8. Project Schedule Element Element Description Required Resources Status 6-10 Sept 13-17 Sept 20-24 Sept 27 Sept - 1 Oct 5-Oct 11-15 Oct 1 Inspire a Smile Today Flyer Development 1.1 Design Pamphlet Logo Germanna Fest Logo 1.2 Develop Inspirational Slogans 1.3 Speak with Student Services about adding content to flyer 1.4 Design flyer layout 1.5 Purchase colored paper 1.6 Print the Inspire a Smile Today flyer Colored Paper 2 Permissions 2.1 Obtain permission for flyer distribution from GCC Student Services 2.2 Obtain permission for flyer distribution from GCC Security office 3 Flyer Distribution 3.1 Determine optimum time(s) for flyer distribution 3.2 Determine the required number of flyers to meet the demand 3.3 Establish the flyer distribution schedule for MDD to include personnel resources 3.4 Distribute the Flyers 4 Volunteers 4 Flyer Clean Up 4.1 Determine the need for "clean up" following the distribution of flyers 4.2 Establish the "clean up" schedule with required personnel resources 4.3 Conduct the project clean up 4 Volunteers 5 Measuring Project Success 5.1 Develop metrics for measuring the success of the Inspire a Smile Today project 5.2 Develop the process for measuring the success of the Inspire a Smile Today project 5.3 Write a final report detailing the success of the Inspire a Smile Today project