ROPE SUSPENDED PLATFORM
(RSP)
Prepared & Presented by
Shiva K, ME(ISE),ASP®
Rope Suspended Working Platform
Technical Classification
Type ZLP 630 ZLP 800
Rated Load Kg 630 800
Lifting Speed m/min 9.3+-0.5 8.2+-0.5
Dimension of Platform
(Length*Width*Height)
mm (2000*3)*690*1180 (2500*3)*690*1180
Weight of the Platform (3 units) Kg 310 386
Weight of the Hoist Kg 50*2=100 54*2=108
Weight of the Electric Control Box Kg 15 15
Weight of the Counter Weight Kg 900 (25*36 Pcs) 1000 (25*40 Pcs)
Wire rope dia mm 8.3 8.6
Rope Suspended Working Platform
Technical Classification
Rope Suspended Working Platform
Technical Classification
• Minimum load bearing strength for keeping suspension bracket
unit is 1500Kg/Sq. m.
• Should not to operate if wind speed exceed 40 Km/hr.
• Ensure to maintain 150 LX illumination during night time.
• The minimum distance to be maintained between tow adjacent
RSP is 0.5 m
Rope Suspended Working Platform
PPE & Operator Qualification
PPE
• The person should wear Helmet, Safety Shoes & Full body safety
harness
• Rope grab fall arrester with life line must for each person
• Proper tying arrangement is required for tying the life line where
the bracket is placed
Operator Qualification
• The person should undergo pre medical checkup
• The person should trained by P&M dept.
• Always keep the operator ID card while working in RSP.
Structural diagram of RSP
Structural diagram of RSP
Schematic diagram for counter weight and
suspension mechanism
Suspension bracket units kept on terrace
Suspension unit - 2
Suspension unit - 1
Stay rope
Front Beam
Counter weight blocks
Rear Bracket
Front Bracket
Anti sliding lock
U-clamps
U-clamps
Over hoist
limit switch
Suspension bracket units kept on terrace
Two eye turn buckle fixed in stay rope
Turn buckle hook with latch
Counter blocks protected with lock & chain
to prevent unauthorized removal
Schematic Diagram of Safety Lock
Safety Wire Rope
Anti tilting
limit switch
Working wire rope
Hoist Motor
Manual
Descending Lever
Safety Lock & Hoist Motor
• Wire rope end to be properly spliced
• Bulldog grip should be always in live end and clamp should be in
dead end.
• Minimum three U-clamps to be fixed
• Eye should be protected with thimble.
Quantity, distance & installation of rope
clamp
• W1 – Total weight of the counter weight
• W2 – Weight of the platform + Rope & Hoist + Person & material
• a – distance between front bracket and rear bracket
• b – length of front extension beam
• The moment in the center bracket towards the counter bracket is always three times
grater than the towards suspension platform.
• The front beam extension length should not exceed 1.7 mts.
Safe Working Load calculation
W-1
W-2
a b
(W1 * a) (W2 * b)> 3
Sample Calculation
• Total weight of the counter blocks (W1) = 1000 Kg.
• Grass weight of the suspended platform (W2) = 860 kg.
Weight of the platform – 310 kg.
Weight of Hoist – 50*2=100 Kg.
Weight of the safety lock & accessories– 20*2 = 40 Kg.
Weight of the persons (3 members) – 210 Kg.
Weight of the material – 200 kg.
• Extension length of front beam (b) – 1.3 mts.
• Distance between the front & rear brackets (a) – 4.0 mts.
W1 * a >= 3 (W2 * b)
(1000*4) / (860*1.3) >= 3
3.6 >= 3
Rope Suspended Working Platform
Do’s
• Ensure working load must be within 80% of rated load
• If erected RSP in road or passage ensure barricade, warning signs
with watch person.
• Daily inspection by P&M engineer
• Ensure daily cleaning (not to allow debris on platform & wire
ropes)
Rope Suspended Working Platform
Dont’s
• Do not run the RSP with full load
• Do not use as a hoisting machine for shifting any materials
• Erect always 10m away form the high voltage line
• Do not operate under rainstorm, thunderstorm, dense fog and heavy snow
• It is prohibited open out swing windows area
• Prohibited to operate by a single person
• It is absolutely prohibited to access from floor when hanging the platform.
• It is prohibited to carry any explosive material such as compressed gas
cylinders.
• Do not tie the life line rope in the suspension bracket
Rope Suspended Working Platform
Rope Suspended Working Platform
Rope Suspended Working Platform
Technical Classification
Overhead protection arrangement
Overhead protection arrangement without disturbing fall
arresting system

