There is room for improvement in project controls for the construction industry. . We have developed a way to capture irrevocable facts showing profit or loss daily in a 3D format. Nothing like it exists.
2. • Continuous VUCA*
* Volatility, uncertainty, complexity, ambiguity
• Dysfunctional operations
• Excessive litigation
• Punitive contracts and late payment
• Unintended consequences of low bid process
• Lack of trust and absence of ethics
Industry Problems
5. Businesses on both sides of the Atlantic initiated and faced more lawsuits.
Most responders expect that an easing in litigation unlikely in 2014 and
beyond.
92% of the companies surveyed expect the number of legal disputes to rise
or stay the same.
80% of construction companies filed at least one suit in the 12 month study
period.
Litigation Trend Report on Construction
6. • We’ve thought long and hard about the
best way to bring constructive change to
the construction industry.
• …and how to improve project controls,
minimize risk, and avoid litigation.
3D Project Plus™
7. • Develop a program that measures
profit & loss daily.
• Reduce risk and avoid litigation
through advances in forensic information
modeling.
Mission Statement
8. We have the qualifications, the
will, and the passion to improve
industry standards and accomplish
our mission…
9. 3D Project Plus™
This project was one year behind schedule when Mr. Gogulski
was recruited as Owner’s Representative for Disney. By
insisting that the architect bring two full time designers on
site, and working 1200 craftsmen two 12 hour shifts seven
days/wk. ,the project met its critical opening schedule.
Contemporary
Resort Hotel
Orlando, FL
13. 3D Project Plus™
This is an example
of how we would
start a new 3D
Project Plus
program. The fly
by is the first step.
Any part of this
model can be
separated and
expanded.
Convergence Training.com
15. Gathering data from several
sources and linking it together
into a format that it is easy to
understand and visualize as the
project is built….
16. 3D Project Plus Master Format
5/17/2014
• Production (estimated v. actual)
• Labor (hours) (estimated v. actual)
• Labor (dollars) (estimated v. actual)
• Equipment (owned) (estimated v. actual)
• Equipment (rented) (estimated v. actual)
• Purchase Orders (estimated v actual)
• Supplies (estimated v actual)
• Services (estimated v actual)
• Base Contract (estimated v actual)
• Change Orders ( site specific)
,
• Total Cost (estimated v actual)
*************************************
• Discreet Events (site specific issues)
Timeline: (days) (weeks) (months)
Navigatio
n
Bar
Multiple Means and Methods for
Generating Images
17. …gives you a picture of cost,
progress and profit/loss of
any part of the project as it is
being built.
For example, labor……
21. Expect: visualization of the project’s progress in
a video that can print each day’s profit and loss.
Result: reduction of risk, avoidance of litigation.