Our Prioritization Story
 North Carolina`s Perspective
 Alpesh Patel, North Carolina Department of Transportation
 Bjorn Hansen, Lake Norman Rural Planning Organization

April 26, 2012 - NADO Conference, Burlington, VT
Today’s Outline
Best way to communicate complex information is through a STORY

• Focus on a single theme - transformation

• Well developed plot -      smoke filled room vs. sunshine


• Word pictures/visual aids - or as engineers/planners say…a graph!

• Faithful to source -       Same data, informed results; “eyewitness”
                             account
Transportation Reform
Public wanted politics removed from transportation decision-making

Governor Purdue issued Executive Order #2
   “The Secretary of the Department of Transportation shall implement throughout the
   Department a professional approval process for all highway construction programs,
   highway construction contracts, highway construction projects, and plans for the
   construction of projects.”


Strategic Planning Office created (3 founding members)

Implemented NCDOT’s first strategic prioritization process in 2009

Completed Prioritization 2.0 (P2.0); started P3.0
North Carolina Department of Transportation




   Map shows MPOs, RPOs, and Divisions




Responsible for 6 modes of transportation:
   •   Aviation (74 publicly-owned airports)
   •   Bicycle and Pedestrian
   •   Ferries – 2nd largest system in US (behind Washington)
   •   Highways – Maintains 80,000 miles of highways (2nd only to Texas)
   •   Public Transportation
   •   Rail
North Carolina Department of Transportation




 Map illustrates MPOS, RPOs, and
 NCDOT Divisions (black outline)




Key Partners
   •   17 Metropolitan Planning Organizations (MPOs)
   •   20 Rural Planning Organizations (RPOs)
   •   14 Field Offices (Divisions)
How it All Fits Together: NCDOT Policy to Projects




                                      Strategic Prioritization
Strategic Prioritization and Programming Process
         1. Score                2. Strategize              3. Schedule
Prioritize Projects using   Set Investment Strategy   Program Projects

• Data                      • Conduct                 • Develop STIP using
                              Scenario/Trade-off        Project Rankings &
• Local Input                 Analysis with DOT &       Investment Strategy
                              Partners
• Multimodal                                          • Apply Constraints
  Characteristics           • Constrained only by
                              Total Available         • Compare Selected
• Classify ranked             Revenue                   Strategy vs. Applied
  Projects into Buckets                                 Constraints
  (Mode, Goal, Tier)
Project Classification – P2.0
Projects classified/scored by NCDOT Goal
• Mobility – make our transportation network move people and goods more efficiently
• Safety – make our transportation network safer
• Infrastructure Health – make our transportation infrastructure last longer

Projects classified/scored by NCDOT Tier
• Statewide – Interstates, Major US Routes, Commercial Service Airports, CSX, NS
• Regional – commuter routes, regional transit systems
• Subregional – low volume secondary roads (80% of NC system), fixed bus route
  systems
P2.0 - Scoring Highway Projects
                  QUANTITATIVE             LOCAL INPUT
   Tier               Data         Division Rank   MPO/RPO Rank



 Statewide           70%               20%             10%




 Regional            50%               25%             25%



Subregional          30%               30%             40%
Local Input
Each MPO/RPO & Division receives equal # of points  1,300

Can choose between Top 25 project ranking or Control Total

                 Top 25                    OR               Control Total
#1 = 100                                      Can rank projects as desired
#2 = 96                                       Max 100 pts per project
#3 = 92                                       Min 4 pts per project
…
#25 = 4                                       Can transfer points to other areas*

* Must be agreement between giving and receiving organizations
Multimodal Bonus Points for Highway Projects
 Multimodal Options  8 points:
   HOV / HOT, light rail, bus rapid transit, or bus-on-shoulder within highway ROW


 Multimodal Connections  5 points:
   Direct connection (property line) to a transportation terminal (airport, seaport, rail depot,
   ferry terminal, transit terminal, freight intermodal terminal, or park and ride lot)

 Military Base Connections  5 points:
   Direct connection (property line) to a major military base.

 Multimodal Design Features  3 points:
   Sidewalks, pedestrian crossings, striped bicycle lanes, wide outside shoulders
   (greater than or equal to two feet), bus pullouts, transit bypass lanes, transit signal
   prioritization, bus shelters

Note: Multimodal Projects must be ranked and must be included in an adopted Comprehensive Transportation Plan, Long
  Range Transportation Plan, or a mode-specific plan to receive pts.
Bicycle and Pedestrian - Scoring
 Same scoring for Bicycle or Pedestrian Projects
                                              18 pts max.

         35 pts max. Rank Top 5
         Projects:                      Right-of-                                15 pts max. Direct access to
              #1 = 35 pts                 Way                                    transit / school / CBD / high-
              #2 = 28 pts               Acquired                                 density residential or linkage to
              #3 = 21 pts                                                        a large system of
              #4 = 14 pts       MPO/RPO                                          interconnected bicycle /
                                                Connectivity
              #5 = 7 pts        Ranking                                          multiuse facilities



                                    Crashes                Inclusion
  5 pts max. Three of more                                in Adopted
  bicycle/vehicle or                                          Plan             15 pts max. Recognition of a
  pedestrian/vehicle crashes
                                              Demand /                         project in an adopted bicycle /
  within last 5 years
                                               Density                         pedestrian plan



                               12 pts max. Greater densities = higher points
Public Transportation - Scoring

Expansion – 25 points max. # of new services hours provided due to capital investment
Connections – 12 points max. # of new synchronized connections (to other modes or other
   transit services)

Technology/Safety – 16 points max. Surveillance cameras, security measures, real time info
   on bus arrival time

Age of Fleet – 27 points max. Ability of the project to reduce the age of the fleet

Improved Facilities – 20 point max. Ability of project to extend life and service space


Local Input (MPO only Ranking) – 550 points/area; max 100 points per project.
Prioritization 2.0 Accomplishments
Generated scores and ranked almost 2000 projects
 • 1200 Highway projects
 • 600 Bicycle & Pedestrian projects
 • 100 Public Transportation projects

Incorporated new performance-based criteria for highway projects

Increased flexibility of local input with use of 1300 control points

Launched new web portal devoted to continuous conversation with
  planning partners (Partner Connect)

Results at http://www.ncdot.org/performance/reform/prioritization/
Prioritization 2.0 Summary
Highways                               Non-Hwy Transportation
• Approx. $9.0B in available revenue   • Approx. $1.0B in avail. revenue
• Data-driven                          • Data Driven
• MPO and RPO ranked projects          • MPO and RPO ranked public
                                         transit and bike/ped. projects


• $51.5B in needs                      • $11.5B in needs
  1,200 projects = $44.5B                 700 Projects = $4.4B
  Other needs = $7B                          Other needs = $7.1B

                $63 Billion in Total Transportation Needs
                $10 Billion in Revenue (Years 2018-2022)
Strategic Prioritization and Programming Process
         1. Score                2. Strategize              3. Schedule
Prioritize Projects using   Set Investment Strategy   Program Projects

• Data                      • Conduct                 • Develop STIP using
                              Scenario/Trade-off        Project Rankings &
• Local Input                 Analysis with DOT &       Investment Strategy
                              Partners
• Multimodal                                          • Apply Constraints
  Characteristics           • Constrained only by
                              Total Available         • Compare Selected
• Classify ranked             Revenue                   Strategy vs. Applied
  Projects into Buckets                                 Constraints
  (Mode, Goal, Tier)
How to Divide the Pie? - Determining the Investment Strategy
How to Divide the Pie? - Determining the Investment Strategy


                        ?%
                 ?%

              ?%                      ?%
Investment Strategy Summits
Summits held throughout NC every 2 years
•   Partner and public input opportunity

Purpose: provide input on where to apply expected revenue
• What are the high-level priorities?
• What is the investment needed to achieve those priorities?
• Revenue is based on expected 10 Year total, unconstrained

Use Level of Service (LOS) analysis to determine return on investment
(i.e., if $X are allocated to Bucket “Y”, expected 10 Year LOS is “Z”)

Outcome is a “picture of where transportation $ should be spent”
Performance Level of Service (LOS)
Quality of service provided to the user

Different than Highway Capacity Manual

Criteria for determining LOS
 • Measures are reliable, repeatable, and affordable
 • Current measure and targets are realistic (graded on A-F scale)
 • Data is readily available, easy to collect and update

Determine existing LOS and baseline LOS for 10 years in future

Translate LOS into $$ needed to maintain and improve performance
LOS
Performance Level of Service (LOS) – Example
                   100
                                                                                                                              Optimal
                                                                                                                              Target
                                                                                                                               LOS
                    90
                    A

                                                                10 YR
                                                                Target
                    80
                    B
Level of Service




                                                                 LOS
                   You are Here
                                                                                 $$ Additional achieve 10 Yr. Target
                                                                                    needed to
                                                                                               Revenue/Funding

                    70
                    C

                                                                                 $     Additional Revenue/Funding needed to
                                                                                       maintain current LOS

                    60
                    D



                    50
                    E
                    Current                                     Year 10                                                       Future
                     Year                                                                                                      Year
                                      LOS based on Do-Nothing   Maintain Current LOS       Achieve Target LOS
LOS – Current Grades (Highways)
           GOAL                     Performance Measure                    Current        Desired Level
                                                                       Level of Service    of Service
                                     % of miles with uncongested
           Mobility                           roadways
                                                                              B                 ?

  Infrastructure Health             % of miles with “Good” rating or
                                                better
                                                                              C                 ?
       (Pavement)

  Infrastructure Health             % of miles meeting DOT paved
                                      shoulder width standards
                                                                              D                 ?
     (Modernization)

           Safety                          Fatal Crash Rates                  C                 ?
  Infrastructure Health
                                    % of bridges with “Good” rating
        (Bridges)                              or better
                                                                              C                 ?


                             Overall Average for Highways                     C                ?
*Note: letter grades reflect an average across Tiers
LOS – Current Grades (Non-Highways)
         MODE                            GOAL            Performance                Current    Desired
                                                           Measure                  Level of   Level of
                                                                                    Service    Service
         Aviation                      All 3 Goals     # of unfunded Projects          D          ?

 Bicycle - Pedestrian                    Mobility      Bike-Pedestrian Index           D          ?
                                                       # of vehicles left behind
                                         Mobility                 / year
           Ferry                                        # of terminals / vessels       C          ?
                                          Health         meeting Coast Guard
                                                               standards
                                                       Passenger trips, age of
Public Transportation                  All 3 Goals     fleet, dollars invested in      C          ?
                                                             safety/security

           Rail                          Mobility           Mobility Index             D          ?
                                 Overall Average for Non-Highways                      D          ?
*Note: letter grades reflect an average across Tiers
Strategic Prioritization and Programming Process
         1. Score                2. Strategize              3. Schedule
Prioritize Projects using   Set Investment Strategy   Program Projects

• Data                      • Classify ranked         • Develop STIP using
                              Projects into Buckets     Project Rankings &
• Local Input                 (Mode, Goal, Tier)        Investment Strategy

• Multimodal                • Conduct                 • Apply Constraints
  Characteristics             Scenario/Trade-off
                              Analysis with DOT &     • Compare Selected
                              Partners                  Strategy vs. Applied
                                                        Constraints
                            • Constrained only by
                              Total Available
                              Revenue
Factors Influencing TIP
        Project
                                   Priority
      Development
                                   Ranking
         Time


Construction                             Investment
 Sequence               TIP                Strategy



                                  Funding
     Equity Formula
                                 Constraints


Prioritization Results ≠ Programming
Questions?
Local Perspective on Input into the North Carolina
DOT Transportation Improvement Program
Project Ranking Process

2012 National Rural Transportation Conference

April 2012
Background of Transportation Planning in
North Carolina




 Page 27
Lake Norman RPO Facts




360,000 people
Northern and western edges of Charlotte region
Report to NCDOT Transportation Planning Branch
Made up of four counties and eight municipalities
Intermediary between local governments and the NCDOT for plan
development, project identification, prioritization, design review, and grant
submittal
Staffed by “about” two people within the Charlotte region’s COG




  Page 28
North Carolina STIP Development Process and MPO/RPO
Input



Statewide Transportation Improvement Program
Updated on a two-year cycle
Five year funding document, with a second five-year planning document
(for a total 10-year document)
Subject to many limitations on the use of funds


RPO Input
Previously NCDOT accepted project rankings, but also accepted projects
from local communities outside of the MPO/RPO system
Since 2009 NCDOT only accepts project rankings from
within the MPO/RPO system


  Page 29
Lake Norman Project Ranking History



2003: First time RPO develops priority list
      Projects solicited from RPO members (five per member)
      All 100+ projects submitted to NCDOT
2005: Refinement of 2003 priority list
      Projects are broken into phases
      List is broken into “high-priority” and “other” projects
      Top 50 projects submitted
2007: First time cost-effectiveness is quantified by RPO
      Submitted project list further limited to reflect available funds
      Top 25 projects submitted
2009: NCDOT moves to formal quantitative statewide project
ranking process (SPOT 1.0), similar to the RPO’s process
    Top 25 projects submitted
2011: RPO revises ranking process to include infrastructure health and submits
prioritized project list under SPOT 2.0 process
      Top 25 projects submitted


   Page 30
Common Ranking Process Variables and LNRPO
Weighting




Travel Demand (4.5)               Cost-benefit (2)
Safety (2.5)                      Natural environment impact (1)
Consistency with existing         Human environment impact (1)
local transportation plans (2.5)   Project already in STIP (1)
Consistency with local land       Air quality impact (1)
use plans (2.5)
                                   Environmental Justice
On NC strategic corridor (2)      considerations (1)
Supports economic                 Infrastructure health
development initiatives (2)
Multi-modal (2)


  Page 31
Lake Norman RPO 2011 Ranking Results



              LAKE NORMAN RPO RANKING PROCESS RESULTS
                                                                Points Assigned   SPOT Ranking within Division 12   Points Assigned by Division 12
Ranking           Project (and RPO Ranking Score)                   by RPO             (OUT OF 96 PROJECTS)                 (Out of 1300)
                                                                 (Out of 1300)

  1             1-40/1-77 Interchange (97.25 points)                 100                        5                                100


  2        I-77 from West Catawba to US 21 (91.5 points)              96                        1                                100


  3         I-77 from NC 115/ US 21 to I-40 (87.25 points)            92                        9                                100


  4          I-77 from US 21 to NC 115/US 21 (87 points)              88                        7                                100

          I-40 widening from Catawba County to Statesville
  5                                                                   84                        48                                0
                           (81.75 points)

           US 74 Bypass from Long Branch Road to west of
  6                                                                   80                        14                               100
                   Stoney Point Road (80 points)

          US 74 Bypass from west of NC 150 to Long Branch
  7                                                                   76                        17                               100
                         Road (79.25 points)


  8       Williamson Road from I-77 to NC 150 (75.5 points)           72                        3                                 0


  9        NC 150 from Harvel Road to I-77 (74.25 points)             68                        10                               100

          Existing US 74 Bypass- widening to six lanes (73.25
  10
      Page 32                                                        64                        53                                0
                               points)
MPO/RPO Responses to NCDOT SPOT Program



       Issue                         Pre-SPOT                          Post-SPOT

                         No format (lists, memos, resolutions
  Submittal format                                               Web-based submittal portal
                                         used)

 Number of Projects         No limit- some organizations
                                                                  Up to 25 per RPO/ MPO
     Allowed                  submitted 50+ projects

                         Bike/ped, transit, and road projects   Project ranking and submittal
    Project Type
                                could be co-mingled                  separated by mode

     Cost Limits                      Unlimited                          Unlimited

  Who can submit
                         Anyone- private, public, MPO/RPO             MPO/RPO only
 candidate projects?
                                                                Increased reliance on “SPOT”
Prioritization Process     Highly variable local processes
                                                                           scores
                         Cause for confusion- Projects were
   Significance of                                               Two five-year categories.
                         occasionally added with little near-
  Inclusion in STIP                                              Inclusion has significance
 Page 33                    term potential for funding
Results of SPOT Process on MPO/RPO
Rankings and Submittals



Reduced MPO/RPO highway project submittals (over 1,000
reduced to ~600). Projects cost a total of $27 billion
MPO/RPOs now focus on projects with “momentum”. Less
focus on aspirational projects
Increase in Bicycle and Pedestrian project submittals (before
there was no formal process soliciting projects)- 229 projects
submitted costing $177 million
Apples to Apples Comparisons: MPOs and RPOs now know
how their projects score relative to their peers
NCDOT Division staff priorities known- scores are
shown in project database

 Page 34
Further Refinement and MPO/RPO
Response


 Recognition of limited resources: Increased focus on smaller
  projects for highest and best use of resources
 Increased coordination with NCDOT Divisions: Greater
  awareness of state priorities and desire to “maximize
  influence”
 Reduced project submittals: Further intent on “maximizing
  influence”
 Common data sources: Safety, congestion, cost figures
  typically rely on NCDOT SPOT office numbers




 Page 35
NC Prioritization Story
Alpesh Patel
North Carolina Department of Transportation
http://www.ncdot.org/performance/reform/prioritization/
email – agpatel@ncdot.gov
Bjorn Hansen
Lake Norman Rural Planning Organization
http://lakenormanrpo.org/
email – BHansen@centralina.org

Weitere ähnliche Inhalte

Was ist angesagt?

Transport Management & Theory Practices (10)
Transport Management & Theory Practices (10)Transport Management & Theory Practices (10)
Transport Management & Theory Practices (10)Tengku Faisal Tg Arifin
 
Chapter1
Chapter1Chapter1
Chapter1APSU
 
Transport Management & Theory Practices (7)
Transport Management & Theory Practices (7)Transport Management & Theory Practices (7)
Transport Management & Theory Practices (7)Tengku Faisal Tg Arifin
 
Chijioke Ifepe Resume Logistics
Chijioke Ifepe Resume LogisticsChijioke Ifepe Resume Logistics
Chijioke Ifepe Resume Logisticschijiokec
 
Transport Management & Theory Practices (9)
Transport Management & Theory Practices (9)Transport Management & Theory Practices (9)
Transport Management & Theory Practices (9)Tengku Faisal Tg Arifin
 
LAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In PracticeLAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In Practicelosangelesaep
 
Profile_Wonho Chun_2016Mar
Profile_Wonho Chun_2016MarProfile_Wonho Chun_2016Mar
Profile_Wonho Chun_2016Marwonho chun
 
LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743losangelesaep
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743losangelesaep
 
Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)Tengku Faisal Tg Arifin
 

Was ist angesagt? (20)

Transport Management & Theory Practices (10)
Transport Management & Theory Practices (10)Transport Management & Theory Practices (10)
Transport Management & Theory Practices (10)
 
Chapter1
Chapter1Chapter1
Chapter1
 
Transport Management & Theory Practices (7)
Transport Management & Theory Practices (7)Transport Management & Theory Practices (7)
Transport Management & Theory Practices (7)
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
SmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display BoardsSmartTrack & Regional Express Rail Display Boards
SmartTrack & Regional Express Rail Display Boards
 
Chijioke Ifepe Resume Logistics
Chijioke Ifepe Resume LogisticsChijioke Ifepe Resume Logistics
Chijioke Ifepe Resume Logistics
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
Transport Management & Theory Practices (9)
Transport Management & Theory Practices (9)Transport Management & Theory Practices (9)
Transport Management & Theory Practices (9)
 
Caltrans District 7 Connected Corridors Pilot on I-210
Caltrans District 7 Connected Corridors Pilot on I-210Caltrans District 7 Connected Corridors Pilot on I-210
Caltrans District 7 Connected Corridors Pilot on I-210
 
LAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In PracticeLAAEP CEQA Seminar: SB 743 In Practice
LAAEP CEQA Seminar: SB 743 In Practice
 
Profile_Wonho Chun_2016Mar
Profile_Wonho Chun_2016MarProfile_Wonho Chun_2016Mar
Profile_Wonho Chun_2016Mar
 
San Diego Region ITS Technologies and Applications
San Diego Region ITS Technologies and ApplicationsSan Diego Region ITS Technologies and Applications
San Diego Region ITS Technologies and Applications
 
Ppp
PppPpp
Ppp
 
LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743LAAEP CEQA Seminar: Impact Analysis Under SB 743
LAAEP CEQA Seminar: Impact Analysis Under SB 743
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
Transport Thursday Niel van Oort
Transport Thursday Niel van OortTransport Thursday Niel van Oort
Transport Thursday Niel van Oort
 
Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)
 

Ähnlich wie Patel hansen rpo2012

Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...WSP
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRPO America
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...RPO America
 
Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...
Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...
Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...VisionGEOMATIQUE2014
 
Regional options for caltrain governance
Regional options for caltrain governanceRegional options for caltrain governance
Regional options for caltrain governanceAdina Levin
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentationbunthy sros
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Avinash Shabade
 
Logistiek manager van het Jaar - sessie Robuust Plannen
Logistiek manager van het Jaar - sessie Robuust PlannenLogistiek manager van het Jaar - sessie Robuust Plannen
Logistiek manager van het Jaar - sessie Robuust PlannenBas Van Bree
 
LCL Advisors, INC - 3/15/2019
LCL Advisors, INC - 3/15/2019LCL Advisors, INC - 3/15/2019
LCL Advisors, INC - 3/15/2019MiaGarcia19
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
NCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for ChangeNCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for ChangeMeghan Makoid
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxNURSUHANABINTIBORHAN
 
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...GIS in the Rockies
 
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and DevelopersSB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and DevelopersMeyers Nave
 

Ähnlich wie Patel hansen rpo2012 (20)

Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
Mobility Pricing: How to Harness Mobility Pricing to Reduce Congestion, Promo...
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning Framework
 
Miami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Accessibility Based Needs Assessment presentationMiami-Dade Accessibility Based Needs Assessment presentation
Miami-Dade Accessibility Based Needs Assessment presentation
 
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
Transportation Alternatives Program (TAP): The Regional Role in Project Selec...
 
Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...
Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...
Requirements for Geospatial Agent Simulation to Strengthen the 'Property-Powe...
 
Regional options for caltrain governance
Regional options for caltrain governanceRegional options for caltrain governance
Regional options for caltrain governance
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
 
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
Ppp for public bicycle sharing and parking management in kharghar navi mumbai...
 
Mobility Fees - An Overview
Mobility Fees - An OverviewMobility Fees - An Overview
Mobility Fees - An Overview
 
Logistiek manager van het Jaar - sessie Robuust Plannen
Logistiek manager van het Jaar - sessie Robuust PlannenLogistiek manager van het Jaar - sessie Robuust Plannen
Logistiek manager van het Jaar - sessie Robuust Plannen
 
LCL Advisors, INC - 3/15/2019
LCL Advisors, INC - 3/15/2019LCL Advisors, INC - 3/15/2019
LCL Advisors, INC - 3/15/2019
 
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
 
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
NCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for ChangeNCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for Change
 
Cleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor TransformationCleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor Transformation
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
 
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
2018 GIS in Government: Prioritization Modeling Lancaster County PA TIP Proje...
 
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and DevelopersSB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
SB 743 & VMT – CEQA Implementation and Issues for Agencies and Developers
 
Cleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National PerspectiveCleveland Peer Exchange - National Perspective
Cleveland Peer Exchange - National Perspective
 

Mehr von RPO America

PEL implementation tools.pptx
PEL implementation tools.pptxPEL implementation tools.pptx
PEL implementation tools.pptxRPO America
 
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...RPO America
 
Cheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewCheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewRPO America
 
CARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityCARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityRPO America
 
BCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIBCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIRPO America
 
Shared. Connected. Sustainable.
Shared. Connected. Sustainable.Shared. Connected. Sustainable.
Shared. Connected. Sustainable.RPO America
 
Microtransit and Digital Infrastructure
Microtransit and Digital InfrastructureMicrotransit and Digital Infrastructure
Microtransit and Digital InfrastructureRPO America
 
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...RPO America
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveRPO America
 
Lowcountry Go Vanpool
Lowcountry Go VanpoolLowcountry Go Vanpool
Lowcountry Go VanpoolRPO America
 
Employment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionEmployment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionRPO America
 
EDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessEDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessRPO America
 
Strengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsStrengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsRPO America
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19RPO America
 
The Future Started Yesterday
The Future Started Yesterday The Future Started Yesterday
The Future Started Yesterday RPO America
 
Brownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceBrownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceRPO America
 
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...RPO America
 
CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase RPO America
 
CEDS 101 and Best Practices
CEDS 101 and Best Practices CEDS 101 and Best Practices
CEDS 101 and Best Practices RPO America
 
EDD Speed Networking and Listening Session
EDD Speed Networking and Listening SessionEDD Speed Networking and Listening Session
EDD Speed Networking and Listening SessionRPO America
 

Mehr von RPO America (20)

PEL implementation tools.pptx
PEL implementation tools.pptxPEL implementation tools.pptx
PEL implementation tools.pptx
 
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
Henry Underwood, Presentation on Linking Transportation & Environment in Sout...
 
Cheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL OverviewCheng Yan, FHWA PEL Overview
Cheng Yan, FHWA PEL Overview
 
CARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural MobilityCARTS Microtransit—Innovation in Rural Mobility
CARTS Microtransit—Innovation in Rural Mobility
 
BCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MIBCGo: Microtransit System Operating throughout Calhoun County, MI
BCGo: Microtransit System Operating throughout Calhoun County, MI
 
Shared. Connected. Sustainable.
Shared. Connected. Sustainable.Shared. Connected. Sustainable.
Shared. Connected. Sustainable.
 
Microtransit and Digital Infrastructure
Microtransit and Digital InfrastructureMicrotransit and Digital Infrastructure
Microtransit and Digital Infrastructure
 
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...Microtransit Planning & Implementation Lessons from the North Carolina Experi...
Microtransit Planning & Implementation Lessons from the North Carolina Experi...
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Lowcountry Go Vanpool
Lowcountry Go VanpoolLowcountry Go Vanpool
Lowcountry Go Vanpool
 
Employment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia RegionEmployment & Transportation in the Southern Georgia Region
Employment & Transportation in the Southern Georgia Region
 
EDDs and States: Collaborating for Success
EDDs and States: Collaborating for SuccessEDDs and States: Collaborating for Success
EDDs and States: Collaborating for Success
 
Strengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development DistrictsStrengthening Partnerships Between States and Economic Development Districts
Strengthening Partnerships Between States and Economic Development Districts
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
The Future Started Yesterday
The Future Started Yesterday The Future Started Yesterday
The Future Started Yesterday
 
Brownfields for Redeveloping Resilience
Brownfields for Redeveloping ResilienceBrownfields for Redeveloping Resilience
Brownfields for Redeveloping Resilience
 
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
Resiliency Means Business! Resources to Assist Your Water Utilities with Prep...
 
CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase CEDS, Resilience, and Recovery Showcase
CEDS, Resilience, and Recovery Showcase
 
CEDS 101 and Best Practices
CEDS 101 and Best Practices CEDS 101 and Best Practices
CEDS 101 and Best Practices
 
EDD Speed Networking and Listening Session
EDD Speed Networking and Listening SessionEDD Speed Networking and Listening Session
EDD Speed Networking and Listening Session
 

Kürzlich hochgeladen

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 

Kürzlich hochgeladen (20)

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 

Patel hansen rpo2012

  • 1. Our Prioritization Story North Carolina`s Perspective Alpesh Patel, North Carolina Department of Transportation Bjorn Hansen, Lake Norman Rural Planning Organization April 26, 2012 - NADO Conference, Burlington, VT
  • 2. Today’s Outline Best way to communicate complex information is through a STORY • Focus on a single theme - transformation • Well developed plot - smoke filled room vs. sunshine • Word pictures/visual aids - or as engineers/planners say…a graph! • Faithful to source - Same data, informed results; “eyewitness” account
  • 3. Transportation Reform Public wanted politics removed from transportation decision-making Governor Purdue issued Executive Order #2 “The Secretary of the Department of Transportation shall implement throughout the Department a professional approval process for all highway construction programs, highway construction contracts, highway construction projects, and plans for the construction of projects.” Strategic Planning Office created (3 founding members) Implemented NCDOT’s first strategic prioritization process in 2009 Completed Prioritization 2.0 (P2.0); started P3.0
  • 4. North Carolina Department of Transportation Map shows MPOs, RPOs, and Divisions Responsible for 6 modes of transportation: • Aviation (74 publicly-owned airports) • Bicycle and Pedestrian • Ferries – 2nd largest system in US (behind Washington) • Highways – Maintains 80,000 miles of highways (2nd only to Texas) • Public Transportation • Rail
  • 5. North Carolina Department of Transportation Map illustrates MPOS, RPOs, and NCDOT Divisions (black outline) Key Partners • 17 Metropolitan Planning Organizations (MPOs) • 20 Rural Planning Organizations (RPOs) • 14 Field Offices (Divisions)
  • 6. How it All Fits Together: NCDOT Policy to Projects Strategic Prioritization
  • 7. Strategic Prioritization and Programming Process 1. Score 2. Strategize 3. Schedule Prioritize Projects using Set Investment Strategy Program Projects • Data • Conduct • Develop STIP using Scenario/Trade-off Project Rankings & • Local Input Analysis with DOT & Investment Strategy Partners • Multimodal • Apply Constraints Characteristics • Constrained only by Total Available • Compare Selected • Classify ranked Revenue Strategy vs. Applied Projects into Buckets Constraints (Mode, Goal, Tier)
  • 8. Project Classification – P2.0 Projects classified/scored by NCDOT Goal • Mobility – make our transportation network move people and goods more efficiently • Safety – make our transportation network safer • Infrastructure Health – make our transportation infrastructure last longer Projects classified/scored by NCDOT Tier • Statewide – Interstates, Major US Routes, Commercial Service Airports, CSX, NS • Regional – commuter routes, regional transit systems • Subregional – low volume secondary roads (80% of NC system), fixed bus route systems
  • 9. P2.0 - Scoring Highway Projects QUANTITATIVE LOCAL INPUT Tier Data Division Rank MPO/RPO Rank Statewide 70% 20% 10% Regional 50% 25% 25% Subregional 30% 30% 40%
  • 10. Local Input Each MPO/RPO & Division receives equal # of points  1,300 Can choose between Top 25 project ranking or Control Total Top 25 OR Control Total #1 = 100 Can rank projects as desired #2 = 96 Max 100 pts per project #3 = 92 Min 4 pts per project … #25 = 4 Can transfer points to other areas* * Must be agreement between giving and receiving organizations
  • 11. Multimodal Bonus Points for Highway Projects Multimodal Options  8 points: HOV / HOT, light rail, bus rapid transit, or bus-on-shoulder within highway ROW Multimodal Connections  5 points: Direct connection (property line) to a transportation terminal (airport, seaport, rail depot, ferry terminal, transit terminal, freight intermodal terminal, or park and ride lot) Military Base Connections  5 points: Direct connection (property line) to a major military base. Multimodal Design Features  3 points: Sidewalks, pedestrian crossings, striped bicycle lanes, wide outside shoulders (greater than or equal to two feet), bus pullouts, transit bypass lanes, transit signal prioritization, bus shelters Note: Multimodal Projects must be ranked and must be included in an adopted Comprehensive Transportation Plan, Long Range Transportation Plan, or a mode-specific plan to receive pts.
  • 12. Bicycle and Pedestrian - Scoring Same scoring for Bicycle or Pedestrian Projects 18 pts max. 35 pts max. Rank Top 5 Projects: Right-of- 15 pts max. Direct access to #1 = 35 pts Way transit / school / CBD / high- #2 = 28 pts Acquired density residential or linkage to #3 = 21 pts a large system of #4 = 14 pts MPO/RPO interconnected bicycle / Connectivity #5 = 7 pts Ranking multiuse facilities Crashes Inclusion 5 pts max. Three of more in Adopted bicycle/vehicle or Plan 15 pts max. Recognition of a pedestrian/vehicle crashes Demand / project in an adopted bicycle / within last 5 years Density pedestrian plan 12 pts max. Greater densities = higher points
  • 13. Public Transportation - Scoring Expansion – 25 points max. # of new services hours provided due to capital investment Connections – 12 points max. # of new synchronized connections (to other modes or other transit services) Technology/Safety – 16 points max. Surveillance cameras, security measures, real time info on bus arrival time Age of Fleet – 27 points max. Ability of the project to reduce the age of the fleet Improved Facilities – 20 point max. Ability of project to extend life and service space Local Input (MPO only Ranking) – 550 points/area; max 100 points per project.
  • 14. Prioritization 2.0 Accomplishments Generated scores and ranked almost 2000 projects • 1200 Highway projects • 600 Bicycle & Pedestrian projects • 100 Public Transportation projects Incorporated new performance-based criteria for highway projects Increased flexibility of local input with use of 1300 control points Launched new web portal devoted to continuous conversation with planning partners (Partner Connect) Results at http://www.ncdot.org/performance/reform/prioritization/
  • 15. Prioritization 2.0 Summary Highways Non-Hwy Transportation • Approx. $9.0B in available revenue • Approx. $1.0B in avail. revenue • Data-driven • Data Driven • MPO and RPO ranked projects • MPO and RPO ranked public transit and bike/ped. projects • $51.5B in needs • $11.5B in needs  1,200 projects = $44.5B  700 Projects = $4.4B  Other needs = $7B  Other needs = $7.1B $63 Billion in Total Transportation Needs $10 Billion in Revenue (Years 2018-2022)
  • 16. Strategic Prioritization and Programming Process 1. Score 2. Strategize 3. Schedule Prioritize Projects using Set Investment Strategy Program Projects • Data • Conduct • Develop STIP using Scenario/Trade-off Project Rankings & • Local Input Analysis with DOT & Investment Strategy Partners • Multimodal • Apply Constraints Characteristics • Constrained only by Total Available • Compare Selected • Classify ranked Revenue Strategy vs. Applied Projects into Buckets Constraints (Mode, Goal, Tier)
  • 17. How to Divide the Pie? - Determining the Investment Strategy How to Divide the Pie? - Determining the Investment Strategy ?% ?% ?% ?%
  • 18. Investment Strategy Summits Summits held throughout NC every 2 years • Partner and public input opportunity Purpose: provide input on where to apply expected revenue • What are the high-level priorities? • What is the investment needed to achieve those priorities? • Revenue is based on expected 10 Year total, unconstrained Use Level of Service (LOS) analysis to determine return on investment (i.e., if $X are allocated to Bucket “Y”, expected 10 Year LOS is “Z”) Outcome is a “picture of where transportation $ should be spent”
  • 19. Performance Level of Service (LOS) Quality of service provided to the user Different than Highway Capacity Manual Criteria for determining LOS • Measures are reliable, repeatable, and affordable • Current measure and targets are realistic (graded on A-F scale) • Data is readily available, easy to collect and update Determine existing LOS and baseline LOS for 10 years in future Translate LOS into $$ needed to maintain and improve performance LOS
  • 20. Performance Level of Service (LOS) – Example 100 Optimal Target LOS 90 A 10 YR Target 80 B Level of Service LOS You are Here $$ Additional achieve 10 Yr. Target needed to Revenue/Funding 70 C $ Additional Revenue/Funding needed to maintain current LOS 60 D 50 E Current Year 10 Future Year Year LOS based on Do-Nothing Maintain Current LOS Achieve Target LOS
  • 21. LOS – Current Grades (Highways) GOAL Performance Measure Current Desired Level Level of Service of Service % of miles with uncongested Mobility roadways B ? Infrastructure Health % of miles with “Good” rating or better C ? (Pavement) Infrastructure Health % of miles meeting DOT paved shoulder width standards D ? (Modernization) Safety Fatal Crash Rates C ? Infrastructure Health % of bridges with “Good” rating (Bridges) or better C ? Overall Average for Highways C ? *Note: letter grades reflect an average across Tiers
  • 22. LOS – Current Grades (Non-Highways) MODE GOAL Performance Current Desired Measure Level of Level of Service Service Aviation All 3 Goals # of unfunded Projects D ? Bicycle - Pedestrian Mobility Bike-Pedestrian Index D ? # of vehicles left behind Mobility / year Ferry # of terminals / vessels C ? Health meeting Coast Guard standards Passenger trips, age of Public Transportation All 3 Goals fleet, dollars invested in C ? safety/security Rail Mobility Mobility Index D ? Overall Average for Non-Highways D ? *Note: letter grades reflect an average across Tiers
  • 23. Strategic Prioritization and Programming Process 1. Score 2. Strategize 3. Schedule Prioritize Projects using Set Investment Strategy Program Projects • Data • Classify ranked • Develop STIP using Projects into Buckets Project Rankings & • Local Input (Mode, Goal, Tier) Investment Strategy • Multimodal • Conduct • Apply Constraints Characteristics Scenario/Trade-off Analysis with DOT & • Compare Selected Partners Strategy vs. Applied Constraints • Constrained only by Total Available Revenue
  • 24. Factors Influencing TIP Project Priority Development Ranking Time Construction Investment Sequence TIP Strategy Funding Equity Formula Constraints Prioritization Results ≠ Programming
  • 26. Local Perspective on Input into the North Carolina DOT Transportation Improvement Program Project Ranking Process 2012 National Rural Transportation Conference April 2012
  • 27. Background of Transportation Planning in North Carolina  Page 27
  • 28. Lake Norman RPO Facts 360,000 people Northern and western edges of Charlotte region Report to NCDOT Transportation Planning Branch Made up of four counties and eight municipalities Intermediary between local governments and the NCDOT for plan development, project identification, prioritization, design review, and grant submittal Staffed by “about” two people within the Charlotte region’s COG  Page 28
  • 29. North Carolina STIP Development Process and MPO/RPO Input Statewide Transportation Improvement Program Updated on a two-year cycle Five year funding document, with a second five-year planning document (for a total 10-year document) Subject to many limitations on the use of funds RPO Input Previously NCDOT accepted project rankings, but also accepted projects from local communities outside of the MPO/RPO system Since 2009 NCDOT only accepts project rankings from within the MPO/RPO system  Page 29
  • 30. Lake Norman Project Ranking History 2003: First time RPO develops priority list  Projects solicited from RPO members (five per member)  All 100+ projects submitted to NCDOT 2005: Refinement of 2003 priority list  Projects are broken into phases  List is broken into “high-priority” and “other” projects  Top 50 projects submitted 2007: First time cost-effectiveness is quantified by RPO  Submitted project list further limited to reflect available funds  Top 25 projects submitted 2009: NCDOT moves to formal quantitative statewide project ranking process (SPOT 1.0), similar to the RPO’s process  Top 25 projects submitted 2011: RPO revises ranking process to include infrastructure health and submits prioritized project list under SPOT 2.0 process  Top 25 projects submitted  Page 30
  • 31. Common Ranking Process Variables and LNRPO Weighting Travel Demand (4.5) Cost-benefit (2) Safety (2.5) Natural environment impact (1) Consistency with existing Human environment impact (1) local transportation plans (2.5) Project already in STIP (1) Consistency with local land Air quality impact (1) use plans (2.5) Environmental Justice On NC strategic corridor (2) considerations (1) Supports economic Infrastructure health development initiatives (2) Multi-modal (2)  Page 31
  • 32. Lake Norman RPO 2011 Ranking Results LAKE NORMAN RPO RANKING PROCESS RESULTS Points Assigned SPOT Ranking within Division 12 Points Assigned by Division 12 Ranking Project (and RPO Ranking Score) by RPO (OUT OF 96 PROJECTS) (Out of 1300) (Out of 1300) 1 1-40/1-77 Interchange (97.25 points) 100 5 100 2 I-77 from West Catawba to US 21 (91.5 points) 96 1 100 3 I-77 from NC 115/ US 21 to I-40 (87.25 points) 92 9 100 4 I-77 from US 21 to NC 115/US 21 (87 points) 88 7 100 I-40 widening from Catawba County to Statesville 5 84 48 0 (81.75 points) US 74 Bypass from Long Branch Road to west of 6 80 14 100 Stoney Point Road (80 points) US 74 Bypass from west of NC 150 to Long Branch 7 76 17 100 Road (79.25 points) 8 Williamson Road from I-77 to NC 150 (75.5 points) 72 3 0 9 NC 150 from Harvel Road to I-77 (74.25 points) 68 10 100 Existing US 74 Bypass- widening to six lanes (73.25 10  Page 32 64 53 0 points)
  • 33. MPO/RPO Responses to NCDOT SPOT Program Issue Pre-SPOT Post-SPOT No format (lists, memos, resolutions Submittal format Web-based submittal portal used) Number of Projects No limit- some organizations Up to 25 per RPO/ MPO Allowed submitted 50+ projects Bike/ped, transit, and road projects Project ranking and submittal Project Type could be co-mingled separated by mode Cost Limits Unlimited Unlimited Who can submit Anyone- private, public, MPO/RPO MPO/RPO only candidate projects? Increased reliance on “SPOT” Prioritization Process Highly variable local processes scores Cause for confusion- Projects were Significance of Two five-year categories. occasionally added with little near- Inclusion in STIP Inclusion has significance  Page 33 term potential for funding
  • 34. Results of SPOT Process on MPO/RPO Rankings and Submittals Reduced MPO/RPO highway project submittals (over 1,000 reduced to ~600). Projects cost a total of $27 billion MPO/RPOs now focus on projects with “momentum”. Less focus on aspirational projects Increase in Bicycle and Pedestrian project submittals (before there was no formal process soliciting projects)- 229 projects submitted costing $177 million Apples to Apples Comparisons: MPOs and RPOs now know how their projects score relative to their peers NCDOT Division staff priorities known- scores are shown in project database  Page 34
  • 35. Further Refinement and MPO/RPO Response  Recognition of limited resources: Increased focus on smaller projects for highest and best use of resources  Increased coordination with NCDOT Divisions: Greater awareness of state priorities and desire to “maximize influence”  Reduced project submittals: Further intent on “maximizing influence”  Common data sources: Safety, congestion, cost figures typically rely on NCDOT SPOT office numbers  Page 35
  • 36. NC Prioritization Story Alpesh Patel North Carolina Department of Transportation http://www.ncdot.org/performance/reform/prioritization/ email – agpatel@ncdot.gov Bjorn Hansen Lake Norman Rural Planning Organization http://lakenormanrpo.org/ email – BHansen@centralina.org