ASTU
SCHOOL OF ELECTRICAL ENGINEERING AND
COMPUTING
DEPT. OF POWER AND CONTROL ENGINEERING
COMPUTER APPLICATION IN POWER SYSTEM
(PCE5307)
CHAPTER TWO
LOAD FLOWANALYSIS
BY: MESFIN M.
OUTLINE
Network Modeling
Transmission line
Transformer
Basic Nodal Method
Power System Matrix
Admittance Matrix
Impedance Matrix
Fast Decouple Power flow Method
INTRODUCTION
 Under normal conditions electrical transmission systems
operate in their steady state mode and the basic calculation
required to determine the characteristics of this state is
termed as load flow (power flow) analysis.
The objective of load flow calculation is to determine the
steady state operating characteristics of the power
generation/transmission system for a given set of bus bar
loads
CONT.…
Active power generation is normally specified according to
economic dispatch practice.
The generation voltage magnitude is maintained at a
specified level by automatic voltage regulator acting on the
excitation system of the machine.
Loads are normally specified by their constant Active and
Reactive power requirement.
NETWORK MODELING
Transmission plant components are modelled by their
equivalent circuit in terms of inductance, capacitance and
resistance.
Among the many alternatives of describing transmission
system is to comply with the Kirchhoff's laws and two
methods Mesh and nodal analysis are used.
Nodal analysis is found to be particularly suitable for
digital computer work and is almost exclusively used for
routine network calculation.
CONT.…
Advantages of nodal analysis
Numbering of node is very simple,
Data preparation is easy
No. of variables and equations is less than mesh
Node voltage and current are easily calculated
Parallel branches doesn’t increase no. of
variable/equations
TRANSMISSION LINE MODELING
The total resistance and inductive reactance of the line
is included in series arm of the equivalent p model and
the total capacitance to the neutral is divided between
its shunt arms.
TRANSFORMER ON NOMINAL RATIO
MODELING
The p model of a transformer is illustrated below,
The impedance parameters are obtained from the open and
short circuit test of a transformer
BASIC NODAL METHOD
 In the nodal method as applied to power system; the variables are
the complex node (busbar) voltages and currents, for which some
reference must be designated.
Two different refences are normally chosen; for voltage magnitude
the reference is the ground and for the angle the reference is chosen
as the busbar voltage angle which is fixed at zero.
In the nodal method it is convenient to use branch admittance rather
than impedance.
CONT.…
By KCL, for a given node the injected current must be
equal to the sum of the currents leaving the node.
In a power system there are three kinds bus corresponding
to the known variables, this are
Generator bus (PV bus):
Load Bus (PQ bus):
Slack (Swing bus): in power system the slack bus is the
generating station which has the responsibility of system
frequency control.
CONT.….
 When node currents are specified, the set of linear equations can be
solved for the node equation.
However in power system the power are known rather than the
current, thus, resulting equation is in terms of power, known as
power flow equation. It is nonlinear and must be solved by iterative
method.
Power flow is back bone of power system analysis and design. They
are necessary for planning, operation, economic scheduling and
power exchange between utilities.
POWER SYSTEM MATRIX
In order to obtain the bus voltage equation, consider the
following sample 4 bus system.
For simplicity the resistance of the transmission line is
neglected and the per unit impedance values are shown.
CONT.….
Applying KCL at each node of the test system we can
develop the following admittance matrix.
𝐼1
𝐼2
𝐼3
𝐼4
=
𝑌11 𝑌12 𝑌13 𝑌14
𝑌21 𝑌22 𝑌23 𝑌24
𝑌31
𝑌41
𝑌32
𝑌42
𝑌33
𝑌43
𝑌34
𝑌44
.
𝑉1
𝑉2
𝑉3
𝑉4
In general
𝐼 𝑏𝑢𝑠 = 𝑌𝑏𝑢𝑠 𝑉𝑏𝑢𝑠
CONT.….
Diagonal elements of Y matrix is known as self admittance
or driving point admittance . i.e.
𝑌𝑖𝑖 =
𝑘=0
𝑛
𝑦𝑖𝑘 𝑖 ≠ 𝑘
Off diagonal elements are known as mutual admittances or
transfer admittance. i.e.
𝑌𝑖𝑘 = 𝑌𝑘𝑖 = −𝑦𝑖𝑘
𝑉𝑏𝑢𝑠 = 𝑌𝑏𝑢𝑠
−1
𝐼 𝑏𝑢𝑠
DECOUPLE METHOD
Transmission lines of a power systems have a very low R/X ratio.
For such system, real power mismatch DP are less sensitive to
changes in voltage magnitude and are very sensitive to changes in
phase angle Dd.
Similarly, reactive power mismatch DQ is less sensitive to changes
in angle and are very much sensitive on changes in voltage
magnitude.
Thus, the Jacobian matrix elements J2 and J3 are set to zero.
CONT.….
Thus,
∆𝑃
∆𝑄
=
𝐽1 0
0 𝐽4
∆𝛿
∆𝑉
Or
∆𝑃 = 𝐽1∆𝛿
∆Q = 𝐽4∆𝑉
CONT.….
Thus, For Diagonal elements of J1 are
𝜕𝑃𝑖
𝜕𝛿𝑖
=
𝑘=1
𝑘≠𝑖
𝑛
𝑉𝑖 𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘)
For off diagonal elements of J1
𝜕𝑃𝑖
𝜕𝛿 𝑘
= − 𝑉𝑖 𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) 𝑘≠𝑖
CONT.….
Thus, For Diagonal elements of J4 are
𝜕𝑄𝑖
𝜕 𝑉𝑖
= −2 𝑉𝑖 𝑌𝑖𝑘 sin 𝜃𝑖𝑖 −
𝑘=1
𝑘≠𝑖
𝑛
𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘)
For off diagonal elements of J4
𝜕𝑄𝑖
𝜕 𝑉𝑘
= − 𝑉𝑖 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) 𝑘≠𝑖
CONT.….
Thus, For Diagonal elements of J4 are
𝜕𝑄𝑖
𝜕 𝑉𝑖
= −2 𝑉𝑖 𝑌𝑖𝑘 sin 𝜃𝑖𝑖 −
𝑘=1
𝑘≠𝑖
𝑛
𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘)
For off diagonal elements of J4
𝜕𝑄𝑖
𝜕 𝑉𝑘
= − 𝑉𝑖 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) 𝑘≠𝑖

