Study Report 3
M2 - Putika Ashfar Khoiri
Water Engineering Laboratory
Department of Civil Engineering
October 17th , 2017
General Purpose:
Simulate past flood event in Surabaya City to derive probabilistic flood maps in
flood prone area by assessing several uncertainties in hydraulic modelling and
flood mapping.
Problems to be discussed :
1. How river discharge and other parameters have influence on flood simulations
(How the model results change depending on the input data)
2. What is the problems while simulating floods?
Objective
Outline
1
Previous Task
• Development of flood scenarios and model simulations
Perform flood inundation modelling for the study area NAYS 2D Flood for 1 flood
event
Inflow discharge hourly observed discharge data from February 11st,
2015 to February 13rd, 2015
water surface at downstream free outflow
Initial water surface Depth = 0
Calculation time 42 hours
Time step 2 mins
Calculation Condition
Parameters which are included :
1. Determination of grid shape
2. Roughness coefficients of the floodplain
2
Current Progress
Modules Evaluation tasks
Hydrological Analysis
Flow hydrograph shape
Peak discharge estimation
water-elevation and distance relationship curve
Rating-curve rating curve estimation
Flood routing Flow hydrograph shape
Flood inundations were simulated using the flow conditions on the past
flood events between January to March in 2014, 2015 and 2016
Reported flood events obtained from National Agency for Disaster Management Data
Date Inundation Height (cm) Duration
23-01-2014 (event 1) 50-70 2 to 3 days
20-02-2015 (event 2) 10-30 2 days
24-02-2016 (event 3) 20-30 2 days
The annual maximum peak discharge during the flood events are observed in 3 weeks around
flood peak
• Initial condition : 2 weeks before the flood occurs
• Simulation period : 100 hours 3
Calculation setting
River length 8.64 km
Size of W 3000 meter
Grid size 30 m x 30 m
number of river
cross section data
9 points
upstream
downstream
inflow
Name of polygon Description Roughness Coefficient
Agricultural area Grass, agricultural site 0.030
Low density area Citizen house 0.040
High density area Office, school and
public facility
0.070 – 0.80
River River 0.01
(*)IRiC User Manual 4
Initial Condition (2 weeks before flooding inundation simulation) based on the observation data
Date Average discharge (m3.s-1) Maximum Discharge (m3.s-1)
9-01-2014 to 22-01-2014 (IC 1) 79.54010976 181.22
5-02-2015 to 19-02-2015 (IC 2) 66.41162405 182.22
9-02-2016 tp 23-02-2016 (IC 3) 60.37975238 180.1
-50.00
0.00
50.00
100.00
150.00
200.00
0 50 100 150 200 250 300 350 400
Discharge(m3.s-1)
Period (Hours)
IC 1
IC 2
IC 3
Calculation setting (initial condition)
The discharge on event 1 is relatively low before the flood events 5
Result (initial condition)
1. The value of river depth are varies from 0.5 m to 4 m -> the depth value need to
calibrate with the datum to produce water elevation.
2. In the middle stream area, the water depth become higher, probably due to the
effect of topographic changes or narrow changes in river cross-section width.
Water depth
6
Result (initial condition)-velocity
1. The velocity magnitude are varies between 0.784 m/s to 1.57m/s along the center
of the stream line.
2. Higher velocity occurs due to the meandering of the river
Velocity
7
Discharge routing method
The Muskingum channel routing method is employed to route the flow
through the streams
𝑄 𝑢 − 𝑄 𝑑 =
∆𝑥
𝑐3
𝜕
𝜕𝑡
𝑄 𝑑 +
1
2
−
𝐿
∆𝑥
(𝑄 𝑢 − 𝑄 𝑑)
𝑄 𝑑,𝑗+1 = 𝐶1 𝑄 𝑢,𝑗+1 + 𝐶2 𝑄 𝑢,𝑗+1 + 𝐶3 𝑄 𝑢,𝑗+1
