INFRASTRUCTURE   REGULATORY   ISSUES                          INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR




                                                       •   INFRASTRUCTURE ISSUES
                                                       •   RISK MITIGATION
                                                       •   DEVELOPMENT CONSIDERATIONS
                                                       •   TENDERING
                                                       •   CONTRACT
                                                       •   FINANCE MODELS
                                                       •   LEGAL FRAMEWORK




                                       Presented by:            P R AT E E K D A S G U P TA
                                                                PRANAV MISHRA
NUCLEAR ENERGY


      When a neutron strikes an atom            of
      uranium, the uranium splits into two lighter
      atoms and releases heat simultaneously.

      This heat energy is used for various
      purpose,     such    as   electrical    power
      generation, powering submarines, space
      shuttles, nuclear bombs and missiles etc.

      It doesn’t emit any polluting gases which have
      adverse effects such as Global Warming, Acid
      Rain, Ozone Depletion etc.

      It is a highly concentrated source of
      energy, with 1 kg Uranium producing power
      of over 50,000 kWh and 35,00,000 kWh on
      reprocessing.




INFRASTRUCTURE    REGULATORY     ISSUES                INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
N U C L E A R P O W E R P R O J E C T S TA G E S



     A nuclear power plant essentially has 5 stages

     •    Pre-Project


     •    Project Decision Making


     •    Plant Construction


     •    Plant Operation


     •    Plant Decommissioning


     The overall project life of Nuclear Power Plant
     is about 75 – 100 years

INFRASTRUCTURE      REGULATORY      ISSUES             INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
N U C L E A R P O W E R P R O J E C T S TA G E S




INFRASTRUCTURE   REGULATORY   ISSUES                INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
NUCLEAR INFRASTRUCTURE ISSUES


      International Agreements and Safeguards      Regulatory Framework

                Financial Resources                 Codes and standards

                    Nuclear Law                 Safety Assessment Capabilities

             Educational Programmes                   Physical Facilities

                 Public Consultation                   Communication

            Engineering / Manufacturing                 Procurement

                 Human Resources                Emergency Response Planning

               Project Management               Construction / Commissioning




INFRASTRUCTURE      REGULATORY         ISSUES               INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
N U C L E A R R I S K S A N D M I T I G AT I O N




INFRASTRUCTURE   REGULATORY   ISSUES                 INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
N U C L E A R R I S K S A N D M I T I G AT I O N




INFRASTRUCTURE   REGULATORY   ISSUES                 INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
A S S O C I AT E D O R G A N I Z AT I O N S



   THE GOVERNMENT (policy making)                         THE FUTURE PLANT OWNER

   •   Energy Supply                                      •   Electricity system expansion planning
   •   Safety and Regulation                              •   Performance of economic analyses
   •   Environmental protection                           •   Defining the projects
   •   Domestic Infrastructure development                •   Obtaining licensing and executing them
                                                              and operating the plant safely




   THE NUCLEAR REGULATORY BODY

   •   Safety of pressure vessels, electrical installations, pollution control, environmental protection
   •   Promotion and Co-ordination between various R&D organizations
   •   Encourage participation for Nuclear Power Plant Projects
   •   Advancement of educational institutions



INFRASTRUCTURE     REGULATORY      ISSUES                                  INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
D E V E L O P M E N T C O N S I D E R AT I O N S


   LAWS
                                                                    Radiation Protection

                               Laws Concerning                         Nuclear Safety

                                                                 Plant / Material Ownership


   •   Law and regulations for radiation protection
   •   Law and regulations for safety of nuclear installations
   •   Compatibility of national radiation protection and nuclear safety regulations with IAEA codes
   •   Law and regulations for ownership of nuclear installations and materials
   •   Law or policy concerning nuclear third party liability
   •   Bilateral nuclear supply agreements
   •   Conventions on early notification and assistance
   •   Physical protection convention
   •   Nuclear safety convention
   •   Convention on safety of waste and spent fuel management
INFRASTRUCTURE     REGULATORY      ISSUES                                 INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
D E V E L O P M E N T C O N S I D E R AT I O N S


   ENERGY AND ELECTRICITY SUPPLY POLICIES


   •   National Development policies and plan.
   •   Implementation mechanisms for National Development plan.
   •   National policies for the Energy and Electricity sectors. Perceptions of major constraints, priorities.
   •   Electricity tariff policies.
   •   Environmental Protection Policies and their impact on the energy sector.



   FINANCIAL MECHANISM


   •   Mechanisms for International Financing.
   •   Mechanisms for Local Financing.



INFRASTRUCTURE        REGULATORY      ISSUES                                 INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
D E V E L O P M E N T C O N S I D E R AT I O N S


   INTERNATIONAL AGREEMENTS


   •   Treaty on the non-proliferation of Nuclear weapons (NPT) INFCIRC/140
   •   Guidelines for Nuclear transfers, 1993 revision of NSG London guidelines
   •   Convention on the prevention of Marine pollution by dumping of wastes and other matter
       (London Dumping Convention), INFCIRC/205
   •   International Convention for the safety of life at sea
   •   Convention for the suppression of Acts of Nuclear Terrorism




INFRASTRUCTURE      REGULATORY      ISSUES                               INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
TENDERS


