Welcomes
Friends from Media
Presents
20/11/2015
Metro Car shed,
Aarey,
and
The Technical
Committee Report
Analysis and comprehensive revelation of
the process and report.
MMRDA through its subsidiary MMRCL makes an
appearance Aarey Colony
Background
Puts up notices on 2298 trees stating that they are
slated for destruction /relocation so that a Metro line
3 carshed can be built on the location
Citizens groups and NGOs unite and vehemently oppose the
proposal.
Faced with stiff public opposition and Media
reports, CM intervenes and sets up a committee
Committee Formed
• March 11th 2015 the GoM issues GR
announcing the formation of committee.
• Constitution of the committee is
– Metropolitan Commissioner
– Principal Secretary UD.
– MCGM commissioner
– Dr Rakesh Kumar (Head Scientist NEERI)
– Dr Shyam Asolekar (Professor/Scientist IIT)
• The report to be submitted in One Month
Committee Begins Work
Meets on
March 19th 2015
April 06th 2015
April 18th 2015
April 24th 2015
May 13th 2015
May 22nd 2015
*** No MoM ( Minutes of Meeting) made or provided to public.
Right to Information Route
• Filed RTI on 22nd June, 2015
• Reply comes stating that information not
available.
• First appeal filed on 21st July, 2015
• Date of hearing 5th August, 2015
• Time sought by MMRDA for 45 days
• Finally the report handed over on 28th October,
2015.
Minutes of Meeting not included!!!
Mandate of the Committee as per
the report
• To study the alternatives for locating the car depot
• To “minimise” the loss of trees at Aarey if
“suitable” alternative is not found.
• To suggest mitigating measures to the site at Aarey
Colony.
2 out of 3 actions directed towards
“positioning” the Car Shed inside Aarey
Colony.
Nine Possible Alternatives
All nine alternatives suggested by the
Citizens groups of the Save Aarey Movement.
MMRDA repeatedly maintained that there
was no other land available or suitable
The Suggested Alternative Sites
• Backbay Reclamation
• Mahalaxmi Race Course
• Mumbai Port Trust
• Dharavi
• Mumbai University, Kalina
• Sariput Nagar
• Bandra Kurla Complex
• Kanjurmarg
• Aarey( Not suggested remotely also by the citizens
but mentioned in the report yet pursued by MMRDA)
Option 1: Backbay Reclamation Site
Merits of Backbay Site as per report:
• Close to proposed route, less than one Km
• Area if reclaimed sufficiently large for the depot.
Demerits of the site as per the report
Point 1: 3.5 ha of Mangroves exist so they will get
“irreversibly damaged”
The several projects are cleared on the assumption
that three times more mangroves will be planted.
Point 2: Entry and exit will require ramps to be
made.
This is true even for Aarey.
Point 3: 7000 Hutments exist near the site.
So they will be allowed to live peacefully for ever at
the site?
Demerits of the site as per the report
Point 4: Relocating 7000 hutments will cost Rs. 1000
Crores.
ACG submits that with the slums intact, the land is still
big enough.
Point 5: Reclamation of 15 ha is environmentally
damaging.
The coastal road which is being cleared on the submission
that environment damage will be minimum after 168ha of
reclamation of open sea front.
Also the land in question already has a breakwater wall
extending into the sea.
Demerits with the site as per the
report
Point 6: Reclamation permissions will take time.
The coastal road permissions were granted within a
fortnight of the CM visiting the MoEF&CC
Point 7: Reclamation will cost 900 crores
The details of this expenses are not known.
Point 8: Additional time will be lost and about 5 -7
years will be needed for a fresh design!
The revised plan of the Aarey site was made within
record time.
Option 2: Mahalaxmi Race Course
(ref. page 21 of the Report)
Merits as per MMRDA
• Site is located within one km of the route
Demerits of Mahalaxmi Site (As per Report)
•The spectators stand is a heritage structure which could get
affected.
•Many heritage structures are present along the metro route.
Still the route there are no issues raised.
•The land is leased to Royal Western India Turf Club.
•A lease can be terminated, RWTC do not OWN the land.
•An underground facility can be considered but underground
depots are unsafe and costly to maintain.
•Considering that the Metro itself is underground at various
locations doesn’t this statement seem hollow and untenable?
Demerits of Mahalaxmi Site as per
report
•Only the racing area of 19.2ha is available for the project
The “revised” Aarey” proposal was fit into 20ha.
•Area is inadequate to construct a depot.
This was “still” considered as an option in the main proposal.
•It is centrally located so not advisable.
The reasoning given defeats the logic.
•500 Trees will be destroyed.
In Aarey 2298 trees will be destroyed
Option 3: Mumbai Port Trust
(MbPT)
Merits as per MMRDA
• None
Demerits of MbPT as per report
•No Contiguous parcel of land available
Land is available(see picture) There are hundreds of unused
warehouses on the site.
•Land is leased to private parties
Leases can be terminated since they are not used for the purposes
given and the land is lying unused.
•Land is proposed to be used to expand existing port facilities.
The fourth terminal of JNPT is already being prepared and Mumbai
is losing its ground as a port.
Proposed marinas and a tourist recreation hub at MbPT.
The extended Victoria dock terminal is lying unused for the past
two years.
Demerits of MbPT as per report
•The extended line will have to cross railway tracks and
needs engineering modifications.
•Technology exists to move the route underground to avoid
conflict.
•Proposed alignment will move beneath dense areas of
South Mumbai .
•Tunnel boring can be done to reduce the impact on the
ground level activities.
•Switchover ramps will be needed
•Whatever is needed for the operations will have to be built.
Option 4: Dharavi
Merits as per MMRDA
• None
Demerits of Dharavi
It involves massive relocation of slums.
Dharavi Revamp is that already over due and is
Govt.’s pet project
Switch over ramp needed
If its needed ,it means it has to be built, there
cannot be two ways about it.
Option 5: Mumbai University Site
Merits as per MMRDA
• Less than one km from route.
• Station planned here.
Demerits of Mumbai University Site as per
report
Land is not available
Land is available
Land is needed for University expansion
Mumbai university has not expanded its facilities
despite having the land for over two decades.
Opposition from students.
When did MMRDA interact with students.
Here the underground depot facility was NEVER
considered.
Option 6: Sariput Nagar
Merits as per MMRDA
• 12ha land available
• 1km from the proposed end of the route.
Demerits of Sariput Nagar Site as per
report
Land is inadequate
Understandably since they have already made a 20ha
proposal which can be located ONLY in Aarey and nowhere
else in the world.
Ramp would be close to Mahakali caves road
which is an archaeological site
Many heritage structures are present along the metro
route.
The JVLR flyover built by MMRDA is in the same proximity
Option 7: BKC land (the best)
Merits as per
MMRDA
• Less than one km
from the route.
• Land ownership
with MMRDA so no
acquisition
involved.
Demerits of BKC as per the report
Since BKC is at an intermediate location, it is
unsuitable.
Untenable and illogical argument.
The land was not even given for the interstate project
Ahmedabad-Mumbai High Speed Connectivity line.
Even national interest projects cannot make MMRDA part
with its “precious” property .
The property is worth 30,000 crores and is a revenue
earner.
BKC was created by reclaiming wetlands, MMRDA did not
buy it.
Will the MMRDA afforest that 20ha to compensate for the
proposed loss of Aarey and convert it into a open green space?
This is the only land available for consuming FSI .
If monetising FSI is priority, then it is necessary to
monetise biodiversity
Is commercial interest and not public interest a
priority for MMRDA
A ramp will be needed to bring the rakes up.
This is true even for Aarey
The report is silent on the possibility of an
underground car shed. It was NEVER discussed.
Demerits of BKC as per the report
Option 8: Kanjurmarg site
Option 8: Kanjurmarg site
Option 8: Kanjurmarg site
Option 8: Kanjurmarg site
Merits as per MMRDA
• Land for the Metro car shed can be easily made available.
(Page 28)
• Land is technically feasible.
• Has nominal or least impact on trees and environment.
• Ideal site for interchange in future.
• All operations can be located in one location away from
human population pressure.
• It will provide good connectivity for future needs towards
expansion needs to Thane.
Demerits Kanjurmarg Site as per
report
Site is under complex litigations.
The land is primarily owned by Salt department of India and
leased it out for salt manufacture.
No salt has been manufactured here for decades
The land has steadily been transformed for real estate
“development”
There is a status quo order of the Hon`ble High
Court of Bombay on the land.
MCGM has 141ha “Sanitary Landfill” in defiance of the High
Court of Bombay order. Even if the ownership is decided
against MMRDA or GoM , the owner can be compensated
using FSI for land acquired for public utility.
Demerits of Kanjurmarg as per report
