 A FLOOD IS RELATIVELY HIGH FLOW THAT OVERTOPS THE
NATURAL OR ARTIFICIAL BANKS IN ANY REACH OF A SYSTEM.
 FLOOD PLAIN IS DESIRABLE LOCATION FOR HUMAN LIVELIHOOD
AND HIS ACTIVITIES, IT IS IMPORTANT THAT FLOODS BE
CONTROLLED SO THAT DAMAGE DOES NOT EXCEED AN
ACCEPTABLE AMOUNT
 DESIGN OF WATER RESOURCES STRUCTURE SUCH AS SPILLWAYS,
DIVERSION WORK, BRIDGES, CULVERT ETC. OFTEN REQUIRE THE
DESIGN AT A CERTAIN LOCATION IN ORDER TO ESTIMATE THE SIZE
AND COST OF THOSE STRUCTURE.
 TO DESIGN THE WATER RESOURCE STRUCTURE SUCH AS
DAM, SPILLWAYS, DIVERSION WORKS, BRIDGE ETC.
 TO DETERMINE THE MAXIMUM DISCHARGE AND MAXIMUM
POTENTIAL.
 ESTIMATE COST AND SIZE OF STRUCTURE.
METHODS
 IT SHOULD BE EMPLOYED ONLY WHEN THERE IS INSUFFICIENT AVAILABLE
HYDROLOGIC INFORMATION FOR PERFORMING THE DETAILED AND PRECISE
ANALYSIS.
 THE VARIOUS EMPIRICAL FORMULAE COMMONLY USED IN INDIA ARE
(a) DICKEN’S FORMULA
(b) RYVE’S FORMULA
(c) MODIFIED REGIONAL FLOOD FORMULAE
 DICKEN (1885) MADE THE FIRST ATTEMPT IN INDIA TO DERIEVE A GENERAL
FORMULA FOR DETERMINING THE MAXIMUM FLOOD ON THE BASIS OF
STUDIES CONDUCTED FOR DETERMINING THE RELATION BETWEEN
DISCHARGE RATE TO DRAINAGE AREA.
 Q=C A(3/4)
where,
Q=PEAK FLOW RATE
C,(3/4)=REGRESSION CONSTANT
A=AREA OF DRAINAGE(km2)
 RYVE’S MODIFIED DICKEN’S FORMULA TO SUIT SOUTH INDIAN CONDITIONS FOR AREAS
WITHIN 25 km FROM THE COAST, BETWEEN 25 TO 175 km FROM THE COAST, AND FOR
LIMITED AREAS NEAR THE HILL
 Q=C A2/3
 THE VALUE OF CONSTANT VARIES WIDELY BEING 6.8 IN FLAT TRACTS ALONG THE
COAST AND ABOUT 42.4 IN THE WESTERN GHAT REGION.
 KUMAR ET AL. (1999) DEVELOPED A METHODOLOGY WHICH MODIFY THE
FORM OF THE EMPIRICAL FORMULA.
 QT=CT Ab
CT = REGIONAL PARAMETERS
QT =FLOOD OF T-YEAR RETURN PERIOD
A=CACHMENT AREA
b = TO BE ESTIMATED FOR REGION USING REGRESSION.
 IT IS MOST WIDELY USED FOR THE ANALYSIS OF RUNOFF RESPONSE FROM
SMALL CATCHMENT
 THIS METHOD TAKE INTO ACCOUNT THE FOLLOWING HYDROLOGICAL
CHRACTERISTICS OR PROCESSES
(a) RAINFALL INTENSITY
(b) RAINFALL DURATION
(c) RAINFALL FREQUENCY
(d) CATCHMENT AREA
(e) HYDROLOGIC ABSTRACTIONS
(f) RUNOFF CONCENTRATION
(g) RUNOFF DIFFUSION
 THE REQUIREMENT OF THE RATIONAL METHOD IS THAT THE CACHMENT BE SMALL .
