Complete the following fields:

Question                                                                                                                                Yes/No         Total
The team is empowered to make decisions.                                                                                                         Yes              0
The team is self-organising and does not rely on management to set and meet its goals.                                                           No               0
The team commits and takes responsibility for delivery and is prepared to help with any task that helps the team to achieve its goal.                             0
The team knows who the product owner is.
                                                                                                                                                               How Agile Are You?
Each sprint/iteration has a clear goal.
All team members, including testers, are included in requirements workshops.
Requirements documentation is barely sufficient and the team collaborates to clarify details as features are ready for development.
Test cases are written up-front with the requirements/user story.
There is a product backlog/feature list prioritised by business value.
The product backlog has estimates created by the team.
The team knows what their velocity is.
Velocity is used to gauge how many user stories should be included in each sprint/iteration.                                                                                                 Yes
                                                                                                                                                                                             No
Sprints/iterations are timeboxed to four weeks or less.
Sprint budget is calculated to determine how many product backlog items/features can be included in the sprint/iteration.
The sprint/iteration ends on the agreed end date.
All tasks on the sprint backlog are broken down to a size that is less than one day.
Requirements are expressed as user stories and written on a card.
The team estimates using points which indicate the relative size of each feature on the product backlog/feature list.
The team generates burndown charts to track progress daily.
Software is tested and working at the end of each sprint/iteration.
The team is not disrupted during the sprint/iteration.
Changes are integrated throughout the sprint/iteration.
Automated unit testing is implemented where appropriate.
                                                                                                                                                 You are #DIV/0! Agile!
There is an automated build and regression test.
Stretch tasks are identified for inclusion in the sprint/iteration if it goes better than expected.
The Product Owner is actively involved throughout each sprint.
All code changes are reversible and it is possible to make a release at any time.
Testing is integrated throughout the lifecycle and starts on delivery of the first feature.
Impediments that hold up progress are raised, recorded on the whiteboard and resolved in a timely fashion.
When someone says 'done', they mean DONE! (ie shippable).
The team uses the whiteboard to provide clear visibility of progress and issues on a daily basis.
The sprint/iteration goal(s) is clearly visible on the board.
All user stories and tasks are displayed on the whiteboard for the duration of the sprint/iteration.
Daily scrums happen at the same time every day – even if the scrum master isn’t present.
The daily scrum is resticted to answering the standard 3 scrum questions and lasts no more than 15 minutes.
There is a product demonstration/sprint review meeting at the end of each sprint/iteration.
All team members, including testers and Product Owner, are included in the sprint/iteration review.
The sprint/iteration review is attended by executive stakeholders.
There is a sprint retrospective at the end of each sprint/iteration.
Key metrics are reviewed and captured during each sprint retrospective.
All team members, including testers, are included in the sprint retrospective meeting.
Actions from the sprint retrospective have a positive impact on the next sprint/iteration.
                                                                                                                                                                                    © 2009 - Agile101.net
How Agile Are You?
                                                           For more information: www.Agile101.net


    Collate the responses from each team member and copy/paste them into this sheet - one set of responses per column starting in B:B>>

This spreadsheet can collate results for up to 24 team members. To add a new team member, press Ctrl+Shift+A

