SlideShare ist ein Scribd-Unternehmen logo
1 von 138
Task order - TO 675
Pictures that highlight the activities/ condition of the components-
before & after the job done
Repair of Chillers 6 & 7 at Combined Utilities Building (CUB) , Bldg 753 NSA II
A. Condenser Loop
Scope of Work 1:
1) Contractor shall open condenser bell caps ( water boxes ) and examine the condition of the
condenser tubes and piping with a camera probe. Copy of the finding and video footage are
to be reported and submitted to the Government
Action Taken :
• Opened Condenser bell caps ( water boxes ) and examined the condition of the condenser
tubes and piping with a camera probe( Video scope)
• The resultant pictures are shown in the following pages of this Presentation. The video scope
recordings are separately given in the CD
• The condenser loop piping were found with loose and hard scale, the strainers were found
clogged fully with contamination. The condenser water boxes / bell caps were found coated
with slurry and other loose scales. The condenser tubes were examined with video scope and
found deposits of loose particles and sediments
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser Tube Sheet
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser Bell Cap
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser Tube sheet
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser Tube sheet & Water Boxes
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser water box
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser water box with outlet pipe view
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
Condenser tube sheet
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
A. Condenser Loop
1. Condenser Bell Cap / water boxes pictures ( Before cleaning )
A. Condenser Loop
1. Tube examination with vedioscope
A. Condenser Loop
1. Tube Internal View- video scope
Tube internal view – video scope ( shown in the link is of a single tube
The balance video scope movies are saved in the CD)
Double-click on AVI
A. Condenser Loop
Scope of Work 2:
2. Contractor shall perform brush cleaning of the condenser tubes
Action Taken :
• Brush cleaned the condenser tubes of Chiller 6 & 7.
• Cleaned the bell caps / water boxes by mechanical means .
• Painted the bell caps / water boxes with epoxy paint
• The following Pictures shows the process
A. Condenser Loop
2. Brush Cleaning of the condenser tubes – Chiller 6
A. Condenser Loop
2. Brush Cleaning of the condenser tubes –Chiller 6
A. Condenser Loop
2. Brush Cleaning of the condenser tubes –Chiller 6
A. Condenser Loop
2. Brush Cleaning of the condenser tubes – Chiller 7
A. Condenser Loop
2. Brush Cleaning of the condenser tubes – Chiller 7
A. Condenser Loop
2. Brush Cleaning of the condenser tubes
A. Condenser Loop
2. Brush Cleaning of the condenser tubes- contamination passing out of the tubes
A. Condenser Loop
2. Brush Cleaning of the condenser tubes- contamination passing out of the tubes
A. Condenser Loop
2. Brush Cleaning of the condenser tubes- contamination collected at the tray
A. Condenser Loop
Scope of Work 3:
1) Contractor shall perform chemical flushing and circulate the chemical thru’ condenser loop and Cooling
Towers on units 6&7
Action Taken :
• Condenser loops of Chiller 6 & 7 were chemical flushed and chemical circulated until the pipes and
accessories were fully cleaned of all contaminations. The cooling tower sump, nozzles , screen of Unit 6
& 7 were cleaned to remove the contaminations .
• The chemical used were NSF approved chemicals . MSDS of chemicals were submitted for approval
• Disposal of the waste chemical were done as per the Bahrain Environmental regulation.
• Cleaned and Painted the Water Boxes/ Bell Caps with Eoxy Paint
• The following Pictures shows the pipe internal coating / deposits prior to the cleaning and after the
chemical cleaning .
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning )
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Strainer Chiller 7– fully clogged ( Before cleaning)
A. Condenser Loop
3. Bucket Strainer Chiller 6 – fully clogged ( Before cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Pipe pictures ( Before chemical cleaning)
A. Condenser Loop
3. Condenser Tube Sheet pictures ( Before cleaning)
A. Condenser Loop
Cooling Tower # 6 before cleaning
A. Condenser Loop
Cooling Tower # 6 before cleaning
A. Condenser Loop
Cooling Tower # 7 before cleaning
A. Condenser Loop
Cooling Tower # 7 before cleaning
A. Condenser Loop
Cooling Tower # 6 before cleaning
A. Condenser Loop
3. Chemical flushing & Cleaning
Chemical Circulation
A. Condenser Loop
3. Chemical flushing & Cleaning