FOLLOWING STEPS ARE INVOLVED IN THIS METHOD
i. DETERMINE THE TIME OF CONCENTRATION
ii. OBTAIN THE RAINFALL INTENSITY FOR THE DESIRED DURATION AND FREQUENCY
FROM THE APPROPRIATE INTENSITY-DURATION-FREQUENCY CURVE.
iii. RUNOFF COEFFICIENT DEPENDS ON THE CONDITION.
Qp= C I A
 FLOOD FREQUENCY DENOTES THE LIKELIHOOD OF FLOOD BEING
EQUALLED OR EXCEEDED.
 THE RETURN PERIOD (Tr)OF ALL FLOODS (Q1,Q2,…….QN) ARE
CALCULATED.
 THE CURVE BETWEEN Q V/S Tr IS PLOTTED .
 THE CURVE CAN BE USED TO DETERMINE THE RETURN PERIOD FOR THE
CORRESPONDING MAGNITUDE OF FLOOD.
 UNIT HYDRO GRAPH WAS PROPOSED BY L.K. SHERMAN.
 UNIT HYDROGRAPH IS DEFINED AS THE HYDROGRAPH OF SURFACE RUNOFF
OF A CACHMENT AREA RESULTING FROM UNIT DEPTH OF RAINFALL EXCESS.
 UNIT HYDROGRAPH IS A LINEAR MODEL OF THE CACHMENT .
 ASSUMPTIONS IN UNIT HYDROGRAPH METHOD
(i) RAINFALL IS OF UNIFORM INTENSITY WITHIN ITS SPECIFIED DURATION.
(ii)THE EFFECTIVE RAINFALL IS UNIFORMLY DISTRIBUTED THROUGHOUT
THE AREA OF DRAINAGE BASIN.
 Step 1: Select Appropriate Precipitation Event
 Step 2: Remove Baseflow Contribution
 Step 3: Calculate Volume of Quick-Response Runoff
 Step 4: Determine Excess Precipitation Depth for the Basin
Final Unit Hydrograph
 WITH THE ADVENT OF HIGH SPEED DIGITAL COMPUTERS WATERSHED
MODELS HAS BEEN DEVELOPED BY MANY INVESTIGATORS.
 SOME INTERACTIVE SOFTWARE PACKAGES HAVE BEEN DEVELOPED BY
NATIONAL INSTITUTE OF HYDROLOGY FOR UNIT HYDROGRAPH DERIVATION
AND FLOOD ESTIMATION.
UHPACKI (Unit Hydrograph Applications for Flood Estimation Package)
FLPACK(Flood Estimation for Large Catchments )
SRA (Software for Reservoir Analysis)
• Global flood risk - Upmanu Lall. Columbia Water Center, IRI.
• www.nih.ernet.in
• http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT%20Kharagpur/Water%20Resource%20Engg/pdf/m1l01.pdf
• ENGINEERING HYDROLOGY, BY K SUBRAMANYA, TATA MCGRAW-HILL THIRD EDITION.
• GLOBAL FLOOD RISK - UPMANU LALL. COLUMBIA WATER CENTER, IRI.
• HYDROLOGY , BY- MADAN MOHAN DAS AND MIMI DAS SAIKIA, 2009 PHI LEARNING PRIVATE
LIMITED, NEW DELHI
• APPLIED HYDROLOGY , BY K N MUTREJA,1986, TATA Mc GRAW HILL PUBLISHING COMPANY
LIMITED, NEW DELHI
Flood estimation