Question                                                                                                                                  Total "Yes"     % "Yes"
The team is empowered to make decisions.                                                                                                       0            0%
The team is self-organising and does not rely on management to set and meet its goals.                                                         0            0%
The team commits and takes responsibility for delivery and is prepared to help with any task that helps the team to achieve its goal.          0            0%
The team knows who the product owner is.                                                                                                       0            0%
Each sprint/iteration has a clear goal.                                                                                                        0            0%
All team members, including testers, are included in requirements workshops.                                                                   0            0%
Requirements documentation is barely sufficient and the team collaborates to clarify details as features are ready for development.            0            0%
Test cases are written up-front with the requirements/user story.                                                                              0            0%
There is a product backlog/feature list prioritised by business value.                                                                         0            0%
The product backlog has estimates created by the team.                                                                                         0            0%
The team knows what their velocity is.                                                                                                         0            0%
Velocity is used to gauge how many user stories should be included in each sprint/iteration.                                                   0            0%
Sprints/iterations are timeboxed to four weeks or less.                                                                                        0            0%
Sprint budget is calculated to determine how many product backlog items/features can be included in the sprint/iteration.                      0            0%
The sprint/iteration ends on the agreed end date.                                                                                              0            0%
All tasks on the sprint backlog are broken down to a size that is less than one day.                                                           0            0%
Requirements are expressed as user stories and written on a card.                                                                              0            0%
The team estimates using points which indicate the relative size of each feature on the product backlog/feature list.                          0            0%
The team generates burndown charts to track progress daily.                                                                                    0            0%
Software is tested and working at the end of each sprint/iteration.                                                                            0            0%
The team is not disrupted during the sprint/iteration.                                                                                         0            0%
Changes are integrated throughout the sprint/iteration.                                                                                        0            0%
Automated unit testing is implemented where appropriate.                                                                                       0            0%
There is an automated build and regression test.                                                                                               0            0%
Stretch tasks are identified for inclusion in the sprint/iteration if it goes better than expected.                                            0            0%
The Product Owner is actively involved throughout each sprint.                                                                                 0            0%
All code changes are reversible and it is possible to make a release at any time.                                                              0            0%
Testing is integrated throughout the lifecycle and starts on delivery of the first feature.                                                    0            0%
Impediments that hold up progress are raised, recorded on the whiteboard and resolved in a timely fashion.                                     0            0%
When someone says 'done', they mean DONE! (ie shippable).                                                                                      0            0%
The team uses the whiteboard to provide clear visibility of progress and issues on a daily basis.                                              0            0%
The sprint/iteration goal(s) is clearly visible on the board.                                                                                  0            0%
All user stories and tasks are displayed on the whiteboard for the duration of the sprint/iteration.                                           0            0%
Daily scrums happen at the same time every day – even if the scrum master isn’t present.                                                       0            0%
The daily scrum is resticted to answering the standard 3 scrum questions and lasts no more than 15 minutes.                                    0            0%
There is a product demonstration/sprint review meeting at the end of each sprint/iteration.                                                    0            0%
All team members, including testers and Product Owner, are included in the sprint/iteration review.                                            0            0%
The sprint/iteration review is attended by executive stakeholders.                                                                             0            0%
There is a sprint retrospective at the end of each sprint/iteration.                                                                           0            0%
Key metrics are reviewed and captured during each sprint retrospective.                                                                        0            0%
All team members, including testers, are included in the sprint retrospective meeting.                                                         0            0%
Actions from the sprint retrospective have a positive impact on the next sprint/iteration.                                                     0            0%
                                                                                                                                               1

                                                                                                                          Your Team is       0%         Agile!




                                                                                                                                                  © 2009 Agile101.net
How Agile Are You?
                                                                                                  For more information: www.Agile101.net


   100%



    90%



    80%



    70%



    60%



    50%



    40%



    30%



    20%



    10%



     0%
                                                                      The team knows who the product owner is.                                                                                           The product backlog has estimates created by the team.
 The team is empowered to make decisions.                                                    Requirements documentation is barely sufficient and the team collaborates to clarify details as features are ready for development.




100%



90%



80%



70%



60%



50%



40%



30%



20%



10%



  0%
                                  Sprints/iterations are timeboxed to four weeks or less.                          Requirements are expressed as user stories and written on a card.                        The team is not disrupted during the sprint/iteration.
The team knows what their velocity is.                                          The sprint/iteration ends on the agreed end date.                             The team generates burndown charts to track progress daily.




                                                                                                                                                                                                                                                    © 2009 Agile101.net
100%



       90%



       80%



       70%



       60%



       50%



       40%



       30%



       20%



       10%



         0%
                                                     There is an automated build and regression test.                              Testing is integrated throughout the lifecycle and starts on delivery of the first feature.
Changes are integrated throughout the sprint/iteration.                                       The Product Owner is actively involved throughout each sprint.                                      When someone says 'done', they mean DONE! (ie shippable).




         100%



          90%



          80%



          70%



          60%



          50%



          40%



          30%



          20%



          10%



            0%
                                       The daily scrum is resticted to answering the standard 3 scrum questions and lasts no more than 15 minutes.                              All team members, including testers, are included in the sprint retrospective meeting.
The sprint/iteration goal(s) is clearly visible on the board.                                                             The sprint/iteration review is attended by executive stakeholders.