Where the coefficients C1,C2,C3 are expressed as
𝐶1 =
−𝐾𝜃 + 0.5∆𝑡
𝐾 1 − 𝜃 + 0.5∆𝑡
𝐶2 =
−𝐾𝜃 + 0.5∆𝑡
𝐾 1 − 𝜃 + 0.5∆𝑡
𝐶3 =
𝐾 1 − 𝜃 − 0.5∆𝑡
𝐾 1 − 𝜃 + 0.5∆𝑡
K= travel time
θ = weighing parameter ( 0 to 1)
Time needed from the water at the
upstream reach the downstream end at the
simulation
∆𝑡 >
∆𝑥𝑗
𝑐𝑗
𝑛
+ 𝑢𝑗
𝑛
∆𝑥𝑗 = 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑡ℎ𝑒 𝑟𝑖𝑣𝑒𝑟 𝑟𝑒𝑎𝑐ℎ
𝑐𝑗
𝑛
= 𝑔𝑟𝑎𝑣𝑖𝑡𝑦 𝑤𝑎𝑣𝑒 𝑐𝑒𝑙𝑒𝑟𝑖𝑡𝑦
𝑢𝑗
𝑛
= 𝑎𝑣𝑒𝑟𝑎𝑔𝑒 𝑟𝑒𝑎𝑐ℎ 𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 8
Calculation setting (2)
Inflow hydrographs used for the simulations boundary conditions
Hourly discharge data are provided at the upstream area of Surabaya River.
Date
Maximum Discharge
(m3.s-1)
Tp
(hours) T0.3 (hours)
23-01-2014 to 27-01-2014 (event 1) 367.55 28 18
20-02-2015 to 24-02-2015 (event 2) 337.53 46 32
24-02-2016 to 28-02-2016 (event 3) 335.9 35 27
Tp (lag time) = the amount of time it will take for a river to flood after a period of heavy
precipitation
T0.3 = the amount of time need from the peak of discharge to 30% peak of discharge
Event Initial Water Surface (m)
time step
(sec)
Initial manning roughness
channel floodplain slope
1 17.48514757 120 0.01 0.001
2 17.71327015 180 0.01 0.001
3 17.672942 120 0.01 0.001
A uniform routing time interval,
Δt = 30min and
Δx = 30 m was used for all the test runs.
9
Routing results (event 1)
1. The hydrograph peak theoretically took 72 minutes to travel between 2 gauges and relatively little
attenuation occurred. With the estimation of velocity between 0.74 m/s to 1.8 m/s
2. Peak flow occurred at the upstream end at 30 hours from the initial condition, and at downstream
end on the same day within 124 minutes
3. The downstream discharge is slightly unstable on the peak of the hydrograph
0
50
100
150
200
250
300
350
400
0 20 40 60 80 100 120
Discharge(m3/s-1)
Time (hours)
upstream boundary
downstream discharge
downstream discharge
(simulation)
10
Routing results (event 2 and 3)
0
50
100
150
200
250
300
350
400
0 20 40 60 80 100 120
Discharge(m3/s-1)
Time (hours)
0
50
100
150
200
250
300
350
400
0 20 40 60 80 100 120
Time (hours)
upstream boundary
downstream discharge
downstream discharge
(simulation)
1. Event 2 and 3 relatively have long peak hydrograph with duration of 4 to 6 hours
2. Using the same travel time estimation (K) for the routing calculation on event 2 and 3,
the downstream simulation result has a close relation with the calculated downstream
discharge
3. But, we still need to evaluate the relative error in the time- to peak of the routed
discharge hydrograph
11
Rating-curve rating-curve estimation (tentative)
Flood dynamics Parameter estimation
Grid-shape accuracy
Damage
estimation
Probabilistic flood Map
water elevation-damage relations
building and land-use value
Methodology
Hydrological
Analysis
Flood routing
Damage
estimation
uncertain
12
Setting of initial condition
Analysis of hydrograph shape and water elevation
profile
Model Parameters
The table lists the factors which are used as calibration factors
in each model implementation.
Parameter Sampling range
Manning roughness channel 0.01-0.04
Floodplain slope 0.001-0.015
Initial water surface at downstream boundary 17.5 m – 17.8 m
Eddy viscosity coefficient 0 to 1
Calibration parameters
1. Capability of the model reproduce hydraulic behaviour of the river and
inundated floodplain
2. Time stationary of model parameter (i.e. roughness parameter)
3. Hydraulic information (i.e. flow hydrograph)
13
Future Tasks
14

