SlideShare ist ein Scribd-Unternehmen logo
1 von 20
Building Morphology Factors
Building Construction process comprises with many stages.

They basically consist of two parts
    Pre Construction
    Post Construction


The Designing process of a building project belongs to the Pre
construction stage.

Considering about the Design Morphology Factors comes
under this Designing stage.
Cost of Construction changes in a rapid manner due to many
reasons.

Therefore a proper analysis of Building Morphology Factors are
essential to reduce cost of Construction.

This presentation is aimed at understanding what the Design
Morphology Factors are.

This discusses about;
        What the Morphology Factors are.
        A practical example on implementing Morphology Factors.
        Analysis and Recommendations of alternatives Designs
        using Morphology Factors.
        Impact of Morphology Factors on Cost of Construction.
Main design Morphology Factors that are considered are;

   Shape of the building
            – Orientation, Proximity and Similarity factors
   Size of the building
   Storey height
   Total height of the building
   Number of storey
   Grouping Buildings
            – Orientation, Proximity and Similarity factors
Shape and Size are interrelated factors.

Both relates with the floor space required by the client.

Research has showed that SQUARE shape is the most cost
effective shape.

When designing the shape the ORIENTATION, PROXMITY
and SIMILARITY factors must be concerned.

If the new building is in a similar shape as the existing
buildings, placing the building in the correct orientation and
proximity becomes easy.
Service integration must be concerned.

For example;
      Air conditioning
      Fire fighting system
      Electrical lighting
      Telecommunication systems


If storey height is not decided according to service integration
requirement;
      Problems occur during installation
      Service lines will be installed in an irregular manner.


Proper height must be selected during designing.
Directly connects with the number of storey and storey height.

Higher the building goes;
   Stronger the structure
   should be.
   Workers, equipment,                             More
   material etc must be           RESULT         Financial
   transported continuously to                  Requirement
   upper floors.
   More scaffolding
   requirement.
Must design to the required number only.

Over designing could result in a stronger structure.

If designed correctly, can avoid expensive foundation types.
Two methods can be used;
      Vertical Grouping
          - Common Walls and Foundations
      Horizontal Grouping
          - Common Roofs


Can be used in Building complexes like Apartment buildings.

Another advantage is reduction of circulation spaces and
service cores.

When grouped buildings can share circulation spaces and
service cores.
SHAPE and SIZE

Designed by UDA designers.

Shape Designed due to
Architectural Influence.

Office areas are located on
either side of the vertical
circulation area.
Recommendation on SHAPE and SIZE

If built in square shape, spaces on either side of the vertical
circulation space could be used.

It increases the efficiency of land usage.

Land value is very high.

Design Efficiency Calculation

Floor area of H-shaped building        = 2744.28 m2
Floor area if designed as a square shape = 3528.36 m2

Wastage of Floor Area                   = 784.08 m2
Recommendation on SHAPE and SIZE

If the building is built without changing the required floor area
land area could have been saved.

Design Efficiency Calculation

Perimeter of the H-shaped building       = 1039.36 ft.

Perimeter if designed as a square shape = 692.82 ft


Design efficiency = (1039.36 – 692.82) x 100       =     50.02%
                           692.82

                   Square shape is 50.02% more effective.
Recommendation on SHAPE and SIZE

The existing main building has a L shape.

If the new building is designed to have the same shape
(similarity factor) orientation of the building could have been
easy.

Since the shape is different the main parts of the building faces
east and west.

Therefore the heat gain through direct sun light is more and
uncomfortable.
HEIGHT of the Building

Storey height is 3600 mm.

Ceiling to be a Lowered 600 mm from the soffit of the slab.

Each floor is designed to be constructed with a proper ducting
for A/C, and other services.

Comprising with 14 storeys.
Recommendation on HEIGHT

The location has natural ventilation.

Natural ventilation method can be easily applied for upper floors.

Therefore A/C ducting is not required for upper floors.

So storey height can be reduced.

It is cost effective because;
     Reduces Construction cost.
     Reduces service installation cost.
     Reduces services maintenance cost.
GROUPING BUILDINGS

New building is constructed few feet away from the existing
main building.