   Information provided by the owner        Information requested from bidders

   1. INVITATION LETTER                     1. GENERAL INFORMATION
   2. ADMINISTRATIVE INSTRUCTIONS           2. GENERAL TECHNICAL ASPECTS
   3. GENERAL INFORMATION                   3. TECHNICAL DESCRIPTIONS
   4. TECHNICAL REQUIREMENTS                4. SCOPE OF SUPPLY AND SERVICES
   5. SCOPE OF SUPPLY AND SERVICES          5. ALTERNATIVES AND OPTIONS
   6. NATIONAL PARTICIPATION                6. QUALITY ASSURANCE PROGRAMME
   7. BID EVALUATION CRITERIA               7. TRAINING
   8. DRAFT CONTRACT TERMS AND CONDITIONS   8. PROJECT SCHEDULE
   9. COMMERCIAL CONDITIONS                 9. TECHNOLOGY TRANSFER
   10. SAFETY AND SECURITY CONSTRAINTS      10. GUARANTEES AND WARRANTIES
                                            11. DEVIATIONS AND EXCEPTIONS
                                            12. COMMERCIAL CONDITIONS




INFRASTRUCTURE    REGULATORY    ISSUES                         INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
CONTRACT

   Contract conditions

   •   Financing arrangements
   •   Down-payments
   •   Governmental approval or authorization
   •   International commitments
   •   Safeguards requirements
   •   Export license, construction license, operation license
   •   Pertinent regulatory and licensing requirements.



               Turnkey Contract                                         Split Package Contract


1. The owner has one contract with the main                1. The owner has multiple contracts with
   supplier.                                                  suppliers.
2. The main supplier has overall responsibility for        2. The overall responsibility is divided
   construction, and turns over responsibility for            between a relatively small number of
   the project to the owner/operator in stages                contractors, each building a large section
   during the commissioning phase.                            of the work.


INFRASTRUCTURE      REGULATORY     ISSUES                                INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
CONTRACT


   Contract Components


   •Definitions                                      •Licensing
   •General clauses                                  •Delivery times
   •Object of the contract                           •Documentation
   •Planning and execution of the work               •Spare and wear parts, consumables and special
   •Information, inspection, testing and control     tools
   •Assignment of the work and subcontracting        •Guarantees or warranties
   •National participation and technology transfer   •Take-over
   •Training of personnel                            •Prices, price adjustments and terms of payment
   •Changes and additional work                      •Force majeure
   •Transport and customs clearance                  •Termination and suspension of the contract
   •Risks and transfer of title                      •Guarantee of title and proprietary information
   •Liability                                        •Execution of the contract
   •Insurances                                       •Applicable law
   •Quality assurance                                •Arbitration




INFRASTRUCTURE     REGULATORY     ISSUES                              INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
FINANCING


   Major Challenges

   •   The high capital cost and technical complexity of
       NPPs, which present relatively high risks during both
       construction and operation
   •   The relatively long period required to recoup investments
       or to repay loans for NPP construction, which increases the
       risk from electricity market uncertainties
   •   The often controversial nature of nuclear projects, which
       gives rise to additional political and regulatory risks
   •   The need for clear solutions and financing schemes for
       radioactive waste management and
       decommissioning, which only governments can formulate



INFRASTRUCTURE      REGULATORY       ISSUES                          INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
FINANCING


   Financial Model for project fully financed through government guarantee.




INFRASTRUCTURE     REGULATORY     ISSUES                               INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
FINANCING

  Financial Model for Public Private Partnership projects.

  The private sector investors bring the equity and loans and the government participates through
  assets and risk mitigation mechanisms.




INFRASTRUCTURE     REGULATORY      ISSUES                               INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
LEGAL FRAMEWORK


  Nuclear laws and regulations address the following


  •   THE SAFETY PRINCIPLE (PREVENTION AND PROTECTION)
  •   THE SECURITY PRINCIPLE (PEACEFUL USE OF NUCLEAR POWER)
  •   THE RESPONSIBILITY PRINCIPLE (OPERATOR OR LICENSEE)
  •   THE PERMISSION PRINCIPLE (REVIEW AND AUTHORIZATION BY REGULATORY BODY)
  •   THE CONTINUOUS CONTROL PRINCIPLE (RIGHT OF INSPECTION AND ACCESS BY THE
      REGULATORY BODY)
  •   THE COMPENSATION PRINCIPLE (EXTENT OF NUCLEAR LIABILITY)
  •   THE SUSTAINABLE DEVELOPMENT PRINCIPLE (PROTECTION OF FUTURE)
  •   THE COMPLIANCE PRINCIPLE (INTERNATIONAL AND TRANSBOUNDARY
      AGREEMENTS, TREATIES AND CONVENTIONS)




INFRASTRUCTURE    REGULATORY     ISSUES                          INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
LEGAL FRAMEWORK


  List of clearances required for setting up a Nuclear Power Plant


  1. Clearance of the Ministry of Environment and Forests
  2. Clearances from the Gol (Civil Aviation Department) and the Director, National Airports
     Authority in connection with the height of any chimneys.
  3. Confirmations from the Department of Economic Affairs, Ministry of Finance, the Department
     of Industrial Development, Ministry of Industry, the Department Company Affairs and the
     RBI, that the Company is permitted to enter into the Financing Agreements,
  4. Consent of Gol to the issue of equity to Foreign investors
  5. Consent of RBI for the subscription by he Foreign Investors in Shares in the Company pursuant
     to Section-29 of FEMA (Foreign Exchange Management Act 1999)
  6. Consent of RBI for the provision by the Company of guarantees and / or indemnities and the
     ability of lenders and suppliers to receive payments in enforcement thereon including
     liquidated damages pursuant to Section-9 and 26 of FEMA 1999.
  7. Consent of RBI for payment to non-resident directors of the Company-Commissioner of
     Electricity
  8. Consent of RBI for the Company to establish and office outside India pursuant to Section-8 of
     FEMA 1999 and to acquire immovable property to Section-25 of FEMA, 1999
  9. Approval of the Chief Engineer Inspector for the Power Station


INFRASTRUCTURE     REGULATORY     ISSUES                               INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
LEGAL FRAMEWORK


  List of clearances required for setting up a Nuclear Power Plant


  10. Exemption from Section-10(15)(iv) of the Income Tax Act 1961 in connection with the interest
      and other charges payment by the company on offshore debt
  11. Permission from the Director General of Foreign Trade for the various imports pursuant to the
      Foreign Trade (Development and Regulation) Act 1992.
  12. Land acquisition Power plant – Land Acquisition Act 1894
  13. Techno economic clearance under section 30 of Electricity Supply) Act, 1948
  14. Permission from the Directorate General of Technical Development / Director General of
      Foreign Trade to import helicopters, Aircrafts, Ships or other such vessels under the Foreign
      Trade (Development and Regulation) Act, 1992
  15. Consent under the Factories Act 1948 relating to firefighting capability
  16. Tax confirmations and clarification in relation to the treatment of capital gains and offshore
      securities offered by the Company and exemptions under Section-10(15)(iv) of the Income Tax
      Act, 1961 in relation to any interest payable by the Company on offshore debt securities.




INFRASTRUCTURE     REGULATORY     ISSUES                                INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
LEGAL FRAMEWORK


  List of clearances required for setting up a Nuclear Power Plant


  17. A certificate form the General Insurance Corporation or any of its subsidiaries to the effect
      that such insurance or reinsurance cannot be obtained from them
  18. Consent from the Gol (Controller of Insurance) to the effecting by the Company of such
      insurance and / or reinsurance with offshore insurers and/ reinsures and
  19. Consent from RBI under FERA 1973/FEMA 1999 for the taking out of insurance and / or
      reinsurance with offshore insures and / or reinsures and for the payment of any premiums
      thereunder
  20. Permission from the Director General of Foreign Trade for the import of spares pursuant to
      the Foreign Trade Development and Regulation Act 1992
  21. Consent of the Direction General of Civil Aviation to use and operate an airstrip and helicopter
      landing pad, and use and operate a helicopter and / or other aircraft pursuant of the Aircraft
      Act 1934




INFRASTRUCTURE     REGULATORY     ISSUES                                  INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
LEGAL FRAMEWORK


  NUCLEAR LIABILITY BILL


  India framed the civil liability for Nuclear damage bill 2010, which stipulates the compensation
  burden on the state-run reactor operator, the liability of government and the responsibility of
  private suppliers and contractors.

  Some major features of the bill are:

  •   The Atomic Energy Regulatory Board has to notify a nuclear incident within 15 days from the date
      of a nuclear incident occurring.

  •   The operator of a nuclear installation will be liable for nuclear damage caused by a nuclear
      incident in that installation or if he is in charge of nuclear material that caused the incident.

  •   If more than one operator is liable for nuclear damage, all operators shall be jointly, and severally
      liable to pay compensation for the damage.

  •   The Bill states that the total liability for a nuclear incident shall not exceed the rupee equivalent
      of 300 million Special Drawing Rights (Approximately Rs. 2100 crore)


INFRASTRUCTURE      REGULATORY      ISSUES                                   INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
T H E AT O M I C E N E R G Y A C T, 1 9 6 2


     The Atomic Energy Regulatory Board (AERB) was constituted on November 15, 1983
     by the President of India by exercising the powers conferred by Section 27 of the
     Atomic Energy Act, 1962 (33 of 1962) to carry out certain regulatory
     and safety functions under the Act. The regulatory authority of AERB is derived from
     the rules and notifications promulgated under the Atomic Energy Act, 1962 and the
     Environmental (Protection) Act, 1986

     Some of the important sections of the Atomic Energy Act are given as follows.


                                        Section 2-1-(e)
     "Plant" includes machinery, equipment or appliance whether affixed to land or not.

                                           Section 3-1-(e)
     To provide for control over radioactive substances or
     radiation generating plant in order to -
     • Prevent radiation hazards
     • Secure public safety and safety of persons handling radioactive substances
     • Ensure safe disposal of radioactive wastes.


INFRASTRUCTURE    REGULATORY     ISSUES                                INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
T H E AT O M I C E N E R G Y A C T, 1 9 6 2

                                            Section 10.1-(c)
  Rights to use and occupy the surface of any land for the purpose of erecting any necessary buildings
  and installing any necessary plant

                                           Section 10-1-(d)
  Rights to use and occupy for the purpose of working the minerals and to use or acquire any plant
  used in connection with any such mine or quarry

                                            Section 10-(3)
  Compensation in respect of any right acquired under this section shall be paid in accordance with
  section 21

                                                Section 22(1)
  Notwithstanding anything contained in the Electricity (Supply) Act1948, the Central Government
  shall have authority -
  (a) to develop a sound and adequate national policy in regard to atomic power, to co-ordinate
  such policy with the Central Electricity Authority and the State Electricity Boards constituted under
  section 3 and 5
  (b) to fix rates for and regulate the supply of electricity from atomic power stations, with the
  concurrence of the Central Electricity Authority


INFRASTRUCTURE     REGULATORY     ISSUES                                 INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
NUCLEAR POWER IN INDIA

  The Nuclear Power Corporation of India Limited (NPCIL), a Public Sector Undertaking (PSU) under the Department
  of Atomic Energy, was registered as a public limited company under the Companies Act in September, 1987 with
  the objective of operating the Atomic Power Stations and implementing the Atomic Power Projects for the
  generation of electricity in pursuance of the schemes and programmes of the Government of India under the
  Atomic Energy Act, 1962.




INFRASTRUCTURE      REGULATORY       ISSUES                                    INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
NUCLEAR POWER PROJECTS




INFRASTRUCTURE   REGULATORY   ISSUES   INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR

Weitere ähnliche Inhalte

Was ist angesagt?

Nuclear Power Plant Safety
Nuclear Power Plant SafetyNuclear Power Plant Safety
Nuclear Power Plant SafetyS.Vijaya Bhaskar
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant Omraj Singh
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar ProSIM R & D Pvt. Ltd.
 
Practical Engineering Failure Analysis - Dekker Mechanical Engineering
Practical Engineering Failure Analysis - Dekker Mechanical EngineeringPractical Engineering Failure Analysis - Dekker Mechanical Engineering
Practical Engineering Failure Analysis - Dekker Mechanical EngineeringJulio Banks
 
Syring MDA Briefing
Syring MDA BriefingSyring MDA Briefing
Syring MDA BriefingLsquirrel
 
Classification of nuclear power plant 2171910 , power plant engineering.
Classification of nuclear power plant 2171910  , power plant  engineering.Classification of nuclear power plant 2171910  , power plant  engineering.
Classification of nuclear power plant 2171910 , power plant engineering.Hitarth Shah
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
95066866 types-of-nuclear-reactors
95066866 types-of-nuclear-reactors95066866 types-of-nuclear-reactors
95066866 types-of-nuclear-reactorsmanojg1990
 
Nuclear power plant-safety measures
Nuclear power plant-safety measures Nuclear power plant-safety measures
Nuclear power plant-safety measures Nishtha Shreya
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power planttmishra3
 
Nsawc command brief_jul_14
Nsawc command brief_jul_14Nsawc command brief_jul_14
Nsawc command brief_jul_14ICSA, LLC
 
guide to offshore structures design for engineers
guide to offshore structures design for engineersguide to offshore structures design for engineers
guide to offshore structures design for engineersProfSNallayarasu
 
Introduction to Pipe stress analysis
Introduction to Pipe stress analysisIntroduction to Pipe stress analysis
Introduction to Pipe stress analysisSaikrishnaNagumalli
 

Was ist angesagt? (20)

EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
 
Nuclear Power Plant Safety
Nuclear Power Plant SafetyNuclear Power Plant Safety
Nuclear Power Plant Safety
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar
 
Oil and gas industry ppt
Oil and gas industry pptOil and gas industry ppt
Oil and gas industry ppt
 
Practical Engineering Failure Analysis - Dekker Mechanical Engineering
Practical Engineering Failure Analysis - Dekker Mechanical EngineeringPractical Engineering Failure Analysis - Dekker Mechanical Engineering
Practical Engineering Failure Analysis - Dekker Mechanical Engineering
 
Syring MDA Briefing
Syring MDA BriefingSyring MDA Briefing
Syring MDA Briefing
 
Topic 4: TYPES OF PETROLEUM CONTRACTS AGREEMENT
Topic 4: TYPES OF PETROLEUM CONTRACTS AGREEMENTTopic 4: TYPES OF PETROLEUM CONTRACTS AGREEMENT
Topic 4: TYPES OF PETROLEUM CONTRACTS AGREEMENT
 
Classification of nuclear power plant 2171910 , power plant engineering.
Classification of nuclear power plant 2171910  , power plant  engineering.Classification of nuclear power plant 2171910  , power plant  engineering.
Classification of nuclear power plant 2171910 , power plant engineering.
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
95066866 types-of-nuclear-reactors
95066866 types-of-nuclear-reactors95066866 types-of-nuclear-reactors
95066866 types-of-nuclear-reactors
 
Nuclear power plant-safety measures
Nuclear power plant-safety measures Nuclear power plant-safety measures
Nuclear power plant-safety measures
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nsawc command brief_jul_14
Nsawc command brief_jul_14Nsawc command brief_jul_14
Nsawc command brief_jul_14
 
guide to offshore structures design for engineers
guide to offshore structures design for engineersguide to offshore structures design for engineers
guide to offshore structures design for engineers
 
Safety Concepts of Plant Design
Safety Concepts of Plant DesignSafety Concepts of Plant Design
Safety Concepts of Plant Design
 
Immobilisation and Storage of Nuclear Waste
Immobilisation and Storage of Nuclear WasteImmobilisation and Storage of Nuclear Waste
Immobilisation and Storage of Nuclear Waste
 
Introduction to Pipe stress analysis
Introduction to Pipe stress analysisIntroduction to Pipe stress analysis
Introduction to Pipe stress analysis
 

Andere mochten auch

Nuclear power station by Romeo Aguilera Jr.
Nuclear power station by Romeo Aguilera Jr.Nuclear power station by Romeo Aguilera Jr.
Nuclear power station by Romeo Aguilera Jr.romeojraguilera
 
Nuclear Power Plant by: Cris Macaranas
Nuclear Power Plant by: Cris MacaranasNuclear Power Plant by: Cris Macaranas
Nuclear Power Plant by: Cris MacaranasPrince Lou
 
nuclear power plant
nuclear power plantnuclear power plant
nuclear power plantHoney Pearl
 
Roopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflictRoopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflictImran Sajol
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantDr. Ramesh B
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.Enigmatic You
 
international thermo nuclear reactor
international thermo nuclear reactorinternational thermo nuclear reactor
international thermo nuclear reactorpushpeswar reddy
 
Advanced nuclear reactor in nuclear power station
Advanced nuclear reactor in nuclear power stationAdvanced nuclear reactor in nuclear power station
Advanced nuclear reactor in nuclear power stationUday Wankar
 
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
 INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI... INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...IAEME Publication
 
2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option
2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option
2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best optionEPS HELLAS
 
Green design retrofit as an alternative to conventional storm-water management
Green design retrofit as an alternative to conventional storm-water managementGreen design retrofit as an alternative to conventional storm-water management
Green design retrofit as an alternative to conventional storm-water managementPresi
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M IssuesNageswar Rao
 
Regulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plantRegulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plantPresi
 
Types of Nuclear Reactor
Types of Nuclear ReactorTypes of Nuclear Reactor
Types of Nuclear ReactorNishit Desai
 
A ppt on natural disaster and safty risks at nuclear power plant
A ppt on natural disaster and safty risks at nuclear power plantA ppt on natural disaster and safty risks at nuclear power plant
A ppt on natural disaster and safty risks at nuclear power plantMadhusudan Sharma
 

Andere mochten auch (20)

Nuclear power station by Romeo Aguilera Jr.
Nuclear power station by Romeo Aguilera Jr.Nuclear power station by Romeo Aguilera Jr.
Nuclear power station by Romeo Aguilera Jr.
 
Nuclear Power Plant by: Cris Macaranas
Nuclear Power Plant by: Cris MacaranasNuclear Power Plant by: Cris Macaranas
Nuclear Power Plant by: Cris Macaranas
 
nuclear power plant
nuclear power plantnuclear power plant
nuclear power plant
 
nuclear power plant
nuclear power plantnuclear power plant
nuclear power plant
 
Pp manish on nuclear power plant
Pp manish on nuclear power plantPp manish on nuclear power plant
Pp manish on nuclear power plant
 
Roopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflictRoopur power plant and iran nuclear conflict
Roopur power plant and iran nuclear conflict
 
Chernobyl
ChernobylChernobyl
Chernobyl
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.
 
international thermo nuclear reactor
international thermo nuclear reactorinternational thermo nuclear reactor
international thermo nuclear reactor
 
Advanced nuclear reactor in nuclear power station
Advanced nuclear reactor in nuclear power stationAdvanced nuclear reactor in nuclear power station
Advanced nuclear reactor in nuclear power station
 
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
 INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI... INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
 
2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option
2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option
2014_Bosnia_Multi criteria optimisation_VIKOR_of insulation_EPS best option
 
Green design retrofit as an alternative to conventional storm-water management
Green design retrofit as an alternative to conventional storm-water managementGreen design retrofit as an alternative to conventional storm-water management
Green design retrofit as an alternative to conventional storm-water management
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
 
Nuclear energy law
Nuclear energy lawNuclear energy law
Nuclear energy law
 
Regulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plantRegulatory Issues for setting up Wind power plant
Regulatory Issues for setting up Wind power plant
 
Types of Nuclear Reactor
Types of Nuclear ReactorTypes of Nuclear Reactor
Types of Nuclear Reactor
 
A ppt on natural disaster and safty risks at nuclear power plant
A ppt on natural disaster and safty risks at nuclear power plantA ppt on natural disaster and safty risks at nuclear power plant
A ppt on natural disaster and safty risks at nuclear power plant
 
Presentation on nuclear reactor on9 10-07
Presentation on nuclear reactor on9 10-07Presentation on nuclear reactor on9 10-07
Presentation on nuclear reactor on9 10-07
 

Ähnlich wie Infrastructure Regulatory Issues in Nuclear Power Projects

Paul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryPaul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryUKTI2014
 
CSIR-Theme-Directorates.pdf
CSIR-Theme-Directorates.pdfCSIR-Theme-Directorates.pdf
CSIR-Theme-Directorates.pdfssuser4fe7c5
 
Portsmouth University Presentation
Portsmouth University PresentationPortsmouth University Presentation
Portsmouth University PresentationStavros Thomas
 
Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryUKTI2014
 
Safety and Health During Construction
Safety and Health During ConstructionSafety and Health During Construction
Safety and Health During ConstructionDr K M SONI
 
Development of Guidelines and Standards for Life Extension
Development of Guidelines and Standards for Life ExtensionDevelopment of Guidelines and Standards for Life Extension
Development of Guidelines and Standards for Life ExtensionE.ON Exploration & Production
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public WorksDr K M SONI
 
Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)M Fikri
 
Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)M Fikri
 
Glasgow elevator pitches
Glasgow elevator pitchesGlasgow elevator pitches
Glasgow elevator pitchesKTN
 
International Bridge Design Standards and Approaches
International Bridge Design Standards and ApproachesInternational Bridge Design Standards and Approaches
International Bridge Design Standards and ApproachesAIT Solutions
 
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovDue Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovSergei Sabanov
 
poyry_nuclear_energy_brochure
poyry_nuclear_energy_brochurepoyry_nuclear_energy_brochure
poyry_nuclear_energy_brochureAlfonso Fox
 
How Bell Energy can help you be a Sustainable and Profitable Organization
How Bell Energy can help you be a Sustainable and Profitable OrganizationHow Bell Energy can help you be a Sustainable and Profitable Organization
How Bell Energy can help you be a Sustainable and Profitable OrganizationChandrashekhar Kulkarni
 
