SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Downloaden Sie, um offline zu lesen
slEconomics
Economics Consulting in Utilities and Infrastructure

Africa Infrastructure Rollout Conference 2013

Sandton, South Africa
19 November 2013

Contact:
Dr Stephen Labson
slabson@sleconomics.com

Contact:
Mtutu Benya
mbenya@sleconomics.com

www.sleconomics.com

www.sleconomics.com


Role of infrastructure development



Pubic sector infrastructure investment



Funding options



Regulatory and policy challenges

slEconomics Pty Ltd

2


The infrastructure challenge has been escalated to a priority agenda due to increased demand for
service delivery and the need to grow the economy in tandem with population growth;



These challenges are not unique to RSA alone but they are a continental problem and as part of the
SADC region together is grappling to achieve economic growth, efficiencies and effectiveness.

Macroeconomic drivers
• The South African economy has averaged about 3
per cent growth a year since 2009.
• GDP growth was roughly 2.5 per cent in 2011/13,
a GDP growth of 5% would meet the current
needs of service delivery.
• There was a modest recovery in job creation
during 2011/12 but the unemployment rate
remains high at 23.9 per cent.

• The national government’s budget deficit for
2011/12 was 5,2 per cent of GDP and public
sector borrowing requirements at 7.1% GDP.
• Total (gross) loan debt was R1.1 trillion as at 31
December 2011, equivalent to 38.6% of GDP.

Infrastructure developments
• Budgeted public sector infrastructure spending of
roughly R845 billion is planned for from 2012/13 to
2014/15 of which R300 billion is targeted to the
energy sector and R262 billion in transport.
• To 2020 R3.2 trillion is expected to be invested in
43 large scale projects in areas such as:
• Adding 11,719 MW of power generation capacity
and 6596 km of high voltage transmission lines.

• Replacing 6405 km of rail freight, coal and ore
lines increasing rail network capacity by 149.7
million tons, and procuring 1317 new locomotives
and 25,000 new wagons.
• A R100 billion port expansion at Durban.
3


Energy and Transport represent the bulk of South Africa’s investment in infrastructure, which is now a
significant proportion of total Government borrowings.

Government
borrowings
(R billion)

2013/14

2014/15

213,9

235,1

225,3

200,8

General
government
borrowing

145,7

158,2

147,8

126,7

Non-financial
public
enterprises

slEconomics Pty Ltd

2012/13

Public sector
borrowing
requirement

Source: South African Reserve Bank, Quarterly Bulletin March 2012

2011/12

68,2

75,9

77,6

74,1

(NB 1 Rand = AUD$ 8.41 as of 19/06/12)
4


South Africa’s public sector infrastructure programme is expected to be funded from a range
of sources
Funding options

Source of funds utilised

• A combination of internally generated surpluses
and borrowings from capital markets by public
enterprises .

• Enterprises such as Eskom, Transnet, SANRAL,
and ACSA have made use of corporate bond
markets and short term commercial paper
facilities.

• Direct private sector investment such as the
Department of Energy’s 3,625MW renewables
Independent Power Producer Procurement
Programme currently underway.
• Mixed shareholding, such as that for Telkom
South Africa (Government retaining 38%
shareholding) and Airports Company South
Africa (Government retaining roughly 75% of
shareholding).
• Direct government contributions for entities
such as Passenger Rail Agency South Africa
(PRASA) and Eskom
slEconomics Pty Ltd

• Multi-lateral institutions such as the African
Development Bank; Development Bank of
Southern Africa; the World Bank; and the
French Development Agency
• Local institutions such as the Industrial
Development
Corporation
and
Public
Investment Corporation
• Sovereign funds (e.g. China and the Middle
East)

5


Four broad components for funding public sector infrastructure projects


Debt financing - which can be sourced directly by the public enterprise where a stand
alone corporate entity has been established and/or by government through loans or loan
guarantees.



Equity injection - in which government as shareholder can provide cash injections to the
sector.



Government grants - whereby government as a policy decision allocates its resources in
the development of public works.



Regulated revenue and tariffs - which (outside of government grants) are ultimately
relied on to repay capital investment over the longer term.

slEconomics Pty Ltd

6


Debt financing in its various forms represents a significant component of infrastructure funding
due to the large capital requirements associated with capacity augmentation, the long term
nature of the physical assets, and the (often) stable source of regulated revenue



The availability and cost of funds is of course currently a critical issue with global capital markets
under strain limiting the availability of funds and making borrowings relatively more expensive
than compared to recent history.



World Bank Group reported that the debt/equity ratios in infrastructure projects reaching closure
changed from around 85/15 in 2005–07 to 73/27 in 2008. 14 Projects reaching financial closure in
early 2009 had debt/equity ratios of around 70/30.



Both availability and cost of borrowings is directly dependent on the credit worthiness of the
entity acquiring financing.

slEconomics Pty Ltd

7
Theory

And practice



Government guarantees can support the
amount of borrowings a state owned
corporation is able to source and the yield
required by debt providers.



However, a government’s cost of capital is
not independent on the level of support
provided to state owned enterprises in the
form of direct guarantees and/or associated
contingent liabilities.


For example, where government is
either legally obligated to service the
debt of a wholly-owned entity in the
case of default – or there is a strong
expectation of the same by debt
providers – the availability of funds is
reduced and the cost is greater than it
otherwise would have been
slEconomics Pty Ltd

•

The relevance of contingent liabilities is illustrated by
recent actions pertaining to SANRAL, whereby in an
affidavit to the Constitutional Court of South Africa
(21 May 2012) the Minister for Finance stated that if
SANRAL was to default on its outstanding loans
there would be:

•

“considerable risk of negative consequences for
the South African Government's capacity to raise
funds from capital markets. The credit rating of
SANRAL in the money markets will in the first
instance be severely affected , since it raises
money by issuing bonds. The credit rating of
South Africa would also be impacted on
negatively, since SANRAL is a wholly
government-owned. entity and its standing
affects the Government’s standing.” (emphasis
added)

8


Direct equity injections (as opposed to pure government grants), sovereign funds and similar investment
vehicles have been used in a number of counties in providing equity capital to infrastructure projects.



Generally speaking, the provision of equity capital implies a future stream of dividends to shareholder,
and is best suited to sectors/projects where there is the expectation of commercial return on investment.
Return on investment for public enterprises


The cost of capital is broadly defined* as “the expected rate of return on alternative investments of
equivalent risk. It is the rate of return that investors require based on the risk-return alternatives
available in competitive capital markets” and there is strong argument to be made that this
fundamental relationship is equally well applied to competitive capital markets and public
enterprises. i.e.





In both market and regulatory environments scarce capital must be allocated to various
investment options.
The underlying opportunity cost of capital employed to each investment option (or business)
is dependent on the risk characteristics of that investment (business).
This is the case for privately held businesses and public enterprises. For this reason, the
commercial rate of return provided for in the capital markets may be seen as the appropriate
conceptual starting point in which to assess the appropriate rate of return on investment in
public infrastructure.

* Brattle Group, “The Cost Of Capital For The Dampier To Bunbury Natural Gas Pipeline” October 1999

9


While government grants often play an important role in infrastructure development, scarce resources
must be allocated to meet a range of social objectives.



This can constrain a government’s ability to build major infrastructure projects by way of grants from the
fiscus. In this sense government grants may not provide a sustainable way in which to fund public
infrastructure.



Broadly speaking, government grants as related to public infrastructure projects are often funded is by
way of:
 General taxation — the general tax base which revenue is sourced and the expenditure of the
revenue raised.
 General purpose public borrowing — funds raised by issuing debt securities (e.g. government
bonds) on domestic or international markets.
 Hypothecated taxes — taxation revenue (usually from specific taxes or levies) directly assigned or
‘earmarked’ to fund designated expenditures.
 Intergovernmental transfers - the transfer of finances between different levels of government (e.g.
from national to state or municipal governments).

slEconomics Pty Ltd

10


Public Private Partnerships (PPP) as developed in the UK in the early 1990s under its Private
Finance Initiative (PFI) are employed extensively in the delivery of public services and
building of infrastructure.


It is sometimes seen as an off balance sheet approach to debt funding.



These programs are generally broader than just financing and often aim to gain efficiencies from
project design, construction, operation, and risk transfer.



Ordinarily, private sector financing is often a significant component of PPPs or PFIs, and useful to set
out as one option for financing public infrastructure.



RSA has since developed its PPP unit with National Treasury.

slEconomics Pty Ltd

11


Long term sustainable outcomes require internally generated funds supported by
tariffs.


Proper licensing , monitoring , tariff setting, and dispute resolution mechanisms must be in place.



Tariffs and prices must recover all the efficient costs of supply including a return that is perceived by
the investor sufficient to invest his capital in the industry over time.



When the tariff levels are set right, they provide a positive incentive for private investors to invest in
the sector.



Tariffs must be set over a long term to provide for predictability by the investors to plan their
enterprise performance over time.



The regulated decisions must provide an environment that is consistent over time for sound
strategic planning.



The regulated decisions must be flexible to be challenged in court if needs be or be re-opened for
review at appropriate cost effective times.

slEconomics Pty Ltd

12


Moody’s provides its approach to rating regulated utilities in which it sets out the following 4 key
rating factors and weighting in its assessment of credit ratings for regulated utilities*

Moody’s Rating Factor Weighting - Regulated
Utilities
Broad Rating Factors

Factors cited by Moody’s

Weighting

40%

Historic and projected financial performance
as assessed by standard credit metrics.

10%

Financial Strength, Liquidity and Key
Financial Metrics

•

25%

Diversification

Supportive regulatory environments and cost
recovery mechanisms.

25%

Ability to Recover Costs and Earn
Returns

Predictability of regulatory decision making;
the level of political intervention in the
regulatory process, and the strength of the
regulator’s authority over regulatory issues.

•

Regulatory Framework

•

* Source: Moody’s Rating Methodology, Regulated Electric and Gas Utilities August 2009

slEconomics Pty Ltd

13


Independent regulators that protect the interest both for a sustainable sector over time
and the interests of customers for tariff structures that are affordable and are flexible
around the different needs.



The balance between cost reflectivity and affordability must be established to the
satisfaction of investors and the customers, that is the tariff must be sufficient for investors
to provide new investment in the sector and the same time it must make the consumers of
the service satisfied that it is value for money.



Regulatory decisions on revenues and tariffs should avoid shocks to the industry and
maintain consistency over time.



Regulatory decisions must be exposed to stakeholder consultation before they are
implemented and stakeholders must be afforded time to comment in writing or orally.

slEconomics Pty Ltd

14


Fast-tracking policy and regulation reforms for their enhanced implementation - licensing,
monitoring, tariff setting, and management of disputes.



Enhanced monitoring of projects for speedy regulatory approvals.



Finalizing the best solution for each infrastructure deficiency - proper load forecasting,
demand projections, and supply deficiency estimations.



Facilitation of funding for infrastructure projects.



Guidelines for preparing a finalized infrastructure roll-out plan.



Managing risk in infrastructure projects.



The future for infrastructure financing – long range price trajectory by sector to inform
decision making in each sector to ensure sustainability over time.



The importance of proper stakeholder engagement on infrastructure funding.
slEconomics Pty Ltd

15


The regulatory environment is still developing:




Appropriate regulatory and governance frameworks need to be applied to enable
sustainable investment in infrastructure.





Tariff levels have not reached cost reflective levels needed to attract private sector
participants

Uncertain implementation of pricing frameworks further impends investment in
major projects (i.e. Sanral) .

As these challenges are addressed, and with a proven track record of
achievement, ongoing investment in South Africa's Infrastructure will provide
the foundation for economic growth and development into the future.

slEconomics Pty Ltd

16
slEconomics is a boutique economics consulting firm providing
specialised advice to governments, regulators and corporate clients in
the area of utilities and infrastructure. We are based in Sydney Australia
and in Pretoria South Africa, backed by an international network of
associates to bring global experience to local initiatives.
www.slEconomics.com

slEconomics Pty Ltd

17

Weitere ähnliche Inhalte

Was ist angesagt?

OSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept NoteOSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept Note
Dr Lendy Spires
 
ADF: Domestic Resource Mobilization
ADF: Domestic Resource MobilizationADF: Domestic Resource Mobilization
ADF: Domestic Resource Mobilization
Dr Lendy Spires
 
The-choice-of-finance-for-capital-investment
The-choice-of-finance-for-capital-investmentThe-choice-of-finance-for-capital-investment
The-choice-of-finance-for-capital-investment
Matthew Rees
 
PIDA Brief Financing
PIDA Brief FinancingPIDA Brief Financing
PIDA Brief Financing
Dr Lendy Spires
 

Was ist angesagt? (20)

Infrastructure development - Holger Van Eden, IMF
Infrastructure development - Holger Van Eden, IMFInfrastructure development - Holger Van Eden, IMF
Infrastructure development - Holger Van Eden, IMF
 
Mobilizing private finance...
Mobilizing private finance...Mobilizing private finance...
Mobilizing private finance...
 
Addressing 11th sdg in drc
Addressing 11th sdg in drcAddressing 11th sdg in drc
Addressing 11th sdg in drc
 
Municipal Bonds Issuance: Opportunities and Challenges for LGs
Municipal Bonds Issuance: Opportunities and Challenges for LGsMunicipal Bonds Issuance: Opportunities and Challenges for LGs
Municipal Bonds Issuance: Opportunities and Challenges for LGs
 
OSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept NoteOSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept Note
 
ADF: Domestic Resource Mobilization
ADF: Domestic Resource MobilizationADF: Domestic Resource Mobilization
ADF: Domestic Resource Mobilization
 
The-choice-of-finance-for-capital-investment
The-choice-of-finance-for-capital-investmentThe-choice-of-finance-for-capital-investment
The-choice-of-finance-for-capital-investment
 
The infrastructure sector contribution to sustainable development - MOOC FFD ...
The infrastructure sector contribution to sustainable development - MOOC FFD ...The infrastructure sector contribution to sustainable development - MOOC FFD ...
The infrastructure sector contribution to sustainable development - MOOC FFD ...
 
PIDA Brief Financing
PIDA Brief FinancingPIDA Brief Financing
PIDA Brief Financing
 
Filip drapak ppp in financial crises english
Filip drapak ppp in financial crises englishFilip drapak ppp in financial crises english
Filip drapak ppp in financial crises english
 
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for GhanaPublic-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
 
PPP for regional development - Lee MIZELL, Consultant
PPP for regional development - Lee MIZELL, ConsultantPPP for regional development - Lee MIZELL, Consultant
PPP for regional development - Lee MIZELL, Consultant
 
Infrastructure financing in developing countries of africa
Infrastructure financing in developing countries of africaInfrastructure financing in developing countries of africa
Infrastructure financing in developing countries of africa
 
Final project
Final projectFinal project
Final project
 
Infrastructure finance, MOOC Digital Artificat
Infrastructure finance, MOOC Digital ArtificatInfrastructure finance, MOOC Digital Artificat
Infrastructure finance, MOOC Digital Artificat
 
Prioritisation and selection of public investment projects - Seungwook LEE, ...
 Prioritisation and selection of public investment projects - Seungwook LEE, ... Prioritisation and selection of public investment projects - Seungwook LEE, ...
Prioritisation and selection of public investment projects - Seungwook LEE, ...
 
Rwanda's financing strategy final
Rwanda's financing strategy finalRwanda's financing strategy final
Rwanda's financing strategy final
 
Lawyer in Vietnam Oliver Massmann THE WORLD BANK REPORT ON RETAIL TARIFF INCR...
Lawyer in Vietnam Oliver Massmann THE WORLD BANK REPORT ON RETAIL TARIFF INCR...Lawyer in Vietnam Oliver Massmann THE WORLD BANK REPORT ON RETAIL TARIFF INCR...
Lawyer in Vietnam Oliver Massmann THE WORLD BANK REPORT ON RETAIL TARIFF INCR...
 
PPP for regional development - Lisa MITCHELL, Canada
PPP for regional development - Lisa MITCHELL, CanadaPPP for regional development - Lisa MITCHELL, Canada
PPP for regional development - Lisa MITCHELL, Canada
 
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
Investing in Turkey: Asli Ozturk, Project Financing for Infrastructure/PPP Pr...
 

Andere mochten auch

Infrastructure unbundling in south africa
Infrastructure unbundling in south africaInfrastructure unbundling in south africa
Infrastructure unbundling in south africa
Kartikeya Pandey
 
Week 9 slides growth&business cycle [core]
Week 9 slides  growth&business cycle [core]Week 9 slides  growth&business cycle [core]
Week 9 slides growth&business cycle [core]
Nicooooleeee
 
types of pipes
types of pipestypes of pipes
types of pipes
Dipesh Patel
 
MBA Internship Report
MBA Internship ReportMBA Internship Report
MBA Internship Report
Ajesh U Bhanu
 

Andere mochten auch (10)

Giåo trÏnh thᝧy l᝹c và khí nÊn nhiᝁu tåc giả
Giåo trÏnh thᝧy l᝹c và khí nÊn   nhiᝁu tåc giảGiåo trÏnh thᝧy l᝹c và khí nÊn   nhiᝁu tåc giả
Giåo trÏnh thᝧy l᝹c và khí nÊn nhiᝁu tåc giả
 
Why South Africa?
Why South Africa?Why South Africa?
Why South Africa?
 
HDPE Pipe
HDPE PipeHDPE Pipe
HDPE Pipe
 
Infrastructure unbundling in south africa
Infrastructure unbundling in south africaInfrastructure unbundling in south africa
Infrastructure unbundling in south africa
 
Week 9 slides growth&business cycle [core]
Week 9 slides  growth&business cycle [core]Week 9 slides  growth&business cycle [core]
Week 9 slides growth&business cycle [core]
 
Water footprint for mining in South Africa
Water footprint for mining in South AfricaWater footprint for mining in South Africa
Water footprint for mining in South Africa
 
Different Types of Water Pipes And Their Uses
Different Types of Water Pipes And Their UsesDifferent Types of Water Pipes And Their Uses
Different Types of Water Pipes And Their Uses
 
types of pipes
types of pipestypes of pipes
types of pipes
 
Types of pipes
Types of pipesTypes of pipes
Types of pipes
 
MBA Internship Report
MBA Internship ReportMBA Internship Report
MBA Internship Report
 

Ähnlich wie slEconomics - Models for funding infrastructure in South Africa - Nov 2013

Cost of Capital for State Owned Enterprises Stephen Labson slEconomics
Cost of Capital for State Owned Enterprises   Stephen Labson slEconomicsCost of Capital for State Owned Enterprises   Stephen Labson slEconomics
Cost of Capital for State Owned Enterprises Stephen Labson slEconomics
Stephen Labson
 
FPS FUNDING REPORT nov 2015
FPS FUNDING REPORT nov 2015 FPS FUNDING REPORT nov 2015
FPS FUNDING REPORT nov 2015
dadco
 

Ähnlich wie slEconomics - Models for funding infrastructure in South Africa - Nov 2013 (20)

Cost of Capital for State Owned Enterprises Stephen Labson slEconomics
Cost of Capital for State Owned Enterprises   Stephen Labson slEconomicsCost of Capital for State Owned Enterprises   Stephen Labson slEconomics
Cost of Capital for State Owned Enterprises Stephen Labson slEconomics
 
PPP role of multinational companies in electricity sector
PPP role of multinational companies in electricity sectorPPP role of multinational companies in electricity sector
PPP role of multinational companies in electricity sector
 
Session 1 Luigi de Pierris, af db
Session 1 Luigi de Pierris, af dbSession 1 Luigi de Pierris, af db
Session 1 Luigi de Pierris, af db
 
Final project, mbatuusa christine, MOOC : Financing for Development: Unlockin...
Final project, mbatuusa christine, MOOC : Financing for Development: Unlockin...Final project, mbatuusa christine, MOOC : Financing for Development: Unlockin...
Final project, mbatuusa christine, MOOC : Financing for Development: Unlockin...
 
Investments in water private and public investments
Investments in water private and public investmentsInvestments in water private and public investments
Investments in water private and public investments
 
Attracting Private Investment To Ghana V3
Attracting Private Investment To Ghana V3Attracting Private Investment To Ghana V3
Attracting Private Investment To Ghana V3
 
Development finance impact project
Development finance impact projectDevelopment finance impact project
Development finance impact project
 
Cityscape jeddah jun 2011
Cityscape jeddah jun 2011Cityscape jeddah jun 2011
Cityscape jeddah jun 2011
 
Budget2010 ppt mba finance
Budget2010 ppt  mba finance Budget2010 ppt  mba finance
Budget2010 ppt mba finance
 
National monetisation pipeline
National monetisation pipelineNational monetisation pipeline
National monetisation pipeline
 
Final project pegui yannick
Final project pegui yannickFinal project pegui yannick
Final project pegui yannick
 
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoudPublic private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
 
Iraqi private sector's perspective on economic zone sectors
Iraqi private sector's perspective on economic zone sectorsIraqi private sector's perspective on economic zone sectors
Iraqi private sector's perspective on economic zone sectors
 
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
 
PPP for regional development - DorothĂŠe ALLAIN-DUPRE, OECD Secretariat
PPP for regional development - DorothĂŠe ALLAIN-DUPRE, OECD SecretariatPPP for regional development - DorothĂŠe ALLAIN-DUPRE, OECD Secretariat
PPP for regional development - DorothĂŠe ALLAIN-DUPRE, OECD Secretariat
 
Final Project ms
Final Project msFinal Project ms
Final Project ms
 
Unlocking financial opportunities for the attainment of sustainable Developme...
Unlocking financial opportunities for the attainment of sustainable Developme...Unlocking financial opportunities for the attainment of sustainable Developme...
Unlocking financial opportunities for the attainment of sustainable Developme...
 
Assingment 2
Assingment 2Assingment 2
Assingment 2
 
FPS FUNDING REPORT nov 2015
FPS FUNDING REPORT nov 2015 FPS FUNDING REPORT nov 2015
FPS FUNDING REPORT nov 2015
 
Trends and Overview of PPP in ASEAN
Trends and Overview of PPP in ASEANTrends and Overview of PPP in ASEAN
Trends and Overview of PPP in ASEAN
 

Mehr von Stephen Labson

LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...
LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...
LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...
Stephen Labson
 
Labson Unbundllng Utility Regulation
Labson Unbundllng Utility RegulationLabson Unbundllng Utility Regulation
Labson Unbundllng Utility Regulation
Stephen Labson
 
factors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technology
factors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technologyfactors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technology
factors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technology
Stephen Labson
 
Labson Demand Managment Agenda
Labson Demand Managment AgendaLabson Demand Managment Agenda
Labson Demand Managment Agenda
Stephen Labson
 

Mehr von Stephen Labson (17)

LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...
LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...
LABSON Asset Valuation and the Test for Excessive Pricing Invited Paper ACER ...
 
Labson Unbundllng Utility Regulation
Labson Unbundllng Utility RegulationLabson Unbundllng Utility Regulation
Labson Unbundllng Utility Regulation
 
factors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technology
factors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technologyfactors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technology
factors-influencing-the-diffusion-of-electric-arc-furnace-steelmaking-technology
 
Labson Demand Managment Agenda
Labson Demand Managment AgendaLabson Demand Managment Agenda
Labson Demand Managment Agenda
 
S Labson, The Changing Approach to Economic Regulation
S Labson,  The Changing Approach to Economic RegulationS Labson,  The Changing Approach to Economic Regulation
S Labson, The Changing Approach to Economic Regulation
 
Stephen Labson, Regulatory Asset Valuation and Regulatory Tariff Setting
Stephen Labson, Regulatory Asset Valuation and Regulatory Tariff SettingStephen Labson, Regulatory Asset Valuation and Regulatory Tariff Setting
Stephen Labson, Regulatory Asset Valuation and Regulatory Tariff Setting
 
Trans African Energy - Overview of Contractring and Hedges in Australia's Nat...
Trans African Energy - Overview of Contractring and Hedges in Australia's Nat...Trans African Energy - Overview of Contractring and Hedges in Australia's Nat...
Trans African Energy - Overview of Contractring and Hedges in Australia's Nat...
 
Trans African Energy - Overview of Australian Wholesale Market Rules
Trans African Energy - Overview of Australian Wholesale Market RulesTrans African Energy - Overview of Australian Wholesale Market Rules
Trans African Energy - Overview of Australian Wholesale Market Rules
 
Trans African Energy Pty - Establishment of an Independent Sytem Operator
Trans African Energy Pty - Establishment of an Independent Sytem OperatorTrans African Energy Pty - Establishment of an Independent Sytem Operator
Trans African Energy Pty - Establishment of an Independent Sytem Operator
 
Trans African Energy Pty, System and Market Operations - An Overview of Gov...
Trans African Energy Pty,   System and Market Operations - An Overview of Gov...Trans African Energy Pty,   System and Market Operations - An Overview of Gov...
Trans African Energy Pty, System and Market Operations - An Overview of Gov...
 
china_steel
china_steelchina_steel
china_steel
 
slEconomics., Electricity sector tariff reforms in Thailand. Stephen Labson 2014
slEconomics., Electricity sector tariff reforms in Thailand. Stephen Labson 2014slEconomics., Electricity sector tariff reforms in Thailand. Stephen Labson 2014
slEconomics., Electricity sector tariff reforms in Thailand. Stephen Labson 2014
 
Trans African Energy Pty. Bidders’ Guide to Power Purchase Programmes,
Trans African Energy Pty. Bidders’ Guide to Power Purchase Programmes, Trans African Energy Pty. Bidders’ Guide to Power Purchase Programmes,
Trans African Energy Pty. Bidders’ Guide to Power Purchase Programmes,
 
Approaches to Government Funding of Airports. Stephen Labson slEconomics
Approaches to Government Funding of Airports.   Stephen Labson slEconomicsApproaches to Government Funding of Airports.   Stephen Labson slEconomics
Approaches to Government Funding of Airports. Stephen Labson slEconomics
 
Economic Impacts of Electricity Price Increases in South Africa, Stephen La...
Economic Impacts of Electricity Price Increases in South Africa,   Stephen La...Economic Impacts of Electricity Price Increases in South Africa,   Stephen La...
Economic Impacts of Electricity Price Increases in South Africa, Stephen La...
 
Funding Public Infrastructure Stephen Labson slEconomics
Funding Public Infrastructure Stephen Labson slEconomicsFunding Public Infrastructure Stephen Labson slEconomics
Funding Public Infrastructure Stephen Labson slEconomics
 
Regulatory Design Toolkit for Utilities, Stephen Labson slEconomics
 Regulatory Design Toolkit for Utilities, Stephen Labson slEconomics Regulatory Design Toolkit for Utilities, Stephen Labson slEconomics
Regulatory Design Toolkit for Utilities, Stephen Labson slEconomics
 

KĂźrzlich hochgeladen

VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort : 9352852248 Make on-demand Arrangements Near yOU
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
Adnet Communications
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 

KĂźrzlich hochgeladen (20)

Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
 
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
VIP Call Girl in Mira Road 💧 9920725232 ( Call Me ) Get A New Crush Everyday ...
 
Top Rated Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Dighi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdf
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdf
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 

slEconomics - Models for funding infrastructure in South Africa - Nov 2013

  • 1. slEconomics Economics Consulting in Utilities and Infrastructure Africa Infrastructure Rollout Conference 2013 Sandton, South Africa 19 November 2013 Contact: Dr Stephen Labson slabson@sleconomics.com Contact: Mtutu Benya mbenya@sleconomics.com www.sleconomics.com www.sleconomics.com
  • 2.  Role of infrastructure development  Pubic sector infrastructure investment  Funding options  Regulatory and policy challenges slEconomics Pty Ltd 2
  • 3.  The infrastructure challenge has been escalated to a priority agenda due to increased demand for service delivery and the need to grow the economy in tandem with population growth;  These challenges are not unique to RSA alone but they are a continental problem and as part of the SADC region together is grappling to achieve economic growth, efficiencies and effectiveness. Macroeconomic drivers • The South African economy has averaged about 3 per cent growth a year since 2009. • GDP growth was roughly 2.5 per cent in 2011/13, a GDP growth of 5% would meet the current needs of service delivery. • There was a modest recovery in job creation during 2011/12 but the unemployment rate remains high at 23.9 per cent. • The national government’s budget deficit for 2011/12 was 5,2 per cent of GDP and public sector borrowing requirements at 7.1% GDP. • Total (gross) loan debt was R1.1 trillion as at 31 December 2011, equivalent to 38.6% of GDP. Infrastructure developments • Budgeted public sector infrastructure spending of roughly R845 billion is planned for from 2012/13 to 2014/15 of which R300 billion is targeted to the energy sector and R262 billion in transport. • To 2020 R3.2 trillion is expected to be invested in 43 large scale projects in areas such as: • Adding 11,719 MW of power generation capacity and 6596 km of high voltage transmission lines. • Replacing 6405 km of rail freight, coal and ore lines increasing rail network capacity by 149.7 million tons, and procuring 1317 new locomotives and 25,000 new wagons. • A R100 billion port expansion at Durban. 3
  • 4.  Energy and Transport represent the bulk of South Africa’s investment in infrastructure, which is now a significant proportion of total Government borrowings. Government borrowings (R billion) 2013/14 2014/15 213,9 235,1 225,3 200,8 General government borrowing 145,7 158,2 147,8 126,7 Non-financial public enterprises slEconomics Pty Ltd 2012/13 Public sector borrowing requirement Source: South African Reserve Bank, Quarterly Bulletin March 2012 2011/12 68,2 75,9 77,6 74,1 (NB 1 Rand = AUD$ 8.41 as of 19/06/12) 4
  • 5.  South Africa’s public sector infrastructure programme is expected to be funded from a range of sources Funding options Source of funds utilised • A combination of internally generated surpluses and borrowings from capital markets by public enterprises . • Enterprises such as Eskom, Transnet, SANRAL, and ACSA have made use of corporate bond markets and short term commercial paper facilities. • Direct private sector investment such as the Department of Energy’s 3,625MW renewables Independent Power Producer Procurement Programme currently underway. • Mixed shareholding, such as that for Telkom South Africa (Government retaining 38% shareholding) and Airports Company South Africa (Government retaining roughly 75% of shareholding). • Direct government contributions for entities such as Passenger Rail Agency South Africa (PRASA) and Eskom slEconomics Pty Ltd • Multi-lateral institutions such as the African Development Bank; Development Bank of Southern Africa; the World Bank; and the French Development Agency • Local institutions such as the Industrial Development Corporation and Public Investment Corporation • Sovereign funds (e.g. China and the Middle East) 5
  • 6.  Four broad components for funding public sector infrastructure projects  Debt financing - which can be sourced directly by the public enterprise where a stand alone corporate entity has been established and/or by government through loans or loan guarantees.  Equity injection - in which government as shareholder can provide cash injections to the sector.  Government grants - whereby government as a policy decision allocates its resources in the development of public works.  Regulated revenue and tariffs - which (outside of government grants) are ultimately relied on to repay capital investment over the longer term. slEconomics Pty Ltd 6
  • 7.  Debt financing in its various forms represents a significant component of infrastructure funding due to the large capital requirements associated with capacity augmentation, the long term nature of the physical assets, and the (often) stable source of regulated revenue  The availability and cost of funds is of course currently a critical issue with global capital markets under strain limiting the availability of funds and making borrowings relatively more expensive than compared to recent history.  World Bank Group reported that the debt/equity ratios in infrastructure projects reaching closure changed from around 85/15 in 2005–07 to 73/27 in 2008. 14 Projects reaching financial closure in early 2009 had debt/equity ratios of around 70/30.  Both availability and cost of borrowings is directly dependent on the credit worthiness of the entity acquiring financing. slEconomics Pty Ltd 7
  • 8. Theory And practice  Government guarantees can support the amount of borrowings a state owned corporation is able to source and the yield required by debt providers.  However, a government’s cost of capital is not independent on the level of support provided to state owned enterprises in the form of direct guarantees and/or associated contingent liabilities.  For example, where government is either legally obligated to service the debt of a wholly-owned entity in the case of default – or there is a strong expectation of the same by debt providers – the availability of funds is reduced and the cost is greater than it otherwise would have been slEconomics Pty Ltd • The relevance of contingent liabilities is illustrated by recent actions pertaining to SANRAL, whereby in an affidavit to the Constitutional Court of South Africa (21 May 2012) the Minister for Finance stated that if SANRAL was to default on its outstanding loans there would be: • “considerable risk of negative consequences for the South African Government's capacity to raise funds from capital markets. The credit rating of SANRAL in the money markets will in the first instance be severely affected , since it raises money by issuing bonds. The credit rating of South Africa would also be impacted on negatively, since SANRAL is a wholly government-owned. entity and its standing affects the Government’s standing.” (emphasis added) 8
  • 9.  Direct equity injections (as opposed to pure government grants), sovereign funds and similar investment vehicles have been used in a number of counties in providing equity capital to infrastructure projects.  Generally speaking, the provision of equity capital implies a future stream of dividends to shareholder, and is best suited to sectors/projects where there is the expectation of commercial return on investment. Return on investment for public enterprises  The cost of capital is broadly defined* as “the expected rate of return on alternative investments of equivalent risk. It is the rate of return that investors require based on the risk-return alternatives available in competitive capital markets” and there is strong argument to be made that this fundamental relationship is equally well applied to competitive capital markets and public enterprises. i.e.    In both market and regulatory environments scarce capital must be allocated to various investment options. The underlying opportunity cost of capital employed to each investment option (or business) is dependent on the risk characteristics of that investment (business). This is the case for privately held businesses and public enterprises. For this reason, the commercial rate of return provided for in the capital markets may be seen as the appropriate conceptual starting point in which to assess the appropriate rate of return on investment in public infrastructure. * Brattle Group, “The Cost Of Capital For The Dampier To Bunbury Natural Gas Pipeline” October 1999 9
  • 10.  While government grants often play an important role in infrastructure development, scarce resources must be allocated to meet a range of social objectives.  This can constrain a government’s ability to build major infrastructure projects by way of grants from the fiscus. In this sense government grants may not provide a sustainable way in which to fund public infrastructure.  Broadly speaking, government grants as related to public infrastructure projects are often funded is by way of:  General taxation — the general tax base which revenue is sourced and the expenditure of the revenue raised.  General purpose public borrowing — funds raised by issuing debt securities (e.g. government bonds) on domestic or international markets.  Hypothecated taxes — taxation revenue (usually from specific taxes or levies) directly assigned or ‘earmarked’ to fund designated expenditures.  Intergovernmental transfers - the transfer of finances between different levels of government (e.g. from national to state or municipal governments). slEconomics Pty Ltd 10
  • 11.  Public Private Partnerships (PPP) as developed in the UK in the early 1990s under its Private Finance Initiative (PFI) are employed extensively in the delivery of public services and building of infrastructure.  It is sometimes seen as an off balance sheet approach to debt funding.  These programs are generally broader than just financing and often aim to gain efficiencies from project design, construction, operation, and risk transfer.  Ordinarily, private sector financing is often a significant component of PPPs or PFIs, and useful to set out as one option for financing public infrastructure.  RSA has since developed its PPP unit with National Treasury. slEconomics Pty Ltd 11
  • 12.  Long term sustainable outcomes require internally generated funds supported by tariffs.  Proper licensing , monitoring , tariff setting, and dispute resolution mechanisms must be in place.  Tariffs and prices must recover all the efficient costs of supply including a return that is perceived by the investor sufficient to invest his capital in the industry over time.  When the tariff levels are set right, they provide a positive incentive for private investors to invest in the sector.  Tariffs must be set over a long term to provide for predictability by the investors to plan their enterprise performance over time.  The regulated decisions must provide an environment that is consistent over time for sound strategic planning.  The regulated decisions must be flexible to be challenged in court if needs be or be re-opened for review at appropriate cost effective times. slEconomics Pty Ltd 12
  • 13.  Moody’s provides its approach to rating regulated utilities in which it sets out the following 4 key rating factors and weighting in its assessment of credit ratings for regulated utilities* Moody’s Rating Factor Weighting - Regulated Utilities Broad Rating Factors Factors cited by Moody’s Weighting 40% Historic and projected financial performance as assessed by standard credit metrics. 10% Financial Strength, Liquidity and Key Financial Metrics • 25% Diversification Supportive regulatory environments and cost recovery mechanisms. 25% Ability to Recover Costs and Earn Returns Predictability of regulatory decision making; the level of political intervention in the regulatory process, and the strength of the regulator’s authority over regulatory issues. • Regulatory Framework • * Source: Moody’s Rating Methodology, Regulated Electric and Gas Utilities August 2009 slEconomics Pty Ltd 13
  • 14.  Independent regulators that protect the interest both for a sustainable sector over time and the interests of customers for tariff structures that are affordable and are flexible around the different needs.  The balance between cost reflectivity and affordability must be established to the satisfaction of investors and the customers, that is the tariff must be sufficient for investors to provide new investment in the sector and the same time it must make the consumers of the service satisfied that it is value for money.  Regulatory decisions on revenues and tariffs should avoid shocks to the industry and maintain consistency over time.  Regulatory decisions must be exposed to stakeholder consultation before they are implemented and stakeholders must be afforded time to comment in writing or orally. slEconomics Pty Ltd 14
  • 15.  Fast-tracking policy and regulation reforms for their enhanced implementation - licensing, monitoring, tariff setting, and management of disputes.  Enhanced monitoring of projects for speedy regulatory approvals.  Finalizing the best solution for each infrastructure deficiency - proper load forecasting, demand projections, and supply deficiency estimations.  Facilitation of funding for infrastructure projects.  Guidelines for preparing a finalized infrastructure roll-out plan.  Managing risk in infrastructure projects.  The future for infrastructure financing – long range price trajectory by sector to inform decision making in each sector to ensure sustainability over time.  The importance of proper stakeholder engagement on infrastructure funding. slEconomics Pty Ltd 15
  • 16.  The regulatory environment is still developing:   Appropriate regulatory and governance frameworks need to be applied to enable sustainable investment in infrastructure.   Tariff levels have not reached cost reflective levels needed to attract private sector participants Uncertain implementation of pricing frameworks further impends investment in major projects (i.e. Sanral) . As these challenges are addressed, and with a proven track record of achievement, ongoing investment in South Africa's Infrastructure will provide the foundation for economic growth and development into the future. slEconomics Pty Ltd 16
  • 17. slEconomics is a boutique economics consulting firm providing specialised advice to governments, regulators and corporate clients in the area of utilities and infrastructure. We are based in Sydney Australia and in Pretoria South Africa, backed by an international network of associates to bring global experience to local initiatives. www.slEconomics.com slEconomics Pty Ltd 17