Weitere ähnliche Inhalte

Was ist angesagt?

Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographuzma shaikh
 
Runoff & Flood Frequency Analysis
Runoff & Flood Frequency AnalysisRunoff & Flood Frequency Analysis
Runoff & Flood Frequency AnalysisMalla Reddy University
 
Flood frequency analysis
Flood frequency analysisFlood frequency analysis
Flood frequency analysisSanjan Banerjee
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analysesvivek gami
 
Unit hydrograph
Unit hydrographUnit hydrograph
Unit hydrographSatish Taji
 
Estimation of runoff by table method
Estimation  of runoff by table methodEstimation  of runoff by table method
Estimation of runoff by table methodAaliya Afroz
 
Reservoir sedimentation
Reservoir sedimentationReservoir sedimentation
Reservoir sedimentationPramoda Raj
 
Stage measurement
Stage measurementStage measurement
Stage measurementKiran Yadav
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurementMOHIT MAYOOR
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysisvivek gami
 
Precipitation unit 2
Precipitation unit 2 Precipitation unit 2
Precipitation unit 2 Parimal Jha
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographSatish Taji
 
Stream Gauging
Stream GaugingStream Gauging
Stream GaugingSunny Agarwal
 
River engineering flood design
River engineering flood designRiver engineering flood design
River engineering flood designSharifah Ain
 
Flood routing
Flood routingFlood routing
Flood routingvivek gami
 
Well hydraulics
Well hydraulicsWell hydraulics
Well hydraulicsSaad Raja
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONLaxmanBhoyewar
 

Was ist angesagt? (20)

Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
Runoff & Flood Frequency Analysis
Runoff & Flood Frequency AnalysisRunoff & Flood Frequency Analysis
Runoff & Flood Frequency Analysis
 
Flood frequency analysis
Flood frequency analysisFlood frequency analysis
Flood frequency analysis
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analyses
 
Unit hydrograph
Unit hydrographUnit hydrograph
Unit hydrograph
 
Estimation of runoff by table method
Estimation  of runoff by table methodEstimation  of runoff by table method
Estimation of runoff by table method
 
Reservoir sedimentation
Reservoir sedimentationReservoir sedimentation
Reservoir sedimentation
 
Stage measurement
Stage measurementStage measurement
Stage measurement
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurement
 
river training work
river training workriver training work
river training work
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysis
 
Precipitation unit 2
Precipitation unit 2 Precipitation unit 2
Precipitation unit 2
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
Hydrograph
HydrographHydrograph
Hydrograph
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
River engineering flood design
River engineering flood designRiver engineering flood design
River engineering flood design
 
Flood routing
Flood routingFlood routing
Flood routing
 
Stream gauging ppt
Stream gauging pptStream gauging ppt
Stream gauging ppt
 
Well hydraulics
Well hydraulicsWell hydraulics
Well hydraulics
 
RESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATIONRESERVOIR SEDIMENTATION
RESERVOIR SEDIMENTATION
 

Ähnlich wie Flood estimation

Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSAnkit Balyan MBA, B.Tech.
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)Jaydeep Dave
 
Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)Dawit A. Melaku
 
Hydrology.pdf
Hydrology.pdfHydrology.pdf
Hydrology.pdftarikuasfaw1
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxCtKamariahMdSaat
 
CE573_Poster2
CE573_Poster2CE573_Poster2
CE573_Poster2Shekhar Mote
 
URBAN FLOOD - ISG 2014
URBAN FLOOD - ISG 2014URBAN FLOOD - ISG 2014
URBAN FLOOD - ISG 2014Amaljit Bharali
 
IRJET- A Review of Synthetic Hydrograph Methods for Design Storm
IRJET-  	  A Review of Synthetic Hydrograph Methods for Design StormIRJET-  	  A Review of Synthetic Hydrograph Methods for Design Storm
IRJET- A Review of Synthetic Hydrograph Methods for Design StormIRJET Journal
 
IRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWAT
IRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWATIRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWAT
IRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWATIRJET Journal
 
2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lecture2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lectureleony1948
 
Modelling of Seawater Intrusion
Modelling of Seawater IntrusionModelling of Seawater Intrusion
Modelling of Seawater IntrusionC. P. Kumar
 
L7 hydrograph
L7 hydrographL7 hydrograph
L7 hydrographMEHEDIMASUM2
 
Basic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and qualityBasic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and qualityvishwaleenram
 
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...RSIS International
 

Ähnlich wie Flood estimation (20)

Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
 
C-039.pdf
C-039.pdfC-039.pdf
C-039.pdf
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
 
Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)
 