Cables Brochure Web
Cables Brochure WebCables Brochure Web
Cables Brochure Webgm330
 
Lecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfLecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfMairaNoor4
 

Ähnlich wie Infrastructure Regulatory Issues in Nuclear Power Projects (20)

Paul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryPaul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th January
 
Drdo basic research
Drdo basic researchDrdo basic research
Drdo basic research
 
CSIR-Theme-Directorates.pdf
CSIR-Theme-Directorates.pdfCSIR-Theme-Directorates.pdf
CSIR-Theme-Directorates.pdf
 
Portsmouth University Presentation
Portsmouth University PresentationPortsmouth University Presentation
Portsmouth University Presentation
 
Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th January
 
Safety and Health During Construction
Safety and Health During ConstructionSafety and Health During Construction
Safety and Health During Construction
 
Development of Guidelines and Standards for Life Extension
Development of Guidelines and Standards for Life ExtensionDevelopment of Guidelines and Standards for Life Extension
Development of Guidelines and Standards for Life Extension
 
Cymi Ecourja
Cymi EcourjaCymi Ecourja
Cymi Ecourja
 
Safety in Public Works
Safety in Public WorksSafety in Public Works
Safety in Public Works
 
2009 Face Conference Energy Le Moine
2009 Face Conference Energy Le Moine2009 Face Conference Energy Le Moine
2009 Face Conference Energy Le Moine
 
Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)
 
Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)Assessing educational policy and objectives (2)
Assessing educational policy and objectives (2)
 
Glasgow elevator pitches
Glasgow elevator pitchesGlasgow elevator pitches
Glasgow elevator pitches
 
International Bridge Design Standards and Approaches
International Bridge Design Standards and ApproachesInternational Bridge Design Standards and Approaches
International Bridge Design Standards and Approaches
 
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovDue Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
 
Jamie Shankland CV
Jamie Shankland CVJamie Shankland CV
Jamie Shankland CV
 
poyry_nuclear_energy_brochure
poyry_nuclear_energy_brochurepoyry_nuclear_energy_brochure
poyry_nuclear_energy_brochure
 
How Bell Energy can help you be a Sustainable and Profitable Organization
How Bell Energy can help you be a Sustainable and Profitable OrganizationHow Bell Energy can help you be a Sustainable and Profitable Organization
How Bell Energy can help you be a Sustainable and Profitable Organization
 
Cables Brochure Web
Cables Brochure WebCables Brochure Web
Cables Brochure Web
 
Lecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdfLecture 1 Bye Laws,codes and spatial data.pdf
Lecture 1 Bye Laws,codes and spatial data.pdf
 