At the designing stage it was decided to group the buildings.

But later it was decided not to due to heavy demolition work of
the existing building.

Recommendation on GROUPING BUILDINGS

Grouping buildings could have reduced the circulation space
needed for the new building.
Design economics helps us to understand the best cost
effective way proceed with the construction.

Discussion between construction professionals prior the
construction helps them to understand these cost effective way.

Each construction has its own cost effective ways.

To understand these ways Building Morphology Factors can be
used.

Concerning about Morphology factors during designing stage is
very important.
The designing stage of a building project is the best stage to
reduce unnecessary costs of the project.

Building Morphology Factors are the key to understand the
ways of reducing unnecessary costs.

Shape, Size, Storey height, Total height, Grouping factors can
be analyzed carefully to make a project cost effective.

Therefore a proper knowledge on Building Morphology is
necessary for construction professionals.
Morphology factors

Weitere ähnliche Inhalte

Was ist angesagt?

Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of buildingtoshi gupta
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Soh Shing
 
Exterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionExterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionTaha Padrawala
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET) Omar Hamim
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Prefabricated wall panel
Prefabricated wall panelPrefabricated wall panel
Prefabricated wall panelSAHIL KUMAR
 
Defects in construction
Defects in constructionDefects in construction
Defects in constructionShivangi Saini
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in constructionUdisha15
 
Modular coordination
Modular coordinationModular coordination
Modular coordinationAtul Verma
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 

Was ist angesagt? (20)

Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 
Exterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionExterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building Construction
 
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET) Presentation on Waterproofing of Basement  (Omar Faruqe Hamim,L2/T1,BUET)
Presentation on Waterproofing of Basement (Omar Faruqe Hamim,L2/T1,BUET)
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Prefabricated wall panel
Prefabricated wall panelPrefabricated wall panel
Prefabricated wall panel
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
Buildings Structure system
Buildings Structure systemBuildings Structure system
Buildings Structure system
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
 
FALSE CEILING
FALSE CEILINGFALSE CEILING
FALSE CEILING
 

Andere mochten auch

Factors Affecting Blava Morph
Factors Affecting Blava MorphFactors Affecting Blava Morph
Factors Affecting Blava MorphEcumene
 
Urban morphology, elements of urban design
Urban morphology, elements of urban designUrban morphology, elements of urban design
Urban morphology, elements of urban designAbdul Rab
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distributionKuNal MeHta
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systemsbecoolseo
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)zeeshan715
 
Refrigration & air conditioning
Refrigration & air conditioningRefrigration & air conditioning
Refrigration & air conditioningSiddharth Bedarker
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac PresentationChoong KW
 

Andere mochten auch (11)

Factors Affecting Blava Morph
Factors Affecting Blava MorphFactors Affecting Blava Morph
Factors Affecting Blava Morph
 
Urban morphology
Urban morphologyUrban morphology
Urban morphology
 
Urban morphology, elements of urban design
Urban morphology, elements of urban designUrban morphology, elements of urban design
Urban morphology, elements of urban design
 
Power transmission & distribution
Power transmission & distributionPower transmission & distribution
Power transmission & distribution
 
Electricity transmission, generation and distribution
Electricity transmission, generation and distributionElectricity transmission, generation and distribution
Electricity transmission, generation and distribution
 
Types of air conditioning systems
Types of air conditioning systemsTypes of air conditioning systems
Types of air conditioning systems
 
Power transmission(ppt)
Power transmission(ppt)Power transmission(ppt)
Power transmission(ppt)
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
Refrigration & air conditioning
Refrigration & air conditioningRefrigration & air conditioning
Refrigration & air conditioning
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 

Ähnlich wie Morphology factors

Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...IJRES Journal
 
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...irjes
 
Modular construction
Modular constructionModular construction
Modular constructionKiran Gill
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdfEyuel24
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Galala University
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Shabaz Khan
 
BUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNINGBUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNINGsatishchapagain1
 