Hydrology.pdf
Hydrology.pdfHydrology.pdf
Hydrology.pdf
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptx
 
Swat model
Swat model Swat model
Swat model
 
CE573_Poster2
CE573_Poster2CE573_Poster2
CE573_Poster2
 
URBAN FLOOD - ISG 2014
URBAN FLOOD - ISG 2014URBAN FLOOD - ISG 2014
URBAN FLOOD - ISG 2014
 
IRJET- A Review of Synthetic Hydrograph Methods for Design Storm
IRJET-  	  A Review of Synthetic Hydrograph Methods for Design StormIRJET-  	  A Review of Synthetic Hydrograph Methods for Design Storm
IRJET- A Review of Synthetic Hydrograph Methods for Design Storm
 
IRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWAT
IRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWATIRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWAT
IRJET- Hydrological Modeling of Penganga Sub-Basin using Arc-SWAT
 
Final Ppt.pdf
Final Ppt.pdfFinal Ppt.pdf
Final Ppt.pdf
 
2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lecture2011 liongson-modeling studies flood control dams-professorial chair lecture
2011 liongson-modeling studies flood control dams-professorial chair lecture
 
Mandal
MandalMandal
Mandal
 
Modelling of Seawater Intrusion
Modelling of Seawater IntrusionModelling of Seawater Intrusion
Modelling of Seawater Intrusion
 
Modflow Nepal
Modflow NepalModflow Nepal
Modflow Nepal
 
Ijmet 10 01_182
Ijmet 10 01_182Ijmet 10 01_182
Ijmet 10 01_182
 
L7 hydrograph
L7 hydrographL7 hydrograph
L7 hydrograph
 
Basic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and qualityBasic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and quality
 
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
 

Mehr von RAJ BAIRWA

Lecture 3 (quality of design and quality of conformance)
Lecture  3 (quality of design and quality of conformance)Lecture  3 (quality of design and quality of conformance)
Lecture 3 (quality of design and quality of conformance)RAJ BAIRWA
 
Lecture 2 (quality methodology and quality control)
Lecture  2 (quality methodology and quality control)Lecture  2 (quality methodology and quality control)
Lecture 2 (quality methodology and quality control)RAJ BAIRWA
 
Lecture 1 manufacturing processes
Lecture  1 manufacturing processesLecture  1 manufacturing processes
Lecture 1 manufacturing processesRAJ BAIRWA
 
Lecture 1 (quality)
Lecture  1 (quality)Lecture  1 (quality)
Lecture 1 (quality)RAJ BAIRWA
 
Licensing for SHP
Licensing for SHPLicensing for SHP
Licensing for SHPRAJ BAIRWA
 
Scope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaScope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaRAJ BAIRWA
 
Dams & environment
Dams & environmentDams & environment
Dams & environmentRAJ BAIRWA
 
Shp components
Shp componentsShp components
Shp componentsRAJ BAIRWA
 
Intake works at diversion
Intake works at diversion Intake works at diversion
Intake works at diversion RAJ BAIRWA
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSRAJ BAIRWA
 
Rubber dam
Rubber dam Rubber dam
Rubber dam RAJ BAIRWA
 

Mehr von RAJ BAIRWA (11)

Lecture 3 (quality of design and quality of conformance)
Lecture  3 (quality of design and quality of conformance)Lecture  3 (quality of design and quality of conformance)
Lecture 3 (quality of design and quality of conformance)
 
Lecture 2 (quality methodology and quality control)
Lecture  2 (quality methodology and quality control)Lecture  2 (quality methodology and quality control)
Lecture 2 (quality methodology and quality control)
 
Lecture 1 manufacturing processes
Lecture  1 manufacturing processesLecture  1 manufacturing processes
Lecture 1 manufacturing processes
 
Lecture 1 (quality)
Lecture  1 (quality)Lecture  1 (quality)
Lecture 1 (quality)
 
Licensing for SHP
Licensing for SHPLicensing for SHP
Licensing for SHP
 
Scope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaScope of solar thermal power plants in India
Scope of solar thermal power plants in India
 