Early possession of land appears difficult.
Leading developers are already started closing in on the land.
Residential towers have started coming up on one side of the
land.
The land is barricaded halfway into it after it was suggested that
the site could be used for the Metro car shed.
Delay in land acquisition will lead to further “Adverse
Economical and Environmental impacts!!!”
The Metro line was already proposed for Kanjurmarg
It is unethical and improper claim.
Barricading at Kanjurmarg site
Demerits of Kanjurmarg Site as per Report
This will entail an extension of 7.5kms but it can be useful for
the proposed Jogeshwari Kanjurmarg lines.
This means that it is a merit, an advantage not to be included in
“demerits”
To make the extended line another 1700 crores will be
needed.
It is not a wasteful expense as East west connectivity would
improve and it is the need of the hour.
Operational difficulties of running the rakes at night etc. would
be difficult.
If the airport can handle flights taking off and landing day and
night at one min intervals, sending some rakes at night is nothing
short of a cakewalk.
Option 9: Aarey Colony
Merits as per MMRDA
• Less than one km from route.
• Adequate land is available and in possession of
MMRCL (Free of cost Forest land)
• Land is available at terminal point.
• Adequate “stable depot” can be made.
• No Social impacts(??)
• Area will not impact “interior” green of Aarey.
• Work can start at the earliest.
Option 9: Aarey Colony
Option 9: Aarey Colony
Demerits of Aarey as per report
2298 trees to be impacted !!
Far more when compared to other sites.
It is not just the 2298 trees but the 30ha landscape.
Requires shifting of cables and pipelines.
This is major flaw for the project site selection.
Underpass to be made for Marol -Aarey road.
This is major impediment for the project.
Page 30 to page 40 extensively deal with the plans for the shed
in Aarey colony compared to the few lines or paras in less than
one page and maximum of two pages for other locations.
Some Interesting facts about the Metro III
Project
Alternative site considered for Metro III
Heritage Structures and Metro III
40m
22m
45m
Metro III and ATC Tower
• Minimum
need is 20
ha.
• Metro I- less
than 17ha
of land
inside dense
inhabitation
.
• 17ha due to
the round
about.
Metro III car shed and inadequate land
Analysis- Part I
• The entire exercise seems to be directed towards
obtaining sanction of the “revised” car shed inside
Aarey.
• There are no indications of any remote honesty
shown by MMRDA in examining the other sites,
• Our assertions have been vindicated in the report
of the Environmental experts from NEERI and IIT.(
Annexure 1)
Analysis- Part II
• Considering the fact that the entire issue was raised due to
citizens concerns for the environment and open spaces,
nothing was done by the committee members collectively
towards addressing it.
• The committee has excluded the environment experts views
and has attempted to unilaterally brush aside the genuine
concerns. (page 12)
• Reading clearly shows that there was NO face to face
interaction and the Environment Experts were forced to give
their submissions in writing or risk being ignored completely.
Analysis- Part III
• This report repeatedly claims that if the land is not
available in 3 months, then work should start in Aarey.
The haste is unwarranted
• The GoM seems to have ignored the directions of the
Hon'ble Supreme Court of India on notifying the
Ecologically Sensitive Zones around national parks
immediately.
• The GoM has allocated Aarey land to MMRDA, despite the
proposal on designating Aarey Colony as the buffer zone
and Ecologically Sensitive Zone of SGNP by the State
Forest Department to MoEF&CC.
Analysis- Part IV
• There seems to be deliberate ploy by MMRDA to
conceal the word Mithi in the report.
• This is significant since the proposed site is in the
immediate vicinity of catchment area of Mithi
River.
Closing remarks of environment experts
DEMANDS
ACG Demands
• A complete detailed review one with respect to Backbay,
Kanjurmarg .
• Immediate compliance of the Hon`ble Supreme Court order
and declaration of Aarey as an Ecologically Sensitive Zone.
This declaration will help promote Aarey as a leisure,
recreation ,nature interpretation zone and nature tourism
hub.
• Respect wishes of the people and protect the green lung of
Mumbai for the future generations and to keep slumlords and
politicians backing them out of Aarey.
• The tourism potential of Aarey can be handled by Dairy
Development Board or Maharashtra Tourism Development
Corporation (MTDC) without disturbing the landscape.
Thank You!!!

Weitere ähnliche Inhalte

Was ist angesagt?

Development plan patna
Development plan patnaDevelopment plan patna
Development plan patnaSumit Suman
 
Singapore's housing policies
Singapore's housing policiesSingapore's housing policies
Singapore's housing policiesAliaa
 
The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...
The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...
The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...kanwargaurav3
 
Housing and Poverty Alleviation Through Five Year Plans in India
Housing and Poverty Alleviation Through Five Year Plans in IndiaHousing and Poverty Alleviation Through Five Year Plans in India
Housing and Poverty Alleviation Through Five Year Plans in IndiaJIT KUMAR GUPTA
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS OverviewNishit kadia
 
Sattellite town
Sattellite townSattellite town
Sattellite townctlachu
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbaiaziz khan
 
Land acquisition
Land acquisitionLand acquisition
Land acquisitionAman Verma
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: MahrashtraMalvika Jaishal
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanLakshman R
 
Pradhan Mantri Awas Yojna
Pradhan Mantri Awas YojnaPradhan Mantri Awas Yojna
Pradhan Mantri Awas YojnaJIT KUMAR GUPTA
 
Vijayawada- Organizational setup and Development control regulations
Vijayawada- Organizational setup and Development control regulationsVijayawada- Organizational setup and Development control regulations
Vijayawada- Organizational setup and Development control regulationsNIT Rourkela
 

Was ist angesagt? (20)

Development plan patna
Development plan patnaDevelopment plan patna
Development plan patna
 
Singapore's housing policies
Singapore's housing policiesSingapore's housing policies
Singapore's housing policies
 
THESIS design
THESIS designTHESIS design
THESIS design
 
The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...
The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...
The challenges-in-affordable-housing-for-urban-poor-in-india-deciphering-the-...
 
Housing and Poverty Alleviation Through Five Year Plans in India
Housing and Poverty Alleviation Through Five Year Plans in IndiaHousing and Poverty Alleviation Through Five Year Plans in India
Housing and Poverty Alleviation Through Five Year Plans in India
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS Overview
 
Sattellite town
Sattellite townSattellite town
Sattellite town
 
LAP Project Concept
LAP Project ConceptLAP Project Concept
LAP Project Concept
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbai
 
Land acquisition
Land acquisitionLand acquisition
Land acquisition
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: Mahrashtra
 
Vadodara
VadodaraVadodara
Vadodara
 
Pune Sec 26-dc rules-final
Pune Sec 26-dc rules-finalPune Sec 26-dc rules-final
Pune Sec 26-dc rules-final
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
Slum Rehabilitation
Slum RehabilitationSlum Rehabilitation
Slum Rehabilitation
 
Pradhan Mantri Awas Yojna
Pradhan Mantri Awas YojnaPradhan Mantri Awas Yojna
Pradhan Mantri Awas Yojna
 
Mumbai metro
Mumbai metroMumbai metro
Mumbai metro
 
GIFT - Presentation
GIFT - PresentationGIFT - Presentation
GIFT - Presentation
 
Vijayawada- Organizational setup and Development control regulations
Vijayawada- Organizational setup and Development control regulationsVijayawada- Organizational setup and Development control regulations
Vijayawada- Organizational setup and Development control regulations
 
Housing Policies- Lalit kumar
Housing Policies- Lalit kumarHousing Policies- Lalit kumar
Housing Policies- Lalit kumar
 

Andere mochten auch

Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupAnalysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupSamiir Halady
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai MetroHansel D'Souza
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro Onekopila
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Mandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts finalMandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts finalMandar Mallappanavar
 
Reliance Mumbai Metro Project Management
Reliance Mumbai Metro Project ManagementReliance Mumbai Metro Project Management
Reliance Mumbai Metro Project ManagementSwapnil Borkar
 
10 - Explore Budapest by Metro Line 2 (March 6)
10 - Explore Budapest by Metro Line 2 (March 6)10 - Explore Budapest by Metro Line 2 (March 6)
10 - Explore Budapest by Metro Line 2 (March 6)Lee Reaney
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail MumbaiSahim Khan
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
 
NMMC Metro Rail Project
NMMC Metro Rail ProjectNMMC Metro Rail Project
NMMC Metro Rail ProjectParth Patil
 
Metro Train Advertising in India
Metro Train Advertising in IndiaMetro Train Advertising in India
Metro Train Advertising in IndiaOutdoor Advertising
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro projectVinay Bardia
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAINNithy Anand
 

Andere mochten auch (20)

Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation GroupAnalysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai Metro
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro One
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Metro project
Metro project Metro project
Metro project
 
Mandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts finalMandar mumbai suburban rail stations and precincts final
Mandar mumbai suburban rail stations and precincts final
 
Reliance Mumbai Metro Project Management
Reliance Mumbai Metro Project ManagementReliance Mumbai Metro Project Management
Reliance Mumbai Metro Project Management
 
10 - Explore Budapest by Metro Line 2 (March 6)
10 - Explore Budapest by Metro Line 2 (March 6)10 - Explore Budapest by Metro Line 2 (March 6)
10 - Explore Budapest by Metro Line 2 (March 6)
 
Monorail Mumbai
Monorail MumbaiMonorail Mumbai
Monorail Mumbai
 
DMRC
DMRCDMRC
DMRC
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
NMMC Metro Rail Project
NMMC Metro Rail ProjectNMMC Metro Rail Project
NMMC Metro Rail Project
 
Metro Train Advertising in India
Metro Train Advertising in IndiaMetro Train Advertising in India
Metro Train Advertising in India
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
 

Ähnlich wie Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group

Mumbai Western Freeway Sealink Project
Mumbai Western Freeway Sealink ProjectMumbai Western Freeway Sealink Project
Mumbai Western Freeway Sealink ProjectOmkar Bhaskar Palande
 
Road Widening In Bangalore
Road Widening In BangaloreRoad Widening In Bangalore
Road Widening In Bangaloreguest9ab0ac5
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 ExamplesRohit Kumar Singh
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agradeeksha sharma
 
Kenya Railways SGR presentation
Kenya Railways SGR presentationKenya Railways SGR presentation
Kenya Railways SGR presentationThe Star Newspaper
 
2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking ManagementTOD India
 
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumarSanjeev Dyamannavar
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkataPiter Biswas
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002Journal For Research
 
Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxSaurabh Patil
 
CMMI Lecture - Business Development Cell Mumbai Port Trust
CMMI Lecture - Business Development Cell Mumbai Port TrustCMMI Lecture - Business Development Cell Mumbai Port Trust
CMMI Lecture - Business Development Cell Mumbai Port Trustcmmindia2017
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaBhavya Jaiswal
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra SkywalkHeemanish Midde
 
HAL - Employee Welfare Fund - project analysis and report
HAL - Employee Welfare Fund - project analysis and reportHAL - Employee Welfare Fund - project analysis and report
HAL - Employee Welfare Fund - project analysis and reportJohn Singh
 
Group 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptxGroup 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptxPMUHaryanaTourism
 
Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...
Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...
Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...ijsrd.com
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSKona Mahesh
 
Waste Management at Allahabad in Crisis
Waste Management at Allahabad in CrisisWaste Management at Allahabad in Crisis
Waste Management at Allahabad in CrisisAmit Kumar
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in indiaNishanth H A
 

Ähnlich wie Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group (20)

Mumbai Western Freeway Sealink Project
Mumbai Western Freeway Sealink ProjectMumbai Western Freeway Sealink Project
Mumbai Western Freeway Sealink Project
 
Road Widening In Bangalore
Road Widening In BangaloreRoad Widening In Bangalore
Road Widening In Bangalore
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 Examples
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
 
Kenya Railways SGR presentation
Kenya Railways SGR presentationKenya Railways SGR presentation
Kenya Railways SGR presentation
 
2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management2020 Karol Bagh Pedestrianization & Parking Management
2020 Karol Bagh Pedestrianization & Parking Management
 
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
 
Role of metro for traffic in kolkata
Role of metro for traffic in kolkataRole of metro for traffic in kolkata
Role of metro for traffic in kolkata
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
 
Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptx
 
CMMI Lecture - Business Development Cell Mumbai Port Trust
CMMI Lecture - Business Development Cell Mumbai Port TrustCMMI Lecture - Business Development Cell Mumbai Port Trust
CMMI Lecture - Business Development Cell Mumbai Port Trust
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra Skywalk
 
HAL - Employee Welfare Fund - project analysis and report
HAL - Employee Welfare Fund - project analysis and reportHAL - Employee Welfare Fund - project analysis and report
HAL - Employee Welfare Fund - project analysis and report
 
Group 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptxGroup 2 PPP Workshop PPT_Final.pptx
Group 2 PPP Workshop PPT_Final.pptx
 
Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...
Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...
Requirement to Improve C.B.R value in Black Cotton Soil in Saline Condition: ...
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMS
 
Waste Management at Allahabad in Crisis
Waste Management at Allahabad in CrisisWaste Management at Allahabad in Crisis
Waste Management at Allahabad in Crisis
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Metro vs. Bus
Metro vs. BusMetro vs. Bus
Metro vs. Bus
 

Kürzlich hochgeladen

办理德州理工大学毕业证书TTU文凭学位证书
办理德州理工大学毕业证书TTU文凭学位证书办理德州理工大学毕业证书TTU文凭学位证书
办理德州理工大学毕业证书TTU文凭学位证书zdzoqco
 
Kavade Mala Call Girls 7001305949 ꧂Enjoy Escorts Service
Kavade Mala Call Girls 7001305949 ꧂Enjoy Escorts ServiceKavade Mala Call Girls 7001305949 ꧂Enjoy Escorts Service
Kavade Mala Call Girls 7001305949 ꧂Enjoy Escorts Serviceneha mumbai
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceSwag Cycle
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfs2015004
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样umasea
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact AssessmentTesfahunTesema
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyKristineRoseCorrales
 

Kürzlich hochgeladen (20)

办理德州理工大学毕业证书TTU文凭学位证书
办理德州理工大学毕业证书TTU文凭学位证书办理德州理工大学毕业证书TTU文凭学位证书
办理德州理工大学毕业证书TTU文凭学位证书
 
Kavade Mala Call Girls 7001305949 ꧂Enjoy Escorts Service
Kavade Mala Call Girls 7001305949 ꧂Enjoy Escorts ServiceKavade Mala Call Girls 7001305949 ꧂Enjoy Escorts Service
Kavade Mala Call Girls 7001305949 ꧂Enjoy Escorts Service
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling Difference
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdf
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
办理La Trobe学位证(文凭证书)拉筹伯大学毕业证成绩单原版一模一样
 
Environmental and Social Impact Assessment
Environmental and Social Impact AssessmentEnvironmental and Social Impact Assessment
Environmental and Social Impact Assessment
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copy
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 

Analysis of Mumbai Metro III Yard Venue Options - Aarey Conservation Group

  • 3. Metro Car shed, Aarey, and The Technical Committee Report Analysis and comprehensive revelation of the process and report.
  • 4. MMRDA through its subsidiary MMRCL makes an appearance Aarey Colony Background Puts up notices on 2298 trees stating that they are slated for destruction /relocation so that a Metro line 3 carshed can be built on the location Citizens groups and NGOs unite and vehemently oppose the proposal. Faced with stiff public opposition and Media reports, CM intervenes and sets up a committee
  • 5. Committee Formed • March 11th 2015 the GoM issues GR announcing the formation of committee. • Constitution of the committee is – Metropolitan Commissioner – Principal Secretary UD. – MCGM commissioner – Dr Rakesh Kumar (Head Scientist NEERI) – Dr Shyam Asolekar (Professor/Scientist IIT) • The report to be submitted in One Month
  • 6. Committee Begins Work Meets on March 19th 2015 April 06th 2015 April 18th 2015 April 24th 2015 May 13th 2015 May 22nd 2015 *** No MoM ( Minutes of Meeting) made or provided to public.
  • 7. Right to Information Route • Filed RTI on 22nd June, 2015 • Reply comes stating that information not available. • First appeal filed on 21st July, 2015 • Date of hearing 5th August, 2015 • Time sought by MMRDA for 45 days • Finally the report handed over on 28th October, 2015. Minutes of Meeting not included!!!
  • 8. Mandate of the Committee as per the report • To study the alternatives for locating the car depot • To “minimise” the loss of trees at Aarey if “suitable” alternative is not found. • To suggest mitigating measures to the site at Aarey Colony. 2 out of 3 actions directed towards “positioning” the Car Shed inside Aarey Colony.
  • 9. Nine Possible Alternatives All nine alternatives suggested by the Citizens groups of the Save Aarey Movement. MMRDA repeatedly maintained that there was no other land available or suitable
  • 10. The Suggested Alternative Sites • Backbay Reclamation • Mahalaxmi Race Course • Mumbai Port Trust • Dharavi • Mumbai University, Kalina • Sariput Nagar • Bandra Kurla Complex • Kanjurmarg • Aarey( Not suggested remotely also by the citizens but mentioned in the report yet pursued by MMRDA)
  • 11. Option 1: Backbay Reclamation Site Merits of Backbay Site as per report: • Close to proposed route, less than one Km • Area if reclaimed sufficiently large for the depot.
  • 12. Demerits of the site as per the report Point 1: 3.5 ha of Mangroves exist so they will get “irreversibly damaged” The several projects are cleared on the assumption that three times more mangroves will be planted. Point 2: Entry and exit will require ramps to be made. This is true even for Aarey. Point 3: 7000 Hutments exist near the site. So they will be allowed to live peacefully for ever at the site?
  • 13. Demerits of the site as per the report Point 4: Relocating 7000 hutments will cost Rs. 1000 Crores. ACG submits that with the slums intact, the land is still big enough. Point 5: Reclamation of 15 ha is environmentally damaging. The coastal road which is being cleared on the submission that environment damage will be minimum after 168ha of reclamation of open sea front. Also the land in question already has a breakwater wall extending into the sea.
  • 14. Demerits with the site as per the report Point 6: Reclamation permissions will take time. The coastal road permissions were granted within a fortnight of the CM visiting the MoEF&CC Point 7: Reclamation will cost 900 crores The details of this expenses are not known. Point 8: Additional time will be lost and about 5 -7 years will be needed for a fresh design! The revised plan of the Aarey site was made within record time.
  • 15. Option 2: Mahalaxmi Race Course (ref. page 21 of the Report) Merits as per MMRDA • Site is located within one km of the route