Weitere ähnliche Inhalte

Was ist angesagt?

Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation ControlBirju Besra
 
Static shunt compensation
Static shunt compensationStatic shunt compensation
Static shunt compensationAyyarao T S L V
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Sifan Welisa
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERNitish NIT
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecastinglinsstalex
 
Load Forecasting II
Load Forecasting IILoad Forecasting II
Load Forecasting IIlinsstalex
 
Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch Hussain Ali
 
Power System Planning
Power System PlanningPower System Planning
Power System Planninglinsstalex
 
implementation of statcom and reactive power compensation
implementation of statcom and reactive power compensationimplementation of statcom and reactive power compensation
implementation of statcom and reactive power compensationprashant shekhar
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatchDeepak John
 
Planning and modern trends in hvdc
Planning and modern trends in hvdcPlanning and modern trends in hvdc
Planning and modern trends in hvdcjawaharramaya
 

Was ist angesagt? (20)

Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation Control
 
Tcsc ppt
Tcsc pptTcsc ppt
Tcsc ppt
 
Static shunt compensation
Static shunt compensationStatic shunt compensation
Static shunt compensation
 
MTDC SYSTEMS
MTDC SYSTEMSMTDC SYSTEMS
MTDC SYSTEMS
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]
 
Power flow analysis
Power flow analysisPower flow analysis
Power flow analysis
 
Static var compensator
Static var compensatorStatic var compensator
Static var compensator
 
Sssc
SsscSssc
Sssc
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
Load Forecasting II
Load Forecasting IILoad Forecasting II
Load Forecasting II
 
Fault analysis using z bus
Fault analysis using z busFault analysis using z bus
Fault analysis using z bus
 
Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch
 
Power system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter fivePower system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter five
 
Swing equation
Swing equationSwing equation
Swing equation
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
implementation of statcom and reactive power compensation
implementation of statcom and reactive power compensationimplementation of statcom and reactive power compensation
implementation of statcom and reactive power compensation
 
Economic load dispatch
Economic load  dispatchEconomic load  dispatch
Economic load dispatch
 