Chemical Circulation
A. Condenser Loop
3. Chemical flushing & Cleaning
Chemical Circulation
A. Condenser Loop
3. Chemical flushing & Cleaning
Chemical Circulation
Tank
A. Condenser Loop
3. Chemical flushing & Cleaning
Chemical Circulation
A. Condenser Loop
3.Piping after chemical cleaning
A. Condenser Loop
3.Piping after chemical cleaning
A. Condenser Loop
3.Pipe Interior after Chemical cleaning
A. Condenser Loop
3.Pump Strainer after chemical cleaning
A. Condenser Loop
3.Bucket Strainer Housing after chemical cleaning
A. Condenser Loop
3.Piping after chemical cleaning
A. Condenser Loop
3. Bucket Strainer Housing after chemical cleaning- Chiller 6
A. Condenser Loop
3.Piping after chemical cleaning
A. Condenser Loop
3.Piping after chemical cleaning
A. Condenser Loop
3.Bucket Strainer Housing after chemical cleaning - Chiller 7
A. Condenser Loop
3.Bucket Strainer after chemical cleaning- Chiller 7
A. Condenser Loop
3.Cooling Tower screen after chemical cleaning
A. Condenser Loop
3.expansion joint after chemical cleaning
A. Condenser Loop
3.cooling tower 6 after cleaning
A. Condenser Loop
3.Cooling Tower 6 after cleaning
A. Condenser Loop
3.Cooling Tower 7 after cleaning
A. Condenser Loop
3.Cooling Tower after chemical cleaning
A. Condenser Loop
3.Condenser water box after cleaning –Chiller 6
A. Condenser Loop
3.Condenser Water Box /Bell caps after cleaning – Chiller 7
A. Condenser Loop
3.Condenser end bell cap after cleaning – chiller 6
A. Condenser Loop
3.Condenser Tube sheet after cleaning – chiller 6
A. Condenser Loop
3.Condenser Bell Cap painted with epoxy paint – chiller 6
A. Condenser Loop
3.Condenser Tube Sheet painted with epoxy paint – chiller 6
A. Condenser Loop
3.Condenser Water Box painted with epoxy paint – chiller 6
A. Condenser Loop
3.Condenser Bell Cap painted with epoxy paint – chiller 7
A. Condenser Loop
3.Condenser Water Box painted with epoxy paint – chiller 7
A. Condenser Loop
3.Condenser Water Box painted with epoxy paint – chiller 7
A. Condenser Loop
3.Condenser Tube Sheet painted with epoxy paint – chiller 7
A. Condenser Loop
Scope of Work 8:
2. Contractor shall properly connect Cooling Tower Fan Motor Gear Box Lubrication piping fittings to rectify
Oil leakages on Cooling Tower 6 & 7
Action Taken :
• Drain the oil , disconnected and removed the lube oil piping fittings , connected back by piping thread
sealant.
• Replaced the flexible hose with hydraulic flexible hose and with hydraulic fittings
• The above job done for both 6 & 7 cooling towers
• The following Pictures shows the new fittings that are leak free
A. Condenser Loop
8. Renewed Lube Oil Piping fittings
A. Condenser Loop
8. Renewed Lube Oil Piping fittings
A. Condenser Loop
8. Renewed Lube Oil Piping fittings
A. Condenser Loop
8. Renewed Lube Oil Piping fittings
. Condenser Loop
8. Renewed Lube Oil Piping fittings
A. Condenser Loop
8. Renewed Lube Oil Piping fittings
A. Condenser Loop
Scope of Work 9:
Contractor shall repair the Cooling Tower Pumps CTP-D-2 so that it will not make any abnormal noise
Action Taken :
• Test run the pump, identified bearing noise for the motor. Disconnected the motor from the drive
coupling , dismantled and replaced both side bearing with new bearings
• Assembled the motor, connected the motor to the drive coupling , carried out alignment checks , test
run and found no abnormal noise.
• The following Pictures shows the bearing replacement for the pump motor
A. Condenser Loop
9. Cooling Tower Pump CTP-D-2 with abnormal noise
Replacement of Motor Bearing with new Bearing
A. Condenser Loop
9. Cooling Tower Pump CTP-D-2 with abnormal noise
Replacement of Motor Bearing with new Bearing
A. Condenser Loop
9. Cooling Tower Pump CTP-D-2 with abnormal noise
Replacement of Motor Bearing with new Bearing
A. Condenser Loop
9. Cooling Tower Pump CTP-D-2 with abnormal noise
Replacement of Motor Bearing with new Bearing
A. Condenser Loop
9. Cooling Tower Pump CTP-D-2 with abnormal noise
Vibration check for motor
A. Condenser Loop
Scope of Work 10:
2. Contractor shall supply and Install Magnetic Sensors ( Vibration Sensors) on Cooling Tower Pumps CTP-D-2
and CTP-D-3
Action Taken :
• Procured i-Alert ( Brand ITT Bell & Gosset Pump) magnetic vibration sensors and installed on the
Pumps
• Tested the function of the i-Alert sensors and found normal functioning
• The following Pictures shows the sensors installed
A. Condenser Loop
10. Missing Magnetic Sensor/ Vibration sensor on CHW Pump CWP-D3
A. Condenser Loop
10. Magnetic Sensor/ Vibration sensor installed on CHW Pump CWP-D3
A. Condenser Loop
10. Missing Magnetic Sensor/ Vibration sensor on CHW Pump CWP-D2
