                                                                                                            Planning

                                                                           1.      Planning is the most important technique of the management.
                                                                           2.      Planning means “Looking ahead”.
                                                                           3.      This is mental process requiring the use of intellectual
                                                                                   facilities, imagination, foresight and sound judgment, to be
                                                                                   dine, who will do it an how the results are to be evaluated.
                                                                                        ,
                 Guided By Dr. U. J. Kahalekar Sir
                 G id d B D U J K h l k Si
                                                                           4.      Planning is necessary to ensure proper utilization of human
                                                                                   and material resources to achieve the objectives of the
                                      Represented by Rahul Agrawal                 project.


                               Govt. College of Engg., A' bad

April 18, 2013               Construction Management                 1   April 18, 2013                  Construction Management                              2
                                     Agrawal                                                                     Agrawal




           Site Selection Criteria considerations                                                  Financial Analysis

  1.      Availability of land, soil characteristics and cover of          1.      Engg. and Project management cost
          land                                                             2.      Lump sum payment for technology cost
  2.      Approach to site                                                 3.      Engg. Fee
  3.      Transportation and availability of material                      4.      Management and supervision during construction
  4.
  4       Availability f
          A il bili of man-power                                           5.
                                                                           5       Enabling works
  5.      Availability of other facilities such water supply,              6.      Construction equipment used
          electricity, drainage, etc                                       7.      Miscellaneous fixed assets
  6.      Acceptance of the project by the local bodies                    8.      Provision of contingencies
                                                                           9.      Operating cost
                                                                           10.     Working cost


April 18, 2013               Construction Management                 3   April 18, 2013                  Construction Management                              4
                                     Agrawal                                                                     Agrawal




                  Steps involved in planning                                                    Objectives of Planning

  1.      Crystallizing the opportunity or problem                         1.      Proper design of each element of the project
                                                                           2.      Proper selection of equipment and machinery in big project
  2.      Securing and analyzing necessary information                     3.      Proper arrangement of repair of equipment and machinery near the site of
  3.      Establishing planning premises and constraints                           work to keep them ready to work
                                                                           4.      Procurement of material well in advance
  4.      Ascertaining alternative course of action or plan
                                                                           5.      Employment of trained and experienced staff on the project
  5.
  5       Selecting optimum plan                                           6.      To provide welfare schemes for the staff and workers such as medical and
  6.      Determining derivative plan                                              recreational facilities
                                                                           7.      To provide incentive for good workers
  7.      Fixing the timing of introduction                                8.      To arrange constant flow of funds for the completion of the project
  8.      Arranging future evaluation of effectiveness of the plan         9.      To provide proper safety measures such as proper ventilation, proper
                                                                                   arrangement of light and water
                                                                           10.     Proper arrangements of means of communications and feedback etc..




April 18, 2013               Construction Management                 5   April 18, 2013                  Construction Management                              6
                                     Agrawal                                                                     Agrawal




                                                                                                                                                                  1
18/04/2013




                    Advantage of Planning                                                         Advantage to contractors

  1.      Advantage to contractors                                               1.      Job is studied in details by help of bar chart
  2.      Advantage to clients                                                   2.      Loss of money and help to relieve the financial burden to
  3.      Advantage to architects/ engineer                                              contractor
                                                                                 3.      Labours requirement are used properly
                                                                                 4.
                                                                                 4       Actual work can be measured
                                                                                 5.      Job is completed in time




April 18, 2013               Construction Management                      7    April 18, 2013               Construction Management                       8
                                     Agrawal                                                                        Agrawal




                     Limitation in Planning                                                            Stages in Planning

                                                                                 1.      Preplanning : objectives are clearly spelt out, general
  1.      The effectiveness of the plan depends upon the correctness of                  framework of the project is formulated, cost benefit analysis
          assumptions                                                                    and investment alternatives.
  2.      Planning is expansive                                                  2.      Detailed Planning : preparation of detailed design, detailed
  3.      Planning delays action                                                         working drawings, specifications and detailed bill of
  4.      Planning encourages a false sense of security                                  quantities.
                                                                                 3.      Monitoring and Control : updating of the schedule, taking
                                                                                         into account the actual progress of project and preparing
                                                                                         revised forecasting regarding availability of various
                                                                                         resources.



April 18, 2013               Construction Management                      9    April 18, 2013               Construction Management                      10
                                     Agrawal                                                                        Agrawal




                          Types of Plans                                                                      Contract

  1.      Standing Plan : used repeatedly & including                            Contract is an agreement, which will be valid in law or enforceable
          managements policies, procedures, rules                                     by law, between or among two or more parities, for provision
                                                                                      of supplies and/or services against consideration of monitory
  2.      Single use Plan : used for single purpose and objective
                                                                                      value, either in cash or in kind.
          is accomplish within short period of time. (Ex. Budgets)
                                                                                 Types of Contract
  3.
  3       Strategic Plan : Vitally effect development of an
                                                                                 1. Lump Sum contract
          organization. Factor include economic, technological
                                                                                 2. Cost plus fixed contract
          and environmental factors.
                                                                                 3. Cost plus bid free contract
  4.      Administrative Plan : this is less subjective than
                                                                                 4. Guaranteed Maximum contract
          strategic plan. It focus on how to accomplish objective
          of project or project or organization.                                 5. Negotiated contract
                                                                                 6. Unit price contract

April 18, 2013               Construction Management                      11   April 18, 2013               Construction Management                      12
                                     Agrawal                                                                        Agrawal




                                                                                                                                                              2
18/04/2013




                            Specification                                                                        Tender Information

  This is description of items of work to be provided in a project                       1.      Name of the dept. calling for tenders
        along with details regarding materials to be used and                            2.      Name of work and location
                                                                                         3.      Designation of officer inviting tenders
        workmanship to be done.
                                                                                         4.      Last date and time of receipt of tenders
  Types of Specification                                                                 5.      Period of availability of tender forms
  •               p
        General specification                                                            6.      Cost of tender documents
                                                                                         7.      Time of completion and type of contract
  •     Detailed specification
                                                                                         8.      Earnest money deposits to be paid
  •     Special specification                                                            9.      Date, time and place of opening tenders
  •     Restricted specification                                                         10.     Designation of the officer opening tenders
  •     Manufacturer’s specification




April 18, 2013               Construction Management                              13   April 18, 2013                   Construction Management                               14
                                     Agrawal                                                                                    Agrawal




           Tender Types                        Tender Document                                                          Scheduling

  1.      Open tender                         1.       General consideration of                   Construction scheduling is a graphical representation
  2.      Limited tender                               tender
                                                                                                      which shows the phasing rate of construction
  3.      Single tender                       2.       Schedule of items of
                                                       work with clear
                                                                                                     activities with the starting completion dates and
  4.      Rate contract                                                                           sequential relationship among the various activities or
                                                       specification
                                              3.
                                              3        Special
                                                       S i l conditions
                                                                   diti                            operations in project so that work can be carried out
                                                                                                            in an orderly and effective manner.




April 18, 2013               Construction Management                              15   April 18, 2013                   Construction Management                               16
                                     Agrawal                                                                                    Agrawal




                   Preparation of scheduling                                               Uses of scheduling Advantages of scheduling
  1.      The project is divided into number of operation and the
                                                                                         1.      Gives quantity of work             1.        Many alternative method can
          sequences of these operation can be derived after knowing
                                                                                                 involved, labour,                            be choose
          their relationship properly.
                                                                                                 materials and equipment            2.        Clear idea regarding workers,
  2.      The quantity of work involved in each operation has to be                              at each stage.                               materials, equipments
          calculated.                                                                    2.      Actual progress of work            3.        Staring time of work is known
  3.
  3       The time required for completion of the project as well as                             can be check
                                                                                                                                    4.        Resources utilization is
          different activities are to be calculated. This can be done                    3.      Carried out in systematic                    minimum
          from the quantity of work involved and rate of performing                              manner
                                                                                                                                    5.        Actual work is monitored
          each work.
                                                                                                                                    6.        Inter-relationship of various
                                                                                                                                              activities are known




April 18, 2013               Construction Management                              17   April 18, 2013                   Construction Management                               18
                                     Agrawal                                                                                    Agrawal




                                                                                                                                                                                   3
18/04/2013




                                      Bar charts                                                            Limitation of Bar Chart
    Henry Gantt around 1900 A.D.
                                                                                     1.       They can be used only for small projects
    Bar chart consists of two coordinate axes representing the jobs or
       activities to be performed and other representing time elapsed.               2.       It does not show the interdependencies between the
                                                                                              various activities in project
    Following step are involved
                                                                                     3.       The progress of the work in project cannot be monitored
    1. Divide project into many activities                                                                 y
                                                                                              scientifically
    2. List out the activities                                                       4.       Delays in the work cannot be detected
    3. Find the inter-relationship among these activities                            5.       It does not indicate critical activities of project
    4. Arrange activities in systematic way
                                                                                     6.       It gives some idea about the physical progress of
                                                                                              project.
    5. Calculate quantity of work and time required
                                                                                     7.       It can’t be used as controlling devices by the project
    6. Draw it according to scale                                                             manager to take any timely action.

