SlideShare ist ein Scribd-Unternehmen logo
1 von 12
ENGG4800 Project Presentation
                                1
   Introduction
   Project description
   Project goals
   Budget
   Schedule
   Risk assessment
   Conclusion & Recommendation




                                  2
   Very useful for efficiently surveilling a large
    area for many reasons:
    ◦   Battlefield intelligence
    ◦   Searching for minerals
    ◦   Border control
    ◦   Bush fire
    ◦   Search and rescue
    ◦   Police work
    ◦   Environment and
        biological sensing


                                                      3
   Objective - to develop a UAV system that
    can be used for missions that are too dull,
    dirty or dangerous for manned aircraft
   The system will essentially be a distributed
    fleet of UAV’s that interact with each other
    ◦ Also known as a MultiAgent system
    ◦ Each UAV has a specific task that contributes to
      the mission goal




                                                         4
   Use a variety of sensors such as laser vision,
    optic sensors, thermo vision, GPS
   The UAV should be of military standard
   Should perform well
   Robust in harsh conditions
   Meet all requirements for designated
    applications (military, mineral exploration)
    ◦ Flight time / duration
    ◦ Range
    ◦ Communication capability


                                                     5
Time   Performance   Cost


Constrain


Enhance


Accept




                                        6
   Project will take
    approximately 14
    months to develop

   This is based on a
    team of 9 engineers,
    2 trades people and
    the project manager




                           7
8
   Material cost per UAV
    is ~$20,000
   Labour cost of $1.5
    million
   Overhead costs
    estimated to be
    ~$80,000




                            9
1. Project may not be complete in a reasonable time
2. Project cost exceed the estimated cost
3. Vital resources not available for successful
   completion
4. Damage to UAV during testing and development
5. Safety of employees – follow CASA (Civil Aviation
   Safety Authority) operation, airworthiness and
   regulation policies
6. Change in the scope and specifications of the
   project
7. Delay in acquiring of parts
8. Poor weather conditions leading to delay in testing
   phase
9. Component failure

                                                         10
   The development costs far exceed the material
    costs!
    ◦ Project only viable if implemented on a medium to large
      scale
   Latest technology surveillance equipment is in
    high demand
    ◦ Military, safety, exploration will benefit
   Commercial potential
    ◦ Agriculture, mining
    ◦ The technology may be patented thereby securing
      licenses
   Great potential for a high return on investment
    ◦ 2007: $5billion; 2010: $12billion!


                                                                11
12

Weitere ähnliche Inhalte

Andere mochten auch

anaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURES
anaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURESanaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURES
anaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURES
Nathaniel A. ADEWOLE
 
UAV Research Paper
UAV Research PaperUAV Research Paper
UAV Research Paper
Allen Bento
 
How drone technology is revolutionizing the marketplace
How drone technology is revolutionizing the marketplaceHow drone technology is revolutionizing the marketplace
How drone technology is revolutionizing the marketplace
Tahoe Silicon Mountain
 
Quadcopter Presentation
Quadcopter PresentationQuadcopter Presentation
Quadcopter Presentation
Joe Loftus
 

Andere mochten auch (15)

Quadcopter presentation by chomp
Quadcopter presentation by chompQuadcopter presentation by chomp
Quadcopter presentation by chomp
 
anaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURES
anaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURESanaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURES
anaFLY01-05: A MULTIPURPOSE QUADCOPTER WITH DUALITY FEATURES
 
UAV Research Paper
UAV Research PaperUAV Research Paper
UAV Research Paper
 
Manual do Phantom 3 Profissional e Avançado em Português (Brasil)
Manual do Phantom 3 Profissional e Avançado em Português (Brasil)Manual do Phantom 3 Profissional e Avançado em Português (Brasil)
Manual do Phantom 3 Profissional e Avançado em Português (Brasil)
 
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential ApplicationsUAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
 
DJI Presentation at European Commission "RPAS for Civil Protection Experts", ...
DJI Presentation at European Commission "RPAS for Civil Protection Experts", ...DJI Presentation at European Commission "RPAS for Civil Protection Experts", ...
DJI Presentation at European Commission "RPAS for Civil Protection Experts", ...
 
The truth about the drones - uav.tools
The truth about the drones - uav.toolsThe truth about the drones - uav.tools
The truth about the drones - uav.tools
 
How drone technology is revolutionizing the marketplace
How drone technology is revolutionizing the marketplaceHow drone technology is revolutionizing the marketplace
How drone technology is revolutionizing the marketplace
 
Quadcopter final report anand
Quadcopter final report anandQuadcopter final report anand
Quadcopter final report anand
 
Quadcopter Presentation
Quadcopter PresentationQuadcopter Presentation
Quadcopter Presentation
 
Quadcopter designing
Quadcopter designingQuadcopter designing
Quadcopter designing
 
Quadcopter
QuadcopterQuadcopter
Quadcopter
 
Unmanned aerial vehicles
Unmanned aerial vehiclesUnmanned aerial vehicles
Unmanned aerial vehicles
 
QUADCOPTER
QUADCOPTERQUADCOPTER
QUADCOPTER
 
QUAD COPTERS FULL PPT
QUAD COPTERS FULL PPTQUAD COPTERS FULL PPT
QUAD COPTERS FULL PPT
 

Ähnlich wie Uav project

Optimism will sink a project
Optimism will sink a projectOptimism will sink a project
Optimism will sink a project
Greg Hyde
 
Jonathan.firth
Jonathan.firthJonathan.firth
Jonathan.firth
NASAPMC
 
Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1
Girish Kabra
 

Ähnlich wie Uav project (20)

7 Key Benefits of Indoor Drones for Mining.pdf
7 Key Benefits of Indoor Drones for Mining.pdf7 Key Benefits of Indoor Drones for Mining.pdf
7 Key Benefits of Indoor Drones for Mining.pdf
 
Optimism will sink a project
Optimism will sink a projectOptimism will sink a project
Optimism will sink a project
 
Gis Company Introduction Presentation
Gis Company Introduction PresentationGis Company Introduction Presentation
Gis Company Introduction Presentation
 
How Satellite Terminals can Best Serve the Agri Sector - Peter Morton - Tacti...
How Satellite Terminals can Best Serve the Agri Sector - Peter Morton - Tacti...How Satellite Terminals can Best Serve the Agri Sector - Peter Morton - Tacti...
How Satellite Terminals can Best Serve the Agri Sector - Peter Morton - Tacti...
 
Application of Drones for Mining Ooperations
Application of Drones for Mining OoperationsApplication of Drones for Mining Ooperations
Application of Drones for Mining Ooperations
 
Dissemination workshop-v2.1
Dissemination workshop-v2.1Dissemination workshop-v2.1
Dissemination workshop-v2.1
 
Standards and Oil Spill Response
Standards and Oil Spill ResponseStandards and Oil Spill Response
Standards and Oil Spill Response
 
Drone Detection & Classification using Machine Learning
Drone Detection & Classification using Machine LearningDrone Detection & Classification using Machine Learning
Drone Detection & Classification using Machine Learning
 
Jonathan.firth
Jonathan.firthJonathan.firth
Jonathan.firth
 
Floating solar farmpdf
Floating solar farmpdfFloating solar farmpdf
Floating solar farmpdf
 
8 July 2015: Persistent surveillance from the air themed competition
8 July 2015: Persistent surveillance from the air themed competition8 July 2015: Persistent surveillance from the air themed competition
8 July 2015: Persistent surveillance from the air themed competition
 
maitreya presentation.pdf
maitreya presentation.pdfmaitreya presentation.pdf
maitreya presentation.pdf
 
Guardicore - Shrink Your Attack Surface with Micro-Segmentation
Guardicore - Shrink Your Attack Surface with Micro-SegmentationGuardicore - Shrink Your Attack Surface with Micro-Segmentation
Guardicore - Shrink Your Attack Surface with Micro-Segmentation
 
Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1Girish-Kabra-Centrica-Energy1
Girish-Kabra-Centrica-Energy1
 
Drones & the internal auditor
Drones & the  internal auditorDrones & the  internal auditor
Drones & the internal auditor
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
 
A ProjeHigh flying technologies
A ProjeHigh flying technologiesA ProjeHigh flying technologies
A ProjeHigh flying technologies
 
Herbert, laure
Herbert, laureHerbert, laure
Herbert, laure
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
Drone delivery project proposal
Drone delivery project proposalDrone delivery project proposal
Drone delivery project proposal
 

Kürzlich hochgeladen

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Kürzlich hochgeladen (20)

2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

Uav project

  • 2. Introduction  Project description  Project goals  Budget  Schedule  Risk assessment  Conclusion & Recommendation 2
  • 3. Very useful for efficiently surveilling a large area for many reasons: ◦ Battlefield intelligence ◦ Searching for minerals ◦ Border control ◦ Bush fire ◦ Search and rescue ◦ Police work ◦ Environment and biological sensing 3
  • 4. Objective - to develop a UAV system that can be used for missions that are too dull, dirty or dangerous for manned aircraft  The system will essentially be a distributed fleet of UAV’s that interact with each other ◦ Also known as a MultiAgent system ◦ Each UAV has a specific task that contributes to the mission goal 4
  • 5. Use a variety of sensors such as laser vision, optic sensors, thermo vision, GPS  The UAV should be of military standard  Should perform well  Robust in harsh conditions  Meet all requirements for designated applications (military, mineral exploration) ◦ Flight time / duration ◦ Range ◦ Communication capability 5
  • 6. Time Performance Cost Constrain Enhance Accept 6
  • 7. Project will take approximately 14 months to develop  This is based on a team of 9 engineers, 2 trades people and the project manager 7
  • 8. 8
  • 9. Material cost per UAV is ~$20,000  Labour cost of $1.5 million  Overhead costs estimated to be ~$80,000 9
  • 10. 1. Project may not be complete in a reasonable time 2. Project cost exceed the estimated cost 3. Vital resources not available for successful completion 4. Damage to UAV during testing and development 5. Safety of employees – follow CASA (Civil Aviation Safety Authority) operation, airworthiness and regulation policies 6. Change in the scope and specifications of the project 7. Delay in acquiring of parts 8. Poor weather conditions leading to delay in testing phase 9. Component failure 10
  • 11. The development costs far exceed the material costs! ◦ Project only viable if implemented on a medium to large scale  Latest technology surveillance equipment is in high demand ◦ Military, safety, exploration will benefit  Commercial potential ◦ Agriculture, mining ◦ The technology may be patented thereby securing licenses  Great potential for a high return on investment ◦ 2007: $5billion; 2010: $12billion! 11
  • 12. 12