A. Condenser Loop
10. Magnetic Sensor/ Vibration sensor installed on CHW Pump CWP-D2
A. Condenser Loop
Scope of Work 11:
Contractor shall perform laser alignment on all pumps related to the Chiller unit 6 & 7 ( 4 pumps)
Action Taken :
• Conducted Alignment Checks on the pumps of Chiller 6 & 7 .
• Corrected the alignment of Cooling Tower Pump CTP- D-2
• The following Pictures shows the alignment check procedures
A. Condenser Loop
11. Pump Alignment Test
A. Condenser Loop
11. Pump Alignment Test
A. Condenser Loop
11. Pump Alignment Test
A. Condenser Loop
11. Pump Alignment Test
A. Condenser Loop
Scope of Job 12.
• Contractor shall supply a Chemical Cleaning Skid which shall be used to chemically clean all chillers as
necessary
Action Taken :
• Supplied Chemical Cleaning Skid
• Delivered to the CUB
B. Refrigerant Loop
Scope of Job 1.
• Contractor shall recover and recycle the Refrigerant on Chillers 6 & 7 to get rid of the contamination
Action Taken :
• Recovered the refrigerant from the Chiller 6 & 7
• Flushed the refrigerant loop with nitrogen, removed trapped debris / contaminations from the loop
• Vacuum the loop
• Recycled the refrigerant thru’ filter driers for further removal of contaminations
• The following pictures show the procedures
B. Refrigerant Loop
1. Refrigerant Recovery
B. Refrigerant Loop
1. Refrigerant Recovery
B. Refrigerant Loop
1. Flushing the refrigerant loop with nitrogen to get rid of the contamination / debris
B. Refrigerant Loop
1. Flushing the refrigerant loop with nitrogen to get rid of the contamination / debris
debris removed from chiller 7
B. Refrigerant Loop
1. Flushing the refrigerant loop with nitrogen to get rid of the contamination / debris
debris removed from chiller 6
B. Refrigerant Loop
1. Vacuum creation prior to Refrigerant recycle
Vacuum Pump operation in progress
B. Refrigerant Loop
1. Vacuum creation prior to Refrigerant recycle
Vacuum gauge showing the vacuum condition in the refrigerant loop
B. Refrigerant Loop
1. Refrigerant Recycle thru’ filter driers
B. Refrigerant Loop
1. Refrigerant Recycle Process
B. Refrigerant Loop
1. Refrigerant recycle
Oil Filling
B. Refrigerant Loop
1. Refrigerant Recovery
B. Refrigerant Loop
1. Refrigerant Recovery
B. Refrigerant Loop
1. Refrigerant Recycle
Refrigerant liquid level in the sight glass- clear refrigerant without contamination
B. Refrigerant Loop
1. Refrigerant Recycle
Refrigerant liquid level in the sight glass- clear refrigerant without contamination
B. Refrigerant Loop
Scope of Work 2:
Contractor shall replace the Oil Filter, Oil and dehydrator of Chiller unit 6 & 7
Action Taken :
• Replaced the Oil Filter, Oil and Dehydrators of Chiller 6 & 7 .
• Leak tested the joints / fittings, Observed the Oil level . Found normal
• The following Pictures shows the process conducted
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 6
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 6
B. Refrigerant Loop
2. Replacement of dehydrator – Chiller 6
B. Refrigerant Loop
2. Replacement of dehydrator – Chiller 7
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 7
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 7
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 7
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 7
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 7
B. Refrigerant Loop
2. Replacement of Oil Filter – Chiller 7
B. Refrigerant Loop
Scope of Work 3:
Contractor shall rectify the faulty differential pressure switches on Chiller unit 6 & 7
Action Taken :
• Rectified the faulty differential switches of Chiller 6 & 7 .
• The following Pictures shows the testing and setting up of DPS
B. Refrigerant Loop
3. Differential Pressure Switch Setting – Chiller 7
B. Refrigerant Loop
3. Differential Pressure Switch Setting – Chiller 7
C. Distribution Pumps and Schneider Control System
Scope of Job 1:
Contractor shall perform laser alignment on Distribution Pumps DP-D-1 and DP-J-1
Action Taken :
• Tested the drive coupling alignment of Distribution Pumps DP-D-1 and DP-J-1
• Corrected the misalignment on DP-J-1
C. Distribution Pumps and Schneider Control System
1. Distribution Pump alignment test
C. Distribution Pumps and Schneider Control System
Scope of Job 2:
Contractor shall investigate and rectify the cause of system short cycling in the Schneider Programming.
Action Taken :
• The sequencing of the chillers and its ancillary units were tested and the control parameter of the
return chilled water temperature set point was found below the design of 12.2 c .
• Reset the control to 12.2 C.
• Observed the system for proper sequencing without short cycle. Found normal