Weitere ähnliche Inhalte

Was ist angesagt?

DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...
DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...
DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...Deltares
 
DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...
DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...
DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...Deltares
 
Morphological model of the river rhine branches from the concept to the opera...
Morphological model of the river rhine branches from the concept to the opera...Morphological model of the river rhine branches from the concept to the opera...
Morphological model of the river rhine branches from the concept to the opera...Deltares
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographSatish Taji
 
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...Alireza Babaee
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographuzma shaikh
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62Riya2001998
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewagesidrarashiddar
 
DSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
DSD-INT 2019 The FEWSPo system - actual state and new developments - TonelliDSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
DSD-INT 2019 The FEWSPo system - actual state and new developments - TonelliDeltares
 
DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...
DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...
DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...Deltares
 
Terrace effects on soil erosion processes
Terrace effects on soil erosion processesTerrace effects on soil erosion processes
Terrace effects on soil erosion processesHui Shao
 
Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...
Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...
Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...ExternalEvents
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)Jaydeep Dave
 

Was ist angesagt? (20)

Mauro Sulis
Mauro SulisMauro Sulis
Mauro Sulis
 
DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...
DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...
DSD-INT 2017 Linking rainfall recharge models with groundwater models in NGMS...
 
7 routing
7 routing7 routing
7 routing
 
Laura Gatel
Laura GatelLaura Gatel
Laura Gatel
 
DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...
DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...
DSD-INT 2017 The unsaturated zone MetaSWAP-package, recent developments - Van...
 
Morphological model of the river rhine branches from the concept to the opera...
Morphological model of the river rhine branches from the concept to the opera...Morphological model of the river rhine branches from the concept to the opera...
Morphological model of the river rhine branches from the concept to the opera...
 
Adige modelling
Adige modellingAdige modelling
Adige modelling
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62
 
Estimation of storm sewage
Estimation of storm sewageEstimation of storm sewage
Estimation of storm sewage
 
DSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
DSD-INT 2019 The FEWSPo system - actual state and new developments - TonelliDSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
DSD-INT 2019 The FEWSPo system - actual state and new developments - Tonelli
 
DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...
DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...
DSD-INT 2016 Integrating information sources for inland waters modelling - Ba...
 
Sylvain Weill
Sylvain WeillSylvain Weill
Sylvain Weill
 
Presentation aboout flood routing
Presentation aboout flood routingPresentation aboout flood routing
Presentation aboout flood routing
 
Terrace effects on soil erosion processes
Terrace effects on soil erosion processesTerrace effects on soil erosion processes
Terrace effects on soil erosion processes
 
Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...
Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...
Recalibration of a modified version of the WaTEM/SEDEM model for the assessme...
 
Gianluca Botter
Gianluca BotterGianluca Botter
Gianluca Botter
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
 

Ähnlich wie Simulating several flood events using Nays 2D Flood

5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).pptJohnAyele
 
Lukman arief water column effect
Lukman arief   water column effectLukman arief   water column effect
Lukman arief water column effectLukman Arief
 
UnitHydrograph.pptx
UnitHydrograph.pptxUnitHydrograph.pptx
UnitHydrograph.pptxssuserdf29f0
 
HydrographAnalysis07.pptx
HydrographAnalysis07.pptxHydrographAnalysis07.pptx
HydrographAnalysis07.pptxssuser33cd2a
 
1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptxJorge Atau
 
poster Eenviro 2020.pdf
poster Eenviro 2020.pdfposter Eenviro 2020.pdf
poster Eenviro 2020.pdfssuserb69f54
 
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...Maryam Izadifar
 
Flood Routing.ppt:flood routing and control
Flood Routing.ppt:flood routing and controlFlood Routing.ppt:flood routing and control
Flood Routing.ppt:flood routing and controlmulugeta48
 
12-runoffprocesses.pdf
12-runoffprocesses.pdf12-runoffprocesses.pdf
12-runoffprocesses.pdfRupeshAditya
 
Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)Dawit A. Melaku
 
McGill Ozone Contactor Design Project
McGill Ozone Contactor Design ProjectMcGill Ozone Contactor Design Project
McGill Ozone Contactor Design ProjectNicholas Mead-Fox
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagementimaduddin91
 

Ähnlich wie Simulating several flood events using Nays 2D Flood (20)