Infrastructure Regulatory Issues in Nuclear Power Projects

  • 1. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR • INFRASTRUCTURE ISSUES • RISK MITIGATION • DEVELOPMENT CONSIDERATIONS • TENDERING • CONTRACT • FINANCE MODELS • LEGAL FRAMEWORK Presented by: P R AT E E K D A S G U P TA PRANAV MISHRA
  • 2. NUCLEAR ENERGY When a neutron strikes an atom of uranium, the uranium splits into two lighter atoms and releases heat simultaneously. This heat energy is used for various purpose, such as electrical power generation, powering submarines, space shuttles, nuclear bombs and missiles etc. It doesn’t emit any polluting gases which have adverse effects such as Global Warming, Acid Rain, Ozone Depletion etc. It is a highly concentrated source of energy, with 1 kg Uranium producing power of over 50,000 kWh and 35,00,000 kWh on reprocessing. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 3. N U C L E A R P O W E R P R O J E C T S TA G E S A nuclear power plant essentially has 5 stages • Pre-Project • Project Decision Making • Plant Construction • Plant Operation • Plant Decommissioning The overall project life of Nuclear Power Plant is about 75 – 100 years INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 4. N U C L E A R P O W E R P R O J E C T S TA G E S INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 5. NUCLEAR INFRASTRUCTURE ISSUES International Agreements and Safeguards Regulatory Framework Financial Resources Codes and standards Nuclear Law Safety Assessment Capabilities Educational Programmes Physical Facilities Public Consultation Communication Engineering / Manufacturing Procurement Human Resources Emergency Response Planning Project Management Construction / Commissioning INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 6. N U C L E A R R I S K S A N D M I T I G AT I O N INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 7. N U C L E A R R I S K S A N D M I T I G AT I O N INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 8. A S S O C I AT E D O R G A N I Z AT I O N S THE GOVERNMENT (policy making) THE FUTURE PLANT OWNER • Energy Supply • Electricity system expansion planning • Safety and Regulation • Performance of economic analyses • Environmental protection • Defining the projects • Domestic Infrastructure development • Obtaining licensing and executing them and operating the plant safely THE NUCLEAR REGULATORY BODY • Safety of pressure vessels, electrical installations, pollution control, environmental protection • Promotion and Co-ordination between various R&D organizations • Encourage participation for Nuclear Power Plant Projects • Advancement of educational institutions INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 9. D E V E L O P M E N T C O N S I D E R AT I O N S LAWS Radiation Protection Laws Concerning Nuclear Safety Plant / Material Ownership • Law and regulations for radiation protection • Law and regulations for safety of nuclear installations • Compatibility of national radiation protection and nuclear safety regulations with IAEA codes • Law and regulations for ownership of nuclear installations and materials • Law or policy concerning nuclear third party liability • Bilateral nuclear supply agreements • Conventions on early notification and assistance • Physical protection convention • Nuclear safety convention • Convention on safety of waste and spent fuel management INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 10. D E V E L O P M E N T C O N S I D E R AT I O N S ENERGY AND ELECTRICITY SUPPLY POLICIES • National Development policies and plan. • Implementation mechanisms for National Development plan. • National policies for the Energy and Electricity sectors. Perceptions of major constraints, priorities. • Electricity tariff policies. • Environmental Protection Policies and their impact on the energy sector. FINANCIAL MECHANISM • Mechanisms for International Financing. • Mechanisms for Local Financing. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 11. D E V E L O P M E N T C O N S I D E R AT I O N S INTERNATIONAL AGREEMENTS • Treaty on the non-proliferation of Nuclear weapons (NPT) INFCIRC/140 • Guidelines for Nuclear transfers, 1993 revision of NSG London guidelines • Convention on the prevention of Marine pollution by dumping of wastes and other matter (London Dumping Convention), INFCIRC/205 • International Convention for the safety of life at sea • Convention for the suppression of Acts of Nuclear Terrorism INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 12. TENDERS Information provided by the owner Information requested from bidders 1. INVITATION LETTER 1. GENERAL INFORMATION 2. ADMINISTRATIVE INSTRUCTIONS 2. GENERAL TECHNICAL ASPECTS 3. GENERAL INFORMATION 3. TECHNICAL DESCRIPTIONS 4. TECHNICAL REQUIREMENTS 4. SCOPE OF SUPPLY AND SERVICES 5. SCOPE OF SUPPLY AND SERVICES 5. ALTERNATIVES AND OPTIONS 6. NATIONAL PARTICIPATION 6. QUALITY ASSURANCE PROGRAMME 7. BID EVALUATION CRITERIA 7. TRAINING 8. DRAFT CONTRACT TERMS AND CONDITIONS 8. PROJECT SCHEDULE 9. COMMERCIAL CONDITIONS 9. TECHNOLOGY TRANSFER 10. SAFETY AND SECURITY CONSTRAINTS 10. GUARANTEES AND WARRANTIES 11. DEVIATIONS AND EXCEPTIONS 12. COMMERCIAL CONDITIONS INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 13. CONTRACT Contract conditions • Financing arrangements • Down-payments • Governmental approval or authorization • International commitments • Safeguards requirements • Export license, construction license, operation license • Pertinent regulatory and licensing requirements. Turnkey Contract Split Package Contract 1. The owner has one contract with the main 1. The owner has multiple contracts with supplier. suppliers. 2. The main supplier has overall responsibility for 2. The overall responsibility is divided construction, and turns over responsibility for between a relatively small number of the project to the owner/operator in stages contractors, each building a large section during the commissioning phase. of the work. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 14. CONTRACT Contract Components •Definitions •Licensing •General clauses •Delivery times •Object of the contract •Documentation •Planning and execution of the work •Spare and wear parts, consumables and special •Information, inspection, testing and control tools •Assignment of the work and subcontracting •Guarantees or warranties •National participation and technology transfer •Take-over •Training of personnel •Prices, price adjustments and terms of payment •Changes and additional work •Force majeure •Transport and customs clearance •Termination and suspension of the contract •Risks and transfer of title •Guarantee of title and proprietary information •Liability •Execution of the contract •Insurances •Applicable law •Quality assurance •Arbitration INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 15. FINANCING Major Challenges • The high capital cost and technical complexity of NPPs, which present relatively high risks during both construction and operation • The relatively long period required to recoup investments or to repay loans for NPP construction, which increases the risk from electricity market uncertainties • The often controversial nature of nuclear projects, which gives rise to additional political and regulatory risks • The need for clear solutions and financing schemes for radioactive waste management and decommissioning, which only governments can formulate INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 16. FINANCING Financial Model for project fully financed through government guarantee. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 17. FINANCING Financial Model for Public Private Partnership projects. The private sector investors bring the equity and loans and the government participates through assets and risk mitigation mechanisms. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 18. LEGAL FRAMEWORK Nuclear laws and regulations address the following • THE SAFETY PRINCIPLE (PREVENTION AND PROTECTION) • THE SECURITY PRINCIPLE (PEACEFUL USE OF NUCLEAR POWER) • THE RESPONSIBILITY PRINCIPLE (OPERATOR OR LICENSEE) • THE PERMISSION PRINCIPLE (REVIEW AND AUTHORIZATION BY REGULATORY BODY) • THE CONTINUOUS CONTROL PRINCIPLE (RIGHT OF INSPECTION AND ACCESS BY THE REGULATORY BODY) • THE COMPENSATION PRINCIPLE (EXTENT OF NUCLEAR LIABILITY) • THE SUSTAINABLE DEVELOPMENT PRINCIPLE (PROTECTION OF FUTURE) • THE COMPLIANCE PRINCIPLE (INTERNATIONAL AND TRANSBOUNDARY AGREEMENTS, TREATIES AND CONVENTIONS) INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 19. LEGAL FRAMEWORK List of clearances required for setting up a Nuclear Power Plant 1. Clearance of the Ministry of Environment and Forests 2. Clearances from the Gol (Civil Aviation Department) and the Director, National Airports Authority in connection with the height of any chimneys. 3. Confirmations from the Department of Economic Affairs, Ministry of Finance, the Department of Industrial Development, Ministry of Industry, the Department Company Affairs and the RBI, that the Company is permitted to enter into the Financing Agreements, 4. Consent of Gol to the issue of equity to Foreign investors 5. Consent of RBI for the subscription by he Foreign Investors in Shares in the Company pursuant to Section-29 of FEMA (Foreign Exchange Management Act 1999) 6. Consent of RBI for the provision by the Company of guarantees and / or indemnities and the ability of lenders and suppliers to receive payments in enforcement thereon including liquidated damages pursuant to Section-9 and 26 of FEMA 1999. 7. Consent of RBI for payment to non-resident directors of the Company-Commissioner of Electricity 8. Consent of RBI for the Company to establish and office outside India pursuant to Section-8 of FEMA 1999 and to acquire immovable property to Section-25 of FEMA, 1999 9. Approval of the Chief Engineer Inspector for the Power Station INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 20. LEGAL FRAMEWORK List of clearances required for setting up a Nuclear Power Plant 10. Exemption from Section-10(15)(iv) of the Income Tax Act 1961 in connection with the interest and other charges payment by the company on offshore debt 11. Permission from the Director General of Foreign Trade for the various imports pursuant to the Foreign Trade (Development and Regulation) Act 1992. 12. Land acquisition Power plant – Land Acquisition Act 1894 13. Techno economic clearance under section 30 of Electricity Supply) Act, 1948 14. Permission from the Directorate General of Technical Development / Director General of Foreign Trade to import helicopters, Aircrafts, Ships or other such vessels under the Foreign Trade (Development and Regulation) Act, 1992 15. Consent under the Factories Act 1948 relating to firefighting capability 16. Tax confirmations and clarification in relation to the treatment of capital gains and offshore securities offered by the Company and exemptions under Section-10(15)(iv) of the Income Tax Act, 1961 in relation to any interest payable by the Company on offshore debt securities. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 21. LEGAL FRAMEWORK List of clearances required for setting up a Nuclear Power Plant 17. A certificate form the General Insurance Corporation or any of its subsidiaries to the effect that such insurance or reinsurance cannot be obtained from them 18. Consent from the Gol (Controller of Insurance) to the effecting by the Company of such insurance and / or reinsurance with offshore insurers and/ reinsures and 19. Consent from RBI under FERA 1973/FEMA 1999 for the taking out of insurance and / or reinsurance with offshore insures and / or reinsures and for the payment of any premiums thereunder 20. Permission from the Director General of Foreign Trade for the import of spares pursuant to the Foreign Trade Development and Regulation Act 1992 21. Consent of the Direction General of Civil Aviation to use and operate an airstrip and helicopter landing pad, and use and operate a helicopter and / or other aircraft pursuant of the Aircraft Act 1934 INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 22. LEGAL FRAMEWORK NUCLEAR LIABILITY BILL India framed the civil liability for Nuclear damage bill 2010, which stipulates the compensation burden on the state-run reactor operator, the liability of government and the responsibility of private suppliers and contractors. Some major features of the bill are: • The Atomic Energy Regulatory Board has to notify a nuclear incident within 15 days from the date of a nuclear incident occurring. • The operator of a nuclear installation will be liable for nuclear damage caused by a nuclear incident in that installation or if he is in charge of nuclear material that caused the incident. • If more than one operator is liable for nuclear damage, all operators shall be jointly, and severally liable to pay compensation for the damage. • The Bill states that the total liability for a nuclear incident shall not exceed the rupee equivalent of 300 million Special Drawing Rights (Approximately Rs. 2100 crore) INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 23. T H E AT O M I C E N E R G Y A C T, 1 9 6 2 The Atomic Energy Regulatory Board (AERB) was constituted on November 15, 1983 by the President of India by exercising the powers conferred by Section 27 of the Atomic Energy Act, 1962 (33 of 1962) to carry out certain regulatory and safety functions under the Act. The regulatory authority of AERB is derived from the rules and notifications promulgated under the Atomic Energy Act, 1962 and the Environmental (Protection) Act, 1986 Some of the important sections of the Atomic Energy Act are given as follows. Section 2-1-(e) "Plant" includes machinery, equipment or appliance whether affixed to land or not. Section 3-1-(e) To provide for control over radioactive substances or radiation generating plant in order to - • Prevent radiation hazards • Secure public safety and safety of persons handling radioactive substances • Ensure safe disposal of radioactive wastes. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 24. T H E AT O M I C E N E R G Y A C T, 1 9 6 2 Section 10.1-(c) Rights to use and occupy the surface of any land for the purpose of erecting any necessary buildings and installing any necessary plant Section 10-1-(d) Rights to use and occupy for the purpose of working the minerals and to use or acquire any plant used in connection with any such mine or quarry Section 10-(3) Compensation in respect of any right acquired under this section shall be paid in accordance with section 21 Section 22(1) Notwithstanding anything contained in the Electricity (Supply) Act1948, the Central Government shall have authority - (a) to develop a sound and adequate national policy in regard to atomic power, to co-ordinate such policy with the Central Electricity Authority and the State Electricity Boards constituted under section 3 and 5 (b) to fix rates for and regulate the supply of electricity from atomic power stations, with the concurrence of the Central Electricity Authority INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 25. NUCLEAR POWER IN INDIA The Nuclear Power Corporation of India Limited (NPCIL), a Public Sector Undertaking (PSU) under the Department of Atomic Energy, was registered as a public limited company under the Companies Act in September, 1987 with the objective of operating the Atomic Power Stations and implementing the Atomic Power Projects for the generation of electricity in pursuance of the schemes and programmes of the Government of India under the Atomic Energy Act, 1962. INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR
  • 26. NUCLEAR POWER PROJECTS INFRASTRUCTURE REGULATORY ISSUES INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR