SlideShare ist ein Scribd-Unternehmen logo
1 von 32
Downloaden Sie, um offline zu lesen
ELF 19 April 2009
1
Life-Saving Rules
Extended Leadership Forum
ELF 19 April 2009
2
Agenda
• Intro
• Life-Saving Rules
• Consequence Matrix
• Contractors & Life-Saving Rules
• Roll-out Plan
• Your Actions
Expectations:
1) Life-Saving Rules are understood
2) Everyone knows what they have to do next and what
their responsibilities are
ELF 19 April 2009
3
HSE Performance to date
2004 2005 2006 2007 2008 2009
Total Fatalities 14 12 11 12 21 3
PDO/Contr Work Related 1 1 5 2 7 1
PDO/Contr Non Work Related 7 1 5 6 14 2
Third Party (from WR incident) 6 10 1 4 0 0
Total LTIs 41 45 76 72 127 14
Industrial LTI's
(Hand/Finger/Thumb)
15 13 36 31 28 6
Industrial LTI's (Others) 20 22 24 29 44 7
RTA - LTI's 6 10 16 12 55 1
RTA's 89 138 155 190 216 55
RTA - Rollover 21 45 54 71 63 11
LTIF 0.54 0.62 0.95 0.66 0.93 0.37
TRCF 2.94 3.05 4.03 3.81 2.97 2.02
RTAF 0.55 0.91 0.96 0.88 0.87 0.86
Million man-hours 75.8 73.0 80.2 109.3 137.1 38.1
Million KM driven 145.0 151.3 161.0 218.4 247.0 63.8
NADs 8 10 18 14 21 3
ELF 19 April 2009
4
Deteriorating HSE Performance
• Maximum exposure with Contractors
• 98% of LTIs involve Contractors
• 100% Fatalities resulting from RTAs
• 44% of LTIs are RTA related
• 56% result from Worksite Hazards
• 4 High Potential Process Safety Incidents
Incompetence
Non-Compliance
Inexperience
Inefficient HSE
Leadership
Mismanagement
of HSE
Outdated
Procedures
Industry
Pace
Compromise
Complacency
Sloppiness
Rule Breaking
Road Safety
Culture
Lack of CEO
accountability
ELF 19 April 2009
5
WHAT IS THE PROBLEM IN PDO?
ELF 19 April 2009
6
The 2009 aim is to develop a sustained HSE performance
Changing attitude and behaviors at all levels
• By doing the following:
¾ Introducing technical solutions & systems
¾ Addressing Hearts & Minds
¾ And backed up by a permanent strong and consistent
verification / policing effort
Long-term Must-Win Projects
for sustained performance
Bridging the short-term
gap until the projects pay
off
Achieving this will impact 2009 and turn PDO
into a top performer!
We plan to attack
on two fronts
ELF 19 April 2009
7
WHM
WHM CHM
CHM RSM
RSM PSM
PSM
Long-term – must win - Projects Management Structure
Overall sponsor: Martin Stäuble
Overall sponsor: Martin Stäuble
Corporate HSE: Naaman al Naamani
Corporate HSE: Naaman al Naamani
Project Office: Graham Degens, Gregory Greenwell,
Purpose of the Project Office: Provide the glue between the Must Wins and Focus Areas to
create & deliver a holistic/integrated PDO plan. Engage the organisation through
communication, support change management, and ensure sustainability
Project Office: Graham Degens, Gregory Greenwell,
Purpose of the Project Office: Provide the glue between the Must Wins and Focus Areas to
create & deliver a holistic/integrated PDO plan. Engage the organisation through
communication, support change management, and ensure sustainability
Champion Eamon Gorman Saif Al Hinai Martin Stäuble Suleiman Toby
PM: Humaid Balushi Hamad Khalfeen Chris Evans Coen Fossen
Projects: • Safety Training
• JSA/TBT
• Contract Holders
• Prequalification &
Banding
• CEO Role
• Driver Training
• Compliance
• Hearts & Minds
• IVMS
• People & systems
• Technical Integrity
• Operating Integrity
• Design Integrity
ELF 19 April 2009
8
Life-Saving Rules
ELF 19 April 2009
9
Obtain a valid
Permit to Work
whenever required
for the task at
hand.
Conduct gas
tests whenever
required.
Verify isolation
before work begins
and use the
specified life-
protecting
equipment.
Obtain
authorization or a
valid Permit to
Work before
entering a
confined space.
Obtain
authorization or a
valid Permit to
Work before
overriding or
disabling safety-
critical equipment.
Use specified fall-
prevention
equipment when
working at height.
Do not walk
under a
suspended
load.
Do not light up
cigarettes, cigars
or pipes in no-
smoking areas.
Do not drive or
work under the
effect of drugs or
alcohol.
While driving, do
not use a mobile
phone and do not
exceed speed
limits.
Follow the
prescribed Safe
Journey
Management Plan.
What Are They?
Wear seat
belts when in
a moving
vehicle.
1
2
3
4
5 7
8
9
10
11
12
6
ELF 19 April 2009
10
No Surprises …
● They are not new rules
● They are already covered by existing standards and procedures
So why treat them differently?
● Violations of the Life-Saving Rules contributed to a very large
proportion fatalities in the industry (e.g. >50% of all Shell fatalities)
● They thus cover the activities that we know have the highest
potential for fatal injury.
ELF 19 April 2009
11
Examples of what happened in 2008 when they were broken
