INTRODUCTION
 Suratgarh thermal power station is the first super
thermal power Station of Rajasthan with total
installed capacity of 1500 MW.
 Suratgarh super thermal power station is located
27 km away from Suratgarh town in Shree
Ganganagar Distt. on the left bank of IGNP at Up
Stream of Suratgarh Barrage.
This station is operated and maintained by Rajasthan
Vidhyt Utpadan Nigam Limited.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 2
S.S.T.P.S. is designed in six stages
•STAGE I - 1x250 MW
•STAGE II - 1x250 MW
•STAGE III - 1x250 MW
•STAGE IV - 1x250 MW
•STAGE V - 1x250 MW
•STAGE VI - 1x250 MW
•STAGE VII - 1x660MW(Under construction)
•STAGE VIII- 1x660MW(Under construction)
Total Power Generation - 1500 MW
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 3
INSTALLED CAPACITY OF
S.S.T.P.S.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 4
 Supply of Water
 Requirement of Land
 Labour Supplies
 Transportation Facility
 Ash Disposal
Distance form Populated Area
 Near to the Load Centre
 Magnitude and nature of load to be handled
SELECTION OF SITE FOR
THERMAL POWER PLANT
Exhaust
Steam
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 5
Boiler
Water
Fuel
Air
Waste
Gases
Steam
Steam
Turbine
Alternator
Bus-Bars
Three Phase Transmission Line
BASIC STRUCTURE OF THERMAL
POWER PLANT
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 6
LAYOUT OF THERMAL POWER
PLANT
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 7
 Coal Handling Plant (C.H.P)
 Water Treatment Plant (W.T.P)
 Boiler Maintenance Division (B.M.D)
 Turbine Maintenance Division (T.M.D)
 Generator Division (G.D)
MAIN UNITS OF THERMAL
POWER PLANT
Raw coal from bharat
coal ltd. Dhanbad &
bilaspur(MP)
To SSTPS from gudla via a single
railway track
Wagon
Tippler
HoppersCrusher HouseBunkers
Raw coal
feeders
Coal mills
(pulverization)
Boiler furnace
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 8
OVER VIEW OF COAL
HANDLIG PLANT
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 9
PLANT FAMILIARIZATION
BOILER
In boiler heat energy is
released from the combustion
of fossils fuel and heat is
transferred to different fluids
in the system.
The boiler installed in
S.T.P.S. are single
drum, tangential fired water
tube naturally circulated over
hanged, pulverizing coal firing
with a max. Continuous steam
output of 375 tons/hour at 138
kg/cm2 pressure and 5400C
temperature.
SUPER HEATER
 A super heater is a device in
a steam engine that heats the
steam generated by the boiler
again, increasing its thermal
energy.
 Super heater eliminates the
formulation of condensate
during transporting of steam in
pipelines and inside the early
stages of turbine, which is
harmful to the turbine blades
and pipelines
Tuesday, September 03, 2013 10Marudhar Engineering College, Bikaner
ECONOMIEER
 Economizer is device which
recover the heat from the flue
gases on their way to chimney.
 Flue gases coming out of the
boiler carry lot of heat.
 An economizer extracts a part of
this heat from flue gases and
uses it for heating feed water.
 This use of economizer results
in saving coal consumption and
higher boiler efficiency .
Tuesday, September 03, 2013 11Marudhar Engineering College, Bikaner
Air Pre-heater is a heat
exchanger in which
preheating of air done by
transferring heat from the
flue gas before supplying
to the combustion chamber.
The preheating of air
results:
1.Improved combustion
2.Saving in fuel
consumption
3.Thermal efficiency.
AIR PRE-HEATER
Tuesday, September 03, 2013 12Marudhar Engineering College, Bikaner
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 13
Steam after rotating steam
turbine comes to the
condenser.
 The purpose of
condenser is to condense
the outlet steam from steam
turbine to get the condensed
steam in the form of pure
water.
This water is then Pumped
back to the boiler.
CONDENSER
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 14
These heaters are used to heat the feed water by means of bled steam
before it is supplied to the boiler. Necessity of heating feed water before
feeding it back to the boiler arises due to the following reasons:
Overall power plant efficiency is improved.
Thermal stresses due to cold water entering the drum of boiler are
avoided.
Increase in the quantity of steam produced by the boiler.
Boiler corrosion are removed in the feed water heaters.
FEED WATER HEATER
 The condensate (water)
formed in the condenser
after condensation is
initially at high temperature.
This hot water is passed to
cooling towers.
 It is a tower- or building-
like structure in which
atmospheric air circulates in
direct or indirect contact
with warmer water and the
water is thereby cooled.
COOLING TOWER
Tuesday, September 03, 2013 15Marudhar Engineering College, Bikaner
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 16
A steam generating boiler requires that the boiler feed water should be
devoid of air and other dissolved gases, particularly corrosive ones.
 In order to avoid corrosion of the metal, power station uses
a Deaerator, for the removal of air and other dissolved gases from the
boiler feed water.