Weitere ähnliche Inhalte

Was ist angesagt?

Hydronic piping systems
Hydronic  piping systemsHydronic  piping systems
Hydronic piping systemsNaiyer Khan
 
Compact Heat Exchangers
Compact Heat ExchangersCompact Heat Exchangers
Compact Heat Exchangersadlinilda
 
BAROMETRIC JET CONDENSER
BAROMETRIC JET CONDENSERBAROMETRIC JET CONDENSER
BAROMETRIC JET CONDENSERClaire Canoy
 
TTK 1H Condenser
TTK 1H CondenserTTK 1H Condenser
TTK 1H Condensermedinage
 
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...Komandur Sunder Raj, P.E.
 
Cooling Systems - Chiller Technologies
Cooling Systems - Chiller TechnologiesCooling Systems - Chiller Technologies
Cooling Systems - Chiller TechnologiesHusain Baqer
 
1 reboilers types
1 reboilers types1 reboilers types
1 reboilers typeslesvit
 
Hvac chilled water distribution schemes
Hvac chilled water distribution schemesHvac chilled water distribution schemes
Hvac chilled water distribution schemesMazhar Sheikh
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...Saikat Halder
 
Steam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticSteam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticPichai Chaibamrung
 
Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02
Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02
Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02Anish Ansari
 
Steam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuumSteam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuumwaqarahmed445
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 

Was ist angesagt? (20)

Hydronic piping systems
Hydronic  piping systemsHydronic  piping systems
Hydronic piping systems
 
Condenser design
Condenser designCondenser design
Condenser design
 
Compact Heat Exchangers
Compact Heat ExchangersCompact Heat Exchangers
Compact Heat Exchangers
 
Project ppt
Project pptProject ppt
Project ppt
 
BAROMETRIC JET CONDENSER
BAROMETRIC JET CONDENSERBAROMETRIC JET CONDENSER
BAROMETRIC JET CONDENSER
 
TTK 1H Condenser
TTK 1H CondenserTTK 1H Condenser
TTK 1H Condenser
 
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
2007 ASME Power Conference Troubleshooting Condenser Vacuum Issues At North O...
 
Cooling Systems - Chiller Technologies
Cooling Systems - Chiller TechnologiesCooling Systems - Chiller Technologies
Cooling Systems - Chiller Technologies
 
1 reboilers types
1 reboilers types1 reboilers types
1 reboilers types
 
Hvac chilled water distribution schemes
Hvac chilled water distribution schemesHvac chilled water distribution schemes
Hvac chilled water distribution schemes
 
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
 
Steam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnosticSteam Condenser performance and loss diagnostic
Steam Condenser performance and loss diagnostic
 
Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02
Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02
Lec 202-28condenser-29-20dis-202011-130727113717-phpapp02
 
Steam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuumSteam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuum
 
