2. Plot
• About the company
• Work Flow
• A Case Study
• Gallery
• Conclusion
3. Leela Electric Power Services Pvt. Ltd.
• Consultancy of Power Distribution
• Estimation & Design of Electrical Schematic
• Erection, Testing and Commissioning of
Transformers up to 2000KVA and HV/MV
switchboards
4. Leela Electric Power Services Pvt. Ltd.
• Erection of Control panel and its wiring
• Erection of 2-pole,4-pole and 6-pole receiving
structure and allied works
• End termination of HT cables up to 33KVA
6. DESIGN
• Starts from load side
• Based on Standards by Electrical Inspectorate
• Fault Level Calculation & Earthing Scheme
• Per Motor Design
– Switch
– Fuse
– Isolation (MCB, MCCB, SFU and MPCB)
– Cable
7. STANDARDS
• Chief Electrical Inspectorate, Govt. Of Kerala
• http://www.cei.kerala.gov.in
• Norms and conditions
• Eg.
– Power Distribution Board
– 3000 W or 2 Points
– Low Voltage Distribution Board
– 800 W or 10 Points
8. EARTHING
• Body Earthing of Equipments
• Earthing Scheme & Grid Formation
• Earthing wire
– Fault level variation according to place of fault
– Copper Aluminum Galvanized Iron
17. INTERLOCK
• Why interlocking ?
• Methods
– Automatic Mains Failure Relay (AMF)
– Castell Key Mechanism
• Crusher Loads
– The plant never sleeps
– High speed interlock required
– Automatic Transfer Switch (ATS) is used
18. Automatic Transfer Switch
• Monitors Voltage and Frequency
• Fast switching (30 Cycles)
• Synchronization
• Two live lines handling simultaneously
19. Automatic Power Factor Correction
Panel
• Optimize energy
consumption
• Increase the power
availability
– Reduced KVA
requirement
• Reduce harmonic
distortion
26. CONCLUSION
• HT wiring Design and Standards is familiarized
• Workflow and Procedures are familiarized
• Techniques like cable glanding and
termination are familiarized
• AUTOCADD electrical drawings are familiarized