning of wheelsConing of wheels
Coning of wheels
Swapnil Mangaonker
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
nkocet
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bd
Md. Sultan Ali
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
Deven Diran
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
Sunil Kumar Meena
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
Ghanashyam Prajapati
 
AERIAL ROPEWAYS.pptx
AERIAL ROPEWAYS.pptxAERIAL ROPEWAYS.pptx
AERIAL ROPEWAYS.pptx
Anshul Yadav
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
Mani Vel
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
17CE67
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
VATSAL PATEL
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERING
fye7884
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
T.Naga Anusha
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
ashrafdgrt
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
gayathrysatheesan1
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
Souvik Mondal
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
Chockalingam T
 

Was ist angesagt? (20)

Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)Railway engineering (CIVIL ENGINEERING)
Railway engineering (CIVIL ENGINEERING)
 
Coning of wheels
Coning of wheelsConing of wheels
Coning of wheels
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bd
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
AERIAL ROPEWAYS.pptx
AERIAL ROPEWAYS.pptxAERIAL ROPEWAYS.pptx
AERIAL ROPEWAYS.pptx
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
Sleepers and Their types
Sleepers and Their typesSleepers and Their types
Sleepers and Their types
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERING
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 

Andere mochten auch

Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
Latif Hyder Wadho
 
ROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIAL
Randhir Kumar
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
Mani Vel
 
Track training 03082013
Track training   03082013Track training   03082013
Track training 03082013
guernica0131
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
Prem Prakash Kumar
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
Latif Hyder Wadho
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
srinivas2036
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
vinaybidarimath
 
Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000 Kasus : Surabay...
Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000   Kasus : Surabay...Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000   Kasus : Surabay...
Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000 Kasus : Surabay...
ikhsan setiawan
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
addavidson
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
Lovely Professional University
 
Railway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracksRailway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracks
Nabaraj Poudel
 
Sub grade
Sub gradeSub grade
Sub grade
gjgunit
 
Volvo Link500 - Project Report
Volvo Link500 - Project ReportVolvo Link500 - Project Report
Volvo Link500 - Project Report
pawarap
 
China Coal Group railway maintenance tools
China Coal Group railway maintenance toolsChina Coal Group railway maintenance tools
China Coal Group railway maintenance tools
Celia Gao
 
Railways ppt
Railways pptRailways ppt
K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89
Al Marson
 
Class note for btech students lce 463 pavement structure-soil interaction
Class note for btech students lce 463 pavement structure-soil interactionClass note for btech students lce 463 pavement structure-soil interaction
Class note for btech students lce 463 pavement structure-soil interaction
abhay mishra
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
Abdul Shukur
 
Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...
Azmeel Contracting Company
 

Andere mochten auch (20)

Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
ROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIALROCKS AS A CONSTRUCTION MATERIAL
ROCKS AS A CONSTRUCTION MATERIAL
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
Track training 03082013
Track training   03082013Track training   03082013
Track training 03082013
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000 Kasus : Surabay...
Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000   Kasus : Surabay...Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000   Kasus : Surabay...
Kontrol Mutu Pelaksanaan Konstruksi Beton Berbasis ISO 9000 Kasus : Surabay...
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
Railway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracksRailway turnouts ,their types and maintenance of tracks
Railway turnouts ,their types and maintenance of tracks
 
Sub grade
Sub gradeSub grade
Sub grade
 
Volvo Link500 - Project Report
Volvo Link500 - Project ReportVolvo Link500 - Project Report
Volvo Link500 - Project Report
 
China Coal Group railway maintenance tools
China Coal Group railway maintenance toolsChina Coal Group railway maintenance tools
China Coal Group railway maintenance tools
 
Railways ppt
Railways pptRailways ppt
Railways ppt
 
K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89
 
Class note for btech students lce 463 pavement structure-soil interaction
Class note for btech students lce 463 pavement structure-soil interactionClass note for btech students lce 463 pavement structure-soil interaction
Class note for btech students lce 463 pavement structure-soil interaction
 
Crane operator safety procedure
Crane operator safety procedureCrane operator safety procedure
Crane operator safety procedure
 
Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...
 

Ähnlich wie P.way

Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
Arun G
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
Dnyaneshwar More
 
Rail gauge
Rail gaugeRail gauge
Rail gauge
Dipesh Raiyani
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
Masudul Robin
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
Bathla Tuition Centre
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
MuhammadAdeel269
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
Akshay D Nicator
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TURUMELLAVIJAYAGOWRI
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TVijayaGowri
 
3rd unit
3rd unit3rd unit
3rd unit
jagadish108
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
MayuriPatel90
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
Bathla Tuition Centre
 
railway.pdf
railway.pdfrailway.pdf
railway.pdf
Chandra535962
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
KHUSHBU SHAH
 
Project Report
Project ReportProject Report
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
Hossam Shafiq I
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdf
ssuser75acc8
 
RAILWAY ENGINEERING.pptx
RAILWAY ENGINEERING.pptxRAILWAY ENGINEERING.pptx
RAILWAY ENGINEERING.pptx
ssuser523d4d
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
jmaghade99
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
AJEETH B
 

Ähnlich wie P.way (20)

Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
Rail gauge
Rail gaugeRail gauge
Rail gauge
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
3rd unit
3rd unit3rd unit
3rd unit
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
railway.pdf
railway.pdfrailway.pdf
railway.pdf
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Project Report
Project ReportProject Report
Project Report
 