Aprds system
Aprds systemAprds system
Aprds system
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
CONDENSERS & COOLING TOWERS
CONDENSERS & COOLING TOWERSCONDENSERS & COOLING TOWERS
CONDENSERS & COOLING TOWERS
 
CONDENSATE RECOVERY SYSTEMS
CONDENSATE RECOVERY SYSTEMSCONDENSATE RECOVERY SYSTEMS
CONDENSATE RECOVERY SYSTEMS
 
Chiller water systems
Chiller water systemsChiller water systems
Chiller water systems
 
MET 214 Module 7
MET 214 Module 7MET 214 Module 7
MET 214 Module 7
 

Andere mochten auch (16)

Coal Syngas
Coal Syngas Coal Syngas
Coal Syngas
 
S3 Lec 2 (Condenser) Note
S3 Lec 2 (Condenser) NoteS3 Lec 2 (Condenser) Note
S3 Lec 2 (Condenser) Note
 
STUDY OF CONDENSER AND ITS DIFFERENT TYPES
STUDY OF CONDENSER  AND ITS DIFFERENT TYPESSTUDY OF CONDENSER  AND ITS DIFFERENT TYPES
STUDY OF CONDENSER AND ITS DIFFERENT TYPES
 
Heat exchangers and types
Heat exchangers and typesHeat exchangers and types
Heat exchangers and types
 
Waste to energy afval is energie!
Waste to energy afval is energie!Waste to energy afval is energie!
Waste to energy afval is energie!
 
Steam Condensers
Steam CondensersSteam Condensers
Steam Condensers
 
Air heater
Air heaterAir heater
Air heater
 
Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)
 
SYNGAS production
SYNGAS productionSYNGAS production
SYNGAS production
 
Heat Exchangers by Hanif Dewan
Heat Exchangers by Hanif DewanHeat Exchangers by Hanif Dewan
Heat Exchangers by Hanif Dewan
 
Design of condenser
Design of condenserDesign of condenser
Design of condenser
 
Condenser and its types
Condenser and its types Condenser and its types
Condenser and its types
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat Exchangers
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
 
Steam Condensers
Steam CondensersSteam Condensers
Steam Condensers
 
Condensers and cooling towers
Condensers and cooling towersCondensers and cooling towers
Condensers and cooling towers
 

Ähnlich wie Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

Centrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case StudyCentrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case StudySiewert Equipment
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptSatish Pydimarla
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training ProgramArul Balan
 
EJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil CollectorEJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil CollectorEvan (E.J.) Roe
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasAshwin Gadgil
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02JicelleBayan
 
cycle and components practical.docx
cycle and components practical.docxcycle and components practical.docx
cycle and components practical.docxsydur10
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishJim Novak (吉因龙)
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfNandhananRaghuraman
 
Design, Construction and Test of Corrosion
Design, Construction and Test of CorrosionDesign, Construction and Test of Corrosion
Design, Construction and Test of CorrosionAmir Reza James Oskui
 
Practrical1
Practrical1Practrical1
Practrical1sydur10
 

Ähnlich wie Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope (20)

BDI November 2016 CO2
BDI November 2016 CO2BDI November 2016 CO2
BDI November 2016 CO2
 
Presentation On Boiler Analysis
Presentation On Boiler AnalysisPresentation On Boiler Analysis
Presentation On Boiler Analysis
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst Report
 
Centrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case StudyCentrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case Study
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training Program
 
Ista catalog
Ista catalogIsta catalog
Ista catalog
 
EJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil CollectorEJ Roe and Michael Watson-Deep Sea Soil Collector
EJ Roe and Michael Watson-Deep Sea Soil Collector
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
Module6 module4draftsanitaryandplumbinglayoutanddetails-140806060206-phpapp02
 
2011 inspector notes
2011 inspector notes2011 inspector notes
2011 inspector notes
 
cycle and components practical.docx
cycle and components practical.docxcycle and components practical.docx
cycle and components practical.docx
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 english
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdf
 
Medical gas cylinders
Medical gas cylindersMedical gas cylinders
Medical gas cylinders
 
Design, Construction and Test of Corrosion
Design, Construction and Test of CorrosionDesign, Construction and Test of Corrosion
Design, Construction and Test of Corrosion
 
Steam boilers
Steam boilersSteam boilers
Steam boilers
 
Practrical1
Practrical1Practrical1
Practrical1
 

Kürzlich hochgeladen

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 

Kürzlich hochgeladen (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 

Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope