SlideShare ist ein Scribd-Unternehmen logo
1 von 31
MELTING FURNACE
MELTING FURNACES
 Various types of melting furnace are used in the foundry shop.
The type of furnace used depends upon the type of metal and
the quantity of metal to be melted. The metal melting furnaces
used in foundries are:
 Cupola furnace – for cast iron
 Blast furnace – for smelting iron to produce pig iron
 Open hearth furnace – for steel
 Crucible furnace – for non ferrous metal
 Pot furnace
 Electric furnace
 Dielectric arc furnace
 Indirect arc furnace
 Induction furnace
CUPOLA FURNACE
CUPOLA FURNACE
 A cupola furnace is a melting device used in foundries
that can be used to melt scrap metal and pig iron
(crude iron as first obtained from a furnace) for
production of various cast irons - nodular and
malleable cast iron.
 Cupola furnace consists of a large shell of steel plate
lined with refractory material.
 The ‘‘charge,’’ consisting of iron, coke, flux, and possible
alloying elements, is loaded through a charging door
located less than halfway up the height of the cupola.
o The iron is usually a mixture of pig iron and scrap
(including risers, runners, and sprues left over from
previous castings).
o Coke is the fuel used to heat the furnace.
o Forced air is introduced through openings near the
bottom of the shell for combustion of the coke.
o The flux is a basic compound such as limestone that
reacts with coke ash and other impurities to form slag.
o The slag serves to cover the melt, protecting it from
reaction with the environment inside the cupola and
reducing heat loss.
o As the mixture is heated and melting of the iron occurs, the
furnace is periodically tapped to provide liquid metal for the
 Heating media or device.
 Used for heating and melting.
 For providing heat to chemical reactions for
processes like cracking.
 The furnace may be heated by fuel as in many
furnaces coke is used as a fuel.
 some are operated by electrical energy e.g.
electric arc furnace.
What is Furnace???
 Cupola was made by Rene-Antoine around
1720.
 Cupola is a melting device.
 Used in foundries for production of cast iron.
 Used for making bronzes.
 Its charge is Coke , Metal , Flux.
 Scrap of blast furnace is re melted in cupola.
 Large cupolas may produce up to 100
tons/hour of hot iron.
Cupola Furnace
 Cupola is a cylindrical in shape and placed vertical.
 Its shell is made of steel.
 Its size is expressed in diameters and can range from
0.5 to 4.0 m.
 It supported by four legs.
 Internal walls are lined with refectory bricks.
Construction
 Spark arrester.
 Charging door.
 Air box.
 Tuyeres.
 Tap hole.
 Slag hole.
Parts of Cupola
Well
 The space between the
bottom of the Tuyeres and the
sand bed.
 Molten metal collected in this
portion.
Combustion zone
 Also known as oxidizing zone
.
 Combustion take place in this
zone.
 It is located between well and
melting zone.
Zones
Zones
 In this zone the temperature
is 1540°C to 1870°C.
 The exothermic reactions
takes place in this zone
these are following .
 C + O2 → CO2 + Heat
 Si + O2 → SiO2 + Heat
 2Mn + O2 → 2MnO + Heat
Reducing zone
 Locate between upper level
of combustion zone and
upper level of coke bed.
Zones
 In this zone temperature is
about 1200°C.
 In this zone CO2 change in
to CO.
CO2 + C (coke) → 2CO
Melting zone
 In this zone the melting is
done.
 It is located between
preheating zone and
combustion zone.
 The following reaction take
Zones
Preheating zone
 This zone is starts from the upper
end of the melting zone and
continues up to the bottom level of
the charging door .
 Objective of this zone is preheat
the charges from room
temperature to about 1090°C
before entering the metal charge
to the melting zone.
Stack
 The empty portion of cupola
above the preheating zone is
called as stack. It provides the
 Before the blower is started, the furnace is
uniformly pre-heated and the metal, flux and coke
charges, lying in alternate layers, are sufficiently
heated up.
 The cover plates are positioned suitably and the
blower is started.
 The height of coke charge in the cupola in each
layer varies generally from 10 to 15 cm . The
requirement of flux to the metal charge depends
upon the quality of the charged metal and scarp,
the composition of the coke and the amount of ash
content present in the coke.
Charging of Cupola Furnace
 Its charge consist of
scrap, coke and flux.
 The charge is placed
layer by layer.
 The first layer is coke,
second is flux and third
metal.
 Air enter through the
bottom tuyeres.
 This increases the
energy efficiency of the
furnace.
Working of Cupola Furnace
Working of Cupola Furnace
 The hot exhaust gases rise up
through the charge, preheating it.
 The charge is melted.
 As the material is consumed,
additional charges can be added
to the furnace.
 A continuous flow of iron emerges
from the bottom of the furnace.
 The slag is removed from slag
hole.
 The molten metal achieved by tap
hole.
 Preparation of cupola.
 Firing the cupola.
 Soaking of iron.
 Opening of air blast.
 Pouring the molten metal.
 Closing the cupola.
Operation of Cupola
 Slag and metal adhere to the cupola lining from
the previous run is removed and lining of cupola
is re made.
 The bottom plates are swung to closing position
supported by prob.
 The sand bed is then prepared with molding sand
such that its slopes to towards the tap hole.
Preparation of cupola
 The cupola is fired by kindling wood at the
bottom.
 This should be done 2.5 to 3 hours before the
molten metal is required.
 On the top of the kindling wood a bed of coke is
built.
 The height of the coke bed is may be vary from
50cm to 125cm according to the size of cupola.
Firing the Cupola
 When the furnace is charged fully it is maintain
for about 45 minutes.
 The charge is slowly heated.
 During the stage the air blast is shut off and iron
is soaked.
Soaking of Iron
 At the end of the soaking period the air blast is
opened.
 The taping hole is closed by a plug when the
melting proceeds and molten metal is collect at
the bottom.
Opening of blast air
 When the sufficient amount of metal has collected
in the hearth the slag hole is opened and the slag
is removed.
 Then taping hole is opened and molten metal is
flows out in the table.
 The same procedure is repeated until the charge
is melted and the operation is over.
Pouring of molten metal
 When the operation is over the air blast is shut off
.
 The bottom of furnace is opened by removing the
prop.
Closing the cupola
 It is simple and economical to operate .
 Cupolas can refine the metal charge, removing
impurities out of the slag.
 High melt rates .
 Ease of operation .
 Adequate temperature control .
 Chemical composition control .
 Efficiency of cupola varies from 30 to 50%.
 Less floor space requirements.
Advantages
 Since molten iron and coke are in contact with
each other, certain elements like si , Mn are lost
and others like sulphur are picked up. This
changes the final analysis of molten metal.
 Close temperature control is difficult to maintain
Disadvantages
BLAST FURNACE
Crucible furnace
Pit type furnace Coke fired stationary furnace
Crucible furnace
Oil fired tilting furnace
Pot furnace
Electric furnace
Dielectric arc furnace
Electric furnace
Indirect arc furnace Induction furnace

Weitere ähnliche Inhalte

Was ist angesagt?

Unit 1 manufacturing technology I Metal casting process
Unit 1 manufacturing technology I Metal casting processUnit 1 manufacturing technology I Metal casting process
Unit 1 manufacturing technology I Metal casting processGopinath Guru
 
Carbon dioxide moulding process 1
Carbon dioxide moulding process 1Carbon dioxide moulding process 1
Carbon dioxide moulding process 1Digvijaysinh Gohil
 
High frequency welding
High frequency weldingHigh frequency welding
High frequency weldingDarshan Shah
 
Different types of casting process and its application
Different types of casting process and its applicationDifferent types of casting process and its application
Different types of casting process and its applicationmangal iron
 
Sand casting of metals - Gating system for sand casting mould
Sand casting of metals - Gating system for sand casting mouldSand casting of metals - Gating system for sand casting mould
Sand casting of metals - Gating system for sand casting mouldAmruta Rane
 
Industrial melting furnaces
Industrial melting furnacesIndustrial melting furnaces
Industrial melting furnacesNear East Uni
 
Gating system :- CASTING PROCESSES
Gating system :- CASTING PROCESSESGating system :- CASTING PROCESSES
Gating system :- CASTING PROCESSESJaimin Patel
 
Production of iron and steel
Production of iron and steelProduction of iron and steel
Production of iron and steeltemkin abdlkader
 
Metal Joining Process
Metal Joining ProcessMetal Joining Process
Metal Joining ProcessMonica Praisy
 

Was ist angesagt? (20)

Powder metallurgy
Powder metallurgyPowder metallurgy
Powder metallurgy
 
Unit 1 manufacturing technology I Metal casting process
Unit 1 manufacturing technology I Metal casting processUnit 1 manufacturing technology I Metal casting process
Unit 1 manufacturing technology I Metal casting process
 
Carbon dioxide moulding process 1
Carbon dioxide moulding process 1Carbon dioxide moulding process 1
Carbon dioxide moulding process 1
 
Die casting
Die castingDie casting
Die casting
 
High frequency welding
High frequency weldingHigh frequency welding
High frequency welding
 
Different types of casting process and its application
Different types of casting process and its applicationDifferent types of casting process and its application
Different types of casting process and its application
 
Sand casting of metals - Gating system for sand casting mould
Sand casting of metals - Gating system for sand casting mouldSand casting of metals - Gating system for sand casting mould
Sand casting of metals - Gating system for sand casting mould
 
Ch 21 sand casting
Ch 21 sand castingCh 21 sand casting
Ch 21 sand casting
 
Pressure die casting
Pressure die castingPressure die casting
Pressure die casting
 
METAL FORMING PROCESS
METAL FORMING PROCESSMETAL FORMING PROCESS
METAL FORMING PROCESS
 
Carburizing
CarburizingCarburizing
Carburizing
 
Industrial melting furnaces
Industrial melting furnacesIndustrial melting furnaces
Industrial melting furnaces
 
Centrifugal casting 1
Centrifugal casting 1Centrifugal casting 1
Centrifugal casting 1
 
Foundry Lectures
Foundry LecturesFoundry Lectures
Foundry Lectures
 
Friction welding
Friction welding Friction welding
Friction welding
 
Gating system :- CASTING PROCESSES
Gating system :- CASTING PROCESSESGating system :- CASTING PROCESSES
Gating system :- CASTING PROCESSES
 
Cupola furnaca
Cupola furnacaCupola furnaca
Cupola furnaca
 
Production of iron and steel
Production of iron and steelProduction of iron and steel
Production of iron and steel
 
Forging
ForgingForging
Forging
 
Metal Joining Process
Metal Joining ProcessMetal Joining Process
Metal Joining Process
 

Ähnlich wie Melting furnace

Metal melting furnaces
Metal melting furnacesMetal melting furnaces
Metal melting furnacesRaj Parekh
 
Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Cleophas Rwemera
 
Chapter 2: Ferrous Material
Chapter 2: Ferrous MaterialChapter 2: Ferrous Material
Chapter 2: Ferrous Materialsyar 2604
 
Manufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyManufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyteddiyfentaw
 
modern meltig practises and metal transfer
modern meltig practises and metal transfermodern meltig practises and metal transfer
modern meltig practises and metal transferdeep shankar
 
3furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp013furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp01John Tauli
 
Types of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of castingTypes of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of castingprashantborakhede1
 
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjSteel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjteddiyfentaw
 
Iron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptxIron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptx029DevendraKumarSing
 
Blast furnace
Blast furnaceBlast furnace
Blast furnaceMD Raza
 
blast furnace.pptx
blast furnace.pptxblast furnace.pptx
blast furnace.pptxJenithM
 
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...029DevendraKumarSing
 

Ähnlich wie Melting furnace (20)

Cupola furnace
Cupola furnaceCupola furnace
Cupola furnace
 
Faisal
FaisalFaisal
Faisal
 
Cupola furnace
Cupola furnaceCupola furnace
Cupola furnace
 
Metal melting furnaces
Metal melting furnacesMetal melting furnaces
Metal melting furnaces
 
Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02
 
Chapter 2: Ferrous Material
Chapter 2: Ferrous MaterialChapter 2: Ferrous Material
Chapter 2: Ferrous Material
 
Manufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyManufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggy
 
Cupola.ppt
Cupola.pptCupola.ppt
Cupola.ppt
 
modern meltig practises and metal transfer
modern meltig practises and metal transfermodern meltig practises and metal transfer
modern meltig practises and metal transfer
 
3furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp013furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp01
 
Types of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of castingTypes of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of casting
 
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjSteel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
 
Metal Casting.pptx
Metal Casting.pptxMetal Casting.pptx
Metal Casting.pptx
 
Iron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptxIron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptx
 
Chapter2 (JF302)
Chapter2 (JF302)Chapter2 (JF302)
Chapter2 (JF302)
 
Blast furnace
Blast furnaceBlast furnace
Blast furnace
 
blast furnace.pptx
blast furnace.pptxblast furnace.pptx
blast furnace.pptx
 
Pit furnace
Pit furnacePit furnace
Pit furnace
 
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
 
Bos
BosBos
Bos
 

Kürzlich hochgeladen

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 

Kürzlich hochgeladen (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 

Melting furnace

  • 2. MELTING FURNACES  Various types of melting furnace are used in the foundry shop. The type of furnace used depends upon the type of metal and the quantity of metal to be melted. The metal melting furnaces used in foundries are:  Cupola furnace – for cast iron  Blast furnace – for smelting iron to produce pig iron  Open hearth furnace – for steel  Crucible furnace – for non ferrous metal  Pot furnace  Electric furnace  Dielectric arc furnace  Indirect arc furnace  Induction furnace
  • 4. CUPOLA FURNACE  A cupola furnace is a melting device used in foundries that can be used to melt scrap metal and pig iron (crude iron as first obtained from a furnace) for production of various cast irons - nodular and malleable cast iron.  Cupola furnace consists of a large shell of steel plate lined with refractory material.
  • 5.  The ‘‘charge,’’ consisting of iron, coke, flux, and possible alloying elements, is loaded through a charging door located less than halfway up the height of the cupola. o The iron is usually a mixture of pig iron and scrap (including risers, runners, and sprues left over from previous castings). o Coke is the fuel used to heat the furnace. o Forced air is introduced through openings near the bottom of the shell for combustion of the coke. o The flux is a basic compound such as limestone that reacts with coke ash and other impurities to form slag. o The slag serves to cover the melt, protecting it from reaction with the environment inside the cupola and reducing heat loss. o As the mixture is heated and melting of the iron occurs, the furnace is periodically tapped to provide liquid metal for the
  • 6.  Heating media or device.  Used for heating and melting.  For providing heat to chemical reactions for processes like cracking.  The furnace may be heated by fuel as in many furnaces coke is used as a fuel.  some are operated by electrical energy e.g. electric arc furnace. What is Furnace???
  • 7.  Cupola was made by Rene-Antoine around 1720.  Cupola is a melting device.  Used in foundries for production of cast iron.  Used for making bronzes.  Its charge is Coke , Metal , Flux.  Scrap of blast furnace is re melted in cupola.  Large cupolas may produce up to 100 tons/hour of hot iron. Cupola Furnace
  • 8.  Cupola is a cylindrical in shape and placed vertical.  Its shell is made of steel.  Its size is expressed in diameters and can range from 0.5 to 4.0 m.  It supported by four legs.  Internal walls are lined with refectory bricks. Construction
  • 9.  Spark arrester.  Charging door.  Air box.  Tuyeres.  Tap hole.  Slag hole. Parts of Cupola