A deaerator has a vertical, domed deaeration section mounted on top
of a horizontal cylindrical vessel which serves as a deaerated boiler feed
water storage tank.
DEAERATOR
TURBINE
 Turbine is rotating device that converts the energy of a
moving stream of water, steam, or gas into mechanical energy.
The basic element in a turbine is a wheel or rotor.
 This mechanical energy is then transferred through
a drive shaft to operate an alternator.
Tuesday, September 03, 2013 17Marudhar Engineering College, Bikaner
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 18
ALTERNATOR
An alternator is a device which convert mechanical energy to
electrical energy.
Turbo-alternators are high
speed machines (3,000 or
5,000RPM) for 50 Hz systems.
 Alternator have horizontal
configurations and smooth
cylindrical (or non salient pole)
type field structure wound
usually for 2 or 4 poles.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 19
 Thermal station use
coal as the main fuel.
 Raw coal is
transported by railway
trains.
 The supply of coal is
from MP, Jharkhand by
rail. About 18000
tonne coal required per
day for whole unit and
each unit consumes
150tonnes coal per day.
COAL HANDLING
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 20
FEED WATER
 The system coming out the turbine is condensed and the
condensate is feedback to the boiler as feed water.
 Some water may be lost due to blow-down, leakage etc. and to
make up these losses additional water, called the make-up water, is
required to be fed to the boiler. The make-up water in a modern
thermal plant is about 1-4%.
The heating of feed water :-
i. Improves the overall efficiency of the plant
ii. Removes dissolved oxygen and carbon-die-oxide
iii.Causes precipitation of other impurities carried by steam and
condensate outside the boiler
iv.Avoids thermal stresses owing to entry of cold water into the
boiler.
ASH HANDLING PLANT
 The percentage of ash in
coal is 5% in good quality
coal & about 40% in poor
quality coal.
 Power plants generally
use poor quality of coal ,
thus amount of ash
produced by it is quite
large.
 A modern 1000MW plant
produces about 4800 tons of
ash daily.
 The stations use some
conveyor arrangement to
carry ash to dump sites.
Tuesday, September 03, 2013 21Marudhar Engineering College, Bikaner
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 22
DRAUGHT SYSTEM
 The circulation of air is caused by a difference in pressure, known as draught.
 In a boiler the combustions of the fuel requires supply of sufficient quantity
of air and removal of exhaust gases and this is achieved by draught system.
 There are two types of drought system
i. Natural Draught : - The natural draught is provided by the action of
chimney or stack and is used only in small boilers. Its intensity depends
upon the average temperature (difference between the flue gases within
the chimney and the outside air (the gases within the chimney are at as
higher temperature than that of the surrounding air) and also on the
height of the chimney above the level of the furnace grate.
ii. Mechanical Draught: - Artificial or mechanical draught is provided
when the natural draught caused by a chimney is not sufficient or where
a certain draught is required to be maintained irrespective of weather
conditions or boiler operating conditions.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 23
THERMAL POWER PLANT
AUXILIARIES
The equipments which help in the proper
functioning of the plant are called plant auxiliaries.
 Boiler make-up water treatment plant and storage
 Fuel preparation system
 Barring gear
 Oil system
 Generator cooling
 Generator high-voltage system
 Monitoring and alarm system
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 24
MAJOR EQUIPMERNT IN
THERMAL POWER PLANT
 Power Transformers
 Voltage Regulators
 Reactors
 Insulators
Switch Yard
SWITCH YARD
 Placed where switching operation of power
distribution is performed is known as Switch Yard.
 Main Components of Switch Yard:
1. Circuit breaker
2. Isolator
3. Lightening arrester
4. Bus bar
5. Current Transformer
6. Potential Transformer
Tuesday, September 03, 2013 25Marudhar Engineering College, Bikaner
SWITCH YARD
Tuesday, September 03, 2013 26Marudhar Engineering College, Bikaner
CIRCUIT BREAKER
 These are used for automatic switching during normal or
abnormal conditions .
Specification:
Manufacturer ABB Limited
Type of Circuit Breaker SF6
Rated Voltage 245 KV
Rated Current
Under Site Condition of 40 0C
Under Site Condition of 50 0C
4000 A
2000 A
Rated Frequency 50 Hz
Tuesday, September 03, 2013 27Marudhar Engineering College, Bikaner
ISOLATOR
 These are used to disconnect transmission line under no-load
condition for safety, isolation and maintenance.
Specification:
Rated current for site
conditions
2000 A
Rated Voltage 245 KV
Rated Frequency 50 Hz
Operating time of Isolator Less than 12 sec.
Tuesday, September 03, 2013 28Marudhar Engineering College, Bikaner
LIGHTENING ARRESTOR
 These are used to discharge lightning over voltages and
switching over voltages to earth.
Specification:
Manufacturer Crompton Greaves Ltd,
Nasik