Weitere ähnliche Inhalte

Was ist angesagt?

working at height
working at heightworking at height
working at heightJYOTHISHKT
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging SafetyNickHawkins19
 
Manlift safety 1 26 11 final
Manlift safety 1 26 11 finalManlift safety 1 26 11 final
Manlift safety 1 26 11 finalJohn Newquist
 
Safety during construction
Safety during construction Safety during construction
Safety during construction BHAGWAN PRASAD
 
scaffolding safety.pdf
scaffolding safety.pdfscaffolding safety.pdf
scaffolding safety.pdfShahzadaGull1
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranesvipin balan
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazardsconstruction
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 

Was ist angesagt? (20)

working at height
working at heightworking at height
working at height
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
Site Aerial Lift/Scissor Lift Training
Site Aerial Lift/Scissor Lift TrainingSite Aerial Lift/Scissor Lift Training
Site Aerial Lift/Scissor Lift Training
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Manlift safety 1 26 11 final
Manlift safety 1 26 11 finalManlift safety 1 26 11 final
Manlift safety 1 26 11 final
 
Ladder safety
Ladder safetyLadder safety
Ladder safety
 
Safety during construction
Safety during construction Safety during construction
Safety during construction
 
scaffolding safety.pdf
scaffolding safety.pdfscaffolding safety.pdf
scaffolding safety.pdf
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazards
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 

Ähnlich wie Rope suspended platform- Safety

1926 power transmission fall issues 2014
1926 power transmission fall issues 20141926 power transmission fall issues 2014
1926 power transmission fall issues 2014vtsiri
 
1926 power transmission fall issues 2014
1926 power transmission fall issues 20141926 power transmission fall issues 2014
1926 power transmission fall issues 2014John Newquist
 
Dynatech lift safety components product range 2020 english
Dynatech lift safety components product range 2020 englishDynatech lift safety components product range 2020 english
Dynatech lift safety components product range 2020 englishDynatech, Lift Safety Components
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfsalem123gmaal
 
DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...
DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...
DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...ijiert bestjournal
 
Linkedin PRESENTATION
Linkedin PRESENTATIONLinkedin PRESENTATION
Linkedin PRESENTATIONMark Fielden
 
Basic liffting Rigging and Signalling.pptx
Basic liffting Rigging and Signalling.pptxBasic liffting Rigging and Signalling.pptx
Basic liffting Rigging and Signalling.pptxmamu21
 
SC Range Brochure
SC Range BrochureSC Range Brochure
SC Range BrochureRon Farr
 
SMT Equipment for PCB Assembly
SMT Equipment for PCB AssemblySMT Equipment for PCB Assembly
SMT Equipment for PCB AssemblyGuo Angela
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safetyaliashraf mohammady
 
Pcb conveyor
Pcb conveyorPcb conveyor
Pcb conveyorLams Han
 

Ähnlich wie Rope suspended platform- Safety (20)

Rope_PP.ppt
Rope_PP.pptRope_PP.ppt
Rope_PP.ppt
 
1926 power transmission fall issues 2014
1926 power transmission fall issues 20141926 power transmission fall issues 2014
1926 power transmission fall issues 2014
 
1926 power transmission fall issues 2014
1926 power transmission fall issues 20141926 power transmission fall issues 2014
1926 power transmission fall issues 2014
 
Dynatech lift safety components product range 2020 english
Dynatech lift safety components product range 2020 englishDynatech lift safety components product range 2020 english
Dynatech lift safety components product range 2020 english
 
Crane safety
Crane safetyCrane safety
Crane safety
 
Coiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdfCoiled Tubing Introduction and Basics.pdf
Coiled Tubing Introduction and Basics.pdf
 
Catu 3
Catu 3Catu 3
Catu 3
 
DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...
DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...
DESIGN OF CANE CARRIER ROLLER CONVEYOR CHAIN OF 150MM PITCH AND TESTING UNDER...
 
Civil works mstart
Civil works mstartCivil works mstart
Civil works mstart
 
Linkedin PRESENTATION
Linkedin PRESENTATIONLinkedin PRESENTATION
Linkedin PRESENTATION
 
Basic liffting Rigging and Signalling.pptx
Basic liffting Rigging and Signalling.pptxBasic liffting Rigging and Signalling.pptx
Basic liffting Rigging and Signalling.pptx
 
Rope Drive
Rope DriveRope Drive
Rope Drive
 
SC Range Brochure
SC Range BrochureSC Range Brochure
SC Range Brochure
 
SMT Equipment for PCB Assembly
SMT Equipment for PCB AssemblySMT Equipment for PCB Assembly
SMT Equipment for PCB Assembly
 
orbitalwrapper_17
orbitalwrapper_17orbitalwrapper_17
orbitalwrapper_17
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 
Oh8000
Oh8000Oh8000
Oh8000
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
 
2014 CRW - Operating Cranes around Power Lines
2014 CRW - Operating Cranes around Power Lines2014 CRW - Operating Cranes around Power Lines
2014 CRW - Operating Cranes around Power Lines
 
Pcb conveyor
Pcb conveyorPcb conveyor
Pcb conveyor
 

Kürzlich hochgeladen

Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhiasmaqueen5
 
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time TogetherShapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Togetheraidasheikh47
 
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhidelhimodel235
 
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your NeedsKohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needsaidasheikh47
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914Delhi Call girls
 
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhidelhimodel235
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
Properties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya DevelopmentProperties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya DevelopmentAntalya Development
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruShivaSeo3
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Venturessheltercareglobal
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdfManishSaxena95
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTurbo Tenant
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)Delhi Call girls
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhidelhimodel235
 
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhidelhimodel235
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfBabyrudram
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhidelhimodel235
 
2k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 92055419142k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 9205541914Delhi Call girls
 
Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024VickyAulakh1
 

Kürzlich hochgeladen (20)

Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
 
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time TogetherShapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
 
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 137 Noida (Call Girls) Delhi
 
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your NeedsKohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
Kohinoor Flats In Hinjewadi Phase 2 | Homes Built To Suit Your Needs
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914
 
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
9990771857 Call Girls Dwarka Sector 9 Delhi (Call Girls ) Delhi
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
Properties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya DevelopmentProperties for Sale in Istanbul with Schools and Parks | Antalya Development
Properties for Sale in Istanbul with Schools and Parks | Antalya Development
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road Bengaluru
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sainik Farm (Delhi)
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
 
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 6 Delhi (Call Girls) Delhi
 
Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdf
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
 
2k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 92055419142k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 9205541914
 
Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024
 

Rope suspended platform- Safety

  • 1. ROPE SUSPENDED PLATFORM (RSP) Prepared & Presented by Shiva K, ME(ISE),ASP®
  • 2. Rope Suspended Working Platform Technical Classification Type ZLP 630 ZLP 800 Rated Load Kg 630 800 Lifting Speed m/min 9.3+-0.5 8.2+-0.5 Dimension of Platform (Length*Width*Height) mm (2000*3)*690*1180 (2500*3)*690*1180 Weight of the Platform (3 units) Kg 310 386 Weight of the Hoist Kg 50*2=100 54*2=108 Weight of the Electric Control Box Kg 15 15 Weight of the Counter Weight Kg 900 (25*36 Pcs) 1000 (25*40 Pcs) Wire rope dia mm 8.3 8.6
  • 3. Rope Suspended Working Platform Technical Classification
  • 4. Rope Suspended Working Platform Technical Classification • Minimum load bearing strength for keeping suspension bracket unit is 1500Kg/Sq. m. • Should not to operate if wind speed exceed 40 Km/hr. • Ensure to maintain 150 LX illumination during night time. • The minimum distance to be maintained between tow adjacent RSP is 0.5 m
  • 5. Rope Suspended Working Platform PPE & Operator Qualification PPE • The person should wear Helmet, Safety Shoes & Full body safety harness • Rope grab fall arrester with life line must for each person • Proper tying arrangement is required for tying the life line where the bracket is placed Operator Qualification • The person should undergo pre medical checkup • The person should trained by P&M dept. • Always keep the operator ID card while working in RSP.
  • 8. Schematic diagram for counter weight and suspension mechanism
  • 9. Suspension bracket units kept on terrace Suspension unit - 2 Suspension unit - 1 Stay rope Front Beam Counter weight blocks Rear Bracket Front Bracket
  • 10. Anti sliding lock U-clamps U-clamps Over hoist limit switch Suspension bracket units kept on terrace
  • 11. Two eye turn buckle fixed in stay rope Turn buckle hook with latch
  • 12. Counter blocks protected with lock & chain to prevent unauthorized removal
  • 13. Schematic Diagram of Safety Lock
  • 14. Safety Wire Rope Anti tilting limit switch Working wire rope Hoist Motor Manual Descending Lever Safety Lock & Hoist Motor
  • 15. • Wire rope end to be properly spliced • Bulldog grip should be always in live end and clamp should be in dead end. • Minimum three U-clamps to be fixed • Eye should be protected with thimble. Quantity, distance & installation of rope clamp
  • 16. • W1 – Total weight of the counter weight • W2 – Weight of the platform + Rope & Hoist + Person & material • a – distance between front bracket and rear bracket • b – length of front extension beam • The moment in the center bracket towards the counter bracket is always three times grater than the towards suspension platform. • The front beam extension length should not exceed 1.7 mts. Safe Working Load calculation W-1 W-2 a b (W1 * a) (W2 * b)> 3
  • 17. Sample Calculation • Total weight of the counter blocks (W1) = 1000 Kg. • Grass weight of the suspended platform (W2) = 860 kg. Weight of the platform – 310 kg. Weight of Hoist – 50*2=100 Kg. Weight of the safety lock & accessories– 20*2 = 40 Kg. Weight of the persons (3 members) – 210 Kg. Weight of the material – 200 kg. • Extension length of front beam (b) – 1.3 mts. • Distance between the front & rear brackets (a) – 4.0 mts. W1 * a >= 3 (W2 * b) (1000*4) / (860*1.3) >= 3 3.6 >= 3
  • 18. Rope Suspended Working Platform Do’s • Ensure working load must be within 80% of rated load • If erected RSP in road or passage ensure barricade, warning signs with watch person. • Daily inspection by P&M engineer • Ensure daily cleaning (not to allow debris on platform & wire ropes)
  • 19. Rope Suspended Working Platform Dont’s • Do not run the RSP with full load • Do not use as a hoisting machine for shifting any materials • Erect always 10m away form the high voltage line • Do not operate under rainstorm, thunderstorm, dense fog and heavy snow • It is prohibited open out swing windows area • Prohibited to operate by a single person • It is absolutely prohibited to access from floor when hanging the platform. • It is prohibited to carry any explosive material such as compressed gas cylinders. • Do not tie the life line rope in the suspension bracket
  • 22. Rope Suspended Working Platform Technical Classification
  • 24. Overhead protection arrangement without disturbing fall arresting system