5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
 
Lukman arief water column effect
Lukman arief   water column effectLukman arief   water column effect
Lukman arief water column effect
 
runoff.pdf
runoff.pdfrunoff.pdf
runoff.pdf
 
UnitHydrograph.pptx
UnitHydrograph.pptxUnitHydrograph.pptx
UnitHydrograph.pptx
 
HydrographAnalysis07.pptx
HydrographAnalysis07.pptxHydrographAnalysis07.pptx
HydrographAnalysis07.pptx
 
1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx
 
poster Eenviro 2020.pdf
poster Eenviro 2020.pdfposter Eenviro 2020.pdf
poster Eenviro 2020.pdf
 
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
Integrated hydro-geological risk for Mallero basin (Alpine Italy) – part 2: h...
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptx
 
Flood Routing.ppt:flood routing and control
Flood Routing.ppt:flood routing and controlFlood Routing.ppt:flood routing and control
Flood Routing.ppt:flood routing and control
 
Poster6
Poster6Poster6
Poster6
 
12-runoffprocesses.pdf
12-runoffprocesses.pdf12-runoffprocesses.pdf
12-runoffprocesses.pdf
 
Rainfall-Runoff Modelling
Rainfall-Runoff ModellingRainfall-Runoff Modelling
Rainfall-Runoff Modelling
 
Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)Evaluation Of Low Impact Developments (LID)
Evaluation Of Low Impact Developments (LID)
 
McGill Ozone Contactor Design Project
McGill Ozone Contactor Design ProjectMcGill Ozone Contactor Design Project
McGill Ozone Contactor Design Project
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
5 ijsrms-02617 (1)
5 ijsrms-02617 (1)5 ijsrms-02617 (1)
5 ijsrms-02617 (1)
 
Final Ppt.pdf
Final Ppt.pdfFinal Ppt.pdf
Final Ppt.pdf
 
Chapter 3.pdf
Chapter 3.pdfChapter 3.pdf
Chapter 3.pdf
 

Mehr von Putika Ashfar Khoiri

Parameter estimation of distributed hydrological model using polynomial chaos...
Parameter estimation of distributed hydrological model using polynomial chaos...Parameter estimation of distributed hydrological model using polynomial chaos...
Parameter estimation of distributed hydrological model using polynomial chaos...Putika Ashfar Khoiri
 
Evaluation of international program of maritime and urban engineering fk
Evaluation of international program of maritime and urban engineering fkEvaluation of international program of maritime and urban engineering fk
Evaluation of international program of maritime and urban engineering fkPutika Ashfar Khoiri
 
How to obtain rainfall data from mlit (x rain)
How to obtain rainfall data from mlit (x rain)How to obtain rainfall data from mlit (x rain)
How to obtain rainfall data from mlit (x rain)Putika Ashfar Khoiri
 
流出モデル入力用降水量データ作成方法
流出モデル入力用降水量データ作成方法流出モデル入力用降水量データ作成方法
流出モデル入力用降水量データ作成方法Putika Ashfar Khoiri
 
Serch discharge observation data from MLIT
Serch discharge observation data from MLITSerch discharge observation data from MLIT
Serch discharge observation data from MLITPutika Ashfar Khoiri
 
Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...
Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...
Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...Putika Ashfar Khoiri
 
Technologies for safety improvement
Technologies for safety improvementTechnologies for safety improvement
Technologies for safety improvementPutika Ashfar Khoiri
 
Senri new town (documentation photos)
Senri new town (documentation photos)Senri new town (documentation photos)
Senri new town (documentation photos)Putika Ashfar Khoiri
 
The problem of application based transportation in indonesia
The problem of application based transportation in indonesiaThe problem of application based transportation in indonesia
The problem of application based transportation in indonesiaPutika Ashfar Khoiri
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinPutika Ashfar Khoiri
 
Levelized Costs of Electricity of OTEC in Halmahera
Levelized Costs of Electricity of OTEC in HalmaheraLevelized Costs of Electricity of OTEC in Halmahera
Levelized Costs of Electricity of OTEC in HalmaheraPutika Ashfar Khoiri
 
Integrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture designIntegrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture designPutika Ashfar Khoiri
 
The importance of Public Transportation System in Indonesia for Reducing Traf...
The importance of Public Transportation System in Indonesia for Reducing Traf...The importance of Public Transportation System in Indonesia for Reducing Traf...
The importance of Public Transportation System in Indonesia for Reducing Traf...Putika Ashfar Khoiri
 
Regulations and Policy Analysis of Brantas River Basin (Introduction)
Regulations and Policy Analysis of  Brantas River Basin(Introduction)Regulations and Policy Analysis of  Brantas River Basin(Introduction)
Regulations and Policy Analysis of Brantas River Basin (Introduction)Putika Ashfar Khoiri
 
The Chimera Grid Concept and Application
The Chimera Grid Concept and Application The Chimera Grid Concept and Application
The Chimera Grid Concept and Application Putika Ashfar Khoiri
 

Mehr von Putika Ashfar Khoiri (20)

Parameter estimation of distributed hydrological model using polynomial chaos...
Parameter estimation of distributed hydrological model using polynomial chaos...Parameter estimation of distributed hydrological model using polynomial chaos...
Parameter estimation of distributed hydrological model using polynomial chaos...
 
Yumesaki Tunnel
Yumesaki TunnelYumesaki Tunnel
Yumesaki Tunnel
 
osaka unniversity campus life
osaka unniversity campus lifeosaka unniversity campus life
osaka unniversity campus life
 
Evaluation of international program of maritime and urban engineering fk
Evaluation of international program of maritime and urban engineering fkEvaluation of international program of maritime and urban engineering fk
Evaluation of international program of maritime and urban engineering fk
 
How to obtain rainfall data from mlit (x rain)
How to obtain rainfall data from mlit (x rain)How to obtain rainfall data from mlit (x rain)
How to obtain rainfall data from mlit (x rain)
 
流出モデル入力用降水量データ作成方法
流出モデル入力用降水量データ作成方法流出モデル入力用降水量データ作成方法
流出モデル入力用降水量データ作成方法
 
Ibo river model manual
Ibo river model manualIbo river model manual
Ibo river model manual
 
Ibo river
Ibo riverIbo river
Ibo river
 
Ibogawa river map
Ibogawa river mapIbogawa river map
Ibogawa river map
 
Serch discharge observation data from MLIT
Serch discharge observation data from MLITSerch discharge observation data from MLIT
Serch discharge observation data from MLIT
 
Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...
Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...
Improving Distributed Hydrologocal Model Simulation Accuracy Using Polynomial...
 
Technologies for safety improvement
Technologies for safety improvementTechnologies for safety improvement
Technologies for safety improvement
 
Senri new town (documentation photos)
Senri new town (documentation photos)Senri new town (documentation photos)
Senri new town (documentation photos)
 
The problem of application based transportation in indonesia
The problem of application based transportation in indonesiaThe problem of application based transportation in indonesia
The problem of application based transportation in indonesia
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River Basin
 
Levelized Costs of Electricity of OTEC in Halmahera
Levelized Costs of Electricity of OTEC in HalmaheraLevelized Costs of Electricity of OTEC in Halmahera
Levelized Costs of Electricity of OTEC in Halmahera
 
Integrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture designIntegrated design and performance target of conceptual architecture design
Integrated design and performance target of conceptual architecture design
 
The importance of Public Transportation System in Indonesia for Reducing Traf...
The importance of Public Transportation System in Indonesia for Reducing Traf...The importance of Public Transportation System in Indonesia for Reducing Traf...
The importance of Public Transportation System in Indonesia for Reducing Traf...
 
Regulations and Policy Analysis of Brantas River Basin (Introduction)
Regulations and Policy Analysis of  Brantas River Basin(Introduction)Regulations and Policy Analysis of  Brantas River Basin(Introduction)
Regulations and Policy Analysis of Brantas River Basin (Introduction)
 
The Chimera Grid Concept and Application
The Chimera Grid Concept and Application The Chimera Grid Concept and Application
The Chimera Grid Concept and Application
 

Kürzlich hochgeladen

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 

Kürzlich hochgeladen (20)

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

Simulating several flood events using Nays 2D Flood

  • 1. Study Report 3 M2 - Putika Ashfar Khoiri Water Engineering Laboratory Department of Civil Engineering October 17th , 2017
  • 2. General Purpose: Simulate past flood event in Surabaya City to derive probabilistic flood maps in flood prone area by assessing several uncertainties in hydraulic modelling and flood mapping. Problems to be discussed : 1. How river discharge and other parameters have influence on flood simulations (How the model results change depending on the input data) 2. What is the problems while simulating floods? Objective Outline 1
  • 3. Previous Task • Development of flood scenarios and model simulations Perform flood inundation modelling for the study area NAYS 2D Flood for 1 flood event Inflow discharge hourly observed discharge data from February 11st, 2015 to February 13rd, 2015 water surface at downstream free outflow Initial water surface Depth = 0 Calculation time 42 hours Time step 2 mins Calculation Condition Parameters which are included : 1. Determination of grid shape 2. Roughness coefficients of the floodplain 2
  • 4. Current Progress Modules Evaluation tasks Hydrological Analysis Flow hydrograph shape Peak discharge estimation water-elevation and distance relationship curve Rating-curve rating curve estimation Flood routing Flow hydrograph shape Flood inundations were simulated using the flow conditions on the past flood events between January to March in 2014, 2015 and 2016 Reported flood events obtained from National Agency for Disaster Management Data Date Inundation Height (cm) Duration 23-01-2014 (event 1) 50-70 2 to 3 days 20-02-2015 (event 2) 10-30 2 days 24-02-2016 (event 3) 20-30 2 days The annual maximum peak discharge during the flood events are observed in 3 weeks around flood peak • Initial condition : 2 weeks before the flood occurs • Simulation period : 100 hours 3
  • 5. Calculation setting River length 8.64 km Size of W 3000 meter Grid size 30 m x 30 m number of river cross section data 9 points upstream downstream inflow Name of polygon Description Roughness Coefficient Agricultural area Grass, agricultural site 0.030 Low density area Citizen house 0.040 High density area Office, school and public facility 0.070 – 0.80 River River 0.01 (*)IRiC User Manual 4
  • 6. Initial Condition (2 weeks before flooding inundation simulation) based on the observation data Date Average discharge (m3.s-1) Maximum Discharge (m3.s-1) 9-01-2014 to 22-01-2014 (IC 1) 79.54010976 181.22 5-02-2015 to 19-02-2015 (IC 2) 66.41162405 182.22 9-02-2016 tp 23-02-2016 (IC 3) 60.37975238 180.1 -50.00 0.00 50.00 100.00 150.00 200.00 0 50 100 150 200 250 300 350 400 Discharge(m3.s-1) Period (Hours) IC 1 IC 2 IC 3 Calculation setting (initial condition) The discharge on event 1 is relatively low before the flood events 5
  • 7. Result (initial condition) 1. The value of river depth are varies from 0.5 m to 4 m -> the depth value need to calibrate with the datum to produce water elevation. 2. In the middle stream area, the water depth become higher, probably due to the effect of topographic changes or narrow changes in river cross-section width. Water depth 6
  • 8. Result (initial condition)-velocity 1. The velocity magnitude are varies between 0.784 m/s to 1.57m/s along the center of the stream line. 2. Higher velocity occurs due to the meandering of the river Velocity 7
  • 9. Discharge routing method The Muskingum channel routing method is employed to route the flow through the streams 𝑄 𝑢 − 𝑄 𝑑 = ∆𝑥 𝑐3 𝜕 𝜕𝑡 𝑄 𝑑 + 1 2 − 𝐿 ∆𝑥 (𝑄 𝑢 − 𝑄 𝑑) 𝑄 𝑑,𝑗+1 = 𝐶1 𝑄 𝑢,𝑗+1 + 𝐶2 𝑄 𝑢,𝑗+1 + 𝐶3 𝑄 𝑢,𝑗+1 Where the coefficients C1,C2,C3 are expressed as 𝐶1 = −𝐾𝜃 + 0.5∆𝑡 𝐾 1 − 𝜃 + 0.5∆𝑡 𝐶2 = −𝐾𝜃 + 0.5∆𝑡 𝐾 1 − 𝜃 + 0.5∆𝑡 𝐶3 = 𝐾 1 − 𝜃 − 0.5∆𝑡 𝐾 1 − 𝜃 + 0.5∆𝑡 K= travel time θ = weighing parameter ( 0 to 1) Time needed from the water at the upstream reach the downstream end at the simulation ∆𝑡 > ∆𝑥𝑗 𝑐𝑗 𝑛 + 𝑢𝑗 𝑛 ∆𝑥𝑗 = 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑡ℎ𝑒 𝑟𝑖𝑣𝑒𝑟 𝑟𝑒𝑎𝑐ℎ 𝑐𝑗 𝑛 = 𝑔𝑟𝑎𝑣𝑖𝑡𝑦 𝑤𝑎𝑣𝑒 𝑐𝑒𝑙𝑒𝑟𝑖𝑡𝑦 𝑢𝑗 𝑛 = 𝑎𝑣𝑒𝑟𝑎𝑔𝑒 𝑟𝑒𝑎𝑐ℎ 𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 8
  • 10. Calculation setting (2) Inflow hydrographs used for the simulations boundary conditions Hourly discharge data are provided at the upstream area of Surabaya River. Date Maximum Discharge (m3.s-1) Tp (hours) T0.3 (hours) 23-01-2014 to 27-01-2014 (event 1) 367.55 28 18 20-02-2015 to 24-02-2015 (event 2) 337.53 46 32 24-02-2016 to 28-02-2016 (event 3) 335.9 35 27 Tp (lag time) = the amount of time it will take for a river to flood after a period of heavy precipitation T0.3 = the amount of time need from the peak of discharge to 30% peak of discharge Event Initial Water Surface (m) time step (sec) Initial manning roughness channel floodplain slope 1 17.48514757 120 0.01 0.001 2 17.71327015 180 0.01 0.001 3 17.672942 120 0.01 0.001 A uniform routing time interval, Δt = 30min and Δx = 30 m was used for all the test runs. 9
  • 11. Routing results (event 1) 1. The hydrograph peak theoretically took 72 minutes to travel between 2 gauges and relatively little attenuation occurred. With the estimation of velocity between 0.74 m/s to 1.8 m/s 2. Peak flow occurred at the upstream end at 30 hours from the initial condition, and at downstream end on the same day within 124 minutes 3. The downstream discharge is slightly unstable on the peak of the hydrograph 0 50 100 150 200 250 300 350 400 0 20 40 60 80 100 120 Discharge(m3/s-1) Time (hours) upstream boundary downstream discharge downstream discharge (simulation) 10
  • 12. Routing results (event 2 and 3) 0 50 100 150 200 250 300 350 400 0 20 40 60 80 100 120 Discharge(m3/s-1) Time (hours) 0 50 100 150 200 250 300 350 400 0 20 40 60 80 100 120 Time (hours) upstream boundary downstream discharge downstream discharge (simulation) 1. Event 2 and 3 relatively have long peak hydrograph with duration of 4 to 6 hours 2. Using the same travel time estimation (K) for the routing calculation on event 2 and 3, the downstream simulation result has a close relation with the calculated downstream discharge 3. But, we still need to evaluate the relative error in the time- to peak of the routed discharge hydrograph 11
  • 13. Rating-curve rating-curve estimation (tentative) Flood dynamics Parameter estimation Grid-shape accuracy Damage estimation Probabilistic flood Map water elevation-damage relations building and land-use value Methodology Hydrological Analysis Flood routing Damage estimation uncertain 12 Setting of initial condition Analysis of hydrograph shape and water elevation profile
  • 14. Model Parameters The table lists the factors which are used as calibration factors in each model implementation. Parameter Sampling range Manning roughness channel 0.01-0.04 Floodplain slope 0.001-0.015 Initial water surface at downstream boundary 17.5 m – 17.8 m Eddy viscosity coefficient 0 to 1 Calibration parameters 1. Capability of the model reproduce hydraulic behaviour of the river and inundated floodplain 2. Time stationary of model parameter (i.e. roughness parameter) 3. Hydraulic information (i.e. flow hydrograph) 13

Hinweis der Redaktion

  1. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  2. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  3. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  4. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  5. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  6. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  7. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  8. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  9. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  10. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  11. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  12. kinetic energy analysis will be irrelevant because flow velocity is considerably low
  13. kinetic energy analysis will be irrelevant because flow velocity is considerably low