Model No. ZLA X 25 C
Ref. Standard IEC 99 – 4. 1991
Rated Frequency 50 Hz
Max. Leakage Current 5 mA
Tuesday, September 03, 2013 29Marudhar Engineering College, Bikaner
BUS BAR
 The conductors to which several incoming and
outgoing lines are connected.
 They are made up of Cu & Al,
 The incoming and outgoing cables are provided
for metering purpose.
Tuesday, September 03, 2013 30Marudhar Engineering College, Bikaner
CURRENT TRANSFORMER
 These are used to step-down currents for measurement, control
& protection.
 Current transformers are used extensively for measuring current
and monitoring the operation of the power grid.
Tuesday, September 03, 2013 31Marudhar Engineering College, Bikaner
VOLTAGE TRANFORMER
 VT measure voltage and this parameter used for protection of
system.
 For high voltage CVT (capacitive voltage transformer) is used
instead of VT and capacitors play divider role.
 We can also use these capacitors for PLC system.
Tuesday, September 03, 2013 32Marudhar Engineering College, Bikaner
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 33
CONTROL ROOM
 The control room is the nerve centre of a power station.
 The various controls performed from here
1. Voltages adjustment
2. Load control
3. Emergency tripping of turbines
4. The equipment and instruments housed in a control room are
synchronising equipment and are controlled form control
room like as voltages regulators, relays, ammeters,
voltmeters, wattmeters, kWh meters, kVARh meters etc.
5. Temperature gauges
6. Water level indicators and other appliances
7. As well as a mimic diagram and suitable indicating
equipment to show the opened or closed position of circuit
breakers, isolators etc.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 34
CONTROL ROOM
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 35
EFFICIENCY OF THERMAL
POWER PLANT
Installed Plant Capacity Average Overall Thermal Efficiency
Up to 1MW 4%
1MW to 10MW 12%
10MW to 50MW 16%
50MW to 100MW 24%
above 100MW 27%
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 36
SUPER CRICTICAL
TECHNOLOAGY
 At a temperature of about 600 degree centigrade and pressure of 30N/mm2, water
enters a supercritical phase and has properties between those of liquid and gas.
 Water in supercritical stage can dissolve a number of organic compounds and gases
and on addition of hydrogen peroxide and liquid oxygen combustion process starts.
 The steam power plants operating on this principle are called supercritical plats.
 Advantages
1. Low grade fossil fuels (e.g. lignite) can be used
2. NO2 emissions are completely eliminated
3. SO2 emission are reduced
4. complete burning of coal occurs.
5. need of desulphurisation and equipment and soot collector.
6. The cost of processing flue gas emissions (electrostatic precipitator etc.) is
eliminated
7. cooling water requirements are also reduced,
8. more economical and efficient.
9. Supercritical power plants, these days have an overall efficiency of just over
40%.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 37
ULTRA SUPER CRITICAL
TECHNOLOGY
Temperature around 700 degree
centigrade is known as ultra
supercritical technology.
Efficiency of the power plant may
be improved to around 50%.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 38
ADVANTAGES
 They can respond to rapidly changing loads without
difficulty
 A portion of the steam generated can be used as a
process steam in different industries
 Steam engines and turbines can work under 25 % of
overload continuously
 Fuel used is cheaper
 Cheaper in production cost in comparison with that of
diesel power stations
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 39
 Maintenance and operating costs are high
 Long time required for erection and putting into action
 A large quantity of water is required
 Great difficulty experienced in coal handling
 Presence of troubles due to smoke and heat in the plant
 Unavailability of good quality coal
 Maximum of heat energy lost
 Problem of ash removing
DISADVANTAGES
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 40
CONCLUSION
Thermal power plants haves low efficiency and
these are releases large amount of harmful gases
in environment and large amount of ash in the
form of wastage. To use renewable energy source
to save environment.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 41
REFERENCE
 "Suratgarh Super Thermal Power Station" Rajasthan Rajya Vidyut Utpadan
Nigam Ltd
 A course in Electrical Power By J.B.Gupta
 Babcock & Wilcox Co. (2005). Steam: Its Generation and Use (41st edition ed.)
ISBN 0-9634570-0-4
 Thomas C. Elliott, Kao Chen, Robert Swanekamp (Co-author) (1997). Standard
Handbook of Power plant Engineering (2nd edition ed.). McGraw-Hill
Professional. ISBN 0-07-019435-1
 Maury Klein, The Power Makers: Steam, Electricity, and the Men Who Invented
Modern America Bloomsbury Publishing USA, 2009 ISBN 1-59691-677-X
 J.C. Hensley (Editor) (2006). Cooling Tower Fundamentals (2nd Ed. ed.). SPX
Cooling Technologies.
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 42
Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 43

