Eco Line Solutions Safety and
Operations Induction
Eco Line Solutions is a
specialty construction
company that services urban
and remote locations in the
fields of hydraulic containment,
waste storage, mining,
environmental protection,
landfill construction and
management, and other
civil/fluid/waste related
projects.
Scope of Works.
• Working at Eco Line Solutions means you
will be involved with deployment,
installation and welding of liner
materials in various applications.
• Personnel are required to perform each
and every task with individual and team
safety in mind.
• Safety items that relate to works onsite
are discussed in detail in the project JHA
/ SWMS. Every individual working on a
Eco Line project site must be inducted
and sign onto the project JHA prior to
commencing works onsite.
• As an employee of Eco Line you will be
expected to undertake all assigned tasks
safely and to the best of your ability with
an attention to detail.
Site Managment
Brendan Hawkins
• Operations Manager with
10 years experience
• Registered first aider
• Certified geosynthetic
quality inspector
Andrew Pillar
• Site Manager with 7 years
experience
• Registered first aider
• Ticketed operator, poly welder
and rope technician
John Codo
• Site Supervisor with 10
years experience
• Ticketed operator, poly
welder
Arnold lopez
• Site CQC Officer
• Certified geosynthetic
quality inspector
Eco Line Personnel Responsibilities
As an Eco Line employee it is expected that you
meet the following a set of requirements prior to
entering the jobsite each day:
• Always arrive to the job site on time, well
rested and ready for the days work
• Complying with Eco Lines minimum PPE
guidelines (long pants, long sleeve shirt, steel
cap boots, hard hats and safety glasses)
• Be clean and presentable, you are
representing Eco Line after all
• To always bring to work any tools or ppe
assigned to you
• Always bring your white card, photo id and
any industry related trade certificates
• To follow supervisor instructions and QC
guidelines at all time
• Bring sufficient food and water for the days
works
Site Rules
Upon entry to site you will need to abide by a
standard set of site rules.
• Unless its an emergency mobile phone use is to
be limited to the lunch break
• All jobsites are a no smoking zones
• Return equipment to its storage location at the
end of each days work
• PPE must be worn at all times
• All employees must attend daily prestart meeting
• All incidents and close calls are to be reported to
your supervisor or CQC officer
• Comply with Eco Line’s zero drug and alcohol
policy - No personnel to attend site with or when
affected by drugs and alcohol
• Eco Line and its contractor’s undertake regular
random drug and alcohol testing
Prestart Meetings
• Each day a prestart meeting with all employees in
attendance to be held by the supervisor to discuss
the planned work for that day and specific safety
and quality consideration for those works. This is an
opportunity for individuals to identify any questions
or safety concerns that they wish to share with the
team to minimise any risk of injury to personnel.
• The purpose of the meeting is to outline any
project safety concerns that may be present in the
day ahead or from previous days works. Mitigation
measure are to be discussed for these hazards to
minimise any risk to personnel.
• Whilst focusing on safety, the prestart meeting is
also an oppurtunity for the site manager or
supervisor to go over the task list for the day
• It is expected for all employees to actively
participate in the daily prestart
Safety Expectations
As an Eco Line employee it is expected you will:
• Follow the site rules at all times
• Understand and follow the site JHA (Job Hazard
Analysis)
• Attend and interact during prestart meetings and
safety discussions
• Comply with the site specific rules as instructed by
contractor induction
• Look out for team members on the jobsite, team
lifting, assessing and discussing risk during works
onsite
• If you do not feel that a task is safe to perform take
the time to reassess how to safely carry out that task
and/or discuss with your supervisor or CQC where
necessary
• Undertake every task safely and efficiently
• Report any hazards to your site supervisor
Disciplinary Procedures
Failure to comply with site rules and Eco
Line’s safety and operations induction will
result in disciplinary acion being taken.
• First offence: Verbal warning from onsite