Dams & environment
Dams & environmentDams & environment
Dams & environment
 
Shp components
Shp componentsShp components
Shp components
 
Intake works at diversion
Intake works at diversion Intake works at diversion
Intake works at diversion
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTS
 
Rubber dam
Rubber dam Rubber dam
Rubber dam
 

KĂźrzlich hochgeladen

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsArindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

KĂźrzlich hochgeladen (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Flood estimation

  • 1. PRESENTED BY: RAJ KUMAR BAIRWA M-TECH (A.H.E.S) IIT ROORKEE
  • 2.  A FLOOD IS RELATIVELY HIGH FLOW THAT OVERTOPS THE NATURAL OR ARTIFICIAL BANKS IN ANY REACH OF A SYSTEM.  FLOOD PLAIN IS DESIRABLE LOCATION FOR HUMAN LIVELIHOOD AND HIS ACTIVITIES, IT IS IMPORTANT THAT FLOODS BE CONTROLLED SO THAT DAMAGE DOES NOT EXCEED AN ACCEPTABLE AMOUNT  DESIGN OF WATER RESOURCES STRUCTURE SUCH AS SPILLWAYS, DIVERSION WORK, BRIDGES, CULVERT ETC. OFTEN REQUIRE THE DESIGN AT A CERTAIN LOCATION IN ORDER TO ESTIMATE THE SIZE AND COST OF THOSE STRUCTURE.
  • 3.  TO DESIGN THE WATER RESOURCE STRUCTURE SUCH AS DAM, SPILLWAYS, DIVERSION WORKS, BRIDGE ETC.  TO DETERMINE THE MAXIMUM DISCHARGE AND MAXIMUM POTENTIAL.  ESTIMATE COST AND SIZE OF STRUCTURE.
  • 4.
  • 5.
  • 6.
  • 8.  IT SHOULD BE EMPLOYED ONLY WHEN THERE IS INSUFFICIENT AVAILABLE HYDROLOGIC INFORMATION FOR PERFORMING THE DETAILED AND PRECISE ANALYSIS.  THE VARIOUS EMPIRICAL FORMULAE COMMONLY USED IN INDIA ARE (a) DICKEN’S FORMULA (b) RYVE’S FORMULA (c) MODIFIED REGIONAL FLOOD FORMULAE
  • 9.  DICKEN (1885) MADE THE FIRST ATTEMPT IN INDIA TO DERIEVE A GENERAL FORMULA FOR DETERMINING THE MAXIMUM FLOOD ON THE BASIS OF STUDIES CONDUCTED FOR DETERMINING THE RELATION BETWEEN DISCHARGE RATE TO DRAINAGE AREA.  Q=C A(3/4) where, Q=PEAK FLOW RATE C,(3/4)=REGRESSION CONSTANT A=AREA OF DRAINAGE(km2)
  • 10.
  • 11.  RYVE’S MODIFIED DICKEN’S FORMULA TO SUIT SOUTH INDIAN CONDITIONS FOR AREAS WITHIN 25 km FROM THE COAST, BETWEEN 25 TO 175 km FROM THE COAST, AND FOR LIMITED AREAS NEAR THE HILL  Q=C A2/3  THE VALUE OF CONSTANT VARIES WIDELY BEING 6.8 IN FLAT TRACTS ALONG THE COAST AND ABOUT 42.4 IN THE WESTERN GHAT REGION.
  • 12.  KUMAR ET AL. (1999) DEVELOPED A METHODOLOGY WHICH MODIFY THE FORM OF THE EMPIRICAL FORMULA.  QT=CT Ab CT = REGIONAL PARAMETERS QT =FLOOD OF T-YEAR RETURN PERIOD A=CACHMENT AREA b = TO BE ESTIMATED FOR REGION USING REGRESSION.