Weitere ähnliche Inhalte

Was ist angesagt?

kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
ravi kant
 
powerplant-140710033945-phpapp01.pptx
powerplant-140710033945-phpapp01.pptxpowerplant-140710033945-phpapp01.pptx
powerplant-140710033945-phpapp01.pptx
njmnjk
 

Was ist angesagt? (20)

Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
powerplant-140710033945-phpapp01.pptx
powerplant-140710033945-phpapp01.pptxpowerplant-140710033945-phpapp01.pptx
powerplant-140710033945-phpapp01.pptx
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
NTPC Farakka
NTPC FarakkaNTPC Farakka
NTPC Farakka
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan  ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 

Andere mochten auch (7)

Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power station
 
complete seminar report on simputer technology
complete seminar report on simputer technology complete seminar report on simputer technology
complete seminar report on simputer technology
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION
 
Industrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptIndustrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant ppt
 
Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copy
 
Presentation suratgarh super thermal power station by rahul dabi
Presentation suratgarh super thermal power station  by rahul dabiPresentation suratgarh super thermal power station  by rahul dabi
Presentation suratgarh super thermal power station by rahul dabi
 
Super thermal power plant,suratgarh
Super thermal power plant,suratgarhSuper thermal power plant,suratgarh
Super thermal power plant,suratgarh
 

Ähnlich wie sstps

Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
Chandra veer singh
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
R G Sanjay Prakash
 

Ähnlich wie sstps (20)

Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial ReportELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
ELECTRICAL ENGINEERING THERMAL POWER PLANT Industrial Report
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Complete report
Complete reportComplete report
Complete report
 
MEJIA THERMAL POWER STATION VT REPORT
MEJIA THERMAL POWER STATION VT REPORTMEJIA THERMAL POWER STATION VT REPORT
MEJIA THERMAL POWER STATION VT REPORT
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
Thermal Power Plant.pptx
Thermal Power Plant.pptxThermal Power Plant.pptx
Thermal Power Plant.pptx
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
suratgarh super thermal power station
suratgarh super thermal power stationsuratgarh super thermal power station
suratgarh super thermal power station
 
Overview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVCOverview of mejia thermal power station, DVC
Overview of mejia thermal power station, DVC
 
harduaganj thermal power station h.t.p.s.
harduaganj thermal power station h.t.p.s.harduaganj thermal power station h.t.p.s.
harduaganj thermal power station h.t.p.s.
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Internship presentation1
Internship presentation1Internship presentation1
Internship presentation1
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
kstps training report
kstps training reportkstps training report
kstps training report
 
project
projectproject
project
 

Kürzlich hochgeladen

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Kürzlich hochgeladen (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 