  • 16. Demerits of Mahalaxmi Site (As per Report) •The spectators stand is a heritage structure which could get affected. •Many heritage structures are present along the metro route. Still the route there are no issues raised. •The land is leased to Royal Western India Turf Club. •A lease can be terminated, RWTC do not OWN the land. •An underground facility can be considered but underground depots are unsafe and costly to maintain. •Considering that the Metro itself is underground at various locations doesn’t this statement seem hollow and untenable?
  • 17. Demerits of Mahalaxmi Site as per report •Only the racing area of 19.2ha is available for the project The “revised” Aarey” proposal was fit into 20ha. •Area is inadequate to construct a depot. This was “still” considered as an option in the main proposal. •It is centrally located so not advisable. The reasoning given defeats the logic. •500 Trees will be destroyed. In Aarey 2298 trees will be destroyed
  • 18. Option 3: Mumbai Port Trust (MbPT) Merits as per MMRDA • None
  • 19. Demerits of MbPT as per report •No Contiguous parcel of land available Land is available(see picture) There are hundreds of unused warehouses on the site. •Land is leased to private parties Leases can be terminated since they are not used for the purposes given and the land is lying unused. •Land is proposed to be used to expand existing port facilities. The fourth terminal of JNPT is already being prepared and Mumbai is losing its ground as a port. Proposed marinas and a tourist recreation hub at MbPT. The extended Victoria dock terminal is lying unused for the past two years.
  • 20. Demerits of MbPT as per report •The extended line will have to cross railway tracks and needs engineering modifications. •Technology exists to move the route underground to avoid conflict. •Proposed alignment will move beneath dense areas of South Mumbai . •Tunnel boring can be done to reduce the impact on the ground level activities. •Switchover ramps will be needed •Whatever is needed for the operations will have to be built.
  • 21. Option 4: Dharavi Merits as per MMRDA • None
  • 22. Demerits of Dharavi It involves massive relocation of slums. Dharavi Revamp is that already over due and is Govt.’s pet project Switch over ramp needed If its needed ,it means it has to be built, there cannot be two ways about it.
  • 23. Option 5: Mumbai University Site Merits as per MMRDA • Less than one km from route. • Station planned here.
  • 24. Demerits of Mumbai University Site as per report Land is not available Land is available Land is needed for University expansion Mumbai university has not expanded its facilities despite having the land for over two decades. Opposition from students. When did MMRDA interact with students. Here the underground depot facility was NEVER considered.
  • 25. Option 6: Sariput Nagar Merits as per MMRDA • 12ha land available • 1km from the proposed end of the route.
  • 26. Demerits of Sariput Nagar Site as per report Land is inadequate Understandably since they have already made a 20ha proposal which can be located ONLY in Aarey and nowhere else in the world. Ramp would be close to Mahakali caves road which is an archaeological site Many heritage structures are present along the metro route. The JVLR flyover built by MMRDA is in the same proximity
  • 27. Option 7: BKC land (the best) Merits as per MMRDA • Less than one km from the route. • Land ownership with MMRDA so no acquisition involved.
  • 28. Demerits of BKC as per the report Since BKC is at an intermediate location, it is unsuitable. Untenable and illogical argument. The land was not even given for the interstate project Ahmedabad-Mumbai High Speed Connectivity line. Even national interest projects cannot make MMRDA part with its “precious” property . The property is worth 30,000 crores and is a revenue earner. BKC was created by reclaiming wetlands, MMRDA did not buy it. Will the MMRDA afforest that 20ha to compensate for the proposed loss of Aarey and convert it into a open green space?
  • 29. This is the only land available for consuming FSI . If monetising FSI is priority, then it is necessary to monetise biodiversity Is commercial interest and not public interest a priority for MMRDA A ramp will be needed to bring the rakes up. This is true even for Aarey The report is silent on the possibility of an underground car shed. It was NEVER discussed. Demerits of BKC as per the report
  • 33. Option 8: Kanjurmarg site Merits as per MMRDA • Land for the Metro car shed can be easily made available. (Page 28) • Land is technically feasible. • Has nominal or least impact on trees and environment. • Ideal site for interchange in future. • All operations can be located in one location away from human population pressure. • It will provide good connectivity for future needs towards expansion needs to Thane.
  • 34. Demerits Kanjurmarg Site as per report Site is under complex litigations. The land is primarily owned by Salt department of India and leased it out for salt manufacture. No salt has been manufactured here for decades The land has steadily been transformed for real estate “development” There is a status quo order of the Hon`ble High Court of Bombay on the land. MCGM has 141ha “Sanitary Landfill” in defiance of the High Court of Bombay order. Even if the ownership is decided against MMRDA or GoM , the owner can be compensated using FSI for land acquired for public utility.
