Windjammer Park Integration Plan
Community Advisory Group Meeting 5 – May 5, 2016
5/5/16
Tonight’s Agenda
5/5/16 2
• Introductions
• Review feedback / design direction
• Discuss preferred plan
• Questions and Answers
• Discuss costs and phasing
• CAG Wrap-up
Ground Rules
3
• Start and end on time
• Silence cell phones
• Participate in the process
• Listen and speak respectfully
• Avoid side conversations
• Express yourself in terms of your personal needs and
interest and the outcomes you wish to achieve
5/5/16
Ground Rules
4
• Start and end on time
• Silence cell phones
• Participate in the process
• Listen and speak respectfully
• Avoid side conversations
• Express yourself in terms of your personal needs and
interest and the outcomes you wish to achieve
5/5/16
Recap:
Community Advisory Group process
55/5/16
Community Advisory Group Purpose / Charter
6
• Provide input and advice regarding proposed layout options
for program elements and landscaping
• Serve as a sounding board for the project team
• Serve as a liaison to the public / representative groups
5/5/16
7
Decembe
r 2015
Januar
y 2016
February
2016
March
2016
April
2016
May/
June
2016
Council and CAG Process
• Provide
feedback on 3
concept
alternatives
• Present WPIP
concept to
community
• Gather community
feedback (Public
Open House and
Online Open
House)
• Review preferred
plan to be
presented to City
Council
• Provide final
feedback
• CAG forms
• CAG provides
feedback on
design
guidelines
• Introduce CAG
and WPIP to
community
• Gather
community
feedback (Public
Open House)
COUNCIL
• Programming
priorities
• Approves CAG
COUNCIL
Report:
Alternatives and
Public feedback
COUNCIL
Approves plan
COUNCIL
CAG formation update
and initial priorities list/
design guidelines
4/19/16






 