COST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxCOST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxabedamtie
 
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...IRJET Journal
 
150316 high rise design
150316 high rise design150316 high rise design
150316 high rise designTieng Wei
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Kai Yun Pang
 
Types Fabrication Drawings: Their Importance and Benefits
Types Fabrication Drawings: Their Importance and BenefitsTypes Fabrication Drawings: Their Importance and Benefits
Types Fabrication Drawings: Their Importance and BenefitsChandresh Chudasama
 
Analysis of Formwork in Multistory Building
Analysis of Formwork in Multistory BuildingAnalysis of Formwork in Multistory Building
Analysis of Formwork in Multistory Buildingcedmmantc5411
 
기스본 도심상업개발을 위한 도시 디자인 가이드북
기스본 도심상업개발을 위한 도시 디자인 가이드북기스본 도심상업개발을 위한 도시 디자인 가이드북
기스본 도심상업개발을 위한 도시 디자인 가이드북Seongwon Kim
 
How can BIM improve Green Building Projects Effectively.pptx
How can BIM improve Green Building Projects Effectively.pptxHow can BIM improve Green Building Projects Effectively.pptx
How can BIM improve Green Building Projects Effectively.pptxArpitGautam20
 

Ähnlich wie Morphology factors (20)

Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
 
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
Assessment of the Effect of Plan Shapes on Cost of Institutional Buildings in...
 
Modular construction
Modular constructionModular construction
Modular construction
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
High rise
High riseHigh rise
High rise
 
BIM9 Fenestra Pro
BIM9 Fenestra ProBIM9 Fenestra Pro
BIM9 Fenestra Pro
 
What BIPV does to YOU R1
What BIPV does to YOU R1What BIPV does to YOU R1
What BIPV does to YOU R1
 
What BIPV does to YOU R1
What BIPV does to YOU R1What BIPV does to YOU R1
What BIPV does to YOU R1
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
BUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNINGBUILDING CONSTRUCTION AND PLANNING
BUILDING CONSTRUCTION AND PLANNING
 
COST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptxCOST EFFECIENT CHAP 2 ppt.pptx
COST EFFECIENT CHAP 2 ppt.pptx
 
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
Analysis of Wind Response on Different Shapes of High Rise Mivan Wall Buildin...
 
150316 high rise design
150316 high rise design150316 high rise design
150316 high rise design
 
Model brief
Model briefModel brief
Model brief
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Types Fabrication Drawings: Their Importance and Benefits
Types Fabrication Drawings: Their Importance and BenefitsTypes Fabrication Drawings: Their Importance and Benefits
Types Fabrication Drawings: Their Importance and Benefits
 
Analysis of Formwork in Multistory Building
Analysis of Formwork in Multistory BuildingAnalysis of Formwork in Multistory Building
Analysis of Formwork in Multistory Building
 
기스본 도심상업개발을 위한 도시 디자인 가이드북
기스본 도심상업개발을 위한 도시 디자인 가이드북기스본 도심상업개발을 위한 도시 디자인 가이드북
기스본 도심상업개발을 위한 도시 디자인 가이드북
 
How can BIM improve Green Building Projects Effectively.pptx
How can BIM improve Green Building Projects Effectively.pptxHow can BIM improve Green Building Projects Effectively.pptx
How can BIM improve Green Building Projects Effectively.pptx
 

Kürzlich hochgeladen

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 

Kürzlich hochgeladen (20)

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 

Morphology factors

  • 1.
  • 3. Building Construction process comprises with many stages. They basically consist of two parts  Pre Construction  Post Construction The Designing process of a building project belongs to the Pre construction stage. Considering about the Design Morphology Factors comes under this Designing stage.
  • 4. Cost of Construction changes in a rapid manner due to many reasons. Therefore a proper analysis of Building Morphology Factors are essential to reduce cost of Construction. This presentation is aimed at understanding what the Design Morphology Factors are. This discusses about; What the Morphology Factors are. A practical example on implementing Morphology Factors. Analysis and Recommendations of alternatives Designs using Morphology Factors. Impact of Morphology Factors on Cost of Construction.
  • 5. Main design Morphology Factors that are considered are; Shape of the building – Orientation, Proximity and Similarity factors Size of the building Storey height Total height of the building Number of storey Grouping Buildings – Orientation, Proximity and Similarity factors
  • 6. Shape and Size are interrelated factors. Both relates with the floor space required by the client. Research has showed that SQUARE shape is the most cost effective shape. When designing the shape the ORIENTATION, PROXMITY and SIMILARITY factors must be concerned. If the new building is in a similar shape as the existing buildings, placing the building in the correct orientation and proximity becomes easy.
  • 7. Service integration must be concerned. For example; Air conditioning Fire fighting system Electrical lighting Telecommunication systems If storey height is not decided according to service integration requirement; Problems occur during installation Service lines will be installed in an irregular manner. Proper height must be selected during designing.
  • 8. Directly connects with the number of storey and storey height. Higher the building goes; Stronger the structure should be. Workers, equipment, More material etc must be RESULT Financial transported continuously to Requirement upper floors. More scaffolding requirement.
  • 9. Must design to the required number only. Over designing could result in a stronger structure. If designed correctly, can avoid expensive foundation types.
  • 10. Two methods can be used; Vertical Grouping - Common Walls and Foundations Horizontal Grouping - Common Roofs Can be used in Building complexes like Apartment buildings. Another advantage is reduction of circulation spaces and service cores. When grouped buildings can share circulation spaces and service cores.
  • 11. SHAPE and SIZE Designed by UDA designers. Shape Designed due to Architectural Influence. Office areas are located on either side of the vertical circulation area.
  • 12. Recommendation on SHAPE and SIZE If built in square shape, spaces on either side of the vertical circulation space could be used. It increases the efficiency of land usage. Land value is very high. Design Efficiency Calculation Floor area of H-shaped building = 2744.28 m2 Floor area if designed as a square shape = 3528.36 m2 Wastage of Floor Area = 784.08 m2
  • 13. Recommendation on SHAPE and SIZE If the building is built without changing the required floor area land area could have been saved. Design Efficiency Calculation Perimeter of the H-shaped building = 1039.36 ft. Perimeter if designed as a square shape = 692.82 ft Design efficiency = (1039.36 – 692.82) x 100 = 50.02% 692.82 Square shape is 50.02% more effective.
  • 14. Recommendation on SHAPE and SIZE The existing main building has a L shape. If the new building is designed to have the same shape (similarity factor) orientation of the building could have been easy. Since the shape is different the main parts of the building faces east and west. Therefore the heat gain through direct sun light is more and uncomfortable.
  • 15. HEIGHT of the Building Storey height is 3600 mm. Ceiling to be a Lowered 600 mm from the soffit of the slab. Each floor is designed to be constructed with a proper ducting for A/C, and other services. Comprising with 14 storeys.
  • 16. Recommendation on HEIGHT The location has natural ventilation. Natural ventilation method can be easily applied for upper floors. Therefore A/C ducting is not required for upper floors. So storey height can be reduced. It is cost effective because; Reduces Construction cost. Reduces service installation cost. Reduces services maintenance cost.
  • 17. GROUPING BUILDINGS New building is constructed few feet away from the existing main building. At the designing stage it was decided to group the buildings. But later it was decided not to due to heavy demolition work of the existing building. Recommendation on GROUPING BUILDINGS Grouping buildings could have reduced the circulation space needed for the new building.
  • 18. Design economics helps us to understand the best cost effective way proceed with the construction. Discussion between construction professionals prior the construction helps them to understand these cost effective way. Each construction has its own cost effective ways. To understand these ways Building Morphology Factors can be used. Concerning about Morphology factors during designing stage is very important.
  • 19. The designing stage of a building project is the best stage to reduce unnecessary costs of the project. Building Morphology Factors are the key to understand the ways of reducing unnecessary costs. Shape, Size, Storey height, Total height, Grouping factors can be analyzed carefully to make a project cost effective. Therefore a proper knowledge on Building Morphology is necessary for construction professionals.