April 18, 2013                     Construction Management                    19   April 18, 2013                     Construction Management                         20
                                           Agrawal                                                                            Agrawal




                                                                                                        Terms in Network Diagram
                              Network Diagram
                                                                                     1.       Activity : any position of project which consume time ot
                 Network is graphical and logical model or plan which lists                   resources and has a definite beginning and an end called as
                        out the sequences of various operations (with                         an activity. It is denoted by an arrow
                 interdependencies) which are required to be performed for           2.       Event : the beginning or completion of an activity is termed
                       the final achievement of the project objectives.                       as an event. It indicates a particular instant of time at which
                                                                                              some specific milestone has been achieved.
                                                                                     3.       Network logic : this denotes the technical dependencies
                                                                                              among activities. A good network logic reflects cost
                                                                                              effectiveness of project in long run.
                                                                                     4.       Dummy : it similar to an activity but it does not consume
                                                                                              any resources. It represent by Dashed Arrow


April 18, 2013                     Construction Management                    21   April 18, 2013                     Construction Management                         22
                                           Agrawal                                                                            Agrawal




           Terms in Network Diagram                                                                                 Types of Events

                                                                                     1.       Tail Event : which marks the beginning of an activity.
     Activity                                                                        2.       Head Event : which marks the completion of an activity.
                                                             Dummy
                                       Node                                          3.       Dual Role Event : which acts as tail event for one activity
                  Representation of Activity, Node, Dummy                                     and head event for other activity.
                                                                                     4.       Burst & Merge Event
                                                                                                    A                                    2
                                                                                                            2                                    A
                         A                 B
                                                                                                        B
           1                      2                    3                                    1                   3                            3           1
                                                                                                                                                 B
                                                                                      Burst                                                                  Merge
                                                                                                            4                             4                  Event
                                                                                      Event         C
                  Representation of Network Logic                                                                                                    C



April 18, 2013                     Construction Management                    23   April 18, 2013                     Construction Management                         24
                                           Agrawal                                                                            Agrawal




                                                                                                                                                                             4
18/04/2013




                      Types of NETWORKS                                                                  Rules for drawing a Networks
                                                                                          1.      Network will have only one initial node. Initial node will be only out going
                                                                                                  arrows
    1.    Activity on Arrow (A-O-A) or Arrow Diagram : the arrow
                                                                                          2.      Network can have only one final node. Final node will have only one incoming
          represent activities and node represent the events.                                     arrow
    2.    Activity on Node (A-O-N) or Precedence Diagram : the                            3.      No activity can start until its tail event has occurred
          node represent activities and arrow represent the events.                       4.      An event can’t occur until all the activities leading upto it are completed
    3.    Event oriented networks (PERT type)
                                      (        yp )                                       5.      No event can occur twice. Hence network looping isn’t permitted
                                                                                          6.      An arrow should represent singular situation. Individuality and separate entity
                                                                                                  of each activity should be maintained.
                                                                                          7.      The network should be drafted such that all activities are completed to reach
                                                                                                  end objectives
                                                                                          8.      All constraints and interdependencies should be shown properly on the network
                                                                                                  using dummies
                                                                                          9.      Network logic should always be maintained
                                                                                          10.     Time flow is usually shown from left to right.


April 18, 2013                 Construction Management                             25   April 18, 2013                    Construction Management                                   26
                                       Agrawal                                                                                    Agrawal




     Fulkerson’s Rule for Numbering the Events                                                              CPM Critical Path Method

    1.    There will be single initial event in network which has only                    1.      CPM was discovered jointly by DuPont and Reunington
          arrows coming out of it. This event is given number 1.                                  Rand Univac in 1957
    2.    All arrows coming out of event 1 are neglected. This
          provides us with one or more initial events. These event are
          numbered 2,3,4,5 etc.
    3.    Again neglect all the arrows coming out of these numbered
          events. A few more initial events will be created. These are
          also numbered similarly.
    4.    This operation is continued until last event is reached and
          numbered.



April 18, 2013                 Construction Management                             27   April 18, 2013                    Construction Management                                   28
                                       Agrawal                                                                                    Agrawal




                 Difference between CPM & PERT                                                                                  CPM
                                                                                          •       Earliest Event Time : earliest occurrence time is the earliest time
                                                                                                  at which an event can occur.
•    CPM is activity oriented               •   PERT is event oriented                            TEj = TEi + tij
•    Time estimates are of fair degree      •   Time estimates are not that                       where TEj = earliest event time of head event
     of accuracy                                accurate                                                 TEi = earliest event time of tail event
•    Deterministic approach                 •   Probabilistic approach                                    tij = duration of the activity (i-j)
•    Cost is governing factor               •   Time is governing factor
                                                                                          •       Latest Event Time : latest allowable occurrence time is the latest
•    Project duration is fixed and cost     •   Cost is directly proportional to                  time by which an event must occur to keep project on schedule.
     is minimum                                 time                                              TL = TLi - tij
•    Critical path which joins critical     •   Her critical path is path which                   where TL = latest event time of head event
     activities                                 joins the critical events                                TLi = earliest event time of tail event
                                                                                                          tij = duration of the activity (i-j)




April 18, 2013                 Construction Management                             29   April 18, 2013                    Construction Management                                   30
                                       Agrawal                                                                                    Agrawal




                                                                                                                                                                                         5
18/04/2013




                               CPM Activity Time                                                                                           Float
                                                                                                  •         Float denote the flexibility range within which activity start and
  •         Earliest start time : is earliest time by which an activity can start.
                                                                                                            finish times many fluctuate without affecting total project
        –        EST =TE(i)
                                                                                                            duration
  •         Earliest finish time : is earliest time by which an activity can completed.           •         Total Float : it is time span by which starting or finishing of an activity
        –        EFT = EST = tij
                                                                                                            can delayed without affecting overall completion time of project.
                                                                                                        –       FT = LFT – EFT
  •         Latest start time : time at which an activity can start without delaying              •         Free Float : it is that duration by which an activity can be delayed
            completion of p j as whole.
               p           project                                                                          without delaying any other succeeding activity.
                                                                                                                        y g y                      g       y
        –        LST = LFT - tij                                                                        –       FF = FT - Sj
                                                                                                  •         Independent Float : it is excess time available if the preceding activity
  •         Latest finish time : time at which an activity can finish without delaying                      ends as late as possible and the succeeding activity starts as early as
            completion of project as whole.                                                                 possible.
        –        LFT = TL(i)                                                                            –       FID = FF - Si
                                                                                                  •         Interfering Float : it is that difference between total float and free
                                                                                                            float.
                                                                                                        –       FIT = FT – FF = Si


April 18, 2013                      Construction Management                               31   April 18, 2013                        Construction Management                               32
                                            Agrawal                                                                                          Agrawal




                       Classification of Activities                                                                                       PERT
                                                                                                 •       Program Evaluation and Review Technique is management tool
  1.        Sub critical activities : when float is +ve; the activity                                    used for planning, controlling and reviewing a project.
            needs normal attention but has no flexibility.                                       •       It follows probabilistic approach towards time durations.
  2.        Critical activities : when float is zero; the activity needs                         •       It is also event oriented network method where more importance is
            extra attention. This has no freedom of action.                                              given to the achievement of discernible milestone rather than the
                                                                                                         activity can’t be made.
  3.        Super critical activities : when float is –ve; such
                                                                                                 •       Slack can be positive, zero or negative
            activities require very special attention and care.
                                                           care
                                                                                                 •       Positive Slack = it is obtained when TL is more than TE. It
                                                                                                         indicates on schedule condition
                                                                                                 •       Zero Slack = it TL is equal to TE. It indicate on schedule condition
                                                                                                 •       Negative Slack = it TL is less than TE. It indicates behind the
                                                                                                         schedule




April 18, 2013                      Construction Management                               33   April 18, 2013                        Construction Management                               34
                                            Agrawal                                                                                          Agrawal




       Classification of Construction Equipment                                                          Excavation Equipment : Power Sovels

       1.        Earth moving equipment                                                          1.      Long lasting and useful class of earth moving equipment.
       2.        Hauling Equipment                                                               2.      One of basic equipment employed to excavate the earth and to load the
                                                                                                         trucks.
       3.        Hoisting Equipment                                                              3.      It is capable of excavating all types of earth, except hard rock.
       4.        Conveying Equipment                                                             4.      It may be crawler mounted or wheel mounted.
                                                                                                 5.      Crawler mounted have low speeds but very effective in unstable soils
       5.
       5         Aggregate and concrete production E i
                 A            d            d i Equipment
                                                                                                 6.      Wheel mounted have higher speeds and are effective only in firm soils
       6.        Pile Driving Equipment                                                          7.      The size of Power Sovels varies from 0.375 to 5 cubic meter
       7.        Tunneling and Rock Drilling Equipment                                           8.      Basic parts include track system, cabin, cables, rack, stick, foot pin, saddle
                                                                                                         block, boom point sheaves and bucket.
       8.        Pumping and Dewatering Equipment




April 18, 2013                      Construction Management                               35   April 18, 2013                        Construction Management                               36
                                            Agrawal                                                                                          Agrawal




                                                                                                                                                                                                  6
18/04/2013




                 Excavation Equipment : Back Hoe                                                                  Excavation Equipment : Drag Line

   1.      It is also termed as Hoe, Back Sovels and Pull Shovel                                    1.      Prominent operation of dragging the bucket against the material to be dug
   2.      Generally used to excavate below natural surface on which it rests.                      2.      Long light crane boom and bucket is loosely attached to the boom through
   3.      Used to excavate trenches, pits for basements and generally grading work,                        cables.
           which requires precise control of depths.                                                3.      Useful in digging below its track level and handling softer materials
   4.      Basic parts include Boom, Jack Boom, Boom foot drum, Boom Sheave,                        4.      The capacity of dragline is indicated by size of the bucket in cubic meters
           Stick Sheave, Bucket and Bucket Sheave.
                          ,                                                                         5.      It can be crawler mounted, wheel mounted or trucked mounted.
                                                                                                    6.      Basic part dragline include the boom, hoist cable, drag cable, hoist chain,
                                                                                                            drag chain and bucket.




April 18, 2013                    Construction Management                                   37   April 18, 2013                   Construction Management                                 38
                                          Agrawal                                                                                         Agrawal




                 Excavation Equipment : Clamshell                                                        Excavation Equipment : Trenching Machine

   1.      Also named as resemblance of its bucket to a clam which is like a shell fish             1.      These are used for excavating trenches for laying pipelines, sewers, cables
           with hinged double shell.                                                                        etc.
   2.      The front end is essentially a crane boom with specially designed bucket                 2.      Their operation is quick giving the required depth or width.
           loosely attached at the end through cables as in drag line.                              3.      Wheel type : this can be used for providing depth of 3m and width ranging
   3.      Basic part are closing line, hoist line, sheaves, brackets, tagline, shell and                   from 0.3 to 0.6m. The machine consist of power driven wheel provided
           hinge.                                                                                           with a number of detachable buckets having cutting teeth.
                                                                                                    4.      Ladder type : this consists of telescopic ladder or boom. There are two
                                                                                                            endless chains on which detachable buckets are mounted. The boom is
                                                                                                            holding the chains. The excavated material is conveyed to conveyor belt
                                                                                                            which disposes off the excavated earth.




April 18, 2013                    Construction Management                                   39   April 18, 2013                   Construction Management                                 40
                                          Agrawal                                                                                         Agrawal




         Excavating & Earth-moving Equipment :                                                            Excavating & Earth-moving Equipment :
                       Scrapers                                                                                        Bull Dozers
   1.      Result of compromise between best loading and best hauling machines                      1.      These versatile equipments are commonly used in construction projects
   2.      They have established an important position in the earth moving field                    2.      Heavy blade attached to the tractor pushes material from one place to other
   3.      It unique machine for digging and long distance hauling of ploughable                    3.      Classified on basic of position of blades, mountings and controlled
           materials                                                                                4.      Generally used for spreading earth fill
   4.      Self operating machine which digs and carry its own load through                         5.      For opening uproot roads through mountainous and rocky terrains
           scrapping the ground, hauls it over the required distance and discharging
                pp g      g      ,                   q                          g g                 6.
                                                                                                    6       Clearing construction site
   5.      Classified as crawler-tractor-pulled and wheel-tractor-pulled depending on               7.      Maintaining hauls roads
           the type of tractor used to pull them
   6.      Basic part are bowl, apron, and tail gate or ejector.




April 18, 2013                    Construction Management                                   41   April 18, 2013                   Construction Management                                 42
                                          Agrawal                                                                                         Agrawal




                                                                                                                                                                                               7
18/04/2013




         Excavating & Earth-moving Equipment :                                                          Excavating Compaction Equipment :
                       Tractors                                                                               Smooth Wheel Rollers
    1.     These are multi purpose machines used mainly for pulling and pushing the           1.      Plain steel rollers, self-propelled type, weighing from 5 to 15 tones and are
           other equipment or heavy loads                                                             used for ordinarily rolling work is where deep compaction isn’t required,
    2.     They are also used for agricultural purposes.                                              the principal application being wider.
    3.     Classified as crawler type tractor and wheel type tractor                          2.      These roller are usually diesel engine type
    4.     Crawler type tractor is versatile equipment used to move bull dozers,              3.      Compacts only small top thickness of earth and it effect doesn’t reach
           scrapers and wagons on rough roads. The speed of this type doesn’t 12
               p            g           g              p             yp                               bottom of the layer
           kmph normally. It isn’t used on bituminous road                                    4.      After compaction roller leave the surface smooth
    5.     Wheel type tractor is mounted on four wheels. The main advantage is
           higher speed upto 50kmph. Used for long distance hauling and on good
           roads. And agricultural used




April 18, 2013                  Construction Management                               43   April 18, 2013                    Construction Management                                  44
                                        Agrawal                                                                                      Agrawal




             Excavating Compaction Equipment :                                                          Excavating Compaction Equipment :
                    Sheep Wheel Rollers                                                                      Pneumatic Tyred Rollers
    1.     Compacting earth work in embankment and canals where compaction deep               1.      Consist of base or platform mounted between tow axles, the rear of which
           into layer of earth is required, these types of rollers are used                           has one more wheel than the front
    2.     Tamping effect produce good effect                                                 2.      Tyres must be so arranged that the tracks of forward wheels lie in between
    3.     Roller is hollow steel drum                                                                tracks of backward wheels
    4.     Self-propelled or as towed units                                                   3.      Compacting fine grained soil and well graded sands
    5.     Weigh upto 15tonnes or more and travel at speed of 25kmph                          4.      Self propelled and ballasting is done using either water or sand or p g iron
                                                                                                           p p                    g             g                         pig
                                                                                                      to increase self weight




April 18, 2013                  Construction Management                               45   April 18, 2013                    Construction Management                                  46
                                        Agrawal                                                                                      Agrawal




         Difference between Crawler & Wheeled                                                                          Hauling Equipment
•   Crawler type roller has slow           •   Wheeled type roller has greater                1.      Defined as movement of material form one place to another
    speed                                      speed                                          2.      Equipment used for transportation of material is called as hauling
•   More compact and powerful and          •   Can handle only lighter jobs                           equipment or simply haulers
    can handle heavier jobs                                                                   3.      They classified as Dump Trucks and Dumpers
                                           •   Cheaper
•   Costly                                                                                    4.      Dump trucks : used for earth moving purpose. Dumping of earth can done
•   Cost of operation & maintenance
             p                             •   Operational & maintenance cost is                      rear, on the sides or at the bottom of truck.
                                                                                                          ,
    is high                                    less
                                               l                                              5.      Selection of the type of dump trucks for a specific job depends on the soil
•   Stick control for steering             •   Wheel steering control                                 condition and the nature of the haul road
                                           •   Moves on rough as well as good                 6.      Dumpers : are high speed pneumatic wheeled trucks with short chassis
•   Moves on rough roads only
                                                                                                      and strong bodies.
•   Used for short distances                   roads
                                                                                              7.      The hauling and dumping and dumping is done very fast compared to other
•   Requires skillful operation,           •   Used for longer distances                              equipment by using the dumper.
    maintenance & repairs                  •   Lesser skills required for operation,
                                               maintenance & repairs


April 18, 2013                  Construction Management                               47   April 18, 2013                    Construction Management                                  48
                                        Agrawal                                                                                      Agrawal




                                                                                                                                                                                           8
18/04/2013




                                 Hoisting Equipment                                                        Hoisting Equipment : Derrick Cranes
   1.      It is the operation of lifting a weight from one location and moving it to           1.      It consist of mast, a boom and a bull wheel on which the boom rotates
           another location which is at a reasonable distance and then dumping it.                      about vertical axis and guys or supporting members
   2.      Now a days, many big projects such as construction of dams, industrial               2.      These cranes are either electrically operated, diesel operated or both
           buildings etc. require hoisting equipment.                                           3.      The guy derrick has small mast supported by a number of guys and boom
   3.      It includes jacks, winches, chain hoists and cranes.                                         pivoted at the lower end of the mast. The boom can revolve through 360’.
   4.      As hoisting equipment, crane is only single machine which has a single                       This crane is used for heavy loads upto 200 tons.
           piece,
           piece is capable of providing three dimensional movement of a weight.
                                                                             weight             4.
                                                                                                4       When load become less then 50 tons, guy ropes are replaced by trussed
                                                                                                                                         tons
   5.      Cranes are broadly classified as                                                             structure which become stiff leg derrick. It consists of mast, which can
         1.       Stationary or derrick cranes                                                          rotate and a boom. A stiff leg derrick is used for loads from 7 to 50tons.
         2.       Mobile cranes
         3.       Overhead or gantry cranes
         4.       Traveler cranes
         5.       Tower cranes




April 18, 2013                          Construction Management                         49   April 18, 2013                        Construction Management                                  50
                                                Agrawal                                                                                    Agrawal




                 Hoisting Equipment : Mobile Cranes                                                        Hoisting Equipment : Traveler Cranes
   1.      These are mounted on mobile units which is either crawlers type or wheel             1.      They have their crabs moving on girders which are supported on legs
           type.                                                                                        instead of on overhead gantry track as used in overhead cranes.
   2.      Truck cranes have high mobility while the crawler mounted cranes move                2.      The legs are capable of moving on tracks laid on the floors
           slowly.
   3.      Crawler type are capable of moving on rough terrain
   4.      Used for transportation of loads to shorter distances
                                                                                                              Hoisting Equipment : Tower Cranes
                                                                                                                     g q p
                                                                                                1.      Used for industrial and residential high rise building.
                                                                                                2.      These are commonly used for assembly of industrial plants with steel
                                                                                                        structures.
                                                                                                3.      Main part of crane are under carriage, slewing platform, tower with
                                                                                                        operator’s cabin and jibs
                                                                                                4.      Tower has truss structure welded from steel bars and channels




April 18, 2013                          Construction Management                         51   April 18, 2013                        Construction Management                                  52
                                                Agrawal                                                                                    Agrawal




                              Conveying Equipment                                                       Conveying Equipment : Belt Conveyor
   1.      It is process of transporting material from one place to another over a              1.      It is one of popular conveying machinery
           stationary structure.                                                                2.      Used when large quantities of materials have to be conveyed over long
   2.      They are those which carry material in continuous stream with its distinct                   distances at fast speed
           features such as endless chain or belt.                                              3.      Simplest form consists of belt running over a pair of end drums or pulleys
   3.      When equipment does horizontally conveying it is know as conveyor                            and supported at regular intervals by series of rollers called idlers
   4.       When equipment does vertically conveying it is know as elevator                     4.      Advantages of belt conveyor are
   5.
   5       Advantages of conveyor are
           Ad t           f                                                                           1.
                                                                                                      1        It can handles light/ heavy materials, dry/ wet, fine/ coarse.
                                                                                                                                           materials       wet        coarse
         1.       It increases output                                                                 2.       Designed for conveying several thousand tons of material per hour and for
         2.       It facilitates continuity in operation                                                       distances of several kilometers.
         3.       It results in time saving                                                           3.       Can carry material horizontally or inclined
         4.       These are no waiting periods                                                        4.       Lighter in weight then other conveyors
                                                                                                      5.       Controlled discharge of material




April 18, 2013                          Construction Management                         53   April 18, 2013                        Construction Management                                  54
                                                Agrawal                                                                                    Agrawal




                                                                                                                                                                                                   9
18/04/2013




         Conveying Equipment : Screw Conveyor                                                              Aggregate Production Equipment
    1.     Used for handling granular or pulverized material
                                                                                              1.     Crushers are generally used to reduce size of the large stone or rock to
    2.     Quantity of material conveyed is less compared to the belt conveyor, at                   smaller uniform sized aggregates required for concrete mix.
           same time cost is also less.
                                                                                                    1.     Jaw Crusher : primary crusher, operates by allowing stone to flow into the
    3.     Can inclined maximum upto 35’                                                                   space between two jaws one of which stationary and other is movable.
    4.     Length of conveyor is 65m                                                                2.     Gyratory Crusher : hardened steel plates. Lead has long conical shape, with
                                                                                                           trough shaft suspended in bearing at the top and an eccentric base connection
                                                                                                           connected to gears.
                                                                                                    3.
                                                                                                    3      Cone C h : are capable of producing large quantities of uniformly fine
                                                                                                           C      Crusher            bl f      d i l              ii    f if      l fi
         Conveying Equipment : Bucket Conveyor                                                             crushed stone. It has shorter cone with smaller inlet and outlet openings.
                                                                                                    4.     Roll Crusher : consists of heavy cast iron frame equipped with two counter
                                                                                                           rotating rollers mounted on separate horizontal shaft.
    1.    Has bucket in shape of V which are open at top
    2.    Length is limited upto 25m due to weight of the conveyor and strength of
          the chains.
    3.    Generally used for coal handling




April 18, 2013                    Construction Management                            55   April 18, 2013                       Construction Management                                     56
                                          Agrawal                                                                                      Agrawal




           Factors affecting selection of Construction
                                                                                                            Equipment Management Checklist
                           Equipment
                                                                                              1.     Mechanize selectively for economy of production, quality and speed of
    1.     Use of equipment available with the organization                                          construction
    2.     Suitability for job condition with special references to climatic and              2.     Choose between buying, hiring and leasing
           operating conditions
                                                                                              3.     Choose size and number of equipment including standby
    3.     Uniformity of type
                                                                                              4.     Select the prime mover –petrol/diesel/electric
    4.     Size of equipment
                                                                                              5.     check suitability for local conditions
    5.     Use of standard equipment
                                                                                              6.     Decide on mobile or stationary equipment
    6.     Country of origin
                                                                                              7.     Arrange finance for purchase
    7.     Unit cost of production
                                                                                              8.     Examine the warranties while purchasing
    8.     Availability of spare parts and selection of manufacturers
                                                                                              9.     Commission equipment within warranty period
    9.     Suitability of local labour for operation
                                                                                              10.    Freeze productivity norms and ensure same
                                                                                              11.    Use only trained personal for operation
                                                                                              12.    Insist on regular preventative maintenance
                                                                                              13.    Ensure that standby power is available
                                                                                              14.    Insist on safety measures

April 18, 2013                    Construction Management                            57   April 18, 2013                       Construction Management                                     58
                                          Agrawal                                                                                      Agrawal




            Management Information Systems in                                                            Management Information Systems in
                  Construction Industry                                                                        Construction Industry
•    Date : it can be defined as group of non-random symbols which represent              •   An Organization is an institute which promotes mechanism of interpersonal
     things that have happened. Data of facts that are obtained by observation or             relations and activates collaboration many resources available such as,
     research and which are recorded frequently are called as Raw data or Basic               Monetary, technical, marketing and business.
     data
•    Information : the concept of information in an organizational sense is
     more complex and difficult than frequent use of this common word would
     suggest. Information is data that have been interpreted and understood by
     the recipient of the message.
•    Communication : information is transmitted by the process of
     communication. Communication involves the interchange of thoughts or
     opinion by word, letters or by similar means.




April 18, 2013                    Construction Management                            59   April 18, 2013                       Construction Management                                     60
                                          Agrawal                                                                                      Agrawal




                                                                                                                                                                                                10
18/04/2013




                             Requirement of MIS                                                                             Payment of Wages Act 1982
•       To provide an organized and efficient means of measuring, collection,                           1.      This act was introduced to regulate the payment of wages, imposition of
        verifying and qualifying data, reflecting the progress and status of operations                         fines, etc
        on the project with respect to progress, cost, resources and quantity                           2.      The term Wages includes all remuneration including all allowances, bonus,
                                                                                                                notice pay, etc but doesn’t include house rent, water and electricity
•       To provide a standard against which progress and cost can be compared                                   charges, travel allowance, medical allowance, pension, gratuity etc
•       To provide an organized, accurate and effectiveness means of converting the                     3.      Accordingly to Act, wages are to be paid promptly on a monthly basis and
        data from the operation into information. The information systems should be                             if any person is terminated from service, his wages should be settled
        realistic should be realistic and should recognize
           li i h ld b         li i     d h ld          i                                                       within two days of the termination.
                                                                                                                                        termination
         – Means of processing the information                                                          4.      This Act is applicable to employees having a salary less then Rs. 1600 pm
         – Skills available
         – Value of information compared with the cost of obtaining
         – Report the correct and necessary information
         – Identify and isolate critical information
         – To deliver the information


April 18, 2013                       Construction Management                                    61   April 18, 2013                   Construction Management                                   62
                                             Agrawal                                                                                          Agrawal




                           Minimum Wages Act 1986                                                                            Indian Contract Act 1872
        1.    This act prevents the exploitation of the unorganized labour in the                       •       In this Act the following words and expressions are used in the following
              construction industry by the employers.                                                           senses, unless a contrary intention appears from the context:-
        2.    Accordingly to this Act, provision is made for the statuary fixation of                         –      When one person signifies to another his willingness to do or to
              minimum rate of wages in the establishment.                                                            abstain from doing anything, with a view to obtaining the assent of that
        3.    Wages to construction workers in India is paid either in time rate basis or                            other to such act or abstinence, he is said to make a proposal
              piece rate basis
                                                                                                              –      When the person to whom the proposal is made signifies his assent
        4.    In the time rate basis, suitable rate of payment is fixed per unit of time that
              the worker i engaged for the work
               h       k is         df h           k                                                                 thereto,
                                                                                                                     thereto the proposal is said to be accepted A proposal, when accepted
                                                                                                                                                        accepted. proposal          accepted,
                                                                                                                     becomes a promise
        5.    Accordingly to this Act, different minimum rates can be fixed depending
              on the class of work, type of personal employed and depending on the                            –      The person making the proposal is called the" promisor and the person
              location of work.                                                                                      accepting the proposal is called the It promise"
                                                                                                              –      When, at the desire of the promisor, the promise or any other person
                                                                                                                     has clone or abstained from doing, or does or abstains from doing, or
                                                                                                                     promises to do or to abstain from doing, something, such Act or
                                                                                                                     abstinence or promise is called a consideration for the promise



April 18, 2013                       Construction Management                                    63   April 18, 2013                   Construction Management                                   64
                                             Agrawal                                                                                          Agrawal




                         Workmen Compensation Act                                                              Preparation for the Construction Interview
    1.       In case of death: 40% of the monthly wage of the deceased workman,
                                                                                                        1.      Personal characteristics : such as physical appearance, health, sense of
             multiplied by the relevant factor or Rs. 20,000; whichever is more.
                                                                                                                humor, Self confidence, cultural level, alertness, manners, general working
    2.       In case of total permanent disablement: 50% of the monthly wage, multiplied                        habits.
             by the relevant factor: or Rs. 24,000; whichever is more.                                  2.      Technical Competency : information about the exams passed, grades
    3.       In case of partial permanent disablement: The compensation is a percentage of                      obtained, awards and honors and extra- curricular activities.
             that payable in the case of total permanent disablement. The earning capacity is           3.      To find the initiative, common sense and general smartness
             determined by a qualified medical practitioners.
                                                                                                        4.      Ability to inspire confidence by sustained effort without super-vision ,
    4.
    4        In case of (total or partial) temporary disablement" A sum equal to 25% of the                     level ki
                                                                                                                l l making ability, originality and initiative.
                                                                                                                                bili     i i li     di ii i
             monthly wages of the workman shall be paid half-monthly.                                   5.      Capacity to work in team-by knowing about his family, community
    •        The minimum rate of compensation is proposed to be raised from 50,000 to Rs.                       interests and his type of friends.
             80,000 for death and from Rs. 60,000 to Rs. 90,000 in case of permanent/total              6.      Potential for growth-long range aspirations of the applicant – whether he is
             disablement. State Government appoints Commissioners to investigate and                            a drifter or one who would exploit every possible chance to develop his
             solve every case for workmen's compensation. The appointed Commissioner's                          potential to the maximum.
             tribunal has some of the powers of a civil court. An appeal against any order of           7.      Having Details of construction done in nearby area he is leaving.
             the Commissioner can be filed in the High Court. This must be done within 60
             days of the order or decision of the Commissioner.