Recap:
Draft Concept Feedback received and design direction
85/5/16
• In-person open house attendance: 28
• Online open house visitors: 356 unique users
• In-person comment forms and surveys completed: 6
• Online Open House feedback received: 49 surveys total
3/29/16 CAG Meeting and Online Open House Recap
95/5/16
Draft Plan Feedback
10
• Family-friendly elements and activities should be prioritized, especially supporting
splash park.
• Observations that there are a lot of different elements in the park plan.
• Concern about effect on Waterside Condos (due to new activities or driveway/
parking).
• Varied opinions on the inclusion of dunes as part of walking path, potentially
needing additional information/clarity of design.
• CAG generally agrees with removing/relocating RV Park and ballfields, if other
locations can be found. Public opinion varies.
• Consensus that the waterfront is a resource and asset.
5/5/16
Updated Preferred Concept
115/5/16
Draft Concept 3: Focus 1
12
3/29/16
Draft Plan/
Preferred
Plan
Concept
Updated Preferred Concept
5/5/16 13
5/5/16
Updated
Draft
Plan/
Preferred
Plan
Concept
5/5/16
145/5/16
5/5/16 15
5/5/16
5/5/16
165/5/16
5/5/16
175/5/16
5/5/16
185/5/16
5/5/16
195/5/16
205/5/16
215/5/16
225/5/16
235/5/16
245/5/16
Questions?
255/5/16
Cost
265/5/16
WPIP Cost and Phasing
275/5/16
WPIP Cost and Phasing
285/5/16
WPIP Cost and Phasing
295/5/16
WPIP Cost and Phasing
305/5/16
WPIP Cost and Phasing
315/5/16
Phasing
325/5/16
335/5/16
345/5/16
355/5/16
365/5/16
375/5/16
385/5/16
395/5/16
Windjammer Park Potential Funding Sources
Phase Grants and Potentially Appropriated City Funding Potential Funding Sources
1 CWF Project Costs
1B Grants and Funding
City General Fund
Park Impact Fees
WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, picnic
shelters, play areas, restrooms)
WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements)
2
TBD
Based on Funding and available opportunities
WRSCO - Aquatic Lands Enhancement Account (Parking lots and entry drives)
WRSCO - Land and Water Conservation Fund (Parking)
WRSCO - Washington Wildlife and Recreation Program (Waterfront parks,
amphitheater/stage)
3
TBD
Based on Funding and available opportunities
WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements)
WRSCO - Washington Wildlife and Recreation Program (Waterfront parks,
hardcourts, picnic shelters, play areas, playing fields, restrooms)
4
TBD
Based on Funding and available opportunities
WRSCO - Aquatic Lands Enhancement Account (Lagoon Renovation, waterfront
parks, waterfront boardwalks)
WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements)
WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, picnic
shelters, play areas, playing fields, restrooms)
5
TBD
Based on Funding and available opportunities
WSRCO- Youth Athletic Fields Grant (Relocation of ball fields)
WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements)
WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, picnic
shelters, play areas, playing fields, restrooms)
Potential City
Funding, where
appropriate
Collaboration with
local groups
Other Potential Grant Resources for
Parks and Recreation Other Ideas
General Fund Arts Commission Weyerhaeuser Company Foundation Fundraising
City 2% Lodging Tax Knights of Columbus Wells Fargo Corporate Giving Grants Brick Sales
.09 Rural County
Economic
Development Seattle Fund Community Garden and Craft Shows
Real Estate Tax Safeco Community Grants
Park Impact Fees
LL Bean Construction and Recreation
Grants
Home Depot Community Impact Grants
American Express Grant Program
Robert Wood Johnson Foundation
HUD Community Development Grant
Program
405/5/16
• Process discussion and reflection
• CAG Debrief
Community Advisory Group Wrap-up
415/5/16
• May 21 Public Works Week Family Fun Day (Windjammer
Park)
• May 25: City Council WPIP Workshop
• June 7: City Council meeting and action on WPIP
Next Steps
425/5/16
BACK POCKET
3/8/16 43
Established Priorities for Park Elements
445/5/16
Park Program: Adjacency Themes
45
Element Auto. Infrastructure Baseball fields Beach access Boat launch Canopy Event plaza Existing wetlands Gateway entrance
Adjacent
Elements
• Baseball fields
• Boat launch
• Event plaza
• Gateway entrance
• Linkage to downtown
• Parking
• RV Park
• Restrooms • Boat launch
• Kayak
campsite
• Trail network
• Parking • Gazebo
• Kitchens
• Restrooms
• Landscape
and gardens
• Multi-purpose
lawn
• Parking
• Restrooms
• Landscape and
gardens
• Landscape and
gardens
• Linkage to
downtown
• Parking
Element Gazebo Kayak
campsite
Kitchens Lagoon Landscape/
gardens
Linkage to
downtown
Multi-purpose
Lawn
Multi-purpose
Hard/basketball
court
Playground Restrooms
Adjacent
Elements
• Kitchens
• Landscape
and
gardens
• Multi-
purpose
lawn
• Restrooms
• Restrooms
• Trail
network
•
Playground
• Restrooms
• Site
furnishings
• Stage /
amphitheate
r
• Multi-
purpose
lawn
•
Playground
• Restrooms
• Trail
network
• Parking • Restrooms
• Trail network
• Restrooms
• Trail network
• Restrooms
• Splash
park
• Splash
park
• Stage /
amphitheate
r
5/5/16
The Basis of the Three Draft Concepts
465/5/16
3/8/16
Concept 1:
Recreation
475/5/16
3/8/16
Concept 2:
Naturalistic
485/5/16
Draft Concept 3: Focus 1
49
3/8/16
Concept 3:
Civic
5/5/16
• Concept preferences by CAG members
were ordered as follows:
• Concept 2 (Naturalistic)
• Concept 3 (Civic)
• Concept 1 (Recreation)
Take-aways from 3/8/16 Concept Review
50
• OK to show removal of RV Park
• While formal fields are desired as a
facility useful for the community, OK to
show removal of formal ballfields and/or
modify to be flexible field space (with
assumption that formal ballfields will find
a new home)
Preferences Other themes
Most inspiring spaces :
• Parking “crescent” (Concept 3)
• Stage (Concept 3)
• Community space/room (Concept 3)
• Event Plaza (Concept 1)
• Lagoon/open space (Concept 1)
5/5/16
Take-aways from 3/8/16 Concept Review, continued
51
• Amphitheater (Concept 3)*
• Ballfields (Concept 2)*
• Beach Access (Concept 2/3)
• Event Plaza (Concept 3)
• Existing wetlands (Concept 1)
• Gateway Entrance @Beeksma/Bayshore
(Concept 3)*
• Interior trails (Concepts 1/3)
• Lagoon (all 3 concepts)
Favorite spaces compared to each other (* indicates >6 responses showing active interest):
• Landscape/gardens (Concept 3)
• Multi-purpose lawn (Concept 2/3)
• Parking (Concept 3)
• Splash park (Concept 1)
• Rentable spaces (Concept 2)*
• RV Park (Concept 2/3)*
• Vehicular access (concept 3)
• Waterfront promenade (Concept 2)*
• Windmill (Concept 1/generally relocate)*
5/5/16

Weitere ähnliche Inhalte

Was ist angesagt?

Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
RamaChilamkurthy
 
Spc presentation
Spc presentationSpc presentation
Spc presentation
bc20105
 
Stow Phase I Final Presentation
Stow Phase I Final PresentationStow Phase I Final Presentation
Stow Phase I Final Presentation
Noam Goldstein
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
DC Department of General Services
 

Was ist angesagt? (10)

Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor Siding
 
Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020Eastern market community meeting presentation 012202020
Eastern market community meeting presentation 012202020
 
Spc presentation
Spc presentationSpc presentation
Spc presentation
 
Chorley Park Trail Connection - Design Factors & Trade-offs
Chorley Park Trail Connection - Design Factors & Trade-offsChorley Park Trail Connection - Design Factors & Trade-offs
Chorley Park Trail Connection - Design Factors & Trade-offs
 
Chorley Park Trail Connection - Accessibility
Chorley Park Trail Connection - AccessibilityChorley Park Trail Connection - Accessibility
Chorley Park Trail Connection - Accessibility
 
Stow Phase I Final Presentation
Stow Phase I Final PresentationStow Phase I Final Presentation
Stow Phase I Final Presentation
 
Rezoning of 1024 and 1026 Foster Ave.
Rezoning of 1024 and 1026 Foster Ave.Rezoning of 1024 and 1026 Foster Ave.
Rezoning of 1024 and 1026 Foster Ave.
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Edgewood community mtg presentation
Edgewood community mtg presentationEdgewood community mtg presentation
Edgewood community mtg presentation
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)
 

Andere mochten auch

Andere mochten auch (13)

Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community RoomOak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
Oak Harbor Wastewater Treatment Facility: Resolution 15-34, Community Room
 
Oak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open houseOak Harbor Community Advisory Group meeing 2 and public open house
Oak Harbor Community Advisory Group meeing 2 and public open house
 
Clean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate PreviewClean Water Facility 60% Cost Estimate Preview
Clean Water Facility 60% Cost Estimate Preview
 
Oak Harbor Rate Study
Oak Harbor Rate StudyOak Harbor Rate Study
Oak Harbor Rate Study
 
Windjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentationWindjammer Park Integration Plan - Council presentation
Windjammer Park Integration Plan - Council presentation
 
Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4Windjammer Park Integration Plan Community Advisory Group meeting 4
Windjammer Park Integration Plan Community Advisory Group meeting 4
 
140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation140416 oak_harbor_workshp_presentation
140416 oak_harbor_workshp_presentation
 
2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm2015 0617 workshop_presentation_outfall_draft_brm
2015 0617 workshop_presentation_outfall_draft_brm
 
Oak Harbor Design Open House
Oak Harbor Design Open HouseOak Harbor Design Open House
Oak Harbor Design Open House
 
Special Workshop presentation on Finance
Special Workshop presentation on FinanceSpecial Workshop presentation on Finance
Special Workshop presentation on Finance
 
Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan Oak Harbor Windjammer Park Integration Plan
Oak Harbor Windjammer Park Integration Plan
 
60% Design and Cost Estimate
60% Design and Cost Estimate60% Design and Cost Estimate
60% Design and Cost Estimate
 
ビザスク採用Tips(20160823 hr meetup)
ビザスク採用Tips(20160823 hr meetup)ビザスク採用Tips(20160823 hr meetup)
ビザスク採用Tips(20160823 hr meetup)
 

Ähnlich wie Community Advisory Group meeting 5

Bond election presentation revamp
Bond election presentation revampBond election presentation revamp
Bond election presentation revamp
Seth
 
S:\bond website\bond election website\bond election presentation revamp
S:\bond website\bond election website\bond election presentation revampS:\bond website\bond election website\bond election presentation revamp
S:\bond website\bond election website\bond election presentation revamp
Seth
 
Bond election presentation
Bond election presentation Bond election presentation
Bond election presentation
Seth
 
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalSp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
cityofevanston
 
Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2
Cosumnes CSD
 

Ähnlich wie Community Advisory Group meeting 5 (20)

Hearst Park & Pool Meeting Presentation (May 10, 2016)
Hearst Park & Pool Meeting Presentation (May 10, 2016)Hearst Park & Pool Meeting Presentation (May 10, 2016)
Hearst Park & Pool Meeting Presentation (May 10, 2016)
 
May 2014 ascension parish recreation presentation a r
May 2014 ascension parish recreation presentation a rMay 2014 ascension parish recreation presentation a r
May 2014 ascension parish recreation presentation a r
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
100928 town square presentation
100928 town square presentation100928 town square presentation
100928 town square presentation
 
Bond election presentation revamp
Bond election presentation revampBond election presentation revamp
Bond election presentation revamp
 
S:\bond website\bond election website\bond election presentation revamp
S:\bond website\bond election website\bond election presentation revampS:\bond website\bond election website\bond election presentation revamp
S:\bond website\bond election website\bond election presentation revamp
 
Bond election presentation
Bond election presentation Bond election presentation
Bond election presentation
 
Wildwood_Final_Report
Wildwood_Final_ReportWildwood_Final_Report
Wildwood_Final_Report
 
Step Up Downtown Public Feedback Summary
Step Up Downtown Public Feedback SummaryStep Up Downtown Public Feedback Summary
Step Up Downtown Public Feedback Summary
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 final
 
Five points Programming Community Roundtable_2.8.218
Five points Programming Community Roundtable_2.8.218Five points Programming Community Roundtable_2.8.218
Five points Programming Community Roundtable_2.8.218
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Bridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentationBridge Square Dec. 9 2013 open house presentation
Bridge Square Dec. 9 2013 open house presentation
 
PHX Block planning Presentation Final by CRTKL powered by Crowdbrite
PHX Block planning Presentation Final by CRTKL powered by CrowdbritePHX Block planning Presentation Final by CRTKL powered by Crowdbrite
PHX Block planning Presentation Final by CRTKL powered by Crowdbrite
 
Central West Focus Area Update for EDPP
Central West Focus Area Update for EDPPCentral West Focus Area Update for EDPP
Central West Focus Area Update for EDPP
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
 
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 finalSp3 follow up power point pedestrian safety presentation 09.24.12 final
Sp3 follow up power point pedestrian safety presentation 09.24.12 final
 
Sectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing PresentationSectors 2 & 3 Charrette Closing Presentation
Sectors 2 & 3 Charrette Closing Presentation
 
Palisades Concepts Community Meeting (August 2015)
Palisades Concepts Community Meeting (August 2015)Palisades Concepts Community Meeting (August 2015)
Palisades Concepts Community Meeting (August 2015)
 
Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2
 

Mehr von publicinvolvement

2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation
publicinvolvement
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshop
publicinvolvement
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
publicinvolvement
 

Mehr von publicinvolvement (14)

Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13Guaranteed Maximum Price Amendment #13
Guaranteed Maximum Price Amendment #13
 
Presentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City CouncilPresentation of Windjammer Park 60% Design to City Council
Presentation of Windjammer Park 60% Design to City Council
 
Preview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City CouncilPreview of Windjammer Park 30% Design to City Council
Preview of Windjammer Park 30% Design to City Council
 
Windjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open HouseWindjammer Park Phase 1 Design Open House
Windjammer Park Phase 1 Design Open House
 
Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9Oak Harbor City Council Meeting: GMP 9
Oak Harbor City Council Meeting: GMP 9
 
Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7Oak Harbor Clean Water Facility GMP #7
Oak Harbor Clean Water Facility GMP #7
 
Oak Harbor Design Open House summary
Oak Harbor Design Open House summaryOak Harbor Design Open House summary
Oak Harbor Design Open House summary
 
Oak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor PlanOak Harbor Good Neighbor Plan
Oak Harbor Good Neighbor Plan
 
150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update150604 Oak Harbor Wastewater Treatment Plant Update
150604 Oak Harbor Wastewater Treatment Plant Update
 
Oh workshop02 full_final
Oh workshop02 full_finalOh workshop02 full_final
Oh workshop02 full_final
 
2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation2015 04-07 city-council_workshop_presentation
2015 04-07 city-council_workshop_presentation
 
130306 City Council Workshop
130306 City Council Workshop130306 City Council Workshop
130306 City Council Workshop
 
130306 city council workshop revised
130306 city council workshop revised130306 city council workshop revised
130306 city council workshop revised
 
Volume i executive summary
Volume i executive summaryVolume i executive summary
Volume i executive summary
 

Kürzlich hochgeladen

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Kürzlich hochgeladen (20)

Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 

Community Advisory Group meeting 5

  • 1. Windjammer Park Integration Plan Community Advisory Group Meeting 5 – May 5, 2016 5/5/16
  • 2. Tonight’s Agenda 5/5/16 2 • Introductions • Review feedback / design direction • Discuss preferred plan • Questions and Answers • Discuss costs and phasing • CAG Wrap-up
  • 3. Ground Rules 3 • Start and end on time • Silence cell phones • Participate in the process • Listen and speak respectfully • Avoid side conversations • Express yourself in terms of your personal needs and interest and the outcomes you wish to achieve 5/5/16
  • 4. Ground Rules 4 • Start and end on time • Silence cell phones • Participate in the process • Listen and speak respectfully • Avoid side conversations • Express yourself in terms of your personal needs and interest and the outcomes you wish to achieve 5/5/16
  • 6. Community Advisory Group Purpose / Charter 6 • Provide input and advice regarding proposed layout options for program elements and landscaping • Serve as a sounding board for the project team • Serve as a liaison to the public / representative groups 5/5/16
  • 7. 7 Decembe r 2015 Januar y 2016 February 2016 March 2016 April 2016 May/ June 2016 Council and CAG Process • Provide feedback on 3 concept alternatives • Present WPIP concept to community • Gather community feedback (Public Open House and Online Open House) • Review preferred plan to be presented to City Council • Provide final feedback • CAG forms • CAG provides feedback on design guidelines • Introduce CAG and WPIP to community • Gather community feedback (Public Open House) COUNCIL • Programming priorities • Approves CAG COUNCIL Report: Alternatives and Public feedback COUNCIL Approves plan COUNCIL CAG formation update and initial priorities list/ design guidelines 4/19/16          
  • 8. Recap: Draft Concept Feedback received and design direction 85/5/16
  • 9. • In-person open house attendance: 28 • Online open house visitors: 356 unique users • In-person comment forms and surveys completed: 6 • Online Open House feedback received: 49 surveys total 3/29/16 CAG Meeting and Online Open House Recap 95/5/16
  • 10. Draft Plan Feedback 10 • Family-friendly elements and activities should be prioritized, especially supporting splash park. • Observations that there are a lot of different elements in the park plan. • Concern about effect on Waterside Condos (due to new activities or driveway/ parking). • Varied opinions on the inclusion of dunes as part of walking path, potentially needing additional information/clarity of design. • CAG generally agrees with removing/relocating RV Park and ballfields, if other locations can be found. Public opinion varies. • Consensus that the waterfront is a resource and asset. 5/5/16
  • 12. Draft Concept 3: Focus 1 12 3/29/16 Draft Plan/ Preferred Plan Concept
  • 13. Updated Preferred Concept 5/5/16 13 5/5/16 Updated Draft Plan/ Preferred Plan Concept
  • 27. WPIP Cost and Phasing 275/5/16
  • 28. WPIP Cost and Phasing 285/5/16
  • 29. WPIP Cost and Phasing 295/5/16
  • 30. WPIP Cost and Phasing 305/5/16
  • 31. WPIP Cost and Phasing 315/5/16
  • 39. 395/5/16 Windjammer Park Potential Funding Sources Phase Grants and Potentially Appropriated City Funding Potential Funding Sources 1 CWF Project Costs 1B Grants and Funding City General Fund Park Impact Fees WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, picnic shelters, play areas, restrooms) WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements) 2 TBD Based on Funding and available opportunities WRSCO - Aquatic Lands Enhancement Account (Parking lots and entry drives) WRSCO - Land and Water Conservation Fund (Parking) WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, amphitheater/stage) 3 TBD Based on Funding and available opportunities WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements) WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, hardcourts, picnic shelters, play areas, playing fields, restrooms) 4 TBD Based on Funding and available opportunities WRSCO - Aquatic Lands Enhancement Account (Lagoon Renovation, waterfront parks, waterfront boardwalks) WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements) WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, picnic shelters, play areas, playing fields, restrooms) 5 TBD Based on Funding and available opportunities WSRCO- Youth Athletic Fields Grant (Relocation of ball fields) WRSCO - Estuary and Salmon Restoration Program (Shoreline Enhancements) WRSCO - Washington Wildlife and Recreation Program (Waterfront parks, picnic shelters, play areas, playing fields, restrooms)
  • 40. Potential City Funding, where appropriate Collaboration with local groups Other Potential Grant Resources for Parks and Recreation Other Ideas General Fund Arts Commission Weyerhaeuser Company Foundation Fundraising City 2% Lodging Tax Knights of Columbus Wells Fargo Corporate Giving Grants Brick Sales .09 Rural County Economic Development Seattle Fund Community Garden and Craft Shows Real Estate Tax Safeco Community Grants Park Impact Fees LL Bean Construction and Recreation Grants Home Depot Community Impact Grants American Express Grant Program Robert Wood Johnson Foundation HUD Community Development Grant Program 405/5/16
  • 41. • Process discussion and reflection • CAG Debrief Community Advisory Group Wrap-up 415/5/16
  • 42. • May 21 Public Works Week Family Fun Day (Windjammer Park) • May 25: City Council WPIP Workshop • June 7: City Council meeting and action on WPIP Next Steps 425/5/16
  • 44. Established Priorities for Park Elements 445/5/16
  • 45. Park Program: Adjacency Themes 45 Element Auto. Infrastructure Baseball fields Beach access Boat launch Canopy Event plaza Existing wetlands Gateway entrance Adjacent Elements • Baseball fields • Boat launch • Event plaza • Gateway entrance • Linkage to downtown • Parking • RV Park • Restrooms • Boat launch • Kayak campsite • Trail network • Parking • Gazebo • Kitchens • Restrooms • Landscape and gardens • Multi-purpose lawn • Parking • Restrooms • Landscape and gardens • Landscape and gardens • Linkage to downtown • Parking Element Gazebo Kayak campsite Kitchens Lagoon Landscape/ gardens Linkage to downtown Multi-purpose Lawn Multi-purpose Hard/basketball court Playground Restrooms Adjacent Elements • Kitchens • Landscape and gardens • Multi- purpose lawn • Restrooms • Restrooms • Trail network • Playground • Restrooms • Site furnishings • Stage / amphitheate r • Multi- purpose lawn • Playground • Restrooms • Trail network • Parking • Restrooms • Trail network • Restrooms • Trail network • Restrooms • Splash park • Splash park • Stage / amphitheate r 5/5/16
  • 46. The Basis of the Three Draft Concepts 465/5/16
  • 49. Draft Concept 3: Focus 1 49 3/8/16 Concept 3: Civic 5/5/16
  • 50. • Concept preferences by CAG members were ordered as follows: • Concept 2 (Naturalistic) • Concept 3 (Civic) • Concept 1 (Recreation) Take-aways from 3/8/16 Concept Review 50 • OK to show removal of RV Park • While formal fields are desired as a facility useful for the community, OK to show removal of formal ballfields and/or modify to be flexible field space (with assumption that formal ballfields will find a new home) Preferences Other themes Most inspiring spaces : • Parking “crescent” (Concept 3) • Stage (Concept 3) • Community space/room (Concept 3) • Event Plaza (Concept 1) • Lagoon/open space (Concept 1) 5/5/16
  • 51. Take-aways from 3/8/16 Concept Review, continued 51 • Amphitheater (Concept 3)* • Ballfields (Concept 2)* • Beach Access (Concept 2/3) • Event Plaza (Concept 3) • Existing wetlands (Concept 1) • Gateway Entrance @Beeksma/Bayshore (Concept 3)* • Interior trails (Concepts 1/3) • Lagoon (all 3 concepts) Favorite spaces compared to each other (* indicates >6 responses showing active interest): • Landscape/gardens (Concept 3) • Multi-purpose lawn (Concept 2/3) • Parking (Concept 3) • Splash park (Concept 1) • Rentable spaces (Concept 2)* • RV Park (Concept 2/3)* • Vehicular access (concept 3) • Waterfront promenade (Concept 2)* • Windmill (Concept 1/generally relocate)* 5/5/16

Hinweis der Redaktion

  1. Erin– Introduce purpose of the CAG
  2. ERIN – Here’s how the CAG process will operate - The CAG will meet 5 times between now and May, with two meetings being open house meetings for the public to provide feedback The Council will receive monthly reports at standing council meetings and will provide feedback to inform to preferred plan, roughly in February and April The Council will adopt the Plan in May
  3. Just a brief recap of major themes from feedback we received from the April 29 Open House and subsequent Online Open House These include CAG and public comments Themes Family-friendly elements and activities, including splash park, should be prioritized Concerned about effect on Waterside Condos from proposed new road and parking on east side of park Questions about the dunes along the walkway Support for open grassy spaces Varied opinions on RV park and baseball field removal Consensus that the waterfront is a resource and asset to Oak Harbor Long-term events could be moved to Windjammer Park and utilize event plaza
  4. Based on the feedback received from the CAG and community through the open house and online open house, the design team has prepared an updated preferred concept The team has focused on updating the preferred concept to address:
  5. Based on the feedback received from the CAG and community through the open house and online open house, the design team has prepared an updated preferred concept The team has focused on updating the preferred concept to address:
  6. [Discuss impacts to waterside condos and tradeoffs]
  7. [Discuss impacts to waterside condos and tradeoffs]
  8. [Discuss impacts to waterside condos and tradeoffs]
  9. [Discuss impacts to waterside condos and tradeoffs]
  10. [Discuss impacts to waterside condos and tradeoffs]
  11. [Discuss range of costs and phasing options]
  12. [Discuss range of costs and phasing options]
  13. [Discuss range of costs and phasing options]
  14. [Discuss range of costs and phasing options]
  15. [Discuss range of costs and phasing options]
  16. [Discuss range of costs and phasing options]
  17. [Discuss range of costs and phasing options]
  18. Final CAG Meeting In the charter we discussed the possibility of providing a recommendation to City Council that they adopt the WPIP – do you feel that as a group, this recommendation can be made (contingent upon feedback received during meeting and discussion). Are there any outstanding questions for the design team? CAG Debrief What do you feel was successful about the CAG process? What challenges / opportunities for improvement do you see? Would you participate in a CAG in the future? Any final feedback for the facilitation / design team?
  19. Erin- Review next steps and adjourn meeting
  20. Gill- Quickly review established priorities.