4. o Stakeholder and Public Involvement
o Land Use Analysis and Scenario
Planning
o Existing and Future Conditions
o Needs Analysis
o Ironton Pavement Management
o Recommendations and
Implementation
PROJECT APPROACH
5. o State of the Corridor Assessment
oTravel Characteristics
oReliability and Safety
o Travel Time index
o Speeds
o Volumes
o Crash Analyses
o Capacity Analyses
o Geometric Deficiencies
EXISTING AND FUTURE CONDITIONS
18. COMMODITIES BY TRUCK (BY TONNAGE)
Rank Originating Commodity
1 Petroleum or Coal Products
2 Secondary (Truck) Traffic
3 Chemicals Or Allied Products
4 Transportation Equipment
5 Clay, Concrete, Glass or Stone
6 Food or Kindred Products
7 Lumber or Wood Products
8 Fabricated Metal Products
9 Primary Metal Products
10 Rubber or Misc Plastics
11 All Other Commodities
Rank Terminating Commodity
1 Nonmetallic Minerals
2 Clay, Concrete, Glass or Stone
3 Food or Kindred Products
4 Chemicals Or Allied Products
5 Secondary (Truck) Traffic
6 Primary Metal Products
7 Petroleum or Coal Products
8 Lumber or Wood Products
9 Fabricated Metal Products
10 Pulp, paper or allied products
11 All Other Commodities
23. PRELIMINARY DRAFT ASSESSMENT
Low Travel
Time
Reliability
At-Grade
Intersections/Driveways
Present
Development
opportunities
Traffic
Growth/Congestion
Issues Present
High Crash
Density
Geometrics
Deficiencies
Present
Current
projects/studies
SR 650 interchange area O O O
Deep cut road O O
SR 93 interchange area O O O O O
SR 141 interchange O O
SR 243 O O O O
12th/13th Street Bridge O O O
CR1/CR 15 O O O
Grandview Avenue O O O O
Solida Road
Burlington Macedonia Rd area O O O O O O
Charley Creek Rd area O O O O O
Buffalo Creek Rd area O
SR 7/6th Street Bridge intersection O O
SR 7/SR 243 O O
SR 7/East Bridge intersection area O O O O O
SR 7/Irene Rd O O O O
SR 7/775 O O O O
SR 7/CR 7 O O O
SR 7 east O O
Preliminary Draft Assessment
24. COMMENTS
o Comments – Give us feedback on initial analyses
o Information shown on KYOVA website –
WWW.KYOVAIPC.ORG
o Matt Selhorst
614-257-8353
Matt.Selhorst@hdrinc.com
25. NEXT STEPS
o Receive and review comments
o Public engagement
o Complete Existing and Future Conditions
o Identify and analyze solutions
28. STUDY OVERVIEW– PROPOSED SCHEDULE
o Land Use and Scenario Planning – June 2020
o Existing and Future Conditions Report – October 2020
o Ironton Pavement Management – October 2020
o Needs Analysis – December 2020
o Recommendations – February 2020
o Final Plan - April 2021
o Stakeholder and Public Engagement
o 3 Stakeholder – May 2020, September 2020,
December 2021, March 2021
o 2 Public Open houses – October 2020, January
2021