                                                                                                                                                                                                                                                            © 2009 Agile101.net

Weitere ähnliche Inhalte

Ähnlich wie How Agile Are You

The product owner and the scrum team. Can one person do this at scale?
The product owner and the scrum team. Can one person do this at scale?The product owner and the scrum team. Can one person do this at scale?
The product owner and the scrum team. Can one person do this at scale?Derek Huether
 
20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx
20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx
20220923 - Vaidas Adomauskas - LeSS conference 2022.pptxVaidas Adomauskas
 
20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx
20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx
20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptxVaidas Adomauskas
 
Agile software-development-overview-1231560734008086-2
Agile software-development-overview-1231560734008086-2Agile software-development-overview-1231560734008086-2
Agile software-development-overview-1231560734008086-2shankar chinn
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayHeidi Owens
 
Single Point Continuous Flo1
Single Point Continuous Flo1Single Point Continuous Flo1
Single Point Continuous Flo1Charles Cooper
 
Scrum. Beginning Your Agile Transformation
Scrum. Beginning Your Agile TransformationScrum. Beginning Your Agile Transformation
Scrum. Beginning Your Agile TransformationAndreea Visanoiu
 
Adaptive Development Methodology
Adaptive Development MethodologyAdaptive Development Methodology
Adaptive Development MethodologySteve Greene
 
The Case for Agile testing
The Case for Agile testingThe Case for Agile testing
The Case for Agile testingCognizant
 
Modern agile devspace - 2017-10-14
Modern agile   devspace - 2017-10-14Modern agile   devspace - 2017-10-14
Modern agile devspace - 2017-10-14Daniel Heater
 
Are We Really Being Agile? (w/ Portuguese)
Are We Really Being Agile? (w/ Portuguese)Are We Really Being Agile? (w/ Portuguese)
Are We Really Being Agile? (w/ Portuguese)Richard Cheng
 
DevOps - Continuous Integration, Continuous Delivery - let's talk
DevOps - Continuous Integration, Continuous Delivery - let's talkDevOps - Continuous Integration, Continuous Delivery - let's talk
DevOps - Continuous Integration, Continuous Delivery - let's talkD Z
 
Sensible Metrics for Dojos
Sensible Metrics for DojosSensible Metrics for Dojos
Sensible Metrics for DojosCprime
 
Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...
Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...
Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...VMware Tanzu
 
Backlog Refinement 101 & 202
Backlog Refinement 101 & 202Backlog Refinement 101 & 202
Backlog Refinement 101 & 202David Hanson
 

Ähnlich wie How Agile Are You (20)

Scrum Fundamentals
Scrum FundamentalsScrum Fundamentals
Scrum Fundamentals
 
The product owner and the scrum team. Can one person do this at scale?
The product owner and the scrum team. Can one person do this at scale?The product owner and the scrum team. Can one person do this at scale?
The product owner and the scrum team. Can one person do this at scale?
 
20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx
20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx
20220923 - Vaidas Adomauskas - LeSS conference 2022.pptx
 
20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx
20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx
20221013 - Vaidas Adomauskas - Agile Tour Vilnius 2022.pptx
 
Agile software-development-overview-1231560734008086-2
Agile software-development-overview-1231560734008086-2Agile software-development-overview-1231560734008086-2
Agile software-development-overview-1231560734008086-2
 
No Time for Testing: Strategies to Keep Testing Inside Your Sprints
No Time for Testing: Strategies to Keep Testing Inside Your SprintsNo Time for Testing: Strategies to Keep Testing Inside Your Sprints
No Time for Testing: Strategies to Keep Testing Inside Your Sprints
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
 
BAAgileQA
BAAgileQABAAgileQA
BAAgileQA
 
Single Point Continuous Flo1
Single Point Continuous Flo1Single Point Continuous Flo1
Single Point Continuous Flo1
 
Scrum. Beginning Your Agile Transformation
Scrum. Beginning Your Agile TransformationScrum. Beginning Your Agile Transformation
Scrum. Beginning Your Agile Transformation
 
Adaptive Development Methodology
Adaptive Development MethodologyAdaptive Development Methodology
Adaptive Development Methodology
 
The Case for Agile testing
The Case for Agile testingThe Case for Agile testing
The Case for Agile testing
 
An Approach to Devops
An Approach to DevopsAn Approach to Devops
An Approach to Devops
 
Modern agile devspace - 2017-10-14
Modern agile   devspace - 2017-10-14Modern agile   devspace - 2017-10-14
Modern agile devspace - 2017-10-14
 
Are We Really Being Agile? (w/ Portuguese)
Are We Really Being Agile? (w/ Portuguese)Are We Really Being Agile? (w/ Portuguese)
Are We Really Being Agile? (w/ Portuguese)
 
DevOps - Continuous Integration, Continuous Delivery - let's talk
DevOps - Continuous Integration, Continuous Delivery - let's talkDevOps - Continuous Integration, Continuous Delivery - let's talk
DevOps - Continuous Integration, Continuous Delivery - let's talk
 
Sensible Metrics for Dojos
Sensible Metrics for DojosSensible Metrics for Dojos
Sensible Metrics for Dojos
 
Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...
Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...
Saving the DoD $800M: How Portfolio Management is the Missing Link Between Ag...
 
What is Scrum?
What is Scrum?What is Scrum?
What is Scrum?
 
Backlog Refinement 101 & 202
Backlog Refinement 101 & 202Backlog Refinement 101 & 202
Backlog Refinement 101 & 202
 

Mehr von Ram Srivastava

Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 
Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013Ram Srivastava
 
Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1Ram Srivastava
 
Atithi Devo Bhav - Guest is God (Incredible India)
Atithi  Devo  Bhav - Guest is God (Incredible India)Atithi  Devo  Bhav - Guest is God (Incredible India)
Atithi Devo Bhav - Guest is God (Incredible India)Ram Srivastava
 
Sprint Backlog Quick Start
Sprint Backlog Quick StartSprint Backlog Quick Start
Sprint Backlog Quick StartRam Srivastava
 
Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)Ram Srivastava
 
Project Initiation Presentation Template
Project Initiation Presentation TemplateProject Initiation Presentation Template
Project Initiation Presentation TemplateRam Srivastava
 
Product Backlog Priority Overview
Product Backlog Priority OverviewProduct Backlog Priority Overview
Product Backlog Priority OverviewRam Srivastava
 
Measuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development TeamMeasuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development TeamRam Srivastava
 
Product Sprint Backlog 0 03
Product Sprint Backlog 0 03Product Sprint Backlog 0 03
Product Sprint Backlog 0 03Ram Srivastava
 
Measuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development TeamMeasuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development TeamRam Srivastava
 
Measuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going AgileMeasuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going AgileRam Srivastava
 
Introducing Agile User Stories
Introducing Agile User StoriesIntroducing Agile User Stories
Introducing Agile User StoriesRam Srivastava
 
Agile Epic Card Template
Agile Epic Card TemplateAgile Epic Card Template
Agile Epic Card TemplateRam Srivastava
 
Cmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace BothCmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace BothRam Srivastava
 
Estimation Agile Projects
Estimation Agile ProjectsEstimation Agile Projects
Estimation Agile ProjectsRam Srivastava
 

Mehr von Ram Srivastava (20)

Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013
 
Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1
 
Atithi Devo Bhav - Guest is God (Incredible India)
Atithi  Devo  Bhav - Guest is God (Incredible India)Atithi  Devo  Bhav - Guest is God (Incredible India)
Atithi Devo Bhav - Guest is God (Incredible India)
 
Sprint Backlog Quick Start
Sprint Backlog Quick StartSprint Backlog Quick Start
Sprint Backlog Quick Start
 
Agile User Story
Agile User StoryAgile User Story
Agile User Story
 
Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)
 
Project Initiation Presentation Template
Project Initiation Presentation TemplateProject Initiation Presentation Template
Project Initiation Presentation Template
 
Product Backlog Priority Overview
Product Backlog Priority OverviewProduct Backlog Priority Overview
Product Backlog Priority Overview
 
Measuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development TeamMeasuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development Team
 
Product Sprint Backlog 0 03
Product Sprint Backlog 0 03Product Sprint Backlog 0 03
Product Sprint Backlog 0 03
 
Measuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development TeamMeasuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development Team
 
Measuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going AgileMeasuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going Agile
 
Introducing Agile User Stories
Introducing Agile User StoriesIntroducing Agile User Stories
Introducing Agile User Stories
 
Lets Talk Agile
Lets Talk AgileLets Talk Agile
Lets Talk Agile
 
Agile Epic Card Template
Agile Epic Card TemplateAgile Epic Card Template
Agile Epic Card Template
 
Forrester Agile
Forrester AgileForrester Agile
Forrester Agile
 
Cmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace BothCmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace Both
 
Estimation Agile Projects
Estimation Agile ProjectsEstimation Agile Projects
Estimation Agile Projects
 
Agile Scrum
Agile ScrumAgile Scrum
Agile Scrum
 

Kürzlich hochgeladen

TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdfTAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdfSocial Samosa
 
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics TradeTechnical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics TradeOptics-Trade
 
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room packageWhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room packageNitya salvi
 
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...baharayali
 
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxNetherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxEuro Cup 2024 Tickets
 
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...
Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...Nitya salvi
 
Spain Vs Italy Spain to be banned from participating in Euro 2024.docx
Spain Vs Italy Spain to be banned from participating in Euro 2024.docxSpain Vs Italy Spain to be banned from participating in Euro 2024.docx
Spain Vs Italy Spain to be banned from participating in Euro 2024.docxWorld Wide Tickets And Hospitality
 
🔝|97111༒99012🔝 Call Girls In {Delhi} Cr Park ₹5.5k Cash Payment With Room De...
🔝|97111༒99012🔝 Call Girls In  {Delhi} Cr Park ₹5.5k Cash Payment With Room De...🔝|97111༒99012🔝 Call Girls In  {Delhi} Cr Park ₹5.5k Cash Payment With Room De...
🔝|97111༒99012🔝 Call Girls In {Delhi} Cr Park ₹5.5k Cash Payment With Room De...Diya Sharma
 
Personal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley DennisPersonal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley Dennisjocksofalltradespodc
 
Trossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docx
Trossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docxTrossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docx
Trossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docxEuro Cup 2024 Tickets
 
Who Is Emmanuel Katto Uganda? His Career, personal life etc.
Who Is Emmanuel Katto Uganda? His Career, personal life etc.Who Is Emmanuel Katto Uganda? His Career, personal life etc.
Who Is Emmanuel Katto Uganda? His Career, personal life etc.Marina Costa
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Eticketing.co
 
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...World Wide Tickets And Hospitality
 
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxSlovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxWorld Wide Tickets And Hospitality
 
Unveiling the Mystery of Main Bazar Chart
Unveiling the Mystery of Main Bazar ChartUnveiling the Mystery of Main Bazar Chart
Unveiling the Mystery of Main Bazar ChartChart Kalyan
 
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...World Wide Tickets And Hospitality
 
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docxUEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docxEuro Cup 2024 Tickets
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...Health
 
JORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdfJORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdfArturo Pacheco Alvarez
 
Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)CMBustamante
 

Kürzlich hochgeladen (20)

TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdfTAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
TAM Sports_IPL 17 Till Match 37_Celebrity Endorsement _Report.pdf
 
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics TradeTechnical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
Technical Data | Sig Sauer Easy6 BDX 1-6x24 | Optics Trade
 
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room packageWhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
 
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
 
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxNetherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
 
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...
Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...
 
Spain Vs Italy Spain to be banned from participating in Euro 2024.docx
Spain Vs Italy Spain to be banned from participating in Euro 2024.docxSpain Vs Italy Spain to be banned from participating in Euro 2024.docx
Spain Vs Italy Spain to be banned from participating in Euro 2024.docx
 
🔝|97111༒99012🔝 Call Girls In {Delhi} Cr Park ₹5.5k Cash Payment With Room De...
🔝|97111༒99012🔝 Call Girls In  {Delhi} Cr Park ₹5.5k Cash Payment With Room De...🔝|97111༒99012🔝 Call Girls In  {Delhi} Cr Park ₹5.5k Cash Payment With Room De...
🔝|97111༒99012🔝 Call Girls In {Delhi} Cr Park ₹5.5k Cash Payment With Room De...
 
Personal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley DennisPersonal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley Dennis
 
Trossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docx
Trossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docxTrossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docx
Trossard's Message Bridging Celebrities and Sports in Euro Cup 2024.docx
 
Who Is Emmanuel Katto Uganda? His Career, personal life etc.
Who Is Emmanuel Katto Uganda? His Career, personal life etc.Who Is Emmanuel Katto Uganda? His Career, personal life etc.
Who Is Emmanuel Katto Uganda? His Career, personal life etc.
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
 
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
 
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxSlovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
 
Unveiling the Mystery of Main Bazar Chart
Unveiling the Mystery of Main Bazar ChartUnveiling the Mystery of Main Bazar Chart
Unveiling the Mystery of Main Bazar Chart
 
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
Spain Vs Italy 20 players confirmed for Spain's Euro 2024 squad, and three po...
 
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docxUEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
JORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdfJORNADA 5 LIGA MURO 2024INSUGURACION.pdf
JORNADA 5 LIGA MURO 2024INSUGURACION.pdf
 
Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)
 

How Agile Are You

  • 1. How Agile Are You? For more information: www.Agile101.net Complete the following fields: Question Yes/No Total The team is empowered to make decisions. Yes 0 The team is self-organising and does not rely on management to set and meet its goals. No 0 The team commits and takes responsibility for delivery and is prepared to help with any task that helps the team to achieve its goal. 0 The team knows who the product owner is. How Agile Are You? Each sprint/iteration has a clear goal. All team members, including testers, are included in requirements workshops. Requirements documentation is barely sufficient and the team collaborates to clarify details as features are ready for development. Test cases are written up-front with the requirements/user story. There is a product backlog/feature list prioritised by business value. The product backlog has estimates created by the team. The team knows what their velocity is. Velocity is used to gauge how many user stories should be included in each sprint/iteration. Yes No Sprints/iterations are timeboxed to four weeks or less. Sprint budget is calculated to determine how many product backlog items/features can be included in the sprint/iteration. The sprint/iteration ends on the agreed end date. All tasks on the sprint backlog are broken down to a size that is less than one day. Requirements are expressed as user stories and written on a card. The team estimates using points which indicate the relative size of each feature on the product backlog/feature list. The team generates burndown charts to track progress daily. Software is tested and working at the end of each sprint/iteration. The team is not disrupted during the sprint/iteration. Changes are integrated throughout the sprint/iteration. Automated unit testing is implemented where appropriate. You are #DIV/0! Agile! There is an automated build and regression test. Stretch tasks are identified for inclusion in the sprint/iteration if it goes better than expected. The Product Owner is actively involved throughout each sprint. All code changes are reversible and it is possible to make a release at any time. Testing is integrated throughout the lifecycle and starts on delivery of the first feature. Impediments that hold up progress are raised, recorded on the whiteboard and resolved in a timely fashion. When someone says 'done', they mean DONE! (ie shippable). The team uses the whiteboard to provide clear visibility of progress and issues on a daily basis. The sprint/iteration goal(s) is clearly visible on the board. All user stories and tasks are displayed on the whiteboard for the duration of the sprint/iteration. Daily scrums happen at the same time every day – even if the scrum master isn’t present. The daily scrum is resticted to answering the standard 3 scrum questions and lasts no more than 15 minutes. There is a product demonstration/sprint review meeting at the end of each sprint/iteration. All team members, including testers and Product Owner, are included in the sprint/iteration review. The sprint/iteration review is attended by executive stakeholders. There is a sprint retrospective at the end of each sprint/iteration. Key metrics are reviewed and captured during each sprint retrospective. All team members, including testers, are included in the sprint retrospective meeting. Actions from the sprint retrospective have a positive impact on the next sprint/iteration. © 2009 - Agile101.net
  • 2. How Agile Are You? For more information: www.Agile101.net Collate the responses from each team member and copy/paste them into this sheet - one set of responses per column starting in B:B>> This spreadsheet can collate results for up to 24 team members. To add a new team member, press Ctrl+Shift+A Question Total "Yes" % "Yes" The team is empowered to make decisions. 0 0% The team is self-organising and does not rely on management to set and meet its goals. 0 0% The team commits and takes responsibility for delivery and is prepared to help with any task that helps the team to achieve its goal. 0 0% The team knows who the product owner is. 0 0% Each sprint/iteration has a clear goal. 0 0% All team members, including testers, are included in requirements workshops. 0 0% Requirements documentation is barely sufficient and the team collaborates to clarify details as features are ready for development. 0 0% Test cases are written up-front with the requirements/user story. 0 0% There is a product backlog/feature list prioritised by business value. 0 0% The product backlog has estimates created by the team. 0 0% The team knows what their velocity is. 0 0% Velocity is used to gauge how many user stories should be included in each sprint/iteration. 0 0% Sprints/iterations are timeboxed to four weeks or less. 0 0% Sprint budget is calculated to determine how many product backlog items/features can be included in the sprint/iteration. 0 0% The sprint/iteration ends on the agreed end date. 0 0% All tasks on the sprint backlog are broken down to a size that is less than one day. 0 0% Requirements are expressed as user stories and written on a card. 0 0% The team estimates using points which indicate the relative size of each feature on the product backlog/feature list. 0 0% The team generates burndown charts to track progress daily. 0 0% Software is tested and working at the end of each sprint/iteration. 0 0% The team is not disrupted during the sprint/iteration. 0 0% Changes are integrated throughout the sprint/iteration. 0 0% Automated unit testing is implemented where appropriate. 0 0% There is an automated build and regression test. 0 0% Stretch tasks are identified for inclusion in the sprint/iteration if it goes better than expected. 0 0% The Product Owner is actively involved throughout each sprint. 0 0% All code changes are reversible and it is possible to make a release at any time. 0 0% Testing is integrated throughout the lifecycle and starts on delivery of the first feature. 0 0% Impediments that hold up progress are raised, recorded on the whiteboard and resolved in a timely fashion. 0 0% When someone says 'done', they mean DONE! (ie shippable). 0 0% The team uses the whiteboard to provide clear visibility of progress and issues on a daily basis. 0 0% The sprint/iteration goal(s) is clearly visible on the board. 0 0% All user stories and tasks are displayed on the whiteboard for the duration of the sprint/iteration. 0 0% Daily scrums happen at the same time every day – even if the scrum master isn’t present. 0 0% The daily scrum is resticted to answering the standard 3 scrum questions and lasts no more than 15 minutes. 0 0% There is a product demonstration/sprint review meeting at the end of each sprint/iteration. 0 0% All team members, including testers and Product Owner, are included in the sprint/iteration review. 0 0% The sprint/iteration review is attended by executive stakeholders. 0 0% There is a sprint retrospective at the end of each sprint/iteration. 0 0% Key metrics are reviewed and captured during each sprint retrospective. 0 0% All team members, including testers, are included in the sprint retrospective meeting. 0 0% Actions from the sprint retrospective have a positive impact on the next sprint/iteration. 0 0% 1 Your Team is 0% Agile! © 2009 Agile101.net
  • 3. How Agile Are You? For more information: www.Agile101.net 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% The team knows who the product owner is. The product backlog has estimates created by the team. The team is empowered to make decisions. Requirements documentation is barely sufficient and the team collaborates to clarify details as features are ready for development. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Sprints/iterations are timeboxed to four weeks or less. Requirements are expressed as user stories and written on a card. The team is not disrupted during the sprint/iteration. The team knows what their velocity is. The sprint/iteration ends on the agreed end date. The team generates burndown charts to track progress daily. © 2009 Agile101.net
  • 4. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% There is an automated build and regression test. Testing is integrated throughout the lifecycle and starts on delivery of the first feature. Changes are integrated throughout the sprint/iteration. The Product Owner is actively involved throughout each sprint. When someone says 'done', they mean DONE! (ie shippable). 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% The daily scrum is resticted to answering the standard 3 scrum questions and lasts no more than 15 minutes. All team members, including testers, are included in the sprint retrospective meeting. The sprint/iteration goal(s) is clearly visible on the board. The sprint/iteration review is attended by executive stakeholders. © 2009 Agile101.net