supervisor
• Second offence: Written warning
• Third offence: Suspension from work or
dismissal from company
• For a serious break of safety or
operational procedures, Eco Line reserves
the right to instantly dismiss any worker
without notice
Site Operations
Deployment
A key activity undertaken by Eco Line personnel
onsite is deployment of liner materials
There are many different types of materials
required to be deployed, deployment techniques
vary between layers.
These deployment technics can be hazardous,
posing risk to personnel due to use of plant lifting
heavy loads
Some key methods to protect personnel include;
• Personnel being aware of the hazardous around
them during works
• never stand downhill from a suspended load or
work directly underneath a suspended load.
• The deployment foreman is responsible for
communication and direction with the operator
• Refer to the project JHA for more in depth
hazard assessment
Construction Quality Control
• Quality control (QC) is a procedure or set of
procedures intended to ensure that a manufactured
product or performed service adheres to a defined
set of quality criteria or meets the requirements of
the client or customer.
• Every aspect of the job is overseen by a CQC officer,
whose main role is to ensure the onsite quality
control of the project
• Eco Line’s goal is to consistently delivery high quality
and specification projects to the clients expectations
• Quality Control is an important part of every Eco
Line project. A QC Guideline has been developed and
is required to be followed by all personnel at all
times
GCL
• GCL is a geosynthetic clay layer that is
deployed via a full length steel axle lifted
via a spreader beam and excavator.
• GCL is a heavy layer that is hard to
manouver once deployed, it is important
that it is deployed into position as re-
adjustment after deployment is very
difficult
• The specified lap for GCL is 300mm, this is
marked on the rolls and can be seen during
deployment
• No seaming is required on the edge of a roll
between panels. Pasting of overlaps is
required between the end of a roll and a
connection panel
• Dust masks should be used in dusty
enviroments including during the
deployment of GCL. Dust masks are
available onsite, notify your supervisor if
you require a mask.
HDPE / LLDPE
• HDPE is a Plastic layer that is deployed via a
spreader bar connection to two axel “horns”
fitted with ball bearings lifted via an excavator
of other plant. It is typically pulled out by hand.
• HDPE comes in both smooth and textured
surface treatments
• It extremely susceptible to being blown about
by wind and therefore need to be weighted
down using sand bags along all “open” edges
• HDPE requires specialised welding tools to
seam the overlaps. The welding of HDPE is an
important task that takes a large amount of
training to consistently achieve a quality weld
Geocomposite
• Geocomposite is a water drainage layer that is
deployed via a full length steel axle lifted via a
spreader beam and machine, or rolled out along the
ground by hand.
• Geocomposite is a light weight material that is easy
to manouver into postition once its deployed.
• The specified overlap for Geocomposite is between
50mm-100mm or as advised by the CQC Officer
• The Geocomposite is seamed with a cable tie every
meter and then the fabric lap is heat sealed with a
gas torch or as required by the CQC Officer
Geotextile
• Geotextile is a common protect used in
various applications in our project works.
As protection to the HDPE liner or
separation between drainage rock and
waste
• Typically deployed via a full length steel
axle lifted via a spreader beam and
machine, or rolled out along the ground by
hand
• Geotextile is a light weight material that is
easy to manouver into postition once its
deployed but is extremely susceptible to
wind.
• The specified overlap for Geocomposite is
between 150mm-300mm or as advised by
the CQC Officer
• The Geotextile is seamed using a gas torch
or a specialised hot air blower
Conclusion
Eco Line Important contacts:
• Eco Line Sydney Office – 02 8057 4528
• Brendan Hawkins (Operations Manager) - 0456107407
• Andrew Hawkins (General Manager) – 0448 394 816
• Andrew Pillar (Site Manager) - 0488 002 906
• Submissions email: submissions@ecolined.com.au
• Accounts email: accounts@ecolinesolutions.com
This concludes the the Eco
Line safety and operations
induction, fell free to raise
any questions or queries

Weitere ähnliche Inhalte

Was ist angesagt?

Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
Allen Schmitgen
 
final presentation
final presentationfinal presentation
final presentation
Jason Rubin
 
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
NAES Corporation
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
Evan Lewis
 

Was ist angesagt? (19)

HPGR and Iron Ore Processing
HPGR and Iron Ore ProcessingHPGR and Iron Ore Processing
HPGR and Iron Ore Processing
 
Enviro Excavations Capability Statement
Enviro Excavations Capability StatementEnviro Excavations Capability Statement
Enviro Excavations Capability Statement
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
 
Nfmt vegas14 how to specify commercial flooring
Nfmt vegas14 how to specify commercial flooringNfmt vegas14 how to specify commercial flooring
Nfmt vegas14 how to specify commercial flooring
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
final presentation
final presentationfinal presentation
final presentation
 
Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Summer Internship in Jaypee Group
Summer Internship in Jaypee Group
 
Sudhanshu Final
Sudhanshu FinalSudhanshu Final
Sudhanshu Final
 
Managing our Most Precious Resource
Managing our Most Precious ResourceManaging our Most Precious Resource
Managing our Most Precious Resource
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Quick trench program
Quick trench programQuick trench program
Quick trench program
 
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
 
Resume
ResumeResume
Resume
 
Construction using Precast technology
Construction using Precast technologyConstruction using Precast technology
Construction using Precast technology
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
2016 Safety Inspector
2016 Safety Inspector2016 Safety Inspector
2016 Safety Inspector
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
 
Linings Failure Prevention vs. Analysis
Linings Failure Prevention vs. AnalysisLinings Failure Prevention vs. Analysis
Linings Failure Prevention vs. Analysis
 

Ähnlich wie "

ARP contractor orientation
ARP contractor orientationARP contractor orientation
ARP contractor orientation
AmcorPackaging
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
GkMechanical
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.ppt
AndreAntWilliams
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe Works
Sajid Ali
 
JLaswell Resume 2017
JLaswell Resume 2017JLaswell Resume 2017
JLaswell Resume 2017
Jason Laswell
 
7073_Slickplug_India
7073_Slickplug_India7073_Slickplug_India
7073_Slickplug_India
Sourabh Dighe
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
Geoff Chandler
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
Stuart Cooper
 

Ähnlich wie " (20)

ARP contractor orientation
ARP contractor orientationARP contractor orientation
ARP contractor orientation
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
HSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.pptHSE-BMS-001 HSE Induction.ppt
HSE-BMS-001 HSE Induction.ppt
 
Darren Johnson CV
Darren Johnson CVDarren Johnson CV
Darren Johnson CV
 
Contractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.pptContractor Safety Orientation - Sappi.ppt
Contractor Safety Orientation - Sappi.ppt
 
Hse new microsoft power point presentation
Hse new microsoft power point presentationHse new microsoft power point presentation
Hse new microsoft power point presentation
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe Works
 
JLaswell Resume 2017
JLaswell Resume 2017JLaswell Resume 2017
JLaswell Resume 2017
 
LSR safety.pdf
LSR safety.pdfLSR safety.pdf
LSR safety.pdf
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvik
 
Contractor Safety Orientation by Sappi
Contractor Safety Orientation by SappiContractor Safety Orientation by Sappi
Contractor Safety Orientation by Sappi
 
m.bendris
m.bendrism.bendris
m.bendris
 
Using drones to conduct safe inspections of commercial solar PV installations
Using drones to conduct safe inspections of commercial solar PV installationsUsing drones to conduct safe inspections of commercial solar PV installations
Using drones to conduct safe inspections of commercial solar PV installations
 
Reg Dwyer - Using drones to conduct safe inspections of commercial solar PV i...
Reg Dwyer - Using drones to conduct safe inspections of commercial solar PV i...Reg Dwyer - Using drones to conduct safe inspections of commercial solar PV i...
Reg Dwyer - Using drones to conduct safe inspections of commercial solar PV i...
 
7073_Slickplug_India
7073_Slickplug_India7073_Slickplug_India
7073_Slickplug_India
 
Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
Henrys Resume 2016 Q3
Henrys Resume 2016 Q3Henrys Resume 2016 Q3
Henrys Resume 2016 Q3
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 

Kürzlich hochgeladen

Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
baharayali
 
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
baharayali
 
Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...
Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...
Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...
baharayali
 
Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...
Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...
Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...
baharayali
 
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
No -1 Astrologer ,Amil Baba In Australia | Uk | Usa | Canada | Pakistan
 
Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...
Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...
Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...
baharayali
 
Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...
Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...
Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...
baharayali
 
Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...
Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...
Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...
makhmalhalaaay
 
Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...
Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...
Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...
baharayali
 

Kürzlich hochgeladen (20)

Emails, Facebook, WhatsApp and the Dhamma (English and Chinese).pdf
Emails, Facebook, WhatsApp and the Dhamma  (English and Chinese).pdfEmails, Facebook, WhatsApp and the Dhamma  (English and Chinese).pdf
Emails, Facebook, WhatsApp and the Dhamma (English and Chinese).pdf
 
Pathankot Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Pathankot Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsPathankot Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Pathankot Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
Famous Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in ka...
 
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
Real Kala Jadu, Black magic specialist in Lahore and Kala ilam expert in kara...
 
Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...
Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...
Popular Kala Jadu, Kala jadu Expert in Islamabad and Kala jadu specialist in ...
 
St. Louise de Marillac and Care of the Sick Poor
St. Louise de Marillac and Care of the Sick PoorSt. Louise de Marillac and Care of the Sick Poor
St. Louise de Marillac and Care of the Sick Poor
 
St. Louise de Marillac and Galley Prisoners
St. Louise de Marillac and Galley PrisonersSt. Louise de Marillac and Galley Prisoners
St. Louise de Marillac and Galley Prisoners
 
Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...
Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...
Famous Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil baba ...
 
Amil baba in Lahore /Amil baba in Karachi /Amil baba in Pakistan
Amil baba in Lahore /Amil baba in Karachi /Amil baba in PakistanAmil baba in Lahore /Amil baba in Karachi /Amil baba in Pakistan
Amil baba in Lahore /Amil baba in Karachi /Amil baba in Pakistan
 
Genesis 1:5 - Meditate the Scripture Daily bit by bit
Genesis 1:5 - Meditate the Scripture Daily bit by bitGenesis 1:5 - Meditate the Scripture Daily bit by bit
Genesis 1:5 - Meditate the Scripture Daily bit by bit
 
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
Famous No -1 amil baba in Hyderabad ! Best No _ Astrologer in Pakistan, UK, A...
 
Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...
Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...
Popular Kala Jadu, Black magic specialist in Sialkot and Kala ilam specialist...
 
Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...
Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...
Popular Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi...
 
Famous Best astrologer in Islamabad / Amil baba in Islamabad/ Amil baba in UK...
Famous Best astrologer in Islamabad / Amil baba in Islamabad/ Amil baba in UK...Famous Best astrologer in Islamabad / Amil baba in Islamabad/ Amil baba in UK...
Famous Best astrologer in Islamabad / Amil baba in Islamabad/ Amil baba in UK...
 
Exploring the Meaning of Jesus’ Ascension
Exploring the Meaning of Jesus’ AscensionExploring the Meaning of Jesus’ Ascension
Exploring the Meaning of Jesus’ Ascension
 
Jude: The Acts of the Apostate: High Handed Sins (vv.5-7).pptx
Jude: The Acts of the Apostate: High Handed Sins (vv.5-7).pptxJude: The Acts of the Apostate: High Handed Sins (vv.5-7).pptx
Jude: The Acts of the Apostate: High Handed Sins (vv.5-7).pptx
 
Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...
Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...
Professional Amil baba, Kala jadu specialist in Multan and Kala ilam speciali...
 
Louise de Marillac and Care for the Elderly
Louise de Marillac and Care for the ElderlyLouise de Marillac and Care for the Elderly
Louise de Marillac and Care for the Elderly
 
Lesson 6 - Our Spiritual Weapons - SBS.pptx
Lesson 6 - Our Spiritual Weapons - SBS.pptxLesson 6 - Our Spiritual Weapons - SBS.pptx
Lesson 6 - Our Spiritual Weapons - SBS.pptx
 
Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...
Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...
Famous Kala Jadu, Black magic expert in UK and Kala ilam expert in Saudi Arab...
 

"

  • 1. Eco Line Solutions Safety and Operations Induction
  • 2. Eco Line Solutions is a specialty construction company that services urban and remote locations in the fields of hydraulic containment, waste storage, mining, environmental protection, landfill construction and management, and other civil/fluid/waste related projects.
  • 3. Scope of Works. • Working at Eco Line Solutions means you will be involved with deployment, installation and welding of liner materials in various applications. • Personnel are required to perform each and every task with individual and team safety in mind. • Safety items that relate to works onsite are discussed in detail in the project JHA / SWMS. Every individual working on a Eco Line project site must be inducted and sign onto the project JHA prior to commencing works onsite. • As an employee of Eco Line you will be expected to undertake all assigned tasks safely and to the best of your ability with an attention to detail.
  • 4. Site Managment Brendan Hawkins • Operations Manager with 10 years experience • Registered first aider • Certified geosynthetic quality inspector Andrew Pillar • Site Manager with 7 years experience • Registered first aider • Ticketed operator, poly welder and rope technician John Codo • Site Supervisor with 10 years experience • Ticketed operator, poly welder Arnold lopez • Site CQC Officer • Certified geosynthetic quality inspector
  • 5. Eco Line Personnel Responsibilities As an Eco Line employee it is expected that you meet the following a set of requirements prior to entering the jobsite each day: • Always arrive to the job site on time, well rested and ready for the days work • Complying with Eco Lines minimum PPE guidelines (long pants, long sleeve shirt, steel cap boots, hard hats and safety glasses) • Be clean and presentable, you are representing Eco Line after all • To always bring to work any tools or ppe assigned to you • Always bring your white card, photo id and any industry related trade certificates • To follow supervisor instructions and QC guidelines at all time • Bring sufficient food and water for the days works
  • 6. Site Rules Upon entry to site you will need to abide by a standard set of site rules. • Unless its an emergency mobile phone use is to be limited to the lunch break • All jobsites are a no smoking zones • Return equipment to its storage location at the end of each days work • PPE must be worn at all times • All employees must attend daily prestart meeting • All incidents and close calls are to be reported to your supervisor or CQC officer • Comply with Eco Line’s zero drug and alcohol policy - No personnel to attend site with or when affected by drugs and alcohol • Eco Line and its contractor’s undertake regular random drug and alcohol testing
  • 7. Prestart Meetings • Each day a prestart meeting with all employees in attendance to be held by the supervisor to discuss the planned work for that day and specific safety and quality consideration for those works. This is an opportunity for individuals to identify any questions or safety concerns that they wish to share with the team to minimise any risk of injury to personnel. • The purpose of the meeting is to outline any project safety concerns that may be present in the day ahead or from previous days works. Mitigation measure are to be discussed for these hazards to minimise any risk to personnel. • Whilst focusing on safety, the prestart meeting is also an oppurtunity for the site manager or supervisor to go over the task list for the day • It is expected for all employees to actively participate in the daily prestart
  • 8. Safety Expectations As an Eco Line employee it is expected you will: • Follow the site rules at all times • Understand and follow the site JHA (Job Hazard Analysis) • Attend and interact during prestart meetings and safety discussions • Comply with the site specific rules as instructed by contractor induction • Look out for team members on the jobsite, team lifting, assessing and discussing risk during works onsite • If you do not feel that a task is safe to perform take the time to reassess how to safely carry out that task and/or discuss with your supervisor or CQC where necessary • Undertake every task safely and efficiently • Report any hazards to your site supervisor
  • 9. Disciplinary Procedures Failure to comply with site rules and Eco Line’s safety and operations induction will result in disciplinary acion being taken. • First offence: Verbal warning from onsite supervisor • Second offence: Written warning • Third offence: Suspension from work or dismissal from company • For a serious break of safety or operational procedures, Eco Line reserves the right to instantly dismiss any worker without notice
  • 11. Deployment A key activity undertaken by Eco Line personnel onsite is deployment of liner materials There are many different types of materials required to be deployed, deployment techniques vary between layers. These deployment technics can be hazardous, posing risk to personnel due to use of plant lifting heavy loads Some key methods to protect personnel include; • Personnel being aware of the hazardous around them during works • never stand downhill from a suspended load or work directly underneath a suspended load. • The deployment foreman is responsible for communication and direction with the operator • Refer to the project JHA for more in depth hazard assessment
  • 12. Construction Quality Control • Quality control (QC) is a procedure or set of procedures intended to ensure that a manufactured product or performed service adheres to a defined set of quality criteria or meets the requirements of the client or customer. • Every aspect of the job is overseen by a CQC officer, whose main role is to ensure the onsite quality control of the project • Eco Line’s goal is to consistently delivery high quality and specification projects to the clients expectations • Quality Control is an important part of every Eco Line project. A QC Guideline has been developed and is required to be followed by all personnel at all times
  • 13. GCL • GCL is a geosynthetic clay layer that is deployed via a full length steel axle lifted via a spreader beam and excavator. • GCL is a heavy layer that is hard to manouver once deployed, it is important that it is deployed into position as re- adjustment after deployment is very difficult • The specified lap for GCL is 300mm, this is marked on the rolls and can be seen during deployment • No seaming is required on the edge of a roll between panels. Pasting of overlaps is required between the end of a roll and a connection panel • Dust masks should be used in dusty enviroments including during the deployment of GCL. Dust masks are available onsite, notify your supervisor if you require a mask.
  • 14. HDPE / LLDPE • HDPE is a Plastic layer that is deployed via a spreader bar connection to two axel “horns” fitted with ball bearings lifted via an excavator of other plant. It is typically pulled out by hand. • HDPE comes in both smooth and textured surface treatments • It extremely susceptible to being blown about by wind and therefore need to be weighted down using sand bags along all “open” edges • HDPE requires specialised welding tools to seam the overlaps. The welding of HDPE is an important task that takes a large amount of training to consistently achieve a quality weld
  • 15. Geocomposite • Geocomposite is a water drainage layer that is deployed via a full length steel axle lifted via a spreader beam and machine, or rolled out along the ground by hand. • Geocomposite is a light weight material that is easy to manouver into postition once its deployed. • The specified overlap for Geocomposite is between 50mm-100mm or as advised by the CQC Officer • The Geocomposite is seamed with a cable tie every meter and then the fabric lap is heat sealed with a gas torch or as required by the CQC Officer
  • 16. Geotextile • Geotextile is a common protect used in various applications in our project works. As protection to the HDPE liner or separation between drainage rock and waste • Typically deployed via a full length steel axle lifted via a spreader beam and machine, or rolled out along the ground by hand • Geotextile is a light weight material that is easy to manouver into postition once its deployed but is extremely susceptible to wind. • The specified overlap for Geocomposite is between 150mm-300mm or as advised by the CQC Officer • The Geotextile is seamed using a gas torch or a specialised hot air blower
  • 17. Conclusion Eco Line Important contacts: • Eco Line Sydney Office – 02 8057 4528 • Brendan Hawkins (Operations Manager) - 0456107407 • Andrew Hawkins (General Manager) – 0448 394 816 • Andrew Pillar (Site Manager) - 0488 002 906 • Submissions email: submissions@ecolined.com.au • Accounts email: accounts@ecolinesolutions.com This concludes the the Eco Line safety and operations induction, fell free to raise any questions or queries