  • 10. Well  The space between the bottom of the Tuyeres and the sand bed.  Molten metal collected in this portion. Combustion zone  Also known as oxidizing zone .  Combustion take place in this zone.  It is located between well and melting zone. Zones
  • 11. Zones  In this zone the temperature is 1540°C to 1870°C.  The exothermic reactions takes place in this zone these are following .  C + O2 → CO2 + Heat  Si + O2 → SiO2 + Heat  2Mn + O2 → 2MnO + Heat Reducing zone  Locate between upper level of combustion zone and upper level of coke bed.
  • 12. Zones  In this zone temperature is about 1200°C.  In this zone CO2 change in to CO. CO2 + C (coke) → 2CO Melting zone  In this zone the melting is done.  It is located between preheating zone and combustion zone.  The following reaction take
  • 13. Zones Preheating zone  This zone is starts from the upper end of the melting zone and continues up to the bottom level of the charging door .  Objective of this zone is preheat the charges from room temperature to about 1090°C before entering the metal charge to the melting zone. Stack  The empty portion of cupola above the preheating zone is called as stack. It provides the
  • 14.  Before the blower is started, the furnace is uniformly pre-heated and the metal, flux and coke charges, lying in alternate layers, are sufficiently heated up.  The cover plates are positioned suitably and the blower is started.  The height of coke charge in the cupola in each layer varies generally from 10 to 15 cm . The requirement of flux to the metal charge depends upon the quality of the charged metal and scarp, the composition of the coke and the amount of ash content present in the coke. Charging of Cupola Furnace
  • 15.  Its charge consist of scrap, coke and flux.  The charge is placed layer by layer.  The first layer is coke, second is flux and third metal.  Air enter through the bottom tuyeres.  This increases the energy efficiency of the furnace. Working of Cupola Furnace
  • 16. Working of Cupola Furnace  The hot exhaust gases rise up through the charge, preheating it.  The charge is melted.  As the material is consumed, additional charges can be added to the furnace.  A continuous flow of iron emerges from the bottom of the furnace.  The slag is removed from slag hole.  The molten metal achieved by tap hole.
  • 17.  Preparation of cupola.  Firing the cupola.  Soaking of iron.  Opening of air blast.  Pouring the molten metal.  Closing the cupola. Operation of Cupola
  • 18.  Slag and metal adhere to the cupola lining from the previous run is removed and lining of cupola is re made.  The bottom plates are swung to closing position supported by prob.  The sand bed is then prepared with molding sand such that its slopes to towards the tap hole. Preparation of cupola
  • 19.  The cupola is fired by kindling wood at the bottom.  This should be done 2.5 to 3 hours before the molten metal is required.  On the top of the kindling wood a bed of coke is built.  The height of the coke bed is may be vary from 50cm to 125cm according to the size of cupola. Firing the Cupola
  • 20.  When the furnace is charged fully it is maintain for about 45 minutes.  The charge is slowly heated.  During the stage the air blast is shut off and iron is soaked. Soaking of Iron
  • 21.  At the end of the soaking period the air blast is opened.  The taping hole is closed by a plug when the melting proceeds and molten metal is collect at the bottom. Opening of blast air
  • 22.  When the sufficient amount of metal has collected in the hearth the slag hole is opened and the slag is removed.  Then taping hole is opened and molten metal is flows out in the table.  The same procedure is repeated until the charge is melted and the operation is over. Pouring of molten metal
  • 23.  When the operation is over the air blast is shut off .  The bottom of furnace is opened by removing the prop. Closing the cupola
  • 24.  It is simple and economical to operate .  Cupolas can refine the metal charge, removing impurities out of the slag.  High melt rates .  Ease of operation .  Adequate temperature control .  Chemical composition control .  Efficiency of cupola varies from 30 to 50%.  Less floor space requirements. Advantages
  • 25.  Since molten iron and coke are in contact with each other, certain elements like si , Mn are lost and others like sulphur are picked up. This changes the final analysis of molten metal.  Close temperature control is difficult to maintain Disadvantages
  • 27. Crucible furnace Pit type furnace Coke fired stationary furnace
  • 28. Crucible furnace Oil fired tilting furnace
  • 31. Electric furnace Indirect arc furnace Induction furnace