April 18, 2013                       Construction Management                                    65   April 18, 2013                   Construction Management                                   66
                                             Agrawal                                                                                          Agrawal




                                                                                                                                                                                                     11
18/04/2013




                       Form work removing periods
   •         Walls, columns and vertical sides of beams
         –       24 to 48 hours may be decided by Engineer-in-charge
   •         Slabs (Prop left under ) 3 day
   •         Beam soffit (Prop left under ) 7 days
   •         Removing of props to slabs
         –       Spanning less then 4.5m = 7 days
         –       Spanning over 4.5m = 14 days
                  p     g                   y
   •         Removing of props to beams and arches
         –       Spanning less then 6m = 14 days
         –       Spanning over 6m = 21 days




April 18, 2013                      Construction Management            67
                                            Agrawal




                                                                                   12

Weitere ähnliche Inhalte

Was ist angesagt?

Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineeringrathodjaydeep2
 
Job Layout
Job LayoutJob Layout
Job LayoutBahzad5
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptssuserb4074f
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Network analysis by PERT and CPM
Network analysis by PERT and CPMNetwork analysis by PERT and CPM
Network analysis by PERT and CPMRajendrakumar Kadi
 
Location/Site Plans
Location/Site PlansLocation/Site Plans
Location/Site PlansFrank Bannon
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management pptRajeshPV12
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSIAEME Publication
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 

Was ist angesagt? (20)

Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
Job Layout
Job LayoutJob Layout
Job Layout
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Network analysis by PERT and CPM
Network analysis by PERT and CPMNetwork analysis by PERT and CPM
Network analysis by PERT and CPM
 
Location/Site Plans
Location/Site PlansLocation/Site Plans
Location/Site Plans
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 

Ähnlich wie Construction management

Cm be civil
Cm be civilCm be civil
Cm be civilRahul
 
Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...IRJET Journal
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectIJERA Editor
 
Theories in management
Theories in managementTheories in management
Theories in managementafaidiana
 
Inspired Training, Planning Scheduling Brochure
Inspired Training, Planning Scheduling BrochureInspired Training, Planning Scheduling Brochure
Inspired Training, Planning Scheduling BrochureRicky Smith CMRP, CMRT
 
Online PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsOnline PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsGlobalSkillup
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013IRJET Journal
 
I tt-o of pmp processes.5th ed
I tt-o of pmp processes.5th edI tt-o of pmp processes.5th ed
I tt-o of pmp processes.5th edElMazagangy
 
OM Session 15 and 16.pdf
OM Session 15 and 16.pdfOM Session 15 and 16.pdf
OM Session 15 and 16.pdfsrijitghoshal
 

Ähnlich wie Construction management (20)

Cm be civil
Cm be civilCm be civil
Cm be civil
 
MCP3
MCP3MCP3
MCP3
 
Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...Resource Optimization in Construction of a Residential Apartment using Primav...
Resource Optimization in Construction of a Residential Apartment using Primav...
 
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential ProjectEfficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
 
Lecture Project Planning
Lecture Project PlanningLecture Project Planning
Lecture Project Planning
 
Cps print
Cps printCps print
Cps print
 
Bie 03
Bie 03Bie 03
Bie 03
 
Ls2419601967
Ls2419601967Ls2419601967
Ls2419601967
 
Eng. Whameed-CV
Eng. Whameed-CVEng. Whameed-CV
Eng. Whameed-CV
 
PMP Material
PMP MaterialPMP Material
PMP Material
 
Theories in management
Theories in managementTheories in management
Theories in management
 
Inspired Training, Planning Scheduling Brochure
Inspired Training, Planning Scheduling BrochureInspired Training, Planning Scheduling Brochure
Inspired Training, Planning Scheduling Brochure
 
Online PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsOnline PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groups
 
Project Management for PhD Research
Project Management for PhD ResearchProject Management for PhD Research
Project Management for PhD Research
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
I tt-o of pmp processes.5th ed
I tt-o of pmp processes.5th edI tt-o of pmp processes.5th ed
I tt-o of pmp processes.5th ed
 
OM Session 15 and 16.pdf
OM Session 15 and 16.pdfOM Session 15 and 16.pdf
OM Session 15 and 16.pdf
 
Resume_geetha
Resume_geethaResume_geetha
Resume_geetha
 
LPM1
LPM1LPM1
LPM1
 

Mehr von Rahul

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdfRahul
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdfRahul
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfRahul
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdfRahul
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineeringRahul
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writingRahul
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measuresRahul
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed managementRahul
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpaRahul
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpaRahul
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQRahul
 
Formwork
FormworkFormwork
FormworkRahul
 
April bulletin
April bulletinApril bulletin
April bulletinRahul
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpimentRahul
 
Egrm
EgrmEgrm
EgrmRahul
 
Retaining walls
Retaining wallsRetaining walls
Retaining wallsRahul
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRahul
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey buildingRahul
 
Indiandrinking
IndiandrinkingIndiandrinking
IndiandrinkingRahul
 
Circular slabs
Circular slabsCircular slabs
Circular slabsRahul
 

Mehr von Rahul (20)

ACEP Magazine 3.pdf
ACEP Magazine 3.pdfACEP Magazine 3.pdf
ACEP Magazine 3.pdf
 
ACEP Magazine 2.pdf
ACEP Magazine 2.pdfACEP Magazine 2.pdf
ACEP Magazine 2.pdf
 
GECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdfGECA Water Magazine Edition one.pdf
GECA Water Magazine Edition one.pdf
 
ACEP Magazine.pdf
ACEP Magazine.pdfACEP Magazine.pdf
ACEP Magazine.pdf
 
Scope of geology in engineering
Scope of geology in engineeringScope of geology in engineering
Scope of geology in engineering
 
Engineering project writing
Engineering project writingEngineering project writing
Engineering project writing
 
Wce agronomic water conservation measures
Wce agronomic water conservation measuresWce agronomic water conservation measures
Wce agronomic water conservation measures
 
WCE -- watershed management
WCE -- watershed managementWCE -- watershed management
WCE -- watershed management
 
Unit i gel space ratio rpa
Unit i gel space ratio rpaUnit i gel space ratio rpa
Unit i gel space ratio rpa
 
Unit vi ferro cement rpa
Unit vi ferro cement rpaUnit vi ferro cement rpa
Unit vi ferro cement rpa
 
Acem water cement ratio MCQ
Acem water cement ratio MCQAcem water cement ratio MCQ
Acem water cement ratio MCQ
 
Formwork
FormworkFormwork
Formwork
 
April bulletin
April bulletinApril bulletin
April bulletin
 
Construction equpiment
Construction equpimentConstruction equpiment
Construction equpiment
 
Egrm
EgrmEgrm
Egrm
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Multistorey building
Multistorey buildingMultistorey building
Multistorey building
 
Indiandrinking
IndiandrinkingIndiandrinking
Indiandrinking
 
Circular slabs
Circular slabsCircular slabs
Circular slabs
 

Kürzlich hochgeladen

JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Kürzlich hochgeladen (20)

JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

Construction management

  • 1. 18/04/2013 Planning 1. Planning is the most important technique of the management. 2. Planning means “Looking ahead”. 3. This is mental process requiring the use of intellectual facilities, imagination, foresight and sound judgment, to be dine, who will do it an how the results are to be evaluated. , Guided By Dr. U. J. Kahalekar Sir G id d B D U J K h l k Si 4. Planning is necessary to ensure proper utilization of human and material resources to achieve the objectives of the Represented by Rahul Agrawal project. Govt. College of Engg., A' bad April 18, 2013 Construction Management 1 April 18, 2013 Construction Management 2 Agrawal Agrawal Site Selection Criteria considerations Financial Analysis 1. Availability of land, soil characteristics and cover of 1. Engg. and Project management cost land 2. Lump sum payment for technology cost 2. Approach to site 3. Engg. Fee 3. Transportation and availability of material 4. Management and supervision during construction 4. 4 Availability f A il bili of man-power 5. 5 Enabling works 5. Availability of other facilities such water supply, 6. Construction equipment used electricity, drainage, etc 7. Miscellaneous fixed assets 6. Acceptance of the project by the local bodies 8. Provision of contingencies 9. Operating cost 10. Working cost April 18, 2013 Construction Management 3 April 18, 2013 Construction Management 4 Agrawal Agrawal Steps involved in planning Objectives of Planning 1. Crystallizing the opportunity or problem 1. Proper design of each element of the project 2. Proper selection of equipment and machinery in big project 2. Securing and analyzing necessary information 3. Proper arrangement of repair of equipment and machinery near the site of 3. Establishing planning premises and constraints work to keep them ready to work 4. Procurement of material well in advance 4. Ascertaining alternative course of action or plan 5. Employment of trained and experienced staff on the project 5. 5 Selecting optimum plan 6. To provide welfare schemes for the staff and workers such as medical and 6. Determining derivative plan recreational facilities 7. To provide incentive for good workers 7. Fixing the timing of introduction 8. To arrange constant flow of funds for the completion of the project 8. Arranging future evaluation of effectiveness of the plan 9. To provide proper safety measures such as proper ventilation, proper arrangement of light and water 10. Proper arrangements of means of communications and feedback etc.. April 18, 2013 Construction Management 5 April 18, 2013 Construction Management 6 Agrawal Agrawal 1
  • 2. 18/04/2013 Advantage of Planning Advantage to contractors 1. Advantage to contractors 1. Job is studied in details by help of bar chart 2. Advantage to clients 2. Loss of money and help to relieve the financial burden to 3. Advantage to architects/ engineer contractor 3. Labours requirement are used properly 4. 4 Actual work can be measured 5. Job is completed in time April 18, 2013 Construction Management 7 April 18, 2013 Construction Management 8 Agrawal Agrawal Limitation in Planning Stages in Planning 1. Preplanning : objectives are clearly spelt out, general 1. The effectiveness of the plan depends upon the correctness of framework of the project is formulated, cost benefit analysis assumptions and investment alternatives. 2. Planning is expansive 2. Detailed Planning : preparation of detailed design, detailed 3. Planning delays action working drawings, specifications and detailed bill of 4. Planning encourages a false sense of security quantities. 3. Monitoring and Control : updating of the schedule, taking into account the actual progress of project and preparing revised forecasting regarding availability of various resources. April 18, 2013 Construction Management 9 April 18, 2013 Construction Management 10 Agrawal Agrawal Types of Plans Contract 1. Standing Plan : used repeatedly & including Contract is an agreement, which will be valid in law or enforceable managements policies, procedures, rules by law, between or among two or more parities, for provision of supplies and/or services against consideration of monitory 2. Single use Plan : used for single purpose and objective value, either in cash or in kind. is accomplish within short period of time. (Ex. Budgets) Types of Contract 3. 3 Strategic Plan : Vitally effect development of an 1. Lump Sum contract organization. Factor include economic, technological 2. Cost plus fixed contract and environmental factors. 3. Cost plus bid free contract 4. Administrative Plan : this is less subjective than 4. Guaranteed Maximum contract strategic plan. It focus on how to accomplish objective of project or project or organization. 5. Negotiated contract 6. Unit price contract April 18, 2013 Construction Management 11 April 18, 2013 Construction Management 12 Agrawal Agrawal 2
  • 3. 18/04/2013 Specification Tender Information This is description of items of work to be provided in a project 1. Name of the dept. calling for tenders along with details regarding materials to be used and 2. Name of work and location 3. Designation of officer inviting tenders workmanship to be done. 4. Last date and time of receipt of tenders Types of Specification 5. Period of availability of tender forms • p General specification 6. Cost of tender documents 7. Time of completion and type of contract • Detailed specification 8. Earnest money deposits to be paid • Special specification 9. Date, time and place of opening tenders • Restricted specification 10. Designation of the officer opening tenders • Manufacturer’s specification April 18, 2013 Construction Management 13 April 18, 2013 Construction Management 14 Agrawal Agrawal Tender Types Tender Document Scheduling 1. Open tender 1. General consideration of Construction scheduling is a graphical representation 2. Limited tender tender which shows the phasing rate of construction 3. Single tender 2. Schedule of items of work with clear activities with the starting completion dates and 4. Rate contract sequential relationship among the various activities or specification 3. 3 Special S i l conditions diti operations in project so that work can be carried out in an orderly and effective manner. April 18, 2013 Construction Management 15 April 18, 2013 Construction Management 16 Agrawal Agrawal Preparation of scheduling Uses of scheduling Advantages of scheduling 1. The project is divided into number of operation and the 1. Gives quantity of work 1. Many alternative method can sequences of these operation can be derived after knowing involved, labour, be choose their relationship properly. materials and equipment 2. Clear idea regarding workers, 2. The quantity of work involved in each operation has to be at each stage. materials, equipments calculated. 2. Actual progress of work 3. Staring time of work is known 3. 3 The time required for completion of the project as well as can be check 4. Resources utilization is different activities are to be calculated. This can be done 3. Carried out in systematic minimum from the quantity of work involved and rate of performing manner 5. Actual work is monitored each work. 6. Inter-relationship of various activities are known April 18, 2013 Construction Management 17 April 18, 2013 Construction Management 18 Agrawal Agrawal 3
  • 4. 18/04/2013 Bar charts Limitation of Bar Chart Henry Gantt around 1900 A.D. 1. They can be used only for small projects Bar chart consists of two coordinate axes representing the jobs or activities to be performed and other representing time elapsed. 2. It does not show the interdependencies between the various activities in project Following step are involved 3. The progress of the work in project cannot be monitored 1. Divide project into many activities y scientifically 2. List out the activities 4. Delays in the work cannot be detected 3. Find the inter-relationship among these activities 5. It does not indicate critical activities of project 4. Arrange activities in systematic way 6. It gives some idea about the physical progress of project. 5. Calculate quantity of work and time required 7. It can’t be used as controlling devices by the project 6. Draw it according to scale manager to take any timely action. April 18, 2013 Construction Management 19 April 18, 2013 Construction Management 20 Agrawal Agrawal Terms in Network Diagram Network Diagram 1. Activity : any position of project which consume time ot Network is graphical and logical model or plan which lists resources and has a definite beginning and an end called as out the sequences of various operations (with an activity. It is denoted by an arrow interdependencies) which are required to be performed for 2. Event : the beginning or completion of an activity is termed the final achievement of the project objectives. as an event. It indicates a particular instant of time at which some specific milestone has been achieved. 3. Network logic : this denotes the technical dependencies among activities. A good network logic reflects cost effectiveness of project in long run. 4. Dummy : it similar to an activity but it does not consume any resources. It represent by Dashed Arrow April 18, 2013 Construction Management 21 April 18, 2013 Construction Management 22 Agrawal Agrawal Terms in Network Diagram Types of Events 1. Tail Event : which marks the beginning of an activity. Activity 2. Head Event : which marks the completion of an activity. Dummy Node 3. Dual Role Event : which acts as tail event for one activity Representation of Activity, Node, Dummy and head event for other activity. 4. Burst & Merge Event A 2 2 A A B B 1 2 3 1 3 3 1 B Burst Merge 4 4 Event Event C Representation of Network Logic C April 18, 2013 Construction Management 23 April 18, 2013 Construction Management 24 Agrawal Agrawal 4
  • 5. 18/04/2013 Types of NETWORKS Rules for drawing a Networks 1. Network will have only one initial node. Initial node will be only out going arrows 1. Activity on Arrow (A-O-A) or Arrow Diagram : the arrow 2. Network can have only one final node. Final node will have only one incoming represent activities and node represent the events. arrow 2. Activity on Node (A-O-N) or Precedence Diagram : the 3. No activity can start until its tail event has occurred node represent activities and arrow represent the events. 4. An event can’t occur until all the activities leading upto it are completed 3. Event oriented networks (PERT type) ( yp ) 5. No event can occur twice. Hence network looping isn’t permitted 6. An arrow should represent singular situation. Individuality and separate entity of each activity should be maintained. 7. The network should be drafted such that all activities are completed to reach end objectives 8. All constraints and interdependencies should be shown properly on the network using dummies 9. Network logic should always be maintained 10. Time flow is usually shown from left to right. April 18, 2013 Construction Management 25 April 18, 2013 Construction Management 26 Agrawal Agrawal Fulkerson’s Rule for Numbering the Events CPM Critical Path Method 1. There will be single initial event in network which has only 1. CPM was discovered jointly by DuPont and Reunington arrows coming out of it. This event is given number 1. Rand Univac in 1957 2. All arrows coming out of event 1 are neglected. This provides us with one or more initial events. These event are numbered 2,3,4,5 etc. 3. Again neglect all the arrows coming out of these numbered events. A few more initial events will be created. These are also numbered similarly. 4. This operation is continued until last event is reached and numbered. April 18, 2013 Construction Management 27 April 18, 2013 Construction Management 28 Agrawal Agrawal Difference between CPM & PERT CPM • Earliest Event Time : earliest occurrence time is the earliest time at which an event can occur. • CPM is activity oriented • PERT is event oriented TEj = TEi + tij • Time estimates are of fair degree • Time estimates are not that where TEj = earliest event time of head event of accuracy accurate TEi = earliest event time of tail event • Deterministic approach • Probabilistic approach tij = duration of the activity (i-j) • Cost is governing factor • Time is governing factor • Latest Event Time : latest allowable occurrence time is the latest • Project duration is fixed and cost • Cost is directly proportional to time by which an event must occur to keep project on schedule. is minimum time TL = TLi - tij • Critical path which joins critical • Her critical path is path which where TL = latest event time of head event activities joins the critical events TLi = earliest event time of tail event tij = duration of the activity (i-j) April 18, 2013 Construction Management 29 April 18, 2013 Construction Management 30 Agrawal Agrawal 5
  • 6. 18/04/2013 CPM Activity Time Float • Float denote the flexibility range within which activity start and • Earliest start time : is earliest time by which an activity can start. finish times many fluctuate without affecting total project – EST =TE(i) duration • Earliest finish time : is earliest time by which an activity can completed. • Total Float : it is time span by which starting or finishing of an activity – EFT = EST = tij can delayed without affecting overall completion time of project. – FT = LFT – EFT • Latest start time : time at which an activity can start without delaying • Free Float : it is that duration by which an activity can be delayed completion of p j as whole. p project without delaying any other succeeding activity. y g y g y – LST = LFT - tij – FF = FT - Sj • Independent Float : it is excess time available if the preceding activity • Latest finish time : time at which an activity can finish without delaying ends as late as possible and the succeeding activity starts as early as completion of project as whole. possible. – LFT = TL(i) – FID = FF - Si • Interfering Float : it is that difference between total float and free float. – FIT = FT – FF = Si April 18, 2013 Construction Management 31 April 18, 2013 Construction Management 32 Agrawal Agrawal Classification of Activities PERT • Program Evaluation and Review Technique is management tool 1. Sub critical activities : when float is +ve; the activity used for planning, controlling and reviewing a project. needs normal attention but has no flexibility. • It follows probabilistic approach towards time durations. 2. Critical activities : when float is zero; the activity needs • It is also event oriented network method where more importance is extra attention. This has no freedom of action. given to the achievement of discernible milestone rather than the activity can’t be made. 3. Super critical activities : when float is –ve; such • Slack can be positive, zero or negative activities require very special attention and care. care • Positive Slack = it is obtained when TL is more than TE. It indicates on schedule condition • Zero Slack = it TL is equal to TE. It indicate on schedule condition • Negative Slack = it TL is less than TE. It indicates behind the schedule April 18, 2013 Construction Management 33 April 18, 2013 Construction Management 34 Agrawal Agrawal Classification of Construction Equipment Excavation Equipment : Power Sovels 1. Earth moving equipment 1. Long lasting and useful class of earth moving equipment. 2. Hauling Equipment 2. One of basic equipment employed to excavate the earth and to load the trucks. 3. Hoisting Equipment 3. It is capable of excavating all types of earth, except hard rock. 4. Conveying Equipment 4. It may be crawler mounted or wheel mounted. 5. Crawler mounted have low speeds but very effective in unstable soils 5. 5 Aggregate and concrete production E i A d d i Equipment 6. Wheel mounted have higher speeds and are effective only in firm soils 6. Pile Driving Equipment 7. The size of Power Sovels varies from 0.375 to 5 cubic meter 7. Tunneling and Rock Drilling Equipment 8. Basic parts include track system, cabin, cables, rack, stick, foot pin, saddle block, boom point sheaves and bucket. 8. Pumping and Dewatering Equipment April 18, 2013 Construction Management 35 April 18, 2013 Construction Management 36 Agrawal Agrawal 6
  • 7. 18/04/2013 Excavation Equipment : Back Hoe Excavation Equipment : Drag Line 1. It is also termed as Hoe, Back Sovels and Pull Shovel 1. Prominent operation of dragging the bucket against the material to be dug 2. Generally used to excavate below natural surface on which it rests. 2. Long light crane boom and bucket is loosely attached to the boom through 3. Used to excavate trenches, pits for basements and generally grading work, cables. which requires precise control of depths. 3. Useful in digging below its track level and handling softer materials 4. Basic parts include Boom, Jack Boom, Boom foot drum, Boom Sheave, 4. The capacity of dragline is indicated by size of the bucket in cubic meters Stick Sheave, Bucket and Bucket Sheave. , 5. It can be crawler mounted, wheel mounted or trucked mounted. 6. Basic part dragline include the boom, hoist cable, drag cable, hoist chain, drag chain and bucket. April 18, 2013 Construction Management 37 April 18, 2013 Construction Management 38 Agrawal Agrawal Excavation Equipment : Clamshell Excavation Equipment : Trenching Machine 1. Also named as resemblance of its bucket to a clam which is like a shell fish 1. These are used for excavating trenches for laying pipelines, sewers, cables with hinged double shell. etc. 2. The front end is essentially a crane boom with specially designed bucket 2. Their operation is quick giving the required depth or width. loosely attached at the end through cables as in drag line. 3. Wheel type : this can be used for providing depth of 3m and width ranging 3. Basic part are closing line, hoist line, sheaves, brackets, tagline, shell and from 0.3 to 0.6m. The machine consist of power driven wheel provided hinge. with a number of detachable buckets having cutting teeth. 4. Ladder type : this consists of telescopic ladder or boom. There are two endless chains on which detachable buckets are mounted. The boom is holding the chains. The excavated material is conveyed to conveyor belt which disposes off the excavated earth. April 18, 2013 Construction Management 39 April 18, 2013 Construction Management 40 Agrawal Agrawal Excavating & Earth-moving Equipment : Excavating & Earth-moving Equipment : Scrapers Bull Dozers 1. Result of compromise between best loading and best hauling machines 1. These versatile equipments are commonly used in construction projects 2. They have established an important position in the earth moving field 2. Heavy blade attached to the tractor pushes material from one place to other 3. It unique machine for digging and long distance hauling of ploughable 3. Classified on basic of position of blades, mountings and controlled materials 4. Generally used for spreading earth fill 4. Self operating machine which digs and carry its own load through 5. For opening uproot roads through mountainous and rocky terrains scrapping the ground, hauls it over the required distance and discharging pp g g , q g g 6. 6 Clearing construction site 5. Classified as crawler-tractor-pulled and wheel-tractor-pulled depending on 7. Maintaining hauls roads the type of tractor used to pull them 6. Basic part are bowl, apron, and tail gate or ejector. April 18, 2013 Construction Management 41 April 18, 2013 Construction Management 42 Agrawal Agrawal 7
  • 8. 18/04/2013 Excavating & Earth-moving Equipment : Excavating Compaction Equipment : Tractors Smooth Wheel Rollers 1. These are multi purpose machines used mainly for pulling and pushing the 1. Plain steel rollers, self-propelled type, weighing from 5 to 15 tones and are other equipment or heavy loads used for ordinarily rolling work is where deep compaction isn’t required, 2. They are also used for agricultural purposes. the principal application being wider. 3. Classified as crawler type tractor and wheel type tractor 2. These roller are usually diesel engine type 4. Crawler type tractor is versatile equipment used to move bull dozers, 3. Compacts only small top thickness of earth and it effect doesn’t reach scrapers and wagons on rough roads. The speed of this type doesn’t 12 p g g p yp bottom of the layer kmph normally. It isn’t used on bituminous road 4. After compaction roller leave the surface smooth 5. Wheel type tractor is mounted on four wheels. The main advantage is higher speed upto 50kmph. Used for long distance hauling and on good roads. And agricultural used April 18, 2013 Construction Management 43 April 18, 2013 Construction Management 44 Agrawal Agrawal Excavating Compaction Equipment : Excavating Compaction Equipment : Sheep Wheel Rollers Pneumatic Tyred Rollers 1. Compacting earth work in embankment and canals where compaction deep 1. Consist of base or platform mounted between tow axles, the rear of which into layer of earth is required, these types of rollers are used has one more wheel than the front 2. Tamping effect produce good effect 2. Tyres must be so arranged that the tracks of forward wheels lie in between 3. Roller is hollow steel drum tracks of backward wheels 4. Self-propelled or as towed units 3. Compacting fine grained soil and well graded sands 5. Weigh upto 15tonnes or more and travel at speed of 25kmph 4. Self propelled and ballasting is done using either water or sand or p g iron p p g g pig to increase self weight April 18, 2013 Construction Management 45 April 18, 2013 Construction Management 46 Agrawal Agrawal Difference between Crawler & Wheeled Hauling Equipment • Crawler type roller has slow • Wheeled type roller has greater 1. Defined as movement of material form one place to another speed speed 2. Equipment used for transportation of material is called as hauling • More compact and powerful and • Can handle only lighter jobs equipment or simply haulers can handle heavier jobs 3. They classified as Dump Trucks and Dumpers • Cheaper • Costly 4. Dump trucks : used for earth moving purpose. Dumping of earth can done • Cost of operation & maintenance p • Operational & maintenance cost is rear, on the sides or at the bottom of truck. , is high less l 5. Selection of the type of dump trucks for a specific job depends on the soil • Stick control for steering • Wheel steering control condition and the nature of the haul road • Moves on rough as well as good 6. Dumpers : are high speed pneumatic wheeled trucks with short chassis • Moves on rough roads only and strong bodies. • Used for short distances roads 7. The hauling and dumping and dumping is done very fast compared to other • Requires skillful operation, • Used for longer distances equipment by using the dumper. maintenance & repairs • Lesser skills required for operation, maintenance & repairs April 18, 2013 Construction Management 47 April 18, 2013 Construction Management 48 Agrawal Agrawal 8
  • 9. 18/04/2013 Hoisting Equipment Hoisting Equipment : Derrick Cranes 1. It is the operation of lifting a weight from one location and moving it to 1. It consist of mast, a boom and a bull wheel on which the boom rotates another location which is at a reasonable distance and then dumping it. about vertical axis and guys or supporting members 2. Now a days, many big projects such as construction of dams, industrial 2. These cranes are either electrically operated, diesel operated or both buildings etc. require hoisting equipment. 3. The guy derrick has small mast supported by a number of guys and boom 3. It includes jacks, winches, chain hoists and cranes. pivoted at the lower end of the mast. The boom can revolve through 360’. 4. As hoisting equipment, crane is only single machine which has a single This crane is used for heavy loads upto 200 tons. piece, piece is capable of providing three dimensional movement of a weight. weight 4. 4 When load become less then 50 tons, guy ropes are replaced by trussed tons 5. Cranes are broadly classified as structure which become stiff leg derrick. It consists of mast, which can 1. Stationary or derrick cranes rotate and a boom. A stiff leg derrick is used for loads from 7 to 50tons. 2. Mobile cranes 3. Overhead or gantry cranes 4. Traveler cranes 5. Tower cranes April 18, 2013 Construction Management 49 April 18, 2013 Construction Management 50 Agrawal Agrawal Hoisting Equipment : Mobile Cranes Hoisting Equipment : Traveler Cranes 1. These are mounted on mobile units which is either crawlers type or wheel 1. They have their crabs moving on girders which are supported on legs type. instead of on overhead gantry track as used in overhead cranes. 2. Truck cranes have high mobility while the crawler mounted cranes move 2. The legs are capable of moving on tracks laid on the floors slowly. 3. Crawler type are capable of moving on rough terrain 4. Used for transportation of loads to shorter distances Hoisting Equipment : Tower Cranes g q p 1. Used for industrial and residential high rise building. 2. These are commonly used for assembly of industrial plants with steel structures. 3. Main part of crane are under carriage, slewing platform, tower with operator’s cabin and jibs 4. Tower has truss structure welded from steel bars and channels April 18, 2013 Construction Management 51 April 18, 2013 Construction Management 52 Agrawal Agrawal Conveying Equipment Conveying Equipment : Belt Conveyor 1. It is process of transporting material from one place to another over a 1. It is one of popular conveying machinery stationary structure. 2. Used when large quantities of materials have to be conveyed over long 2. They are those which carry material in continuous stream with its distinct distances at fast speed features such as endless chain or belt. 3. Simplest form consists of belt running over a pair of end drums or pulleys 3. When equipment does horizontally conveying it is know as conveyor and supported at regular intervals by series of rollers called idlers 4. When equipment does vertically conveying it is know as elevator 4. Advantages of belt conveyor are 5. 5 Advantages of conveyor are Ad t f 1. 1 It can handles light/ heavy materials, dry/ wet, fine/ coarse. materials wet coarse 1. It increases output 2. Designed for conveying several thousand tons of material per hour and for 2. It facilitates continuity in operation distances of several kilometers. 3. It results in time saving 3. Can carry material horizontally or inclined 4. These are no waiting periods 4. Lighter in weight then other conveyors 5. Controlled discharge of material April 18, 2013 Construction Management 53 April 18, 2013 Construction Management 54 Agrawal Agrawal 9
  • 10. 18/04/2013 Conveying Equipment : Screw Conveyor Aggregate Production Equipment 1. Used for handling granular or pulverized material 1. Crushers are generally used to reduce size of the large stone or rock to 2. Quantity of material conveyed is less compared to the belt conveyor, at smaller uniform sized aggregates required for concrete mix. same time cost is also less. 1. Jaw Crusher : primary crusher, operates by allowing stone to flow into the 3. Can inclined maximum upto 35’ space between two jaws one of which stationary and other is movable. 4. Length of conveyor is 65m 2. Gyratory Crusher : hardened steel plates. Lead has long conical shape, with trough shaft suspended in bearing at the top and an eccentric base connection connected to gears. 3. 3 Cone C h : are capable of producing large quantities of uniformly fine C Crusher bl f d i l ii f if l fi Conveying Equipment : Bucket Conveyor crushed stone. It has shorter cone with smaller inlet and outlet openings. 4. Roll Crusher : consists of heavy cast iron frame equipped with two counter rotating rollers mounted on separate horizontal shaft. 1. Has bucket in shape of V which are open at top 2. Length is limited upto 25m due to weight of the conveyor and strength of the chains. 3. Generally used for coal handling April 18, 2013 Construction Management 55 April 18, 2013 Construction Management 56 Agrawal Agrawal Factors affecting selection of Construction Equipment Management Checklist Equipment 1. Mechanize selectively for economy of production, quality and speed of 1. Use of equipment available with the organization construction 2. Suitability for job condition with special references to climatic and 2. Choose between buying, hiring and leasing operating conditions 3. Choose size and number of equipment including standby 3. Uniformity of type 4. Select the prime mover –petrol/diesel/electric 4. Size of equipment 5. check suitability for local conditions 5. Use of standard equipment 6. Decide on mobile or stationary equipment 6. Country of origin 7. Arrange finance for purchase 7. Unit cost of production 8. Examine the warranties while purchasing 8. Availability of spare parts and selection of manufacturers 9. Commission equipment within warranty period 9. Suitability of local labour for operation 10. Freeze productivity norms and ensure same 11. Use only trained personal for operation 12. Insist on regular preventative maintenance 13. Ensure that standby power is available 14. Insist on safety measures April 18, 2013 Construction Management 57 April 18, 2013 Construction Management 58 Agrawal Agrawal Management Information Systems in Management Information Systems in Construction Industry Construction Industry • Date : it can be defined as group of non-random symbols which represent • An Organization is an institute which promotes mechanism of interpersonal things that have happened. Data of facts that are obtained by observation or relations and activates collaboration many resources available such as, research and which are recorded frequently are called as Raw data or Basic Monetary, technical, marketing and business. data • Information : the concept of information in an organizational sense is more complex and difficult than frequent use of this common word would suggest. Information is data that have been interpreted and understood by the recipient of the message. • Communication : information is transmitted by the process of communication. Communication involves the interchange of thoughts or opinion by word, letters or by similar means. April 18, 2013 Construction Management 59 April 18, 2013 Construction Management 60 Agrawal Agrawal 10
  • 11. 18/04/2013 Requirement of MIS Payment of Wages Act 1982 • To provide an organized and efficient means of measuring, collection, 1. This act was introduced to regulate the payment of wages, imposition of verifying and qualifying data, reflecting the progress and status of operations fines, etc on the project with respect to progress, cost, resources and quantity 2. The term Wages includes all remuneration including all allowances, bonus, notice pay, etc but doesn’t include house rent, water and electricity • To provide a standard against which progress and cost can be compared charges, travel allowance, medical allowance, pension, gratuity etc • To provide an organized, accurate and effectiveness means of converting the 3. Accordingly to Act, wages are to be paid promptly on a monthly basis and data from the operation into information. The information systems should be if any person is terminated from service, his wages should be settled realistic should be realistic and should recognize li i h ld b li i d h ld i within two days of the termination. termination – Means of processing the information 4. This Act is applicable to employees having a salary less then Rs. 1600 pm – Skills available – Value of information compared with the cost of obtaining – Report the correct and necessary information – Identify and isolate critical information – To deliver the information April 18, 2013 Construction Management 61 April 18, 2013 Construction Management 62 Agrawal Agrawal Minimum Wages Act 1986 Indian Contract Act 1872 1. This act prevents the exploitation of the unorganized labour in the • In this Act the following words and expressions are used in the following construction industry by the employers. senses, unless a contrary intention appears from the context:- 2. Accordingly to this Act, provision is made for the statuary fixation of – When one person signifies to another his willingness to do or to minimum rate of wages in the establishment. abstain from doing anything, with a view to obtaining the assent of that 3. Wages to construction workers in India is paid either in time rate basis or other to such act or abstinence, he is said to make a proposal piece rate basis – When the person to whom the proposal is made signifies his assent 4. In the time rate basis, suitable rate of payment is fixed per unit of time that the worker i engaged for the work h k is df h k thereto, thereto the proposal is said to be accepted A proposal, when accepted accepted. proposal accepted, becomes a promise 5. Accordingly to this Act, different minimum rates can be fixed depending on the class of work, type of personal employed and depending on the – The person making the proposal is called the" promisor and the person location of work. accepting the proposal is called the It promise" – When, at the desire of the promisor, the promise or any other person has clone or abstained from doing, or does or abstains from doing, or promises to do or to abstain from doing, something, such Act or abstinence or promise is called a consideration for the promise April 18, 2013 Construction Management 63 April 18, 2013 Construction Management 64 Agrawal Agrawal Workmen Compensation Act Preparation for the Construction Interview 1. In case of death: 40% of the monthly wage of the deceased workman, 1. Personal characteristics : such as physical appearance, health, sense of multiplied by the relevant factor or Rs. 20,000; whichever is more. humor, Self confidence, cultural level, alertness, manners, general working 2. In case of total permanent disablement: 50% of the monthly wage, multiplied habits. by the relevant factor: or Rs. 24,000; whichever is more. 2. Technical Competency : information about the exams passed, grades 3. In case of partial permanent disablement: The compensation is a percentage of obtained, awards and honors and extra- curricular activities. that payable in the case of total permanent disablement. The earning capacity is 3. To find the initiative, common sense and general smartness determined by a qualified medical practitioners. 4. Ability to inspire confidence by sustained effort without super-vision , 4. 4 In case of (total or partial) temporary disablement" A sum equal to 25% of the level ki l l making ability, originality and initiative. bili i i li di ii i monthly wages of the workman shall be paid half-monthly. 5. Capacity to work in team-by knowing about his family, community • The minimum rate of compensation is proposed to be raised from 50,000 to Rs. interests and his type of friends. 80,000 for death and from Rs. 60,000 to Rs. 90,000 in case of permanent/total 6. Potential for growth-long range aspirations of the applicant – whether he is disablement. State Government appoints Commissioners to investigate and a drifter or one who would exploit every possible chance to develop his solve every case for workmen's compensation. The appointed Commissioner's potential to the maximum. tribunal has some of the powers of a civil court. An appeal against any order of 7. Having Details of construction done in nearby area he is leaving. the Commissioner can be filed in the High Court. This must be done within 60 days of the order or decision of the Commissioner. April 18, 2013 Construction Management 65 April 18, 2013 Construction Management 66 Agrawal Agrawal 11
  • 12. 18/04/2013 Form work removing periods • Walls, columns and vertical sides of beams – 24 to 48 hours may be decided by Engineer-in-charge • Slabs (Prop left under ) 3 day • Beam soffit (Prop left under ) 7 days • Removing of props to slabs – Spanning less then 4.5m = 7 days – Spanning over 4.5m = 14 days p g y • Removing of props to beams and arches – Spanning less then 6m = 14 days – Spanning over 6m = 21 days April 18, 2013 Construction Management 67 Agrawal 12