Table of content Pages
Abstract 4
CHAPTER ONE- INTRODUCTION
1.1 Background of the industry 5
1.2 Statement of the problem 6
1.3 Objective of the research 8
1.4 Scope of study 9
1.5 Significant of the study 9
1.6 Limitation of the study 9
CHAPTER TWO – LITERATURE RIVIEW
2.1 Background of the research areas 10
2.2 Concept and definition of key components of the research area 10
2.3 Theoretical framework 11
2.4 Summarize to conclude 13
CHAPTER THREE- RESEARCH DESIGN AND METHODOLOGY
3.1 The research design 14
3.2 The population sample 14
3.3 Sampling technique 15
3.4 The fieldwork and data collection method 16
2
3.5 The data analysis 16
CHAPTER FOUR- OVERVIEW OF FUTURE APPLICATION 17
REFERENCES 18
3
Abstract
Supply chain management and supplier selection have become the fastest growing
areas of management especially in the last few years. Although study in the area started in
1960s, it is in the 90s that scholars gained much interest in the area of supplier selection.
The reason is that with heightened global competition that has reduced the profit margins of
most companies, hence cost cutting has become the option and is being focused in logistics
which has become the single largest and most important activity of most firms, both in the for
profit and not-for-profit sectors. As such, quite a significant portion of organizations’ budgets
is spent in these activities. Supplier selection in particular is crucial in management of a
supply chain. The decision is one of the most fundamental and important decisions made by
buyers and organizations. This is because supplier selection and management can be
applied to a variety of suppliers throughout a products’ life cycle from initial raw materials
acquisition to end-of-life service providers (Bai and Sarkis, 2009).
Supplier selection is the process by which firms identify, evaluate and contract with
suppliers. The supplier selection process deploys a tremendous amount of a firm’s financial
resources. In return, firms expect significant benefits from contracting with suppliers offering
high value. This research is to identify selection process: Identifying suppliers, soliciting
information from suppliers, setting contract terms, negotiating with suppliers and evaluating
suppliers. The researchers want to highlights why each step is important, how the steps are
interrelated and how the resulting complexity provides fertile ground for research.
4
CHAPTER ONE- INTRODUCTION
1.1 Background of the industry
Maxell Tohshin (Malaysia) Sdn. Bhd. or “MTM” in short was formed with effective as at 1
January 2006 (an integrated of company between Maxell Electronics (M) Sdn. Bhd. &
Tohshin (M) Sdn). Subsidiary Hitachi Maxell Ltd., Japan a member of the Hitachi Group of
Companies. MTM started with the Plastic Injection Molding of components for camera parts,
Manufactures Optical Lenses, Processing Lens Coating and Assemblies of Micro-Camera
Lens Unit, Manufacturers the 3.5 inch Floppy Diskettes, Assembling and certifying DVD-
RAMs under the renowned name of Maxell and in addition to this. MTM also punches Disk
Sheets (cookies) for the 3.5 inch Floppy Diskettes. Registered office at Lot 1, Batu
Berendam free Trade Zone Phase III, Batu Berendam 75350 Melaka, Malaysia.
1.1.1 The concept of supplier selection and procurement
Supplier selection and evaluation have become one of the major topics in production and
operations management literature (Motwani et al., 1999).It is the process by which firms
identify, evaluate and contract with suppliers. The supplier selection is one part of the value
chain that is now considered to deploy tremendous amount of an organization’s resources
and for this reason, much is expected in terms of high value from suppliers (Beil,
2009).These are part of what is today called supply management in the supply chain
management function in an organization. Supply management refers to “the process of
identification, acquisition, access, positioning, and management of resources an
organization needs or potentially needs in the attainment of its strategic objectives” (Institute
of Supply Management). Weber et al. (1991) define supplier selection as the search for
potential providers where the providers are sorted (evaluated) into potential ad non potential
providers. Typical criteria for supplier selection could be price structure, delivery which
5
entails timeliness and cost, product and services quality. It is the ongoing process of
searching and evaluating process to find a supplier of essential goods and services required
in an organization for normal operations.
The term procurement is used in the place of purchasing however, and encompasses
activities of specifications and development, expediting, supplier quality control and some
logistic activities (Wisner,Tan,and Leong,2008).Some scholars have postulated that supply
management is today a mainstream value adding process that is viewed as most
strategic(Cousins,2005). The main objective of supplier selection process is to reduce
purchase risk, maximize overall value to the purchaser, and develop closeness and long-
term relationships between buyers and suppliers (Li et al., 1997 as cited in Tahriri, Osman,
Ali and Yusuff, 2008). According to Benyoucef et al (2003), supplier selection process is
continuous in order to upgrade the existing variety and typology of their product range. It is
necessitated by the fact that most products generally have short lifecycle of 3 to 4 years.
1.2 Statement of the problem
Two different aspects characterize the supplier selection problem:
The first aspect is the determination of the number of the suppliers and the mode of relations
with them. Considering the characteristics of the company, product and market, its strategic
plan can encourage a large number of suppliers or not. Today, we are involved in a “co-
operative logistic” environment. The company seeks a strong co-operation with its principal
suppliers. Indeed, a strong co-operation with high number of suppliers is very difficult to
manage. An area of current research focuses on the classification of components or parts or
process to externalise in order to establish a suitable relation with the suppliers of each
category. For example, the company can consider a relation of partnership or even a
strategic alliance with a supplier who provides a part or a component and with which it
wishes to have a durable co-operation. On the other hand, this company can have a
hierarchical relation and a significant number of suppliers for the standard parts in order to
establish a competition between them and thus to reduce the cost of purchasing. Second
6
aspect is the selection of the best suppliers among the existing alternatives. In this work, we
consider this aspect of the problem and thus we assume that the number of the suppliers to
be selected is already given.
Issue in MTM under Procurement Department with the vender that influence the team
to search and find the alternative supplier and involve with the supplier selection.
1) Lead time-
Some of the supplier required the lead time more than 3 month. This is because their
material incoming from the overseas take about 1-2 month and the production lead
time takes about 1 month (depends to the production plan from their side.
2) Price-
Prices based on the material itself and also the terms. Some of the prices based on
the exwork , DDU, FOB, CIF and others. Certain country the prices based on the
currency and exchange rate. Sometimes, MTM facing the un-flexible prices,
especially the commodity item.(wire, plastic, spare part and etc.)
3) Quality
The quality must be meet the MTM requirement. If there is any quality issue, MTM
will request the supplier to send the replacement, or send the man power to do
sorting at MTM. However, the supplier also request to return the lot, but due the MTM
located at the FTZ area, any incoming or outgoing must be apply the custom
exemption. Normally to get the approval, it will take about 2-3 days. If there is no
customs officer at the office, the application will drack until a week. The issue will be
happen when the supplier do not have stock to send out the replacement and
required the MTM to return ASAP, but due the requirement for the rules and
regulation, MTM alternative plan to proceed the line sorting.
4) Delivery/mode of transport
The delivery can divided with 3 normal types; by sea, air, courier, or land transport. If
by sea, each country does have their lead time.
5) Payment terms
7
Whether the 60 days or 30 days. Or even advance payment
6) Rules and regulation
Customs exemption, documentation requirement (K1, K2,K8 etc.)
7) Documentation
Invoices and delivery order. According to the standard info
8) Services and pic involvement
The service provided and the response of any comment or issue from the ‘window’.
1.3 Objective of the research
The first stream dominates the purchasing literature and identifies appropriate criteria and
methods supporting supplier evaluation. The primary goals are to help the buyer decide what
its objectives are, what dimensions to evaluate suppliers over, and how to evaluate suppliers
using these dimensions. The second stream assumes that the buyer knows what it wants
and has an existing methodology for evaluating suppliers. It focuses on decisions such as
what types of negotiation formats or contracts to employ, and how to elicit information that
suppliers may be reluctant to reveal.
1.3.1 Research questions
The research questions for the study shall be:
What are some of the factors that determine supplier selection in the procurement process in
Maxell Tohshin? Is the supplier size a criterion for selection as a supplier in the procurement
process by Maxell Tohshin? To what extent does quality of supplies determine the supplier
selection in the procurement process in the Maxell Tohshin? Is cost a factor in the selection
of suppliers by the Maxell Tohshin? What is the overall effect of bribery and connections in
the supplier selection decision Maxell Tohshin?
8
1.4 Scope of Study
The focused on effectiveness and efficiency of selecting supplier selection method
determination of quality performance supplier selection criteria and the between supplier
selection techniques and quality performance of organization.
1.4.1 Geographical Scope
The study was conducted in Maxell Tohshin industries located on plot industries area Batu
Berendam, Melaka.
1.5 Significance of the Study
1. To contribute to the field of knowledge about supplier selection and quality
performance.
2. The research will benefit organization recognize the importance of supplier selection
in enhancing quality performance.
3. The study will provide organization with the various tools of supplier selection that
can enhance quality performance.
1.6 Limitations of the study
The researcher envisages a number of limitations such as the inability of the respondents to
adequately fill the questionnaires as required, the inadequacy of the research instrument to
capture all the required information, and failure of some respondents to fill the questionnaire,
and the inherent weakness in the research design.Also,the study is limited in that it only
focuses on Maxell Tohshin supplier selection determinants, yet there are many other
company that also rely on local suppliers. The findings in this study might not be adequate
representation of the supplier selection determinants in the Maxell Tohshin; hence the
results cannot be generalized to all.
9
CHAPTER TWO – LITERATURE RIVIEW
2.1 Background of the research areas
This chapter the principles and concepts that has been explore and brought out by various
authors in an existing literature on suppler selection and quality performance of organization
in Maxell Tohshin industries.The literature is reviewed under the following sub headings. The
supplier selection process, determinants of quality performance of organization, and the
relationship between suppliers selection technique and quality performance in Maxell
Tohshin industries.
2.2 Concept and definition of key components of the research area
Supplier selection criteria for a particular product or service category should be
defined by a “cross-functional” team of representatives from different sectors of your
organization. In a manufacturing company, for example, members of the team typically
would include representatives from purchasing, quality, engineering and production. Team
members should include personnel with technical/applications knowledge of the product or
service to be purchased, as well as members of the department that uses the purchased
item. With increasing significance of the purchasing function, purchasing decisions become
more important. As organisations become more dependent on suppliers the direct and
indirect consequences of poor decision-making become more severe. For example, in
industrial companies, purchasing’s share in the total turnover typically ranges between 50-
90% (Telgen, 1994), making decisions about purchasing strategies and operations primary
determinants of probability. In addition, several developments further complicate purchasing
decision-making. Globalisation of trade and the Internet enlarge a purchaser’s choice set.
Changing customer preferences require a broader and faster supplier selection. Public
procurement Public Procurement regulations demand more transparency in decision-
making. New organisational forms lead to the involvement of more decision-makers.
.
10
2.3 Theoretical framework
Consumers buy products based on a combination of cost, quality, availability, maintainability,
and reputation factors. The companies along with their supply chains, which can provide
these desired things, will ultimately be successful (Wisner, J.et al, 2008).But when
confronted with risky purchase decisions, most firms consider first and foremost, sellers or
suppliers with proven track record with the firm are favoured as familiar suppliers help
reduce perceived risks (Hutt and Speh, 2009).
Quantitative approaches used in supplier selection range from simple linear weighting
models to complex mathematical programming models. Linear weighting models are
essentially scoring models which place a weight on subjectively a determined criterion and
provide a total score for each supplier. Mathematical programming models use linear
programming, mixed-integer programming and goal programming to determine supplier
selection (Chaundry et al. as cited in Wissenschaftsverlag, 2007).
According to Beil (2009) supplier selection assists organizations in identifying, evaluating
and contract with suppliers for strategic partnership. Organizations will only achieve their
sourcing objectives once they get the right suppliers who will deliver goods and services on
time. Weber et al (1993) considered supplier selection to be long term process and suggests
that suppliers should be evaluated based on core competences and strategic needs.
2.3.1 Empirical Review
Literature review shows that from empirical front, comprehensive efforts have been made to
develop decision methods and techniques for supplier selection. Weber et al(1991) reviewed
and classified 74 articles that appeared since 1966 with regard to particular criteria used in
supplier selection ( as cited in Mendoza, 2007).In these papers, what comes out as the
major supplier selection determinants include price, delivery, quality, and production capacity
and location. Holt presented a review of contractor evaluation and supplier section
methodologies such as multi-attribute analysis, multi-attribute utility theory, and cluster
11
analysis where he discusses applications of each of these techniques. Degraeve et al uses
the Total Cost of Ownership (TCO) as the framework for comparing supplier selection
models. But it is De Boer et al study that is comprehensive enough as it looks at supplier
selection literature by even classifying the existing literature in a framework. The framework
enumerates steps preceding supplier selection decision. These steps are, problem definition,
formulation of selection criteria, pre-qualification, and final selection. The other unique thing
about their analysis is the classification of supplier selection literature according to different
purchasing situations namely first time buys, modified re-buys, and straight
rebuys(Mendoza,2007).Yet, this analysis though comprehensive leaves crucial gaps as it
does not clearly state the supplier selection determinants, but instead dwells on the selection
procedures.
Dickinson (1966) in his pioneering work on supplier selection identified and ranked 23
supplier selection criteria as collected from a questionnaire given to purchasing agents.
Quality, delivery, and performance history rank top with net price ranking a distant sixth. This
seems to concur with previous studies, but one notable discrepancy is that price curiously
ranks lower than quality. Again, net price is deceptive as other related costs such as
packaging and freight cost could raise the total cost. Total cost covers everything hence
should be the one listed and not net cost. Ellram (1990) proposed three criteria for supplier
selection. These are: the financial statement of the supplier, organizational culture and
strategy of supplier, and the technological state of supplier.
Omar & Sim (2010) in a study on supplier selection criteria conducted on Malaysian
Manufacturing firms found that cost followed by quality ranked higher than any other
determinants. Delivery ranks third based on their analysis.
12
2.4 Summarize to conclude
One of the highly ranked supplier selection determinants from the available literature is the
quality of supplies. Pioneering works of Dickinson (1966) which surveyed 300 commercial
organizations ranked quality as the highest determinant for supplier selection. Quality refers
to conformance to requirements or fit to use. Conformance quality is also viewed as absence
of defects (APICs, 1999).Since the early studies of 60s on supplier selection all through to
90s, quality has consistently ranked top among the various supplier selection determinants.
Purchasers would like to buy only those goods and services that are of high quality. The
other critical factor for supplier selection beside quality is delivery. Meeting delivery
deadlines is critical so as to avoid operations disruptions for lack of supplies. hoi(19960 as
cited in Cheraghi et al. delivery together with quality constitute what might be considered the
threshold criteria for supplier selection.
Performance history of a supplier is also a critical determinant in supplier selection as
literature adduces. In particular, for those goods and services that are of great value or
involving huge cost outlay, then the purchaser tends to go for that supplier whom they are
sure about their past performance. This is basically to reduce risks associated with failure of
unknown suppliers to deliver goods or execute their part of contract.
According to Weber et al. (1991) cost is one of the key determinants for supplier selection.
Cost of supplies like delivery and quality constitutes the traditional determinants of supplier
selection, also known as order qualifiers. Most organizations both in business and Non-
governmental organization world consider the lowest cost offer since the purchaser aims to
minimize on cost of procurement while trying to maximize on the quality and quantity of
purchases. Service factors such as after sales service, repairs capacities, change and
supply of parts, easy assessable, customer service, technical capacity, and warranty of the
product (Omar & Sim, 2010).For this reason, most purchasers tend to consider these service
factors capacity in a potential supplier. Any supplier with the capacities to provide these
services ultimately gets selected as a supplier to most organizations.
13
CHAPTER THREE- RESEARCH DESIGN AND METHODOLOGY
3.1 The research design
The sources used for study consisted of scientific refereed journals, textbooks and doctoral
dissertations. Publications in languages other than English and non-refereed professional
publications were not included. The search keys used were supplier selection, vendor
selection, purchasing decision-making.
Qualitative methods may include tools for visualising and analysing the decision-maker’s
perception of a problem situation and tools for brainstorming about possible (alternative)
solutions. The collection of quantitative methods comprises a wide variety of approaches.
Data mining techniques can be used to analyse similar decisions made in the past in order
to derive general patterns and decision rules that may subsequently be used to improve the
efficiency and effectiveness of future decisions.
Furthermore, we only included articles that report on a method or technique that specifically
aims at supporting a decision-maker in one or more of the four steps of the supplier
selection process. This implies that articles merely describing the supplier selection process
o the relevant criteria have not been included. Also, articles reporting on methods for
monitoring an existing supplier relationship were excluded.
3.2 The population sample
A population is the total collection of elements about which inferences are made and refers
to all possible cases which are of interest for a study (Sekaran, 2003).The target population
for the study is the 10 Maxell Tohshin department based in Batu Berendam, Melaka. The
study will target the chief procurement and logistics officers in these agencies as the unit of
analysis. These are selected because they are the ones tasked with the responsibility of
sourcing for suppliers of goods and services to their organizations.
14
3.3 Sampling Technique
Sampling refers to the systematic selection of a limited number of elements out of a
theoretically specified population of elements. The rationale is to draw conclusions about the
entire population. According to Kothari (2004), the ultimate test of a sample design is how
well it represents the characteristics of the population it purports to. The reason for sampling
in this study is to lower cost, accessibility of study population and the greater speed of data
collection.
A sample size of 50% of the population will be taken to give a total sample of 9 Maxell
Tohshin department. This is informed by the principle that if the elements of a population are
quite similar, only a small sample is necessary to accurately portray the characteristics of
interest Stratified random sampling will be used where the sample size of 50% shall be taken
from each of the three categories (strata) of the population. Stratified random sampling will
be used because it ensures a greater statistical efficiency, and reduce sampling
error.Kothari(2003) supports random sampling as it satisfies the law of statistical regularity ‘if
a sample is chosen at random, on average it has the same characteristics and composition
as the population’.
Table 3.2: Sample Size
Target Population Sample Percentage Sample Units
Headquartered 2 50 1
Regional Offices 14 50 7
Others 2 50 1
Total 18 9
Source: Author (2012)
15
3.4 The field of work and data collection method
The overall aim of the study is to establish the determinants of supplier selection among
international organizations, specifically the Maxell Tohshin in Batu Berendam Melaka. The
bulk of data collected will therefore be primary in nature. The questionnaire will be the main
instrument, alongside face to face interviews. The use of questionnaires for primary data
collection has been supported by many scholars among them; Mugenda (1999),and Peil
(1995).A questionnaire is easier to administer, less costly, and ensures greater depth of
response, according to Mugenda (1999).A questionnaire also helps capture factual
information effectively. For the purpose of this study, the questionnaire will be used for the
mainly economical, and appropriateness reasons. A pilot study shall be conducted using
questionnaires to be administered to respondents from four Maxell Tohshin departments.
Those questions that will not be clear or are ambiguous will be revised so as to collect the
desired information. A senior academic from the school of Business of University
Technology MARA will assess the validity and reliability of the instrument.
Research Procedure
The researcher will first obtain a letter of introduction from Universiti Teknologi Mara. The
letter will help in identification in the various Maxell Tohshin premises while approaching
respondents. The questionnaires shall be personally administered through drop and pick
method.
3.5 Data Analysis and Presentation
The statistical method used in this study is descriptive and inferential statistics. Data analysis
will be done using Statistical Package for Social Sciences computer software
(SPSS).Tables, pie charts and graphs will be used to present the results on various
variables in the study. Descriptive statistics such as mode, mean and median shall be used
to present the various characteristics for data sets after the descriptive analysis. For this kind
of study, descriptive analysis is the best and has been supported by such scholars as
Schindler (2001), and Crawford (1995).
16
CHAPTER FOUR: OVERVIEW OF POSSIBLE FUTURE APPLICATION
The previous section has made clear that support in the phase of problem definition is an
underdeveloped area in supplier selection since we did not come across any model in the
purchasing literature that pays attention to this important phase. Some approaches in the
operations research literature deal explicitly with problem definition but have thus far not
been used in the purchasing literature. We also identified three additional methods that
seem particularly suitable for supplier qualification phase. These three models are elucidated
in Table 4.
Table 4
Methods for supporting pre-qualification of supplier
Method Typical feature
Conjunctive screening
(Hwang and Yoon, 1981)
A supplier is acceptable if the supplier equal
or exceeds a minimum score on each
criterion
Disjunctive screening
(Hwang and Yoon, 1981)
A supplier is acceptable if the supplier at
least equals or exceeds a minimum score on
one criterion.
Lexicographical screening
(Hwang and Yoon, 1981)
Criteria are ranked in order of importance.
Suppliers are first evaluated on the most
important criterion. Suppliers that pass this
criterion are then evaluated on the second
criterion and so on.
REFERENCES
17
Bai, C. and Sarkis, J. (2009).Supplier selection and sustainability: A Grey Rough
Set evaluation (Working paper 2009-05).Clark University, George Perkins Marsh Institute.
Beil, D. (2009).Supplier selection (unpublished research paper).Stephen M. Ross School of
Business. University of Michigan, Michigan, USA. Available at
www.personal.umich.edu/.../Supplier Selection_...
Bonhestaut, A. (Ed.). (2008).Procurement and supply in Kenya: The market for Small and
Medium Enterprises. Nairobi: Strategic Business Advisors (Africa Ltd).
Cheraghi, S.H.et al. (n.d).critical success factors for supplier selection. Journal of
Applied Business Research, 20, 2
Crawford, I. (1995).Marketing research and information systems. Rome: FAO.
Creswell, J.W. (2003).Research design: Qualitative, quantitative and mixedMethod
approaches.Carlifornia: Sage Publishers.
Delfmann, W. and Wissing-horsten, K. (2007).Strategic supply chain design: Theory,
concepts and applications.
Ellram (1990).The supplier selection decisions in strategic partnerships. Journal
of Purchasing and Materials Management.8-14
Hutt, M.D., and Speh, T.W. (2009).Business marketing management: B2B(10th
ed.).Mason,
OH: Cengage Learning South-Western.http://www.un.org
Mendoza, A. (2007).Effective methodologies for supplier selection and order Quantity
allocation (PHD thesis, The University of Michigan, Michigan.
Motwani, J. and Youssef, M. (1999). Supplier selection in developing countries: a model
development. Emerald, 10(13):154-162.
Mugenda, O.M & Mugenda, A.G. (1999).Research methods: Quantitative and
18
qualitative Approaches: Nairobi: ACTS Press.
Omar, M.K.and Sim, H.K.(2010,December).A survey of supplier selection criteria in the
manufacturing industry in Malysia.The 11th
Asia Pacific Industrial
Engineering and Management systems conference, Melaka, Malysia.
Orodho, J.A. (2004).Techniques of writing research proposals and reports ineducation and
social sciences. Nairobi: Masola Publishers.
Peil, M. (1995).Social science research methods handbook for Africa. Nairobi: East African
Educational Publishers.
Tahriri,F.,Osman,M.R.,Ali,A.,&Yussuff,R.M.,(2008).A review of supplier election methods in
manufacturing industries.Suranaree Journal of Scienceand Technology, 15(3),201208.
Weber, et al. (1991).Vendor selection criteria and methods.European Journal Of Operational
Research, 50, 2-18.
19

Weitere ähnliche Inhalte

Was ist angesagt?

ASQ QMD GSC Supplier Scorecard Benchmark 021209
ASQ QMD GSC Supplier Scorecard Benchmark 021209ASQ QMD GSC Supplier Scorecard Benchmark 021209
ASQ QMD GSC Supplier Scorecard Benchmark 021209John Cachat
 
shahank soni vendor evaluation presentation
shahank soni   vendor evaluation presentationshahank soni   vendor evaluation presentation
shahank soni vendor evaluation presentationAkash Maurya
 
Supplier evaluation and selection
Supplier evaluation and selectionSupplier evaluation and selection
Supplier evaluation and selectionAnish Gambhir
 
Vendor development in pharmaceutical industry
Vendor development in pharmaceutical industryVendor development in pharmaceutical industry
Vendor development in pharmaceutical industryshikha singh
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selectionAnkit
 
Supplier selection process of Merk
Supplier selection process of MerkSupplier selection process of Merk
Supplier selection process of MerkSana Fatima
 
A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...Sachin Mathews
 
Vendor development
Vendor developmentVendor development
Vendor developmentPadmadhar PD
 
Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787Uyoyo Edosio
 
Vendor Selection And Interaction
Vendor Selection And InteractionVendor Selection And Interaction
Vendor Selection And Interactionyashpal01
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONZamri Yahya
 
Managing-Supplier-Performance-Key-Competitive-Advantage
Managing-Supplier-Performance-Key-Competitive-AdvantageManaging-Supplier-Performance-Key-Competitive-Advantage
Managing-Supplier-Performance-Key-Competitive-Advantageddodd
 
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...TraceGains
 
operations management(vendor selection and rating)
operations  management(vendor selection and rating)operations  management(vendor selection and rating)
operations management(vendor selection and rating)POOJA UDAYAN
 

Was ist angesagt? (20)

Supplier Evaluation & Selection
Supplier Evaluation & SelectionSupplier Evaluation & Selection
Supplier Evaluation & Selection
 
ASQ QMD GSC Supplier Scorecard Benchmark 021209
ASQ QMD GSC Supplier Scorecard Benchmark 021209ASQ QMD GSC Supplier Scorecard Benchmark 021209
ASQ QMD GSC Supplier Scorecard Benchmark 021209
 
Developing a Supplier Scorecard - Term Paper
Developing a Supplier Scorecard - Term PaperDeveloping a Supplier Scorecard - Term Paper
Developing a Supplier Scorecard - Term Paper
 
shahank soni vendor evaluation presentation
shahank soni   vendor evaluation presentationshahank soni   vendor evaluation presentation
shahank soni vendor evaluation presentation
 
Business Process Management - Choosing The Right Supplier
Business Process Management - Choosing The Right SupplierBusiness Process Management - Choosing The Right Supplier
Business Process Management - Choosing The Right Supplier
 
Supplier evaluation and selection
Supplier evaluation and selectionSupplier evaluation and selection
Supplier evaluation and selection
 
Vendor development in pharmaceutical industry
Vendor development in pharmaceutical industryVendor development in pharmaceutical industry
Vendor development in pharmaceutical industry
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selection
 
Supplier selection process of Merk
Supplier selection process of MerkSupplier selection process of Merk
Supplier selection process of Merk
 
Supplier Approval And Assessment
Supplier Approval And AssessmentSupplier Approval And Assessment
Supplier Approval And Assessment
 
A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...
 
Vendor development
Vendor developmentVendor development
Vendor development
 
Onicra Vendor Rating
Onicra Vendor RatingOnicra Vendor Rating
Onicra Vendor Rating
 
Supplier Assessment and Performance Measurement
Supplier Assessment and Performance MeasurementSupplier Assessment and Performance Measurement
Supplier Assessment and Performance Measurement
 
Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787
 
Vendor Selection And Interaction
Vendor Selection And InteractionVendor Selection And Interaction
Vendor Selection And Interaction
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
 
Managing-Supplier-Performance-Key-Competitive-Advantage
Managing-Supplier-Performance-Key-Competitive-AdvantageManaging-Supplier-Performance-Key-Competitive-Advantage
Managing-Supplier-Performance-Key-Competitive-Advantage
 
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
 
operations management(vendor selection and rating)
operations  management(vendor selection and rating)operations  management(vendor selection and rating)
operations management(vendor selection and rating)
 

Ähnlich wie Supplier selection (abr)

Selection of Supplier by Using Saw and Vikor Methods
Selection of Supplier by Using Saw and Vikor MethodsSelection of Supplier by Using Saw and Vikor Methods
Selection of Supplier by Using Saw and Vikor MethodsIJERA Editor
 
Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...inventionjournals
 
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...IJERA Editor
 
Supply chain management in the textile industry
Supply chain management in the textile industrySupply chain management in the textile industry
Supply chain management in the textile industryPoorna Chandra Garalapati
 
139450132_KURIEN PUNNOOSE_ALAN_MN50178
139450132_KURIEN PUNNOOSE_ALAN_MN50178139450132_KURIEN PUNNOOSE_ALAN_MN50178
139450132_KURIEN PUNNOOSE_ALAN_MN50178Alan Kurien Punnoose
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachIRJET Journal
 
Designing a Computational tool for Supplier Selection using Analytical Hierar...
Designing a Computational tool for Supplier Selection using Analytical Hierar...Designing a Computational tool for Supplier Selection using Analytical Hierar...
Designing a Computational tool for Supplier Selection using Analytical Hierar...Dr. Soumendra Kumar Patra
 
Utilitas mathematica
Utilitas mathematicaUtilitas mathematica
Utilitas mathematicarikaseorika
 
mathematica journal
mathematica journal mathematica journal
mathematica journal rikaseorika
 
journal for research
journal for researchjournal for research
journal for researchrikaseorika
 
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...Steven Wallach
 
Factors that Influence the Supplier Selection of Manufacturing Businesses
Factors that Influence the Supplier Selection of Manufacturing BusinessesFactors that Influence the Supplier Selection of Manufacturing Businesses
Factors that Influence the Supplier Selection of Manufacturing BusinessesQUESTJOURNAL
 
Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...
Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...
Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...IJERA Editor
 
Supply chain management in the textile industry
Supply chain management in the textile industrySupply chain management in the textile industry
Supply chain management in the textile industryManish Tiwary
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET Journal
 

Ähnlich wie Supplier selection (abr) (20)

Selection of Supplier by Using Saw and Vikor Methods
Selection of Supplier by Using Saw and Vikor MethodsSelection of Supplier by Using Saw and Vikor Methods
Selection of Supplier by Using Saw and Vikor Methods
 
Supplier selection using fuzzy AHP method and D-numbers
Supplier selection using fuzzy AHP method and D-numbersSupplier selection using fuzzy AHP method and D-numbers
Supplier selection using fuzzy AHP method and D-numbers
 
Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...
 
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
 
Supply chain management in the textile industry
Supply chain management in the textile industrySupply chain management in the textile industry
Supply chain management in the textile industry
 
139450132_KURIEN PUNNOOSE_ALAN_MN50178
139450132_KURIEN PUNNOOSE_ALAN_MN50178139450132_KURIEN PUNNOOSE_ALAN_MN50178
139450132_KURIEN PUNNOOSE_ALAN_MN50178
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
 
Designing a Computational tool for Supplier Selection using Analytical Hierar...
Designing a Computational tool for Supplier Selection using Analytical Hierar...Designing a Computational tool for Supplier Selection using Analytical Hierar...
Designing a Computational tool for Supplier Selection using Analytical Hierar...
 
journal research paper
journal research paperjournal research paper
journal research paper
 
Utilitas mathematica
Utilitas mathematicaUtilitas mathematica
Utilitas mathematica
 
mathematica journal
mathematica journal mathematica journal
mathematica journal
 
journal for research
journal for researchjournal for research
journal for research
 
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
 
Impact of SRM on organization performance
Impact of SRM on organization performanceImpact of SRM on organization performance
Impact of SRM on organization performance
 
Factors that Influence the Supplier Selection of Manufacturing Businesses
Factors that Influence the Supplier Selection of Manufacturing BusinessesFactors that Influence the Supplier Selection of Manufacturing Businesses
Factors that Influence the Supplier Selection of Manufacturing Businesses
 
Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...
Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...
Selection of Best Supplier in Furniture Manufacturing Company by Using Analyt...
 
Evaluation and selection of supplier in supply chain with fuzzy analytical ne...
Evaluation and selection of supplier in supply chain with fuzzy analytical ne...Evaluation and selection of supplier in supply chain with fuzzy analytical ne...
Evaluation and selection of supplier in supply chain with fuzzy analytical ne...
 
Tehakelew
TehakelewTehakelew
Tehakelew
 
Supply chain management in the textile industry
Supply chain management in the textile industrySupply chain management in the textile industry
Supply chain management in the textile industry
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
 

Kürzlich hochgeladen

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 

Kürzlich hochgeladen (20)

Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 

Supplier selection (abr)

  • 1. Master of Business Administration [BM 771] Universiti Teknologi MARA, Bandaraya Melaka PROPOSAL FOR ABR SUPPLIER SELECTION: Maxell Tohshin (Malaysia) Sdn. Bhd. PREPARED BY: Name : Siti Suryati Bt Bahari Name : Noorhafizah Bt Badalehshah
  • 2. Table of content Pages Abstract 4 CHAPTER ONE- INTRODUCTION 1.1 Background of the industry 5 1.2 Statement of the problem 6 1.3 Objective of the research 8 1.4 Scope of study 9 1.5 Significant of the study 9 1.6 Limitation of the study 9 CHAPTER TWO – LITERATURE RIVIEW 2.1 Background of the research areas 10 2.2 Concept and definition of key components of the research area 10 2.3 Theoretical framework 11 2.4 Summarize to conclude 13 CHAPTER THREE- RESEARCH DESIGN AND METHODOLOGY 3.1 The research design 14 3.2 The population sample 14 3.3 Sampling technique 15 3.4 The fieldwork and data collection method 16 2
  • 3. 3.5 The data analysis 16 CHAPTER FOUR- OVERVIEW OF FUTURE APPLICATION 17 REFERENCES 18 3
  • 4. Abstract Supply chain management and supplier selection have become the fastest growing areas of management especially in the last few years. Although study in the area started in 1960s, it is in the 90s that scholars gained much interest in the area of supplier selection. The reason is that with heightened global competition that has reduced the profit margins of most companies, hence cost cutting has become the option and is being focused in logistics which has become the single largest and most important activity of most firms, both in the for profit and not-for-profit sectors. As such, quite a significant portion of organizations’ budgets is spent in these activities. Supplier selection in particular is crucial in management of a supply chain. The decision is one of the most fundamental and important decisions made by buyers and organizations. This is because supplier selection and management can be applied to a variety of suppliers throughout a products’ life cycle from initial raw materials acquisition to end-of-life service providers (Bai and Sarkis, 2009). Supplier selection is the process by which firms identify, evaluate and contract with suppliers. The supplier selection process deploys a tremendous amount of a firm’s financial resources. In return, firms expect significant benefits from contracting with suppliers offering high value. This research is to identify selection process: Identifying suppliers, soliciting information from suppliers, setting contract terms, negotiating with suppliers and evaluating suppliers. The researchers want to highlights why each step is important, how the steps are interrelated and how the resulting complexity provides fertile ground for research. 4
  • 5. CHAPTER ONE- INTRODUCTION 1.1 Background of the industry Maxell Tohshin (Malaysia) Sdn. Bhd. or “MTM” in short was formed with effective as at 1 January 2006 (an integrated of company between Maxell Electronics (M) Sdn. Bhd. & Tohshin (M) Sdn). Subsidiary Hitachi Maxell Ltd., Japan a member of the Hitachi Group of Companies. MTM started with the Plastic Injection Molding of components for camera parts, Manufactures Optical Lenses, Processing Lens Coating and Assemblies of Micro-Camera Lens Unit, Manufacturers the 3.5 inch Floppy Diskettes, Assembling and certifying DVD- RAMs under the renowned name of Maxell and in addition to this. MTM also punches Disk Sheets (cookies) for the 3.5 inch Floppy Diskettes. Registered office at Lot 1, Batu Berendam free Trade Zone Phase III, Batu Berendam 75350 Melaka, Malaysia. 1.1.1 The concept of supplier selection and procurement Supplier selection and evaluation have become one of the major topics in production and operations management literature (Motwani et al., 1999).It is the process by which firms identify, evaluate and contract with suppliers. The supplier selection is one part of the value chain that is now considered to deploy tremendous amount of an organization’s resources and for this reason, much is expected in terms of high value from suppliers (Beil, 2009).These are part of what is today called supply management in the supply chain management function in an organization. Supply management refers to “the process of identification, acquisition, access, positioning, and management of resources an organization needs or potentially needs in the attainment of its strategic objectives” (Institute of Supply Management). Weber et al. (1991) define supplier selection as the search for potential providers where the providers are sorted (evaluated) into potential ad non potential providers. Typical criteria for supplier selection could be price structure, delivery which 5
  • 6. entails timeliness and cost, product and services quality. It is the ongoing process of searching and evaluating process to find a supplier of essential goods and services required in an organization for normal operations. The term procurement is used in the place of purchasing however, and encompasses activities of specifications and development, expediting, supplier quality control and some logistic activities (Wisner,Tan,and Leong,2008).Some scholars have postulated that supply management is today a mainstream value adding process that is viewed as most strategic(Cousins,2005). The main objective of supplier selection process is to reduce purchase risk, maximize overall value to the purchaser, and develop closeness and long- term relationships between buyers and suppliers (Li et al., 1997 as cited in Tahriri, Osman, Ali and Yusuff, 2008). According to Benyoucef et al (2003), supplier selection process is continuous in order to upgrade the existing variety and typology of their product range. It is necessitated by the fact that most products generally have short lifecycle of 3 to 4 years. 1.2 Statement of the problem Two different aspects characterize the supplier selection problem: The first aspect is the determination of the number of the suppliers and the mode of relations with them. Considering the characteristics of the company, product and market, its strategic plan can encourage a large number of suppliers or not. Today, we are involved in a “co- operative logistic” environment. The company seeks a strong co-operation with its principal suppliers. Indeed, a strong co-operation with high number of suppliers is very difficult to manage. An area of current research focuses on the classification of components or parts or process to externalise in order to establish a suitable relation with the suppliers of each category. For example, the company can consider a relation of partnership or even a strategic alliance with a supplier who provides a part or a component and with which it wishes to have a durable co-operation. On the other hand, this company can have a hierarchical relation and a significant number of suppliers for the standard parts in order to establish a competition between them and thus to reduce the cost of purchasing. Second 6
  • 7. aspect is the selection of the best suppliers among the existing alternatives. In this work, we consider this aspect of the problem and thus we assume that the number of the suppliers to be selected is already given. Issue in MTM under Procurement Department with the vender that influence the team to search and find the alternative supplier and involve with the supplier selection. 1) Lead time- Some of the supplier required the lead time more than 3 month. This is because their material incoming from the overseas take about 1-2 month and the production lead time takes about 1 month (depends to the production plan from their side. 2) Price- Prices based on the material itself and also the terms. Some of the prices based on the exwork , DDU, FOB, CIF and others. Certain country the prices based on the currency and exchange rate. Sometimes, MTM facing the un-flexible prices, especially the commodity item.(wire, plastic, spare part and etc.) 3) Quality The quality must be meet the MTM requirement. If there is any quality issue, MTM will request the supplier to send the replacement, or send the man power to do sorting at MTM. However, the supplier also request to return the lot, but due the MTM located at the FTZ area, any incoming or outgoing must be apply the custom exemption. Normally to get the approval, it will take about 2-3 days. If there is no customs officer at the office, the application will drack until a week. The issue will be happen when the supplier do not have stock to send out the replacement and required the MTM to return ASAP, but due the requirement for the rules and regulation, MTM alternative plan to proceed the line sorting. 4) Delivery/mode of transport The delivery can divided with 3 normal types; by sea, air, courier, or land transport. If by sea, each country does have their lead time. 5) Payment terms 7
  • 8. Whether the 60 days or 30 days. Or even advance payment 6) Rules and regulation Customs exemption, documentation requirement (K1, K2,K8 etc.) 7) Documentation Invoices and delivery order. According to the standard info 8) Services and pic involvement The service provided and the response of any comment or issue from the ‘window’. 1.3 Objective of the research The first stream dominates the purchasing literature and identifies appropriate criteria and methods supporting supplier evaluation. The primary goals are to help the buyer decide what its objectives are, what dimensions to evaluate suppliers over, and how to evaluate suppliers using these dimensions. The second stream assumes that the buyer knows what it wants and has an existing methodology for evaluating suppliers. It focuses on decisions such as what types of negotiation formats or contracts to employ, and how to elicit information that suppliers may be reluctant to reveal. 1.3.1 Research questions The research questions for the study shall be: What are some of the factors that determine supplier selection in the procurement process in Maxell Tohshin? Is the supplier size a criterion for selection as a supplier in the procurement process by Maxell Tohshin? To what extent does quality of supplies determine the supplier selection in the procurement process in the Maxell Tohshin? Is cost a factor in the selection of suppliers by the Maxell Tohshin? What is the overall effect of bribery and connections in the supplier selection decision Maxell Tohshin? 8
  • 9. 1.4 Scope of Study The focused on effectiveness and efficiency of selecting supplier selection method determination of quality performance supplier selection criteria and the between supplier selection techniques and quality performance of organization. 1.4.1 Geographical Scope The study was conducted in Maxell Tohshin industries located on plot industries area Batu Berendam, Melaka. 1.5 Significance of the Study 1. To contribute to the field of knowledge about supplier selection and quality performance. 2. The research will benefit organization recognize the importance of supplier selection in enhancing quality performance. 3. The study will provide organization with the various tools of supplier selection that can enhance quality performance. 1.6 Limitations of the study The researcher envisages a number of limitations such as the inability of the respondents to adequately fill the questionnaires as required, the inadequacy of the research instrument to capture all the required information, and failure of some respondents to fill the questionnaire, and the inherent weakness in the research design.Also,the study is limited in that it only focuses on Maxell Tohshin supplier selection determinants, yet there are many other company that also rely on local suppliers. The findings in this study might not be adequate representation of the supplier selection determinants in the Maxell Tohshin; hence the results cannot be generalized to all. 9
  • 10. CHAPTER TWO – LITERATURE RIVIEW 2.1 Background of the research areas This chapter the principles and concepts that has been explore and brought out by various authors in an existing literature on suppler selection and quality performance of organization in Maxell Tohshin industries.The literature is reviewed under the following sub headings. The supplier selection process, determinants of quality performance of organization, and the relationship between suppliers selection technique and quality performance in Maxell Tohshin industries. 2.2 Concept and definition of key components of the research area Supplier selection criteria for a particular product or service category should be defined by a “cross-functional” team of representatives from different sectors of your organization. In a manufacturing company, for example, members of the team typically would include representatives from purchasing, quality, engineering and production. Team members should include personnel with technical/applications knowledge of the product or service to be purchased, as well as members of the department that uses the purchased item. With increasing significance of the purchasing function, purchasing decisions become more important. As organisations become more dependent on suppliers the direct and indirect consequences of poor decision-making become more severe. For example, in industrial companies, purchasing’s share in the total turnover typically ranges between 50- 90% (Telgen, 1994), making decisions about purchasing strategies and operations primary determinants of probability. In addition, several developments further complicate purchasing decision-making. Globalisation of trade and the Internet enlarge a purchaser’s choice set. Changing customer preferences require a broader and faster supplier selection. Public procurement Public Procurement regulations demand more transparency in decision- making. New organisational forms lead to the involvement of more decision-makers. . 10
  • 11. 2.3 Theoretical framework Consumers buy products based on a combination of cost, quality, availability, maintainability, and reputation factors. The companies along with their supply chains, which can provide these desired things, will ultimately be successful (Wisner, J.et al, 2008).But when confronted with risky purchase decisions, most firms consider first and foremost, sellers or suppliers with proven track record with the firm are favoured as familiar suppliers help reduce perceived risks (Hutt and Speh, 2009). Quantitative approaches used in supplier selection range from simple linear weighting models to complex mathematical programming models. Linear weighting models are essentially scoring models which place a weight on subjectively a determined criterion and provide a total score for each supplier. Mathematical programming models use linear programming, mixed-integer programming and goal programming to determine supplier selection (Chaundry et al. as cited in Wissenschaftsverlag, 2007). According to Beil (2009) supplier selection assists organizations in identifying, evaluating and contract with suppliers for strategic partnership. Organizations will only achieve their sourcing objectives once they get the right suppliers who will deliver goods and services on time. Weber et al (1993) considered supplier selection to be long term process and suggests that suppliers should be evaluated based on core competences and strategic needs. 2.3.1 Empirical Review Literature review shows that from empirical front, comprehensive efforts have been made to develop decision methods and techniques for supplier selection. Weber et al(1991) reviewed and classified 74 articles that appeared since 1966 with regard to particular criteria used in supplier selection ( as cited in Mendoza, 2007).In these papers, what comes out as the major supplier selection determinants include price, delivery, quality, and production capacity and location. Holt presented a review of contractor evaluation and supplier section methodologies such as multi-attribute analysis, multi-attribute utility theory, and cluster 11
  • 12. analysis where he discusses applications of each of these techniques. Degraeve et al uses the Total Cost of Ownership (TCO) as the framework for comparing supplier selection models. But it is De Boer et al study that is comprehensive enough as it looks at supplier selection literature by even classifying the existing literature in a framework. The framework enumerates steps preceding supplier selection decision. These steps are, problem definition, formulation of selection criteria, pre-qualification, and final selection. The other unique thing about their analysis is the classification of supplier selection literature according to different purchasing situations namely first time buys, modified re-buys, and straight rebuys(Mendoza,2007).Yet, this analysis though comprehensive leaves crucial gaps as it does not clearly state the supplier selection determinants, but instead dwells on the selection procedures. Dickinson (1966) in his pioneering work on supplier selection identified and ranked 23 supplier selection criteria as collected from a questionnaire given to purchasing agents. Quality, delivery, and performance history rank top with net price ranking a distant sixth. This seems to concur with previous studies, but one notable discrepancy is that price curiously ranks lower than quality. Again, net price is deceptive as other related costs such as packaging and freight cost could raise the total cost. Total cost covers everything hence should be the one listed and not net cost. Ellram (1990) proposed three criteria for supplier selection. These are: the financial statement of the supplier, organizational culture and strategy of supplier, and the technological state of supplier. Omar & Sim (2010) in a study on supplier selection criteria conducted on Malaysian Manufacturing firms found that cost followed by quality ranked higher than any other determinants. Delivery ranks third based on their analysis. 12
  • 13. 2.4 Summarize to conclude One of the highly ranked supplier selection determinants from the available literature is the quality of supplies. Pioneering works of Dickinson (1966) which surveyed 300 commercial organizations ranked quality as the highest determinant for supplier selection. Quality refers to conformance to requirements or fit to use. Conformance quality is also viewed as absence of defects (APICs, 1999).Since the early studies of 60s on supplier selection all through to 90s, quality has consistently ranked top among the various supplier selection determinants. Purchasers would like to buy only those goods and services that are of high quality. The other critical factor for supplier selection beside quality is delivery. Meeting delivery deadlines is critical so as to avoid operations disruptions for lack of supplies. hoi(19960 as cited in Cheraghi et al. delivery together with quality constitute what might be considered the threshold criteria for supplier selection. Performance history of a supplier is also a critical determinant in supplier selection as literature adduces. In particular, for those goods and services that are of great value or involving huge cost outlay, then the purchaser tends to go for that supplier whom they are sure about their past performance. This is basically to reduce risks associated with failure of unknown suppliers to deliver goods or execute their part of contract. According to Weber et al. (1991) cost is one of the key determinants for supplier selection. Cost of supplies like delivery and quality constitutes the traditional determinants of supplier selection, also known as order qualifiers. Most organizations both in business and Non- governmental organization world consider the lowest cost offer since the purchaser aims to minimize on cost of procurement while trying to maximize on the quality and quantity of purchases. Service factors such as after sales service, repairs capacities, change and supply of parts, easy assessable, customer service, technical capacity, and warranty of the product (Omar & Sim, 2010).For this reason, most purchasers tend to consider these service factors capacity in a potential supplier. Any supplier with the capacities to provide these services ultimately gets selected as a supplier to most organizations. 13
  • 14. CHAPTER THREE- RESEARCH DESIGN AND METHODOLOGY 3.1 The research design The sources used for study consisted of scientific refereed journals, textbooks and doctoral dissertations. Publications in languages other than English and non-refereed professional publications were not included. The search keys used were supplier selection, vendor selection, purchasing decision-making. Qualitative methods may include tools for visualising and analysing the decision-maker’s perception of a problem situation and tools for brainstorming about possible (alternative) solutions. The collection of quantitative methods comprises a wide variety of approaches. Data mining techniques can be used to analyse similar decisions made in the past in order to derive general patterns and decision rules that may subsequently be used to improve the efficiency and effectiveness of future decisions. Furthermore, we only included articles that report on a method or technique that specifically aims at supporting a decision-maker in one or more of the four steps of the supplier selection process. This implies that articles merely describing the supplier selection process o the relevant criteria have not been included. Also, articles reporting on methods for monitoring an existing supplier relationship were excluded. 3.2 The population sample A population is the total collection of elements about which inferences are made and refers to all possible cases which are of interest for a study (Sekaran, 2003).The target population for the study is the 10 Maxell Tohshin department based in Batu Berendam, Melaka. The study will target the chief procurement and logistics officers in these agencies as the unit of analysis. These are selected because they are the ones tasked with the responsibility of sourcing for suppliers of goods and services to their organizations. 14
  • 15. 3.3 Sampling Technique Sampling refers to the systematic selection of a limited number of elements out of a theoretically specified population of elements. The rationale is to draw conclusions about the entire population. According to Kothari (2004), the ultimate test of a sample design is how well it represents the characteristics of the population it purports to. The reason for sampling in this study is to lower cost, accessibility of study population and the greater speed of data collection. A sample size of 50% of the population will be taken to give a total sample of 9 Maxell Tohshin department. This is informed by the principle that if the elements of a population are quite similar, only a small sample is necessary to accurately portray the characteristics of interest Stratified random sampling will be used where the sample size of 50% shall be taken from each of the three categories (strata) of the population. Stratified random sampling will be used because it ensures a greater statistical efficiency, and reduce sampling error.Kothari(2003) supports random sampling as it satisfies the law of statistical regularity ‘if a sample is chosen at random, on average it has the same characteristics and composition as the population’. Table 3.2: Sample Size Target Population Sample Percentage Sample Units Headquartered 2 50 1 Regional Offices 14 50 7 Others 2 50 1 Total 18 9 Source: Author (2012) 15
  • 16. 3.4 The field of work and data collection method The overall aim of the study is to establish the determinants of supplier selection among international organizations, specifically the Maxell Tohshin in Batu Berendam Melaka. The bulk of data collected will therefore be primary in nature. The questionnaire will be the main instrument, alongside face to face interviews. The use of questionnaires for primary data collection has been supported by many scholars among them; Mugenda (1999),and Peil (1995).A questionnaire is easier to administer, less costly, and ensures greater depth of response, according to Mugenda (1999).A questionnaire also helps capture factual information effectively. For the purpose of this study, the questionnaire will be used for the mainly economical, and appropriateness reasons. A pilot study shall be conducted using questionnaires to be administered to respondents from four Maxell Tohshin departments. Those questions that will not be clear or are ambiguous will be revised so as to collect the desired information. A senior academic from the school of Business of University Technology MARA will assess the validity and reliability of the instrument. Research Procedure The researcher will first obtain a letter of introduction from Universiti Teknologi Mara. The letter will help in identification in the various Maxell Tohshin premises while approaching respondents. The questionnaires shall be personally administered through drop and pick method. 3.5 Data Analysis and Presentation The statistical method used in this study is descriptive and inferential statistics. Data analysis will be done using Statistical Package for Social Sciences computer software (SPSS).Tables, pie charts and graphs will be used to present the results on various variables in the study. Descriptive statistics such as mode, mean and median shall be used to present the various characteristics for data sets after the descriptive analysis. For this kind of study, descriptive analysis is the best and has been supported by such scholars as Schindler (2001), and Crawford (1995). 16
  • 17. CHAPTER FOUR: OVERVIEW OF POSSIBLE FUTURE APPLICATION The previous section has made clear that support in the phase of problem definition is an underdeveloped area in supplier selection since we did not come across any model in the purchasing literature that pays attention to this important phase. Some approaches in the operations research literature deal explicitly with problem definition but have thus far not been used in the purchasing literature. We also identified three additional methods that seem particularly suitable for supplier qualification phase. These three models are elucidated in Table 4. Table 4 Methods for supporting pre-qualification of supplier Method Typical feature Conjunctive screening (Hwang and Yoon, 1981) A supplier is acceptable if the supplier equal or exceeds a minimum score on each criterion Disjunctive screening (Hwang and Yoon, 1981) A supplier is acceptable if the supplier at least equals or exceeds a minimum score on one criterion. Lexicographical screening (Hwang and Yoon, 1981) Criteria are ranked in order of importance. Suppliers are first evaluated on the most important criterion. Suppliers that pass this criterion are then evaluated on the second criterion and so on. REFERENCES 17
  • 18. Bai, C. and Sarkis, J. (2009).Supplier selection and sustainability: A Grey Rough Set evaluation (Working paper 2009-05).Clark University, George Perkins Marsh Institute. Beil, D. (2009).Supplier selection (unpublished research paper).Stephen M. Ross School of Business. University of Michigan, Michigan, USA. Available at www.personal.umich.edu/.../Supplier Selection_... Bonhestaut, A. (Ed.). (2008).Procurement and supply in Kenya: The market for Small and Medium Enterprises. Nairobi: Strategic Business Advisors (Africa Ltd). Cheraghi, S.H.et al. (n.d).critical success factors for supplier selection. Journal of Applied Business Research, 20, 2 Crawford, I. (1995).Marketing research and information systems. Rome: FAO. Creswell, J.W. (2003).Research design: Qualitative, quantitative and mixedMethod approaches.Carlifornia: Sage Publishers. Delfmann, W. and Wissing-horsten, K. (2007).Strategic supply chain design: Theory, concepts and applications. Ellram (1990).The supplier selection decisions in strategic partnerships. Journal of Purchasing and Materials Management.8-14 Hutt, M.D., and Speh, T.W. (2009).Business marketing management: B2B(10th ed.).Mason, OH: Cengage Learning South-Western.http://www.un.org Mendoza, A. (2007).Effective methodologies for supplier selection and order Quantity allocation (PHD thesis, The University of Michigan, Michigan. Motwani, J. and Youssef, M. (1999). Supplier selection in developing countries: a model development. Emerald, 10(13):154-162. Mugenda, O.M & Mugenda, A.G. (1999).Research methods: Quantitative and 18
  • 19. qualitative Approaches: Nairobi: ACTS Press. Omar, M.K.and Sim, H.K.(2010,December).A survey of supplier selection criteria in the manufacturing industry in Malysia.The 11th Asia Pacific Industrial Engineering and Management systems conference, Melaka, Malysia. Orodho, J.A. (2004).Techniques of writing research proposals and reports ineducation and social sciences. Nairobi: Masola Publishers. Peil, M. (1995).Social science research methods handbook for Africa. Nairobi: East African Educational Publishers. Tahriri,F.,Osman,M.R.,Ali,A.,&Yussuff,R.M.,(2008).A review of supplier election methods in manufacturing industries.Suranaree Journal of Scienceand Technology, 15(3),201208. Weber, et al. (1991).Vendor selection criteria and methods.European Journal Of Operational Research, 50, 2-18. 19