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdf
 
RAILWAY ENGINEERING.pptx
RAILWAY ENGINEERING.pptxRAILWAY ENGINEERING.pptx
RAILWAY ENGINEERING.pptx
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1Railway planning RHTA - VTU Module 1
Railway planning RHTA - VTU Module 1
 

Mehr von vaignan

Earthen dams
Earthen damsEarthen dams
Earthen dams
vaignan
 
M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge
M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge
M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge
vaignan
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
vaignan
 
Mini project For M.tech Structural Engineering Deflection of Simply supported...
Mini project For M.tech Structural Engineering Deflection of Simply supported...Mini project For M.tech Structural Engineering Deflection of Simply supported...
Mini project For M.tech Structural Engineering Deflection of Simply supported...
vaignan
 
Hover craft science experiment
Hover craft science experimentHover craft science experiment
Hover craft science experiment
vaignan
 
Rocket science experiment for class iv
Rocket science experiment for class ivRocket science experiment for class iv
Rocket science experiment for class iv
vaignan
 
Base isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structuresBase isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structures
vaignan
 

Mehr von vaignan (7)

Earthen dams
Earthen damsEarthen dams
Earthen dams
 
M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge
M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge
M.Tech Structural Engineering Project of Voided and Cellular Deck slab Bridge
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
 
Mini project For M.tech Structural Engineering Deflection of Simply supported...
Mini project For M.tech Structural Engineering Deflection of Simply supported...Mini project For M.tech Structural Engineering Deflection of Simply supported...
Mini project For M.tech Structural Engineering Deflection of Simply supported...
 
Hover craft science experiment
Hover craft science experimentHover craft science experiment
Hover craft science experiment
 
Rocket science experiment for class iv
Rocket science experiment for class ivRocket science experiment for class iv
Rocket science experiment for class iv
 
Base isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structuresBase isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structures
 

Kürzlich hochgeladen

2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 

Kürzlich hochgeladen (20)

2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 

P.way

  • 1. PERMANENT WAY + TRACK FOUNDATION RAILWAY TRACK
  • 3.
  • 4.
  • 5. POINTS & CROSSINGSTo Guide The Vehicle For Directional Change
  • 6. Switch expansion joints (SEJ) are provided at the ends of long welded rails to allow for the cumulative thermal expansion movements of the ends of the rails
  • 7.
  • 8. 1. RAILS TRACK STRUCTURE 2. SLEEPERS 3. BALLAST 4. FASTENINGS PERMANENT WAY
  • 9. TRACK FOUNDATION & PERMANENT WAY DIAGRAM
  • 10. The "track bed" is the layers of ballast and sub-ballast above a prepared subgrade/formation (see diagram). It is designed primarily to reduce the stress on the subgrade. The trackbed can significantly influence the performance of the track, especially ride quality of passenger service
  • 11. GAUGE  The perpendicular distance between the inner faces of heads of the two rails forming the track is known as the ‘Gauge’.  Broad Gauge - 1676 MM  Meter Gauge - 1000 MM  Narrow Gauge - 762 MM OR 610 MM  Broad gauge is known as Indian standard gauge.  The WORLD standard gauge is 1483MM.
  • 12. RAILS  Rails are continuous girders which carry the axle load.  Functions:-Provides  Hard and smooth surface for the wheels of a train to roll on  Bears lateral stress and vertical loads due to breaking and thermal stresses.  Transmit load to the formation through sleepers and ballast.
  • 13. Types of Rails-  Double headed rails  Bull headed rails &  Flat footed rail or Vignoles rails(Invented by CHARLETS VIGNOLES) 95% of the railway track in the world laid with this form of rails. Classification According to Size: 1.60KG Rails 2.52KG Rails 3.90R
  • 14. FLAT FOOTED RAIL & BULL- HEADED RAIL
  • 16. Manufacture of Rails:- Most commonly used alloy steels are:  1.Medium manganese steel  2.High Manganese steel  3.Chromium Steel Standard Lengths of Rails are:  12.8 M for B.G  11.89 M for M.G
  • 17. SLEEPERS:  Sleepers are transverse ties in a Railway Track  Functions:  To support the rails firmly and evenly  To maintain gauge correctly  To transfer the load from rails to ballast  To maintain alignment of the track
  • 18. Types of Sleepers: 1. Timber or Wooden sleepers 2. Steel Sleepers 3. Cast Iron Sleepers 4. R.C.C Sleepers Classification according to the size: 60 Kg 2.74 m x 25 cm x 13 cm on BG 52 Kg
  • 19. BALLAST  Broken stone or any other suitable material placed below and around the sleepers. Functions: Provides 1. Provides Hard and level bed for the sleepers to rest on 2. Provides to hold sleepers in position 3. Provides Elasticity to the track 4. To drain away the rain water and prevent its percolation into the formation
  • 20. FORMATION  Distribute the load of traffic from the sleepers to the formation without  Progressive settlement  Permit drainage of the track  Prevent lateral movement of the track  Prevent longitudinal movement of the track, and  Afford a convenient medium for packing the track to cross level and
  • 21. Rail fastenings:  Fish Plates and Fish Bolts  Spikes and hook Bolts  Chairs and keys  Bearing Plates Functions:  Distribute the load coming on rails to the sleepers over a large area.  To hold Rails to the sleepers firmly