sstps

  • 1. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 1 A SEMINAR REPORT ON SUMMER TRAINING FROM SURATGARH SUPER THERMAL POWER STATION SUBMITTED TO: HEMANT KAUSHIK SEMINAR COVERNER SUBMITTED BY: Ramesh tholiya Electrical engineering
  • 2. INTRODUCTION  Suratgarh thermal power station is the first super thermal power Station of Rajasthan with total installed capacity of 1500 MW.  Suratgarh super thermal power station is located 27 km away from Suratgarh town in Shree Ganganagar Distt. on the left bank of IGNP at Up Stream of Suratgarh Barrage. This station is operated and maintained by Rajasthan Vidhyt Utpadan Nigam Limited. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 2
  • 3. S.S.T.P.S. is designed in six stages •STAGE I - 1x250 MW •STAGE II - 1x250 MW •STAGE III - 1x250 MW •STAGE IV - 1x250 MW •STAGE V - 1x250 MW •STAGE VI - 1x250 MW •STAGE VII - 1x660MW(Under construction) •STAGE VIII- 1x660MW(Under construction) Total Power Generation - 1500 MW Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 3 INSTALLED CAPACITY OF S.S.T.P.S.
  • 4. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 4  Supply of Water  Requirement of Land  Labour Supplies  Transportation Facility  Ash Disposal Distance form Populated Area  Near to the Load Centre  Magnitude and nature of load to be handled SELECTION OF SITE FOR THERMAL POWER PLANT
  • 5. Exhaust Steam Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 5 Boiler Water Fuel Air Waste Gases Steam Steam Turbine Alternator Bus-Bars Three Phase Transmission Line BASIC STRUCTURE OF THERMAL POWER PLANT
  • 6. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 6 LAYOUT OF THERMAL POWER PLANT
  • 7. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 7  Coal Handling Plant (C.H.P)  Water Treatment Plant (W.T.P)  Boiler Maintenance Division (B.M.D)  Turbine Maintenance Division (T.M.D)  Generator Division (G.D) MAIN UNITS OF THERMAL POWER PLANT
  • 8. Raw coal from bharat coal ltd. Dhanbad & bilaspur(MP) To SSTPS from gudla via a single railway track Wagon Tippler HoppersCrusher HouseBunkers Raw coal feeders Coal mills (pulverization) Boiler furnace Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 8 OVER VIEW OF COAL HANDLIG PLANT
  • 9. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 9 PLANT FAMILIARIZATION BOILER In boiler heat energy is released from the combustion of fossils fuel and heat is transferred to different fluids in the system. The boiler installed in S.T.P.S. are single drum, tangential fired water tube naturally circulated over hanged, pulverizing coal firing with a max. Continuous steam output of 375 tons/hour at 138 kg/cm2 pressure and 5400C temperature.
  • 10. SUPER HEATER  A super heater is a device in a steam engine that heats the steam generated by the boiler again, increasing its thermal energy.  Super heater eliminates the formulation of condensate during transporting of steam in pipelines and inside the early stages of turbine, which is harmful to the turbine blades and pipelines Tuesday, September 03, 2013 10Marudhar Engineering College, Bikaner
  • 11. ECONOMIEER  Economizer is device which recover the heat from the flue gases on their way to chimney.  Flue gases coming out of the boiler carry lot of heat.  An economizer extracts a part of this heat from flue gases and uses it for heating feed water.  This use of economizer results in saving coal consumption and higher boiler efficiency . Tuesday, September 03, 2013 11Marudhar Engineering College, Bikaner
  • 12. Air Pre-heater is a heat exchanger in which preheating of air done by transferring heat from the flue gas before supplying to the combustion chamber. The preheating of air results: 1.Improved combustion 2.Saving in fuel consumption 3.Thermal efficiency. AIR PRE-HEATER Tuesday, September 03, 2013 12Marudhar Engineering College, Bikaner
  • 13. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 13 Steam after rotating steam turbine comes to the condenser.  The purpose of condenser is to condense the outlet steam from steam turbine to get the condensed steam in the form of pure water. This water is then Pumped back to the boiler. CONDENSER
  • 14. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 14 These heaters are used to heat the feed water by means of bled steam before it is supplied to the boiler. Necessity of heating feed water before feeding it back to the boiler arises due to the following reasons: Overall power plant efficiency is improved. Thermal stresses due to cold water entering the drum of boiler are avoided. Increase in the quantity of steam produced by the boiler. Boiler corrosion are removed in the feed water heaters. FEED WATER HEATER
  • 15.  The condensate (water) formed in the condenser after condensation is initially at high temperature. This hot water is passed to cooling towers.  It is a tower- or building- like structure in which atmospheric air circulates in direct or indirect contact with warmer water and the water is thereby cooled. COOLING TOWER Tuesday, September 03, 2013 15Marudhar Engineering College, Bikaner
