INDUSTRIAL TRAINING
Leela Electric Power Services
Pvt. Ltd., Ernakulam
01-May-2015 to 30-May-2015
Plot
• About the company
• Work Flow
• A Case Study
• Gallery
• Conclusion
Leela Electric Power Services Pvt. Ltd.
• Consultancy of Power Distribution
• Estimation & Design of Electrical Schematic
• Erection, Testing and Commissioning of
Transformers up to 2000KVA and HV/MV
switchboards
Leela Electric Power Services Pvt. Ltd.
• Erection of Control panel and its wiring
• Erection of 2-pole,4-pole and 6-pole receiving
structure and allied works
• End termination of HT cables up to 33KVA
WORK FLOW
DESIGN
• Starts from load side
• Based on Standards by Electrical Inspectorate
• Fault Level Calculation & Earthing Scheme
• Per Motor Design
– Switch
– Fuse
– Isolation (MCB, MCCB, SFU and MPCB)
– Cable
STANDARDS
• Chief Electrical Inspectorate, Govt. Of Kerala
• http://www.cei.kerala.gov.in
• Norms and conditions
• Eg.
– Power Distribution Board
– 3000 W or 2 Points
– Low Voltage Distribution Board
– 800 W or 10 Points
EARTHING
• Body Earthing of Equipments
• Earthing Scheme & Grid Formation
• Earthing wire
– Fault level variation according to place of fault
– Copper  Aluminum  Galvanized Iron
EARTHING
EARTH PLATE
• Copper and GI plates
• 60 cm x 60 cm x 3 mm / 6
mm ( Min. Dimension)
• No. of plates based on
fault level
PLATE EARTHING
PLATE EARTHING
51G Earth Fault Relay
• Inverse time over
current relay
• Severe fault – Fast
tripping
• Main protection relay
used below 500kVA
A2XFY cable
• A – Aluminum
• 2X – XLPE insulation
• F/ Fa – Steel strip armor variations
• W/Ww/Wa – Steel round wire armor
variations
• Y – PVC outer sheath
• C/CE – Metallic screening
Basic Architecture of a Control Panel
INTERLOCK
• Why interlocking ?
• Methods
– Automatic Mains Failure Relay (AMF)
– Castell Key Mechanism
• Crusher Loads
– The plant never sleeps
– High speed interlock required
– Automatic Transfer Switch (ATS) is used
Automatic Transfer Switch
• Monitors Voltage and Frequency
• Fast switching (30 Cycles)
• Synchronization
• Two live lines handling simultaneously
Automatic Power Factor Correction
Panel
• Optimize energy
consumption
• Increase the power
availability
– Reduced KVA
requirement
• Reduce harmonic
distortion
ISOLATION
EQUIPMENT
ORDER
RATING
MCB Less than 500 A
MCCB 500 to 1 kA
ACB, VCB, SF6 above 1 kA
MCCB and MCB
• Difference ?
• 3- Phase 4/6 way TPN MCB DB
• 4/6 ways in each phase
• Percentage tripping
requirement ?
TOD Meter
• Time of Use Meter
• Peak and Off Peak Slabs
• Measures
– When Energy is Consumed
– How much Energy is Consumed
CASE STUDY
• Avees Food Products, Pulincunnoo, Aleppy
– Washing
– Powdering
– Roasting
– Grading
– Packing
• Load Requirement
– 290.75 HP
– 14.7 kW
– 80 kVAr
Glanding
Cable Termination Kit
CONCLUSION
• HT wiring Design and Standards is familiarized
• Workflow and Procedures are familiarized
• Techniques like cable glanding and
termination are familiarized
• AUTOCADD electrical drawings are familiarized
THANK YOU ALL VERY MUCH 

Weitere ähnliche Inhalte

Was ist angesagt?

NEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONS
NEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONSNEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONS
NEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONS
Dženan Ćelić
 
System and method for generating electric power
System and method for generating electric powerSystem and method for generating electric power
System and method for generating electric power
shalsub
 
Understanding operation of shunt capacitors and oltc for transmission
Understanding operation of shunt capacitors and oltc for transmissionUnderstanding operation of shunt capacitors and oltc for transmission
Understanding operation of shunt capacitors and oltc for transmission
IAEME Publication
 
Modern electric trends in electric drives
Modern electric trends in electric drivesModern electric trends in electric drives
Modern electric trends in electric drives
Surinder Kumar
 

Was ist angesagt? (20)

Electric traction
Electric tractionElectric traction
Electric traction
 
NEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONS
NEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONSNEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONS
NEW APPROACH OF DESIGNING AND EXPLOATATION OF ELECTRICAL TRACTION SUBSTATIONS
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
CV
CVCV
CV
 
System and method for generating electric power
System and method for generating electric powerSystem and method for generating electric power
System and method for generating electric power
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
 
Multi-phase Brush-less DC motor And Applications
Multi-phase Brush-less DC motor And Applications Multi-phase Brush-less DC motor And Applications
Multi-phase Brush-less DC motor And Applications
 
Understanding operation of shunt capacitors and oltc for transmission
Understanding operation of shunt capacitors and oltc for transmissionUnderstanding operation of shunt capacitors and oltc for transmission
Understanding operation of shunt capacitors and oltc for transmission
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Modern electric trends in electric drives
Modern electric trends in electric drivesModern electric trends in electric drives
Modern electric trends in electric drives
 
Railway ppt
Railway pptRailway ppt
Railway ppt
 
Electrification of railway, problems and types of solution
Electrification of railway, problems and types of solutionElectrification of railway, problems and types of solution
Electrification of railway, problems and types of solution
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Types of PANTOGRAPH
Types of PANTOGRAPHTypes of PANTOGRAPH
Types of PANTOGRAPH
 
Transmission line zero seq reactance
Transmission line zero seq reactanceTransmission line zero seq reactance
Transmission line zero seq reactance
 
Brushless dc (bldc) motors
Brushless dc (bldc) motorsBrushless dc (bldc) motors
Brushless dc (bldc) motors
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 

Ähnlich wie INDUSTRIAL TRAINING

Electrical & MEP Design - Study material.pdf
Electrical & MEP Design - Study material.pdfElectrical & MEP Design - Study material.pdf
Electrical & MEP Design - Study material.pdf
sureshrajan38
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
Devesh54
 
High Reliability and Efficiency Single phase Transformerless Inverter for Gri...
High Reliability and Efficiency Single phase Transformerless Inverter for Gri...High Reliability and Efficiency Single phase Transformerless Inverter for Gri...
High Reliability and Efficiency Single phase Transformerless Inverter for Gri...
Anoop kumar Niravuparambil
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
Sarthak Panigrahi
 

Ähnlich wie INDUSTRIAL TRAINING (20)

Starting First
Starting FirstStarting First
Starting First
 
Extra high voltage long ac transmission lines
Extra high voltage long ac transmission linesExtra high voltage long ac transmission lines
Extra high voltage long ac transmission lines
 
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptxBASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
BASIC ELECTRO MECHANICAL ARRANGEMENTS.pptx
 
Electrical & MEP Design - Study material.pdf
Electrical & MEP Design - Study material.pdfElectrical & MEP Design - Study material.pdf
Electrical & MEP Design - Study material.pdf
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
IEEE Blue Book
IEEE Blue BookIEEE Blue Book
IEEE Blue Book
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
HOTEL LOAD
HOTEL LOADHOTEL LOAD
HOTEL LOAD
 
High Reliability and Efficiency Single phase Transformerless Inverter for Gri...
High Reliability and Efficiency Single phase Transformerless Inverter for Gri...High Reliability and Efficiency Single phase Transformerless Inverter for Gri...
High Reliability and Efficiency Single phase Transformerless Inverter for Gri...
 