Planning and modern trends in hvdc
Planning and modern trends in hvdcPlanning and modern trends in hvdc
Planning and modern trends in hvdc
 
Load forecasting
Load forecastingLoad forecasting
Load forecasting
 

Ähnlich wie Computer Application in Power system: Chapter two - load flow analysis

Improved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithmImproved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithmAlexander Decker
 
Soft power factor modification using static
Soft power factor modification using staticSoft power factor modification using static
Soft power factor modification using staticchodachude
 
Capacitor current analysis of a three-level neutral point clamped converter u...
Capacitor current analysis of a three-level neutral point clamped converter u...Capacitor current analysis of a three-level neutral point clamped converter u...
Capacitor current analysis of a three-level neutral point clamped converter u...IJECEIAES
 
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...IJMER
 
Comparison of Three leg and Four Leg VSC DSTATCOM for Power Quality Assessment
Comparison of Three leg and Four Leg VSC DSTATCOM for Power Quality AssessmentComparison of Three leg and Four Leg VSC DSTATCOM for Power Quality Assessment
Comparison of Three leg and Four Leg VSC DSTATCOM for Power Quality AssessmentIOSR Journals
 
Unit -1 Introdcution to PSA.pptx
Unit -1  Introdcution to PSA.pptxUnit -1  Introdcution to PSA.pptx
Unit -1 Introdcution to PSA.pptxSanjeevKumarkumar11
 
A Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff Source
A Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff SourceA Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff Source
A Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff SourceIJERA Editor
 
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...Venkata Gowtam Nallamothu
 
A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...EditorIJAERD
 
A Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact DevicesA Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact DevicesIOSR Journals
 
Indraneel perfect paper on dstatcom using pq theory
Indraneel perfect paper on dstatcom using pq theoryIndraneel perfect paper on dstatcom using pq theory
Indraneel perfect paper on dstatcom using pq theoryindranilsaaki
 
Volt/Var Optimization by Smart Inverters and Capacitor Banks
Volt/Var Optimization by Smart Inverters and Capacitor BanksVolt/Var Optimization by Smart Inverters and Capacitor Banks
Volt/Var Optimization by Smart Inverters and Capacitor BanksPower System Operation
 

Ähnlich wie Computer Application in Power system: Chapter two - load flow analysis (20)

dstatcom
dstatcomdstatcom
dstatcom
 
Improved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithmImproved dynamic response of dstatcom using genetic algorithm
Improved dynamic response of dstatcom using genetic algorithm
 
Soft power factor modification using static
Soft power factor modification using staticSoft power factor modification using static
Soft power factor modification using static
 
F0363028034
F0363028034F0363028034
F0363028034
 
Capacitor current analysis of a three-level neutral point clamped converter u...
Capacitor current analysis of a three-level neutral point clamped converter u...Capacitor current analysis of a three-level neutral point clamped converter u...
Capacitor current analysis of a three-level neutral point clamped converter u...
 
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
A High Performance PWM Voltage Source Inverter Used for VAR Compensation and ...
 
Comparison of Three leg and Four Leg VSC DSTATCOM for Power Quality Assessment
Comparison of Three leg and Four Leg VSC DSTATCOM for Power Quality AssessmentComparison of Three leg and Four Leg VSC DSTATCOM for Power Quality Assessment
Comparison of Three leg and Four Leg VSC DSTATCOM for Power Quality Assessment
 
[IJET V2I2P30] Authors: AnkurGheewala, Jay Chanawala,Nikhil Jadav,Modi Rishit...
[IJET V2I2P30] Authors: AnkurGheewala, Jay Chanawala,Nikhil Jadav,Modi Rishit...[IJET V2I2P30] Authors: AnkurGheewala, Jay Chanawala,Nikhil Jadav,Modi Rishit...
[IJET V2I2P30] Authors: AnkurGheewala, Jay Chanawala,Nikhil Jadav,Modi Rishit...
 
Unit -1 Introdcution to PSA.pptx
Unit -1  Introdcution to PSA.pptxUnit -1  Introdcution to PSA.pptx
Unit -1 Introdcution to PSA.pptx
 
P.u systems.pptx
P.u systems.pptxP.u systems.pptx
P.u systems.pptx
 
Ci36507510
Ci36507510Ci36507510
Ci36507510
 
A Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff Source
A Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff SourceA Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff Source
A Novel Hybrid Dstatcom Topology for Load Compensation with Non-Stiff Source
 
A Repetitive Sparce Matrix Converter with Z-Source Network to having less Cur...
A Repetitive Sparce Matrix Converter with Z-Source Network to having less Cur...A Repetitive Sparce Matrix Converter with Z-Source Network to having less Cur...
A Repetitive Sparce Matrix Converter with Z-Source Network to having less Cur...
 
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
Predictive-Control-For-Harmonic-And-Unbalance-Compensation-Using-Active-Power...
 
F0443847
F0443847F0443847
F0443847
 
A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...
 
A Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact DevicesA Simulink Model for Damping Power System Oscillations Using Fact Devices
A Simulink Model for Damping Power System Oscillations Using Fact Devices
 
R01043105113
R01043105113R01043105113
R01043105113
 
Indraneel perfect paper on dstatcom using pq theory
Indraneel perfect paper on dstatcom using pq theoryIndraneel perfect paper on dstatcom using pq theory
Indraneel perfect paper on dstatcom using pq theory
 
Volt/Var Optimization by Smart Inverters and Capacitor Banks
Volt/Var Optimization by Smart Inverters and Capacitor BanksVolt/Var Optimization by Smart Inverters and Capacitor Banks
Volt/Var Optimization by Smart Inverters and Capacitor Banks
 

Mehr von Adama Science and Technology University (9)

Power system planing and operation (pce5312) chapter four
Power system planing and operation (pce5312) chapter fourPower system planing and operation (pce5312) chapter four
Power system planing and operation (pce5312) chapter four
 
Power system planing and operation (pce5312) chapter one
Power system planing and operation (pce5312) chapter onePower system planing and operation (pce5312) chapter one
Power system planing and operation (pce5312) chapter one
 
Power system planing and operation (pce5312) chapter three
Power system planing and operation (pce5312) chapter threePower system planing and operation (pce5312) chapter three
Power system planing and operation (pce5312) chapter three
 
Power system planing and operation (pce5312) chapter two
Power system planing and operation (pce5312) chapter twoPower system planing and operation (pce5312) chapter two
Power system planing and operation (pce5312) chapter two
 
Solar power Plant
Solar power PlantSolar power Plant
Solar power Plant
 
Geothermal power plant
Geothermal power plantGeothermal power plant
Geothermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Overview of thermodynamics
Overview of thermodynamicsOverview of thermodynamics
Overview of thermodynamics
 
Wind energy
Wind energyWind energy
Wind energy
 

Kürzlich hochgeladen

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Kürzlich hochgeladen (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Computer Application in Power system: Chapter two - load flow analysis

  • 1. ASTU SCHOOL OF ELECTRICAL ENGINEERING AND COMPUTING DEPT. OF POWER AND CONTROL ENGINEERING COMPUTER APPLICATION IN POWER SYSTEM (PCE5307) CHAPTER TWO LOAD FLOWANALYSIS BY: MESFIN M.
  • 2. OUTLINE Network Modeling Transmission line Transformer Basic Nodal Method Power System Matrix Admittance Matrix Impedance Matrix Fast Decouple Power flow Method
  • 3. INTRODUCTION  Under normal conditions electrical transmission systems operate in their steady state mode and the basic calculation required to determine the characteristics of this state is termed as load flow (power flow) analysis. The objective of load flow calculation is to determine the steady state operating characteristics of the power generation/transmission system for a given set of bus bar loads
  • 4. CONT.… Active power generation is normally specified according to economic dispatch practice. The generation voltage magnitude is maintained at a specified level by automatic voltage regulator acting on the excitation system of the machine. Loads are normally specified by their constant Active and Reactive power requirement.
  • 5. NETWORK MODELING Transmission plant components are modelled by their equivalent circuit in terms of inductance, capacitance and resistance. Among the many alternatives of describing transmission system is to comply with the Kirchhoff's laws and two methods Mesh and nodal analysis are used. Nodal analysis is found to be particularly suitable for digital computer work and is almost exclusively used for routine network calculation.
  • 6. CONT.… Advantages of nodal analysis Numbering of node is very simple, Data preparation is easy No. of variables and equations is less than mesh Node voltage and current are easily calculated Parallel branches doesn’t increase no. of variable/equations
  • 7. TRANSMISSION LINE MODELING The total resistance and inductive reactance of the line is included in series arm of the equivalent p model and the total capacitance to the neutral is divided between its shunt arms.
  • 8. TRANSFORMER ON NOMINAL RATIO MODELING The p model of a transformer is illustrated below, The impedance parameters are obtained from the open and short circuit test of a transformer
  • 9. BASIC NODAL METHOD  In the nodal method as applied to power system; the variables are the complex node (busbar) voltages and currents, for which some reference must be designated. Two different refences are normally chosen; for voltage magnitude the reference is the ground and for the angle the reference is chosen as the busbar voltage angle which is fixed at zero. In the nodal method it is convenient to use branch admittance rather than impedance.
  • 10. CONT.… By KCL, for a given node the injected current must be equal to the sum of the currents leaving the node. In a power system there are three kinds bus corresponding to the known variables, this are Generator bus (PV bus): Load Bus (PQ bus): Slack (Swing bus): in power system the slack bus is the generating station which has the responsibility of system frequency control.
  • 11. CONT.….  When node currents are specified, the set of linear equations can be solved for the node equation. However in power system the power are known rather than the current, thus, resulting equation is in terms of power, known as power flow equation. It is nonlinear and must be solved by iterative method. Power flow is back bone of power system analysis and design. They are necessary for planning, operation, economic scheduling and power exchange between utilities.
  • 12. POWER SYSTEM MATRIX In order to obtain the bus voltage equation, consider the following sample 4 bus system. For simplicity the resistance of the transmission line is neglected and the per unit impedance values are shown.
  • 13. CONT.…. Applying KCL at each node of the test system we can develop the following admittance matrix. 𝐼1 𝐼2 𝐼3 𝐼4 = 𝑌11 𝑌12 𝑌13 𝑌14 𝑌21 𝑌22 𝑌23 𝑌24 𝑌31 𝑌41 𝑌32 𝑌42 𝑌33 𝑌43 𝑌34 𝑌44 . 𝑉1 𝑉2 𝑉3 𝑉4 In general 𝐼 𝑏𝑢𝑠 = 𝑌𝑏𝑢𝑠 𝑉𝑏𝑢𝑠
  • 14. CONT.…. Diagonal elements of Y matrix is known as self admittance or driving point admittance . i.e. 𝑌𝑖𝑖 = 𝑘=0 𝑛 𝑦𝑖𝑘 𝑖 ≠ 𝑘 Off diagonal elements are known as mutual admittances or transfer admittance. i.e. 𝑌𝑖𝑘 = 𝑌𝑘𝑖 = −𝑦𝑖𝑘 𝑉𝑏𝑢𝑠 = 𝑌𝑏𝑢𝑠 −1 𝐼 𝑏𝑢𝑠
  • 15. DECOUPLE METHOD Transmission lines of a power systems have a very low R/X ratio. For such system, real power mismatch DP are less sensitive to changes in voltage magnitude and are very sensitive to changes in phase angle Dd. Similarly, reactive power mismatch DQ is less sensitive to changes in angle and are very much sensitive on changes in voltage magnitude. Thus, the Jacobian matrix elements J2 and J3 are set to zero.
  • 17. CONT.…. Thus, For Diagonal elements of J1 are 𝜕𝑃𝑖 𝜕𝛿𝑖 = 𝑘=1 𝑘≠𝑖 𝑛 𝑉𝑖 𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) For off diagonal elements of J1 𝜕𝑃𝑖 𝜕𝛿 𝑘 = − 𝑉𝑖 𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) 𝑘≠𝑖
  • 18. CONT.…. Thus, For Diagonal elements of J4 are 𝜕𝑄𝑖 𝜕 𝑉𝑖 = −2 𝑉𝑖 𝑌𝑖𝑘 sin 𝜃𝑖𝑖 − 𝑘=1 𝑘≠𝑖 𝑛 𝑉𝑘 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) For off diagonal elements of J4 𝜕𝑄𝑖 𝜕 𝑉𝑘 = − 𝑉𝑖 𝑌𝑖𝑘 sin(𝜃𝑖𝑘 − 𝛿𝑖 + 𝛿 𝑘) 𝑘≠𝑖