LTI
76
(fatality)
No seat belts worn
LTI
24-26
Failure to follow Safe
Journey Management
Plan
No valid
Permit to Work
LTI
97
ELF 19 April 2009
12
Examples of what is still happening
No verification of
isolation before work
begins
Near Miss on 25 February 2009 at Harweel Main Production Station
Safety equipment
overridden without
Permit to Work
Near Miss on 5 March 2009 at Hoist 21
Incorrect fall-prevention
equipment used when
working at height.
Near Miss on 23 February 2009 at Rig 52
Workers entered
confined space without
Permit to Work and
without a gas test being
conducted
Near Miss on 1 February 2009 at Hoist 20
ELF 19 April 2009
13
Obtain a valid Permit to Work
whenever required for the task at hand
• PtW Applicant must visit the worksite when
planning the task.
• The PtW Approver must also visit the
worksite, when required by the PtW
procedure.
• An effective, documented toolbox talk is
needed to ensure that all PtW conditions
are well understood by the work team.
• Proper controls and procedures must be
followed.
• Through site visits, supervisors and
department heads shall verify PtW is
adhered to and Job Safety Plans are being
followed.
ELF 19 April 2009
14
Conduct gas tests whenever required
• When gas testing is required by the
PtW, the Area Authority shall ensure
that the appropriate test (for oxygen,
hydrocarbons or toxics) is carried out
by an Authorised Gas Tester at the
frequency specified on the PtW.
• The test results must be accepted by
Permit Holder before work
commences.
ELF 19 April 2009
15
Verify isolation before work begins
and use the specified life-protecting equipment
• Area Authority shall verify that all
locks, disabling devices and isolation
tags are in place, as specified on the
PtW and Isolation Certificate
(Mechanical/Electrical).
• Area Authority shall update the
isolation/override registers.
• Marked-up drawings and sketches
showing the isolation arrangement
must be available at the work site with
the PtW.
• The Area Authority will verify the
reinstatement of systems and update
the isolation/override registers on
completion of all works.
ELF 19 April 2009
16
Obtain authorization or a valid Permit to Work
before entering a confined space
• No one shall enter a confined space
without a valid PtW and a Confined
Space Entry Certificate.
• When gas testing is required by the
PtW, the Area Authority shall ensure
that the appropriate test (for oxygen,
hydrocarbons or toxics) is carried out
by an Authorised Gas Tester and that
the results are accepted by the Permit
Holder before and during the
confined-space work.
• Supervisors will ensure a ‘Standby
Watch’ or ‘Standby Person’ is posted
and monitors the confined-space
work.
ELF 19 April 2009
17
Obtain authorization or a valid Permit to Work
before overriding or disabling safety-critical equipment.
• Instrument Technician or Area Authority
shall ensure the Overriding Request
Form is completed and authorised
before any overrides are put in place.
• Safety System Overrides must be
clearly labelled, communicated and
registered.
• Instrument Technician shall verify the
removal of overrides, normalisation of
the systems and close out the
Overriding Request Form on completion
of all works.
• The Area Authority shall close out the
PtW and verify all isolations and
overrides are removed.
ELF 19 April 2009
18
Use specified fall-prevention equipment when working at height
• Supervisors shall ensure work at
height is safe.
• All persons working above 2 metres
will use a safety harness, unless
working on a flatbed trailer.
• Supervisors are responsible for 100%
tie-off compliance.
• Supervisors shall ensure fixed
barriers are placed around openings
where a potential fall is more than 2
meters.
• Supervisor shall ensure that
scaffolding is certified prior to any
worker working on it.
ELF 19 April 2009
19
Do not walk under a suspended load
• Every “routine” lift must have a
generic lifting plan.
• Every “non-routine” lift must have
specific lifting plan.
• Person In Charge shall ensure lift
area is cordoned off during the lifting
operations.
• No one should ever be under any
working crane or suspended load.
ELF 19 April 2009
20
Do not light up cigarettes, cigars or pipes in no-smoking areas
• Zero tolerance for smoking outside
designated area.
ELF 19 April 2009
21
Follow the prescribed safe Journey Management Plan
• Drivers will not commence a journey
without a Journey Management Plan
(JMP) where required and will follow
the approved JMP.
• Journey Manager will ensure drivers
are aware of the JMP requirements
and verify compliance before
authorizing the journey.
• Vehicles must meet the JMP
requirements, and drivers must
inspect the vehicles prior to
departure.
ELF 19 April 2009
22
Wear seat belts when in a moving vehicle
• Vehicle occupants shall never be in a
moving vehicle without wearing a
seatbelt.
• Drivers will never drive without first
ensuring that all vehicle occupants
are wearing seat belts.
ELF 19 April 2009
23
While driving, do not use a mobile phone
and do not exceed speed limits
• While driving, no one shall use mobile
phones, including hands-free/blue
tooth GSM or two-way radio.
• Drivers shall never exceed posted
speed limits.
• Drivers shall never overtake in a dust
cloud nor tamper with a vehicle’s
safety devices.
ELF 19 April 2009
24
Do not drive or work under the effect of drugs or alcohol
• No person will report for work or be at
work under the influence of alcohol or
drugs.
ELF 19 April 2009
25
Life-Saving Rules
The Consequence Matrix
ELF 19 April 2009
26
What are the Consequences of Rule-Breaking
for PDO Staff?
The Company reserves the right to take circumstances of the rule breaking into account to increase or decrease the disciplinary measure(s). The breaking of a Life-Saving Rule is
considered a Major Misconduct, and the HR disciplinary process as defined in the Employee Policy Manual will be used to administer this consequence matrix. ROP speed and
alcohol thresholds will be used. Other existing rules and procedures remain valid.
First Warning Letter
Low Potential Impact
Final Warning Letter
High Potential Impact
Second time Rule Breaking
or if several Rules are
broken at the same time
Final Warning Letter Dismissal
Third time rule breaking, or
rule breaking caused
injury or death or
done recklessly or wilfully
Dismissal
A Life Saving Rule is
broken for the first time
Final
Warning
Letter
Dismissal
ELF 19 April 2009
27
The Fine Print
• The Company reserves the right to take circumstances
of the rule breaking into account to modify the
disciplinary measures.
• The Breaking of a Life-Saving Rule is considered a
Major Misconduct, and the HR disciplinary process as
defined in the Employee Policy Manual will be used to
administer this consequence matrix.
• ROP speed and alcohol thresholds will be used.
• Other existing rules and procedures remain valid.
ELF 19 April 2009
28
The PDO Consequence Management Process
1. The breaking of a rule is considered a major misconduct, as defined in the
HR policy.
2. Issuing a warning letter follows standard HR procedures as outlined in the
Policy.
3. If the investigation show that a dismissal is possible, a formal Disciplinary
Panel, following standard HR procedures is convened.
4. As part of the LSR roll-out, HRO will update the section 1.5 (Discipline) of
the Employee Policy Manual
Ownership: Life-Saving Rules (LSR) Scheme is owned by MSEM
• Consequence management process owned by HR through Policy manual
ELF 19 April 2009
29
● We expect the contractor to investigate why a rule was broken
and feed back the investigation’s conclusions to the CH
● Contractor staff who are caught breaking the rules can be
removed from the site and will not be allowed to work on any
PDO activities.
● Standard contractual clauses allows for such suspensions.
● Contractors are responsible for dealing with their rule-breakers.
● Contractors will need to demonstrate to PDO that they indeed
have an effective and verifiable process for dealing with rule-
breakers.
‰ LOA includes e.g. & Pre-qualification & Life Saving Rules
What are the Consequences of Rule-Breaking
for Contractor Staff?
ELF 19 April 2009
30
Roll-out Plans
21 April
Management Circular to all staff
22 April
Letter to all contractors
25 April
“Town Hall” meeting for Contract
Holders
26 April – 3 June
Contract Holder engagement with
contractors
9 May – 3 June
Stop-work sessions with slides to be
made accessible through intranet
14 June – 1 July
Insight Browser to confirm
understanding & commitment of all staff
ELF 19 April 2009
31
Your Actions
● You will lead a two-hour stop-work sessions to discuss the Life-Saving
Rules with your direct reports, starting off a cascade of such sessions
between 9 May and 3 June
● You will ensure that the Life-Saving Rules cascade has been completed
down the line (also in the interior for both shifts) by 3 June
● You will be responsible for coaching your staff through the Insight Browser
declaration of understanding and commitment beginning 14 June
● Support your Contract Holders & CSRs in the LSR Roll-out amongst
contractors.
● Live the Life-Saving Rules
Set an example from now on: show how you fully comply with them and
intervene with respect wherever you see potential for them being broken
ELF 19 April 2009
32
Good Luck

Weitere ähnliche Inhalte

Was ist angesagt?

8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazardsconstruction
 
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docxDwarika Bhushan Sharma
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrSidhanath Singh
 
12 lifting rigging operations
12  lifting  rigging operations12  lifting  rigging operations
12 lifting rigging operationsAlan Bassett
 
Forklift Safety | Gaurav Singh Rajput
Forklift Safety | Gaurav Singh RajputForklift Safety | Gaurav Singh Rajput
Forklift Safety | Gaurav Singh RajputGaurav Singh Rajput
 
Wks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guideWks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guideAkhilesh Singh
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height worksPavan Noel
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templatesDwarika Bhushan Sharma
 

Was ist angesagt? (20)

Life Saving Rules - HSE
Life Saving Rules - HSELife Saving Rules - HSE
Life Saving Rules - HSE
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazards
 
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
18 Laying blockwork with access scaffolding Risk Assessment Templates.docx
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Operation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel RrOperation Of Heavy Equipment In The Present Of Personnel Rr
Operation Of Heavy Equipment In The Present Of Personnel Rr
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 
12 lifting rigging operations
12  lifting  rigging operations12  lifting  rigging operations
12 lifting rigging operations
 
Forklift Safety | Gaurav Singh Rajput
Forklift Safety | Gaurav Singh RajputForklift Safety | Gaurav Singh Rajput
Forklift Safety | Gaurav Singh Rajput
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Scaffold
ScaffoldScaffold
Scaffold
 
Wks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guideWks 4-excavations-excavation-safety-guide
Wks 4-excavations-excavation-safety-guide
 
Constrution site
Constrution siteConstrution site
Constrution site
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height works
 
23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates23 casting of concrete slabs risk assessment templates
23 casting of concrete slabs risk assessment templates
 

Ähnlich wie LSR safety.pdf

HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptGkMechanical
 
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.pptKaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.pptErselKizilay1
 
Milford Contractor Training Video
Milford Contractor Training VideoMilford Contractor Training Video
Milford Contractor Training Videojconroy1121
 
MILFORD POWER LLC Contractors Safety Brief
MILFORD POWER LLC Contractors Safety Brief MILFORD POWER LLC Contractors Safety Brief
MILFORD POWER LLC Contractors Safety Brief jconroy1121
 
HSE-Newsletter-Issue4
HSE-Newsletter-Issue4HSE-Newsletter-Issue4
HSE-Newsletter-Issue4RAMS Boards
 
CF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - LillieCF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - LillieDoug Lillie, CIRO
 
Construction best practices 2019
Construction best practices 2019Construction best practices 2019
Construction best practices 2019Stephen Hassett
 
Heavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptxHeavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptxAdeniranIdris
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptAndreAntWilliams
 
Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)
Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)
Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)Invest Northern Ireland
 

Ähnlich wie LSR safety.pdf (20)

HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.pptKaiwera Downs Wind Farm Induction presentation Rev 4.ppt
Kaiwera Downs Wind Farm Induction presentation Rev 4.ppt
 
Milford Contractor Training Video
Milford Contractor Training VideoMilford Contractor Training Video
Milford Contractor Training Video
 
MILFORD POWER LLC Contractors Safety Brief
MILFORD POWER LLC Contractors Safety Brief MILFORD POWER LLC Contractors Safety Brief
MILFORD POWER LLC Contractors Safety Brief
 
HSE-Newsletter-Issue4
HSE-Newsletter-Issue4HSE-Newsletter-Issue4
HSE-Newsletter-Issue4
 
CF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - LillieCF Regional Conference PPT template - Lillie
CF Regional Conference PPT template - Lillie
 
Construction best practices 2019
Construction best practices 2019Construction best practices 2019
Construction best practices 2019
 
"
""
"
 
Site Induction
Site InductionSite Induction
Site Induction
 
Safety plan
Safety planSafety plan
Safety plan
 
Contractor Safety Orientation by Sappi
Contractor Safety Orientation by SappiContractor Safety Orientation by Sappi
Contractor Safety Orientation by Sappi
 
new induction n0.2.pptx
new induction n0.2.pptxnew induction n0.2.pptx
new induction n0.2.pptx
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Heavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptxHeavy Equipment Inspection Report 03.01.2024.pptx
Heavy Equipment Inspection Report 03.01.2024.pptx
 
johncv
johncvjohncv
johncv
 
Total golden rules
Total golden rulesTotal golden rules
Total golden rules
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.ppt
 
Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)
Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)
Sustainex 2013 - Protect Your Profit HSENI Jim King (PDF)
 

Kürzlich hochgeladen

Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...Escorts Call Girls
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Kürzlich hochgeladen (20)

Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 

LSR safety.pdf

  • 1. ELF 19 April 2009 1 Life-Saving Rules Extended Leadership Forum
  • 2. ELF 19 April 2009 2 Agenda • Intro • Life-Saving Rules • Consequence Matrix • Contractors & Life-Saving Rules • Roll-out Plan • Your Actions Expectations: 1) Life-Saving Rules are understood 2) Everyone knows what they have to do next and what their responsibilities are
  • 3. ELF 19 April 2009 3 HSE Performance to date 2004 2005 2006 2007 2008 2009 Total Fatalities 14 12 11 12 21 3 PDO/Contr Work Related 1 1 5 2 7 1 PDO/Contr Non Work Related 7 1 5 6 14 2 Third Party (from WR incident) 6 10 1 4 0 0 Total LTIs 41 45 76 72 127 14 Industrial LTI's (Hand/Finger/Thumb) 15 13 36 31 28 6 Industrial LTI's (Others) 20 22 24 29 44 7 RTA - LTI's 6 10 16 12 55 1 RTA's 89 138 155 190 216 55 RTA - Rollover 21 45 54 71 63 11 LTIF 0.54 0.62 0.95 0.66 0.93 0.37 TRCF 2.94 3.05 4.03 3.81 2.97 2.02 RTAF 0.55 0.91 0.96 0.88 0.87 0.86 Million man-hours 75.8 73.0 80.2 109.3 137.1 38.1 Million KM driven 145.0 151.3 161.0 218.4 247.0 63.8 NADs 8 10 18 14 21 3
  • 4. ELF 19 April 2009 4 Deteriorating HSE Performance • Maximum exposure with Contractors • 98% of LTIs involve Contractors • 100% Fatalities resulting from RTAs • 44% of LTIs are RTA related • 56% result from Worksite Hazards • 4 High Potential Process Safety Incidents Incompetence Non-Compliance Inexperience Inefficient HSE Leadership Mismanagement of HSE Outdated Procedures Industry Pace Compromise Complacency Sloppiness Rule Breaking Road Safety Culture Lack of CEO accountability
  • 5. ELF 19 April 2009 5 WHAT IS THE PROBLEM IN PDO?
  • 6. ELF 19 April 2009 6 The 2009 aim is to develop a sustained HSE performance Changing attitude and behaviors at all levels • By doing the following: ¾ Introducing technical solutions & systems ¾ Addressing Hearts & Minds ¾ And backed up by a permanent strong and consistent verification / policing effort Long-term Must-Win Projects for sustained performance Bridging the short-term gap until the projects pay off Achieving this will impact 2009 and turn PDO into a top performer! We plan to attack on two fronts
  • 7. ELF 19 April 2009 7 WHM WHM CHM CHM RSM RSM PSM PSM Long-term – must win - Projects Management Structure Overall sponsor: Martin Stäuble Overall sponsor: Martin Stäuble Corporate HSE: Naaman al Naamani Corporate HSE: Naaman al Naamani Project Office: Graham Degens, Gregory Greenwell, Purpose of the Project Office: Provide the glue between the Must Wins and Focus Areas to create & deliver a holistic/integrated PDO plan. Engage the organisation through communication, support change management, and ensure sustainability Project Office: Graham Degens, Gregory Greenwell, Purpose of the Project Office: Provide the glue between the Must Wins and Focus Areas to create & deliver a holistic/integrated PDO plan. Engage the organisation through communication, support change management, and ensure sustainability Champion Eamon Gorman Saif Al Hinai Martin Stäuble Suleiman Toby PM: Humaid Balushi Hamad Khalfeen Chris Evans Coen Fossen Projects: • Safety Training • JSA/TBT • Contract Holders • Prequalification & Banding • CEO Role • Driver Training • Compliance • Hearts & Minds • IVMS • People & systems • Technical Integrity • Operating Integrity • Design Integrity
  • 8. ELF 19 April 2009 8 Life-Saving Rules
  • 9. ELF 19 April 2009 9 Obtain a valid Permit to Work whenever required for the task at hand. Conduct gas tests whenever required. Verify isolation before work begins and use the specified life- protecting equipment. Obtain authorization or a valid Permit to Work before entering a confined space. Obtain authorization or a valid Permit to Work before overriding or disabling safety- critical equipment. Use specified fall- prevention equipment when working at height. Do not walk under a suspended load. Do not light up cigarettes, cigars or pipes in no- smoking areas. Do not drive or work under the effect of drugs or alcohol. While driving, do not use a mobile phone and do not exceed speed limits. Follow the prescribed Safe Journey Management Plan. What Are They? Wear seat belts when in a moving vehicle. 1 2 3 4 5 7 8 9 10 11 12 6
  • 10. ELF 19 April 2009 10 No Surprises … ● They are not new rules ● They are already covered by existing standards and procedures So why treat them differently? ● Violations of the Life-Saving Rules contributed to a very large proportion fatalities in the industry (e.g. >50% of all Shell fatalities) ● They thus cover the activities that we know have the highest potential for fatal injury.
  • 11. ELF 19 April 2009 11 Examples of what happened in 2008 when they were broken LTI 76 (fatality) No seat belts worn LTI 24-26 Failure to follow Safe Journey Management Plan No valid Permit to Work LTI 97
  • 12. ELF 19 April 2009 12 Examples of what is still happening No verification of isolation before work begins Near Miss on 25 February 2009 at Harweel Main Production Station Safety equipment overridden without Permit to Work Near Miss on 5 March 2009 at Hoist 21 Incorrect fall-prevention equipment used when working at height. Near Miss on 23 February 2009 at Rig 52 Workers entered confined space without Permit to Work and without a gas test being conducted Near Miss on 1 February 2009 at Hoist 20
  • 13. ELF 19 April 2009 13 Obtain a valid Permit to Work whenever required for the task at hand • PtW Applicant must visit the worksite when planning the task. • The PtW Approver must also visit the worksite, when required by the PtW procedure. • An effective, documented toolbox talk is needed to ensure that all PtW conditions are well understood by the work team. • Proper controls and procedures must be followed. • Through site visits, supervisors and department heads shall verify PtW is adhered to and Job Safety Plans are being followed.
  • 14. ELF 19 April 2009 14 Conduct gas tests whenever required • When gas testing is required by the PtW, the Area Authority shall ensure that the appropriate test (for oxygen, hydrocarbons or toxics) is carried out by an Authorised Gas Tester at the frequency specified on the PtW. • The test results must be accepted by Permit Holder before work commences.
  • 15. ELF 19 April 2009 15 Verify isolation before work begins and use the specified life-protecting equipment • Area Authority shall verify that all locks, disabling devices and isolation tags are in place, as specified on the PtW and Isolation Certificate (Mechanical/Electrical). • Area Authority shall update the isolation/override registers. • Marked-up drawings and sketches showing the isolation arrangement must be available at the work site with the PtW. • The Area Authority will verify the reinstatement of systems and update the isolation/override registers on completion of all works.
  • 16. ELF 19 April 2009 16 Obtain authorization or a valid Permit to Work before entering a confined space • No one shall enter a confined space without a valid PtW and a Confined Space Entry Certificate. • When gas testing is required by the PtW, the Area Authority shall ensure that the appropriate test (for oxygen, hydrocarbons or toxics) is carried out by an Authorised Gas Tester and that the results are accepted by the Permit Holder before and during the confined-space work. • Supervisors will ensure a ‘Standby Watch’ or ‘Standby Person’ is posted and monitors the confined-space work.
  • 17. ELF 19 April 2009 17 Obtain authorization or a valid Permit to Work before overriding or disabling safety-critical equipment. • Instrument Technician or Area Authority shall ensure the Overriding Request Form is completed and authorised before any overrides are put in place. • Safety System Overrides must be clearly labelled, communicated and registered. • Instrument Technician shall verify the removal of overrides, normalisation of the systems and close out the Overriding Request Form on completion of all works. • The Area Authority shall close out the PtW and verify all isolations and overrides are removed.
  • 18. ELF 19 April 2009 18 Use specified fall-prevention equipment when working at height • Supervisors shall ensure work at height is safe. • All persons working above 2 metres will use a safety harness, unless working on a flatbed trailer. • Supervisors are responsible for 100% tie-off compliance. • Supervisors shall ensure fixed barriers are placed around openings where a potential fall is more than 2 meters. • Supervisor shall ensure that scaffolding is certified prior to any worker working on it.
  • 19. ELF 19 April 2009 19 Do not walk under a suspended load • Every “routine” lift must have a generic lifting plan. • Every “non-routine” lift must have specific lifting plan. • Person In Charge shall ensure lift area is cordoned off during the lifting operations. • No one should ever be under any working crane or suspended load.
  • 20. ELF 19 April 2009 20 Do not light up cigarettes, cigars or pipes in no-smoking areas • Zero tolerance for smoking outside designated area.
  • 21. ELF 19 April 2009 21 Follow the prescribed safe Journey Management Plan • Drivers will not commence a journey without a Journey Management Plan (JMP) where required and will follow the approved JMP. • Journey Manager will ensure drivers are aware of the JMP requirements and verify compliance before authorizing the journey. • Vehicles must meet the JMP requirements, and drivers must inspect the vehicles prior to departure.
  • 22. ELF 19 April 2009 22 Wear seat belts when in a moving vehicle • Vehicle occupants shall never be in a moving vehicle without wearing a seatbelt. • Drivers will never drive without first ensuring that all vehicle occupants are wearing seat belts.
  • 23. ELF 19 April 2009 23 While driving, do not use a mobile phone and do not exceed speed limits • While driving, no one shall use mobile phones, including hands-free/blue tooth GSM or two-way radio. • Drivers shall never exceed posted speed limits. • Drivers shall never overtake in a dust cloud nor tamper with a vehicle’s safety devices.
  • 24. ELF 19 April 2009 24 Do not drive or work under the effect of drugs or alcohol • No person will report for work or be at work under the influence of alcohol or drugs.
  • 25. ELF 19 April 2009 25 Life-Saving Rules The Consequence Matrix
  • 26. ELF 19 April 2009 26 What are the Consequences of Rule-Breaking for PDO Staff? The Company reserves the right to take circumstances of the rule breaking into account to increase or decrease the disciplinary measure(s). The breaking of a Life-Saving Rule is considered a Major Misconduct, and the HR disciplinary process as defined in the Employee Policy Manual will be used to administer this consequence matrix. ROP speed and alcohol thresholds will be used. Other existing rules and procedures remain valid. First Warning Letter Low Potential Impact Final Warning Letter High Potential Impact Second time Rule Breaking or if several Rules are broken at the same time Final Warning Letter Dismissal Third time rule breaking, or rule breaking caused injury or death or done recklessly or wilfully Dismissal A Life Saving Rule is broken for the first time Final Warning Letter Dismissal
  • 27. ELF 19 April 2009 27 The Fine Print • The Company reserves the right to take circumstances of the rule breaking into account to modify the disciplinary measures. • The Breaking of a Life-Saving Rule is considered a Major Misconduct, and the HR disciplinary process as defined in the Employee Policy Manual will be used to administer this consequence matrix. • ROP speed and alcohol thresholds will be used. • Other existing rules and procedures remain valid.
  • 28. ELF 19 April 2009 28 The PDO Consequence Management Process 1. The breaking of a rule is considered a major misconduct, as defined in the HR policy. 2. Issuing a warning letter follows standard HR procedures as outlined in the Policy. 3. If the investigation show that a dismissal is possible, a formal Disciplinary Panel, following standard HR procedures is convened. 4. As part of the LSR roll-out, HRO will update the section 1.5 (Discipline) of the Employee Policy Manual Ownership: Life-Saving Rules (LSR) Scheme is owned by MSEM • Consequence management process owned by HR through Policy manual
  • 29. ELF 19 April 2009 29 ● We expect the contractor to investigate why a rule was broken and feed back the investigation’s conclusions to the CH ● Contractor staff who are caught breaking the rules can be removed from the site and will not be allowed to work on any PDO activities. ● Standard contractual clauses allows for such suspensions. ● Contractors are responsible for dealing with their rule-breakers. ● Contractors will need to demonstrate to PDO that they indeed have an effective and verifiable process for dealing with rule- breakers. ‰ LOA includes e.g. & Pre-qualification & Life Saving Rules What are the Consequences of Rule-Breaking for Contractor Staff?
  • 30. ELF 19 April 2009 30 Roll-out Plans 21 April Management Circular to all staff 22 April Letter to all contractors 25 April “Town Hall” meeting for Contract Holders 26 April – 3 June Contract Holder engagement with contractors 9 May – 3 June Stop-work sessions with slides to be made accessible through intranet 14 June – 1 July Insight Browser to confirm understanding & commitment of all staff
  • 31. ELF 19 April 2009 31 Your Actions ● You will lead a two-hour stop-work sessions to discuss the Life-Saving Rules with your direct reports, starting off a cascade of such sessions between 9 May and 3 June ● You will ensure that the Life-Saving Rules cascade has been completed down the line (also in the interior for both shifts) by 3 June ● You will be responsible for coaching your staff through the Insight Browser declaration of understanding and commitment beginning 14 June ● Support your Contract Holders & CSRs in the LSR Roll-out amongst contractors. ● Live the Life-Saving Rules Set an example from now on: show how you fully comply with them and intervene with respect wherever you see potential for them being broken
  • 32. ELF 19 April 2009 32 Good Luck