Electronic circuit breaker by saurabh chauhan
Electronic circuit breaker by saurabh chauhanElectronic circuit breaker by saurabh chauhan
Electronic circuit breaker by saurabh chauhan
 
Resume_Dipti Ranjan Rout
Resume_Dipti Ranjan RoutResume_Dipti Ranjan Rout
Resume_Dipti Ranjan Rout
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
9539060.ppt
9539060.ppt9539060.ppt
9539060.ppt
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
HVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyHVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading Technology
 

INDUSTRIAL TRAINING

  • 1. INDUSTRIAL TRAINING Leela Electric Power Services Pvt. Ltd., Ernakulam 01-May-2015 to 30-May-2015
  • 2. Plot • About the company • Work Flow • A Case Study • Gallery • Conclusion
  • 3. Leela Electric Power Services Pvt. Ltd. • Consultancy of Power Distribution • Estimation & Design of Electrical Schematic • Erection, Testing and Commissioning of Transformers up to 2000KVA and HV/MV switchboards
  • 4. Leela Electric Power Services Pvt. Ltd. • Erection of Control panel and its wiring • Erection of 2-pole,4-pole and 6-pole receiving structure and allied works • End termination of HT cables up to 33KVA
  • 6. DESIGN • Starts from load side • Based on Standards by Electrical Inspectorate • Fault Level Calculation & Earthing Scheme • Per Motor Design – Switch – Fuse – Isolation (MCB, MCCB, SFU and MPCB) – Cable
  • 7. STANDARDS • Chief Electrical Inspectorate, Govt. Of Kerala • http://www.cei.kerala.gov.in • Norms and conditions • Eg. – Power Distribution Board – 3000 W or 2 Points – Low Voltage Distribution Board – 800 W or 10 Points
  • 8. EARTHING • Body Earthing of Equipments • Earthing Scheme & Grid Formation • Earthing wire – Fault level variation according to place of fault – Copper  Aluminum  Galvanized Iron
  • 10. EARTH PLATE • Copper and GI plates • 60 cm x 60 cm x 3 mm / 6 mm ( Min. Dimension) • No. of plates based on fault level
  • 13. 51G Earth Fault Relay • Inverse time over current relay • Severe fault – Fast tripping • Main protection relay used below 500kVA
  • 14. A2XFY cable • A – Aluminum • 2X – XLPE insulation • F/ Fa – Steel strip armor variations • W/Ww/Wa – Steel round wire armor variations • Y – PVC outer sheath • C/CE – Metallic screening
  • 15.
  • 16. Basic Architecture of a Control Panel
  • 17. INTERLOCK • Why interlocking ? • Methods – Automatic Mains Failure Relay (AMF) – Castell Key Mechanism • Crusher Loads – The plant never sleeps – High speed interlock required – Automatic Transfer Switch (ATS) is used
  • 18. Automatic Transfer Switch • Monitors Voltage and Frequency • Fast switching (30 Cycles) • Synchronization • Two live lines handling simultaneously
  • 19. Automatic Power Factor Correction Panel • Optimize energy consumption • Increase the power availability – Reduced KVA requirement • Reduce harmonic distortion
  • 20. ISOLATION EQUIPMENT ORDER RATING MCB Less than 500 A MCCB 500 to 1 kA ACB, VCB, SF6 above 1 kA
  • 21. MCCB and MCB • Difference ? • 3- Phase 4/6 way TPN MCB DB • 4/6 ways in each phase • Percentage tripping requirement ?
  • 22. TOD Meter • Time of Use Meter • Peak and Off Peak Slabs • Measures – When Energy is Consumed – How much Energy is Consumed
  • 23. CASE STUDY • Avees Food Products, Pulincunnoo, Aleppy – Washing – Powdering – Roasting – Grading – Packing • Load Requirement – 290.75 HP – 14.7 kW – 80 kVAr
  • 26. CONCLUSION • HT wiring Design and Standards is familiarized • Workflow and Procedures are familiarized • Techniques like cable glanding and termination are familiarized • AUTOCADD electrical drawings are familiarized
  • 27. THANK YOU ALL VERY MUCH 