  • 13.  IT IS MOST WIDELY USED FOR THE ANALYSIS OF RUNOFF RESPONSE FROM SMALL CATCHMENT  THIS METHOD TAKE INTO ACCOUNT THE FOLLOWING HYDROLOGICAL CHRACTERISTICS OR PROCESSES (a) RAINFALL INTENSITY (b) RAINFALL DURATION (c) RAINFALL FREQUENCY (d) CATCHMENT AREA (e) HYDROLOGIC ABSTRACTIONS (f) RUNOFF CONCENTRATION (g) RUNOFF DIFFUSION
  • 14.  THE REQUIREMENT OF THE RATIONAL METHOD IS THAT THE CACHMENT BE SMALL . FOLLOWING STEPS ARE INVOLVED IN THIS METHOD i. DETERMINE THE TIME OF CONCENTRATION ii. OBTAIN THE RAINFALL INTENSITY FOR THE DESIRED DURATION AND FREQUENCY FROM THE APPROPRIATE INTENSITY-DURATION-FREQUENCY CURVE. iii. RUNOFF COEFFICIENT DEPENDS ON THE CONDITION. Qp= C I A
  • 15.  FLOOD FREQUENCY DENOTES THE LIKELIHOOD OF FLOOD BEING EQUALLED OR EXCEEDED.  THE RETURN PERIOD (Tr)OF ALL FLOODS (Q1,Q2,…….QN) ARE CALCULATED.  THE CURVE BETWEEN Q V/S Tr IS PLOTTED .  THE CURVE CAN BE USED TO DETERMINE THE RETURN PERIOD FOR THE CORRESPONDING MAGNITUDE OF FLOOD.
  • 16.
  • 17.  UNIT HYDRO GRAPH WAS PROPOSED BY L.K. SHERMAN.  UNIT HYDROGRAPH IS DEFINED AS THE HYDROGRAPH OF SURFACE RUNOFF OF A CACHMENT AREA RESULTING FROM UNIT DEPTH OF RAINFALL EXCESS.  UNIT HYDROGRAPH IS A LINEAR MODEL OF THE CACHMENT .  ASSUMPTIONS IN UNIT HYDROGRAPH METHOD (i) RAINFALL IS OF UNIFORM INTENSITY WITHIN ITS SPECIFIED DURATION. (ii)THE EFFECTIVE RAINFALL IS UNIFORMLY DISTRIBUTED THROUGHOUT THE AREA OF DRAINAGE BASIN.
  • 18.  Step 1: Select Appropriate Precipitation Event
  • 19.  Step 2: Remove Baseflow Contribution
  • 20.  Step 3: Calculate Volume of Quick-Response Runoff  Step 4: Determine Excess Precipitation Depth for the Basin
  • 21.
  • 23.  WITH THE ADVENT OF HIGH SPEED DIGITAL COMPUTERS WATERSHED MODELS HAS BEEN DEVELOPED BY MANY INVESTIGATORS.  SOME INTERACTIVE SOFTWARE PACKAGES HAVE BEEN DEVELOPED BY NATIONAL INSTITUTE OF HYDROLOGY FOR UNIT HYDROGRAPH DERIVATION AND FLOOD ESTIMATION. UHPACKI (Unit Hydrograph Applications for Flood Estimation Package) FLPACK(Flood Estimation for Large Catchments ) SRA (Software for Reservoir Analysis)
  • 24. • Global flood risk - Upmanu Lall. Columbia Water Center, IRI. • www.nih.ernet.in • http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT%20Kharagpur/Water%20Resource%20Engg/pdf/m1l01.pdf • ENGINEERING HYDROLOGY, BY K SUBRAMANYA, TATA MCGRAW-HILL THIRD EDITION. • GLOBAL FLOOD RISK - UPMANU LALL. COLUMBIA WATER CENTER, IRI. • HYDROLOGY , BY- MADAN MOHAN DAS AND MIMI DAS SAIKIA, 2009 PHI LEARNING PRIVATE LIMITED, NEW DELHI • APPLIED HYDROLOGY , BY K N MUTREJA,1986, TATA Mc GRAW HILL PUBLISHING COMPANY LIMITED, NEW DELHI