  • 35. Demerits of Kanjurmarg as per report Early possession of land appears difficult. Leading developers are already started closing in on the land. Residential towers have started coming up on one side of the land. The land is barricaded halfway into it after it was suggested that the site could be used for the Metro car shed. Delay in land acquisition will lead to further “Adverse Economical and Environmental impacts!!!” The Metro line was already proposed for Kanjurmarg It is unethical and improper claim.
  • 37. Demerits of Kanjurmarg Site as per Report This will entail an extension of 7.5kms but it can be useful for the proposed Jogeshwari Kanjurmarg lines. This means that it is a merit, an advantage not to be included in “demerits” To make the extended line another 1700 crores will be needed. It is not a wasteful expense as East west connectivity would improve and it is the need of the hour. Operational difficulties of running the rakes at night etc. would be difficult. If the airport can handle flights taking off and landing day and night at one min intervals, sending some rakes at night is nothing short of a cakewalk.
  • 38. Option 9: Aarey Colony Merits as per MMRDA • Less than one km from route. • Adequate land is available and in possession of MMRCL (Free of cost Forest land) • Land is available at terminal point. • Adequate “stable depot” can be made. • No Social impacts(??) • Area will not impact “interior” green of Aarey. • Work can start at the earliest.
  • 39. Option 9: Aarey Colony
  • 40. Option 9: Aarey Colony
  • 41. Demerits of Aarey as per report 2298 trees to be impacted !! Far more when compared to other sites. It is not just the 2298 trees but the 30ha landscape. Requires shifting of cables and pipelines. This is major flaw for the project site selection. Underpass to be made for Marol -Aarey road. This is major impediment for the project. Page 30 to page 40 extensively deal with the plans for the shed in Aarey colony compared to the few lines or paras in less than one page and maximum of two pages for other locations.
  • 42. Some Interesting facts about the Metro III Project
  • 44. Heritage Structures and Metro III 40m 22m 45m
  • 45. Metro III and ATC Tower
  • 46. • Minimum need is 20 ha. • Metro I- less than 17ha of land inside dense inhabitation . • 17ha due to the round about. Metro III car shed and inadequate land
  • 47.
  • 48. Analysis- Part I • The entire exercise seems to be directed towards obtaining sanction of the “revised” car shed inside Aarey. • There are no indications of any remote honesty shown by MMRDA in examining the other sites, • Our assertions have been vindicated in the report of the Environmental experts from NEERI and IIT.( Annexure 1)
  • 49. Analysis- Part II • Considering the fact that the entire issue was raised due to citizens concerns for the environment and open spaces, nothing was done by the committee members collectively towards addressing it. • The committee has excluded the environment experts views and has attempted to unilaterally brush aside the genuine concerns. (page 12) • Reading clearly shows that there was NO face to face interaction and the Environment Experts were forced to give their submissions in writing or risk being ignored completely.
  • 50. Analysis- Part III • This report repeatedly claims that if the land is not available in 3 months, then work should start in Aarey. The haste is unwarranted • The GoM seems to have ignored the directions of the Hon'ble Supreme Court of India on notifying the Ecologically Sensitive Zones around national parks immediately. • The GoM has allocated Aarey land to MMRDA, despite the proposal on designating Aarey Colony as the buffer zone and Ecologically Sensitive Zone of SGNP by the State Forest Department to MoEF&CC.
  • 51. Analysis- Part IV • There seems to be deliberate ploy by MMRDA to conceal the word Mithi in the report. • This is significant since the proposed site is in the immediate vicinity of catchment area of Mithi River.
  • 52. Closing remarks of environment experts
  • 54. ACG Demands • A complete detailed review one with respect to Backbay, Kanjurmarg . • Immediate compliance of the Hon`ble Supreme Court order and declaration of Aarey as an Ecologically Sensitive Zone. This declaration will help promote Aarey as a leisure, recreation ,nature interpretation zone and nature tourism hub. • Respect wishes of the people and protect the green lung of Mumbai for the future generations and to keep slumlords and politicians backing them out of Aarey. • The tourism potential of Aarey can be handled by Dairy Development Board or Maharashtra Tourism Development Corporation (MTDC) without disturbing the landscape.