  • 16. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 16 A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones.  In order to avoid corrosion of the metal, power station uses a Deaerator, for the removal of air and other dissolved gases from the boiler feed water. A deaerator has a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as a deaerated boiler feed water storage tank. DEAERATOR
  • 17. TURBINE  Turbine is rotating device that converts the energy of a moving stream of water, steam, or gas into mechanical energy. The basic element in a turbine is a wheel or rotor.  This mechanical energy is then transferred through a drive shaft to operate an alternator. Tuesday, September 03, 2013 17Marudhar Engineering College, Bikaner
  • 18. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 18 ALTERNATOR An alternator is a device which convert mechanical energy to electrical energy. Turbo-alternators are high speed machines (3,000 or 5,000RPM) for 50 Hz systems.  Alternator have horizontal configurations and smooth cylindrical (or non salient pole) type field structure wound usually for 2 or 4 poles.
  • 19. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 19  Thermal station use coal as the main fuel.  Raw coal is transported by railway trains.  The supply of coal is from MP, Jharkhand by rail. About 18000 tonne coal required per day for whole unit and each unit consumes 150tonnes coal per day. COAL HANDLING
  • 20. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 20 FEED WATER  The system coming out the turbine is condensed and the condensate is feedback to the boiler as feed water.  Some water may be lost due to blow-down, leakage etc. and to make up these losses additional water, called the make-up water, is required to be fed to the boiler. The make-up water in a modern thermal plant is about 1-4%. The heating of feed water :- i. Improves the overall efficiency of the plant ii. Removes dissolved oxygen and carbon-die-oxide iii.Causes precipitation of other impurities carried by steam and condensate outside the boiler iv.Avoids thermal stresses owing to entry of cold water into the boiler.
  • 21. ASH HANDLING PLANT  The percentage of ash in coal is 5% in good quality coal & about 40% in poor quality coal.  Power plants generally use poor quality of coal , thus amount of ash produced by it is quite large.  A modern 1000MW plant produces about 4800 tons of ash daily.  The stations use some conveyor arrangement to carry ash to dump sites. Tuesday, September 03, 2013 21Marudhar Engineering College, Bikaner
  • 22. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 22 DRAUGHT SYSTEM  The circulation of air is caused by a difference in pressure, known as draught.  In a boiler the combustions of the fuel requires supply of sufficient quantity of air and removal of exhaust gases and this is achieved by draught system.  There are two types of drought system i. Natural Draught : - The natural draught is provided by the action of chimney or stack and is used only in small boilers. Its intensity depends upon the average temperature (difference between the flue gases within the chimney and the outside air (the gases within the chimney are at as higher temperature than that of the surrounding air) and also on the height of the chimney above the level of the furnace grate. ii. Mechanical Draught: - Artificial or mechanical draught is provided when the natural draught caused by a chimney is not sufficient or where a certain draught is required to be maintained irrespective of weather conditions or boiler operating conditions.
  • 23. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 23 THERMAL POWER PLANT AUXILIARIES The equipments which help in the proper functioning of the plant are called plant auxiliaries.  Boiler make-up water treatment plant and storage  Fuel preparation system  Barring gear  Oil system  Generator cooling  Generator high-voltage system  Monitoring and alarm system
  • 24. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 24 MAJOR EQUIPMERNT IN THERMAL POWER PLANT  Power Transformers  Voltage Regulators  Reactors  Insulators Switch Yard
  • 25. SWITCH YARD  Placed where switching operation of power distribution is performed is known as Switch Yard.  Main Components of Switch Yard: 1. Circuit breaker 2. Isolator 3. Lightening arrester 4. Bus bar 5. Current Transformer 6. Potential Transformer Tuesday, September 03, 2013 25Marudhar Engineering College, Bikaner
  • 26. SWITCH YARD Tuesday, September 03, 2013 26Marudhar Engineering College, Bikaner
  • 27. CIRCUIT BREAKER  These are used for automatic switching during normal or abnormal conditions . Specification: Manufacturer ABB Limited Type of Circuit Breaker SF6 Rated Voltage 245 KV Rated Current Under Site Condition of 40 0C Under Site Condition of 50 0C 4000 A 2000 A Rated Frequency 50 Hz Tuesday, September 03, 2013 27Marudhar Engineering College, Bikaner
  • 28. ISOLATOR  These are used to disconnect transmission line under no-load condition for safety, isolation and maintenance. Specification: Rated current for site conditions 2000 A Rated Voltage 245 KV Rated Frequency 50 Hz Operating time of Isolator Less than 12 sec. Tuesday, September 03, 2013 28Marudhar Engineering College, Bikaner
  • 29. LIGHTENING ARRESTOR  These are used to discharge lightning over voltages and switching over voltages to earth. Specification: Manufacturer Crompton Greaves Ltd, Nasik Model No. ZLA X 25 C Ref. Standard IEC 99 – 4. 1991 Rated Frequency 50 Hz Max. Leakage Current 5 mA Tuesday, September 03, 2013 29Marudhar Engineering College, Bikaner
  • 30. BUS BAR  The conductors to which several incoming and outgoing lines are connected.  They are made up of Cu & Al,  The incoming and outgoing cables are provided for metering purpose. Tuesday, September 03, 2013 30Marudhar Engineering College, Bikaner
  • 31. CURRENT TRANSFORMER  These are used to step-down currents for measurement, control & protection.  Current transformers are used extensively for measuring current and monitoring the operation of the power grid. Tuesday, September 03, 2013 31Marudhar Engineering College, Bikaner
  • 32. VOLTAGE TRANFORMER  VT measure voltage and this parameter used for protection of system.  For high voltage CVT (capacitive voltage transformer) is used instead of VT and capacitors play divider role.  We can also use these capacitors for PLC system. Tuesday, September 03, 2013 32Marudhar Engineering College, Bikaner
  • 33. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 33 CONTROL ROOM  The control room is the nerve centre of a power station.  The various controls performed from here 1. Voltages adjustment 2. Load control 3. Emergency tripping of turbines 4. The equipment and instruments housed in a control room are synchronising equipment and are controlled form control room like as voltages regulators, relays, ammeters, voltmeters, wattmeters, kWh meters, kVARh meters etc. 5. Temperature gauges 6. Water level indicators and other appliances 7. As well as a mimic diagram and suitable indicating equipment to show the opened or closed position of circuit breakers, isolators etc.
  • 34. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 34 CONTROL ROOM
  • 35. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 35 EFFICIENCY OF THERMAL POWER PLANT Installed Plant Capacity Average Overall Thermal Efficiency Up to 1MW 4% 1MW to 10MW 12% 10MW to 50MW 16% 50MW to 100MW 24% above 100MW 27%
  • 36. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 36 SUPER CRICTICAL TECHNOLOAGY  At a temperature of about 600 degree centigrade and pressure of 30N/mm2, water enters a supercritical phase and has properties between those of liquid and gas.  Water in supercritical stage can dissolve a number of organic compounds and gases and on addition of hydrogen peroxide and liquid oxygen combustion process starts.  The steam power plants operating on this principle are called supercritical plats.  Advantages 1. Low grade fossil fuels (e.g. lignite) can be used 2. NO2 emissions are completely eliminated 3. SO2 emission are reduced 4. complete burning of coal occurs. 5. need of desulphurisation and equipment and soot collector. 6. The cost of processing flue gas emissions (electrostatic precipitator etc.) is eliminated 7. cooling water requirements are also reduced, 8. more economical and efficient. 9. Supercritical power plants, these days have an overall efficiency of just over 40%.
  • 37. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 37 ULTRA SUPER CRITICAL TECHNOLOGY Temperature around 700 degree centigrade is known as ultra supercritical technology. Efficiency of the power plant may be improved to around 50%.
  • 38. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 38 ADVANTAGES  They can respond to rapidly changing loads without difficulty  A portion of the steam generated can be used as a process steam in different industries  Steam engines and turbines can work under 25 % of overload continuously  Fuel used is cheaper  Cheaper in production cost in comparison with that of diesel power stations
  • 39. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 39  Maintenance and operating costs are high  Long time required for erection and putting into action  A large quantity of water is required  Great difficulty experienced in coal handling  Presence of troubles due to smoke and heat in the plant  Unavailability of good quality coal  Maximum of heat energy lost  Problem of ash removing DISADVANTAGES
  • 40. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 40 CONCLUSION Thermal power plants haves low efficiency and these are releases large amount of harmful gases in environment and large amount of ash in the form of wastage. To use renewable energy source to save environment.
  • 41. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 41 REFERENCE  "Suratgarh Super Thermal Power Station" Rajasthan Rajya Vidyut Utpadan Nigam Ltd  A course in Electrical Power By J.B.Gupta  Babcock & Wilcox Co. (2005). Steam: Its Generation and Use (41st edition ed.) ISBN 0-9634570-0-4  Thomas C. Elliott, Kao Chen, Robert Swanekamp (Co-author) (1997). Standard Handbook of Power plant Engineering (2nd edition ed.). McGraw-Hill Professional. ISBN 0-07-019435-1  Maury Klein, The Power Makers: Steam, Electricity, and the Men Who Invented Modern America Bloomsbury Publishing USA, 2009 ISBN 1-59691-677-X  J.C. Hensley (Editor) (2006). Cooling Tower Fundamentals (2nd Ed. ed.). SPX Cooling Technologies.
  • 42. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 42
  • 43. Tuesday, September 03, 2013 Marudhar Engineering College, Bikaner 43